Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.521 N 7th St.0160.2018 (18).ARBK
Field Plan Set Must Be Printed In Color k•.,. PERMIT NUMBERA160.2018.ARBK MASTER PERMIT: DATE: 5/30/2018 --w--- PERMIT NUMBER: ADDRESS: ' COMMUNITY DEVELOPMENT DEPARTMENT II COMMUNITY DEVELOPMENT DEPARTMENTlib �: BUILDING PERMIT APPLICATION Th.:,,,... BUILDING PERMIT CONTACT SHEET nfEOoor n,,,, PROPERTY INFORMATION ADDRESS 521 N.7th Street UNITeA PARCEL ID Rr�rzs21iew, Name Jeffrey Henr.ex Phone976818-5588 E-mall ieerey®nencoxgaup.wm The City of Aspen LOT_ BLOCK ORSUBDIVISION LBH Association DESCRIPTION OF Demo existing finishes in the Unit.No structural work to be completed.No exterior work to be completed. Name Brian Steele phone 9l0.3]42388 g.rpa;;pdansreelesandsglanso.com — RESIDENTIAL REFERENCES FROM 2015 IBC WORK IN DETAIL These plans must be kept at the Meadows and Seventh LLC 971-915-1102 1209 S=crawl space ventilation sec.1203.4. 18"x 24"access required inspection phone Cell buildingsite or ins ection ziszEoNTAcrBrain Steele CELL970-947-9486 EMAIL briansteelesands@yahoo.com Manioc 875 Park Ave New York NY 10075 EE=emergency escape required sec 1030 delays may occur.Construction ram City New zip EU=enclosed usable space under stairs shall be 1-hr construction or stair OWNER NAME Meadows and Seventh LLC CELL 971-915-1102 EMAILgracielahaim@me.com E-ail gracielahaim@me.com enclosure rating.No access from stair enclosure.'A"gypsum permitted for shall conform to these plans.All Address stairs inside a single dwelling unit.1011.7.3. changes shall be approved by PROJECT DETAILS rvame Hancox Group phone Cell Peon. RV=roof and rafter ventilation required 1203.2 the building official. A=Attic Access 20"x 30"1209.2 PROIER Use of BuildingClass of Work Fixture Counts Equipment Checklist Ed ding SA=smoke alarm(NFPA 72)required sec 907.2.11 VALUATION 30.000x 0,eS City sure ZIP pp ❑ Commerical ❑New 0 Toilets,Bidets Forced Air/Greviwsystems CO=carbon monoxide detector req.per Aspen Municipal Code 8.15 %t anxx 1,731.00 ❑. Multi-Family ❑Addition 1-Bathtub —Wall,suspended,or Unit Heaters ndaa:a SG=safety glazing required sec 2406 0 Single Family . Lavatory(Wash Basin) — V=mechanical ventilation required sec 1203.1&IMC 403 bath fans and SEPARATE PERMITS ARE g El Shower Gas Log q UNIT 5q R.2155.00 ❑ Mixed-Use ❑Repair �K:tohen Sink(*Disposal) Gas Appliancew Name Bran sleele whole house ventilation) REQUIRED FOR ELECTRICAL, F Phone Cell phone `or suE ❑ D IF R -rDishwasher —Appliance Vents GR=guards,42"min ht,4"max opening.Guards within dwelling unit 36"min PLUMBING,MECHANICAL,OR 154 Fp 10,805 ❑Tenant Finish i La.&y Bag Utility Sink—Heat,Raffia,Cooling,or M,7,50 City state ZIP ht sec 1015 FIRE SPRINKLER WORK Will there be 0 Demolition IClothes Washer Absorption Unit s FTOF LANK add,e�t HR=handrails 34"-38"ht sec 1014 scgtPE WORK o.00 any roof/wall 0 Change Order—Floor SinkBoners(includes vent) 1E- ad penetrations? 0 Floor Drain Air Handling Unit padres_ _ DS=Draft stopping/fire blocking 718 NEw sq FT 0.00 El Yes _Shower I Cooling Systems RD=Roof drainage 1503.4 SMOKE ALARMS AND NpE FT DF Rooms 111 NO NOTICE:This permit becomes nun and Water e (Pan Req)4 Ventilation Fans Name Ha::cox G000uu Phone97 50300 cell phone B�Rta-•586 STC=Sound transmission class not less than 50 at dwelling separations,sec CARBON MONOXIDE Mir UTRm WORK 25.o0 void if wore:or construction authorized as I Range Hood J`I vCC 19[PS JAm 1207 commenced within ISO days,or Water Treatment mining 79F '�r `led Basalt CO 81621 DETECTORS REQUIRED is construction or work is suspended or —other ✓t of Gas system outlets Aaareaa city srete zip SI=Stairway Illumination 1205A abandoned for a period of ago days at Snowmelt system Sq Ft THROUGHOUT DWELLING any time after work is commenced./ E-mail Jeffrey@hancoxgroup.corn PD=protect against decay,sec 2304.12 Aaare:. REFERENCES FROM 20151MC UNIT PER CITY OF ASPEN Details Term Definitions DE=clothes dryer exhaust,sec 504.Makeupair req'd if over 200 CFM MUNICIPAL CODE 8.15 Project Valuation:Cost of project as defined in Valuation Affidavit. Name"'a Phone Cell phone ry q Sq Ft of Work Area:Total square footage of area undergoing change or reconfiguration. AS=access and service space for maintenance req'd,sec 306 Unit Sq Ft:Gross Square Footage,not FAR,of permitted unit. APPROVALS -in MA=make up air required if hood exhausts greater than 400 CFM,sec 505.2 Lot Size:Total surveyed square footage of property. PC-KH address City State ZIP Sq Ft of Landscape Work:Square footage of disturbed exterior area. Reviewing Reeiow aeeuaOer Date E-mail ET=exhausts terminate 3'from prop line and openings,10'from intakes, SPECIAL INSPECTION REQUIRED: New Sq Ft:Total added square footage for additions to net livable or net leasble space. Department Required Im6aie Approved Address_ 501.3.1 So Ft of Rooms with Utility Work:Total square footage,not FAR,of all rooms with plumbing work. Zoning x BN 9/5/18 IT=intake openings 10'from lot line&contaminant sources(vents,streets), -Structural steel welding:Field&Shop • Name Albright and Associates phone 870-9274383 Cell Phone 401 A SUBMITTAL FEES 414 38 ISSUANCE FE-w'1l7 5n ISSUANCE FEES HPC X M - D=fasten and seal all ductwork per 603.9 -High strength bolting Plan check Permit Fee Parks Impact 0 Building TF 9/14 ailings ,,,,Basalt Sute ZIP402 Park Circle Basalt CO 81621 REFERENCES FROM 2015 IFGC -Epoxy anchors Addres Energy Code 055.60 REMP School oed. 0 Fire X DV=direct vent req'd,sec 303.3 -Intumescent paint E-mail Zoning(50%) 325 Plan Check TDM Impact 0 Engineering Aaare::marshal)@albright-associates.com CA=combustion air not taken from bedrooms,bathrooms or -Spray applied fire resistive materials (Howdy) CMP PH 7/1]. storage sec 303.3 -Permanent micropiles Engineering Review Zoning(Hourly) Fed.Amenity 0 x — Name S and S Construction ohone970-373-2360 Cell Phone OD=outdoor appliances must be listed for outdoor use,sec 303.6 Utilities REFERENCES FROM 20151ECC CMP(50%) 926.09 Engineering Housing Cash in Lieu 0 X mvu 110 Haystack Rd O GWS since CO rip 81601 =F newor Special inspection is required per 2015 IBC (Hourly) Water x sw rylabel requirered,Ordinance 4052016n shall not exceed 0.28 U-factor,NFRC section 1704.Inspector o veri that copyof Parks Review 324.15 Zoning(50%) 325 Stormwater Stormwater paafelSs briansteelesands@yahoo.comqverifyo Utility Review CMP(50%) city use Tax -PM 6/19 L=75%of lamps in permanently installed lights must be high efficacy,sec agreement for inspection program to be on 32G.09 75.00 Sanitation X R404.1 Other Electrical County Use Tax the job site prior to performing any Env.Health INSPECTIONS:The General Contractor must schedule inspections online. SE=Continuous air barrier required;all exterior joints,cracks,and holes to be Plumbing GIS Please visit www.aspenpitkin.wm/Departments/Community-Development-Forms/to do so. inspections.A copy of all Special Inspector Parks Dr 9/5/18 caulked,gasketed,sealed,table R402.4.1.1 Mechanical Sanitation X I hereby certify that I have read and examined this application and know the same to be true and correct.All provisions of laws andREFERENCES FROM 2014 NEC field reports to be on the job site for Landscape ordinances governing this type of work will be complied with whether specified herein or not.The granting of a permit does not EP=electric panel'happy space'30"x36"x78",not in storage,sec 110.26 inspectors'review if requested.Failure to Lot Area Efficiency presume to give authority to viol teeacanre the provisions of any other state or local law regulating construction or the performance comply may result in denial of inspection. R-6 Zone District Approved DAM 9 18/18 of construction,„t-Is'rrN re sibility to revi the approved plans and any comments that are contained thereon and see that the ADU Deed Restriction/Rec.No.352887 Deed Restricted To Issue structure and r/b p s b ilt n '_. applicable codes. Refer 53.1 Census Code RECEIVED �rcr Dare 4=30-18 F� PLANS LOCATION Issuance _ D RRN1(1q-nqq-R42 #of Dwellings 0 Check if you area tested owner•ulfderTsingle-family homes only).You must take a test and complete the owner/RECEIVE ,I 7in (CITY USE ONLY)Owner builder approved by: Date: Affidavit on I Dwelling Separation Required-2015 IBC CITY OF ASPEN August 201J 130 S.GALENA ST I ASPEN, CO 81611J 9611 0 B 708 Fire Partitions,711 Horizontal Assemblies: CITY OF ASPEN.... 130 S.GALENA ST I ASPEN,CO$1 fi BUILDING DEPARTMENT , A Walls and floor/ceilings separating dwelling units shall have a fire-resistance BUILDING DEPARTMENT rating of at least 1 hour.Walls shall extend from the top of the floor assembly below to the underside of the floor or roof slab or deck above or to the fire-resistance-rated floor/ceiling assembly above. -714:Penetrations must be protected by a through-penetration firestop system.Recessed fixtures shall not reduce the required fire resistance by use of a listed fixture,a listed frehood,or a drywall assembly meeting the required fire resistance.Exhaust fans require ceiling radiation damper. -1207 Sound Transmission:Separating walls and floor/ceilings shall have an STC rating of at least 50.Floor/ceilings shall have an IIC rating of at least 50. 5. Provide Final inspection Report.The special inspector shall submit a written final Field Plan Set Must B e Printed I n Color •• ,..'�` epAlki ee aeon documenting required special inspections and correction of any discrepancies .t.,_ 40 noted m the inspections prior to the final building inspection. tar 0110r Auto SPECIAL INSPECTION AND TESTING AGREEMENT 'a^ ,� B.Owner Responsibilities.The project owner,the engineer or architect or record,or an agent of the \ To permit applicants of project requiring special inspection and\or testing per Section 1704 of the owner is responsible for employing special-inspection services.The special inspector\agency shall 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written International Building Code(IBC). not be in the employ of the contractor,subcontractor or material supplier.[IBC Sec ]In procedural and quality control manuals and periodic auditing of fabrication practices by \ _ 521 N SEVENTH 0160.2018.ARBK case of an owner\contractor,the special inspector\agency shall be employed as specifiedfied b by the an approved special inspection agency. Project Address: Permit Number: building official. I 3, Completion of fabrication.Upon completion of fabrication,the approved fabricator The City of Aspen BEFORE A PERMIT CAN BE ISSUED:The owner,or the engineer or architect of record,acting as the C.Engineer or Architect of Record Responsibilities shall submit certificate of compliance to the building official stating that the work was owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing performed in accordance with the approved construction documents. Schedule,including the required acknowledgments.A pre-construction conference with the parties 1. Prepare special inspection program,The engineer or architect of record shall fist the items for which special inspection is required;and shall indicate any items for which the G. Building Department Responsibilities • These plans must be kept at the involved may be required to review the special-inspection requirements and procedures. IBC or the buildingofficial a die inspection and the frequency f such approves pea q yr/ building site or inspection APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the inspections. 1. Approve special-inspection program-The building department shall approve all delays mayoccur.Construction projects for which they provide special inspections.Special inspectors shall be approved by the building special inspectors and special-inspection requirements. y ep prior pe g any Specialinspectors qua 2. Respond to field discrepancies.The engineer or architect of record shall respond to shall conform to these lans.All department to rfomdn duties. ins tors shall submit their qualifications and are p uncorrected field discrepancies in design,material,or workmanship observed by the 2. Enforces special inspection. requiring special inspection and the building subject to personal interviews for pre-qualification.Special inspectors shall display approvedp pec'oo.Work p g changes shall be approved by special inspector. inspector as stipulated by the building official,when performing the function of special inspector. shag monitor the perfommnce of special inspectors.Hist[-ler approval,in the buildingofficial. addition to that of the special inspector,must be obtained prior to placement of concrete, 3. Review shop drawings and submit design changes.The engineer or architect of record Special inspection and testing shall meet the minimum requirements of the International Building Code covering of structural steel,or other similar materials. Section 1704.The following conditions are also applicable: shall acknowledge and review for conformance with the construction drawings those shop drawings that may detail structural information,shall submit to the building official 3. Review Inspection reports.The building official should review special-inspection A.Duties and Responsibilities of the Special Inspector and to the special-inspection agency written documentation of any verbally authorized ponsi pe pe progress and final reports. SEPARATE PERMITS ARE deviations from the approved construction documents,and shall submit revised REQUIRED FOR ELECTRICAL, 1. Signify presence at job site.Special inspectors shouldnotify contractor personnel of documents for building official approval as required. 4. Perform fmal inspection.The building official should perform the final inspection and their presence and responsibilities at the job site. required by the building official,they approval for a project[IBC Sec.109.3.11 after the final special-inspection report has been PLUMBING,MECHANICAL,OR shall sign in on the appropriate form posted with the building permit. D.Contractor Responsibilities reviewed and approved. FIRE SPRINKLER WORK 2. Observe assigned work.The special inspector shall observe assigned work for 1. Notify the special inspector.The contractor is responsible for notifying the special conformance with the building department approved(stamped)design week f inspector or agency regarding individual inspections for items listed on the attached 521 N.7th Street,Aspen g p pprove (s p ) gn drawings, Project Address: Permit Number: specifications,and applicable workmanship provisions of the International Building schedule and as noted on the building department approved plans.Adequate notice shall Code.Architect\engineer-reviewed shop drawings may be used only as an aid to be provided so the special inspector has time to become familiar with the project. inspection. 2. Provide access to approved plans.The contractor is responsible for providing the ACKNOWLEDGMENTS For continuous special-inspection,the special inspector shall be on site at all times special inspector access to approved plans. observing the work requiring special inspection.Periodic inspections,if any,must have I have reed and agree to comply with the conditions of this agreement. prior approval based on a separate written plan reviewed and approved by the building 3. Retain special inspection records.Upon request,the contractor is also responsible for department and the engineer or architect of record. retaining,at the job site,all special inspection records completed by the special inspector. Special Inspection Agency: Signature: Printed Nmce:. Date: 3. Report nonconforming items.The special inspector shall bring nonconforming items to E.Inspection of Fabricators the immediate attention of the contractor and note all such items in the daily report.If 1. Fabrication of structural assemblies and members.Where fabrication of structural Owner: Si v Printed Name Date any item is not resolved in a timely manner or is about to be incorporated in the work,the load-bearing members and assemblies is being performed on the premises of a /, v special inspector shall immediately notify the building department by telephone or in fabricator's shop,IBC Section 1704.2 shall require special inspection of the fabricated G tCZA ir'A//"I ,.4,F 5 f-a.I v person,notify the engineer or architect,and post a discrepancy notice. // items. 4. Provide timely reports.The special inspector shall complete written inspection reports Engineer/Architect S' attire: Printed Name: Date: for each inspection visit and provide the reports on a timely basis determined by the 2. Fabrication and implementation procedures.The special inspector shall verify that building official.The special impactor or inspection agency shall furnish these reports the fabricator maintains detailed fabrication and quality control procedures that provide a directly to the building official,engineer or architect of record,and others as designated. basis for inspection control of the workmanship and the fabricator's ability toec conform to [IBC Sec.1704.L2]These reports should be organized on a daily format and maybe approved construction documents and reference standards.The special inspector shall Contractor; Signature: /��/J Printed Name:/ /, Date: / submitted weekly at the option of the building official.These reports should include: review the procedures for completeness and adequacy relative to code requirements for G ( j 6, Ss"�-'"�---'�-- /if a f LS h+4 ©g/S/20 IT a.Description of daily inspections and tests made with applicable locations, fabricator's scope of work. ///TTT``` �/7yC b.Listing of nonconforming items, F.Approved Fabricator Responsibilities c.Report on how nonconforming items were resolved or unresolved as ved Fabricator: Si Printed Name: Date: • applicable, 1. Fabrication exempt inspections.Special inspections are not required where work is ,�yf� I/f ,,,,f`., yf� d.Itemized changes authorized by the architect,engineer,and building official if done on the premise of a fabricator registered and approved to perform such work �'� t�R� �2f`r'��a�� � '���" ` not included in nonconforming items. without special inspection. Inspected Fabricator: Signature: Printed Name: Date: 1 2 (circle one) Signature: Printed Name: Date: I CITY OF ASPEN PITKIN COUNTY: 2, Apprevsl of fabricator,Approval shall he hared spun review of the fabricator's miner procr-dural and quality control manuals and periodic auditing of fabricmion practices by an appmved special inspection agency. 3. Completion of fabrication.Upon completion of 1'abricstion,the approved fabricator shall submit certificate of compliance to the building official staling that the work was performed in accordance with the approved construction doeumcros. """'`�•^"•^"�..s...., w++Ya+y +via w.,wuvauv,...ua stun aEr eewcu� G. Building Department Responsibilities Special Inspection Agency: Signature: Printed Name: Date: I. Approve special-Inspection program.The building department shall approve all special inspectors and special-inspection requirements. 2. Enforce special inspection.Work requiring special inspection and the building inspector shall monitor the pe of special inspectors.Bis;Rer approval,in Owner: pew-Inman. Signature: Printed Name Date addition to that of the special inspector,must be obtained prior to placement grenade. covering of structural steel,or other similar materials. 3. Review Inspection reports,The building official should review special-inspection progress and final reports. Engineer/Architect: Signature: Printed Name: Date: 4, Perform fins!inspection.The building official should perform the final inspection and }--�s y.,, (` 7�n1 {{�� / approval for a project[IBC Sec.109.7.1]afire the final special-inspection report has been E W t 4 c.�..z t1, t...„6, 1 b' reviewed and approved. tI —d` d ���JJI v' Contractor: Signature: Printed Name: Date: Project Address- I Permit Norbert • ACKNOWLEDGMENTS I have read and agree to comply with the conditions of this agreement. Approved Fabricator: Signature: Printed Name: Date: ecial}nspecti n Ag Signature: tinted Name: Date: J 7' O er. i' SSgna r• Printed Name de/L. -e'� Inspected Fabricator. SigDature: Printed Name: Date: Engineer/Architect Signature: Printed Name: Date: (circle one) Signature: Printed Name: Date: CTTY OF ASPEN • PITKINCOUNTY: DAM DENISMURRAY 9/19/18 Contractor: Signature: Primed Name: Data: Apprmed Fabricator: Signature: Printed Name: Data: Inspected Fabricator Signature: Printed Name: Dine: (circle one) Signature: Printed Name: Dino: CITY OP ASPEN PITKIN COUNTY: ,„_ _-,_.... 1