Loading...
HomeMy WebLinkAboutFile Documents.517 Park Cir.0161.2018 (11).ARBK r , Field Plan Set Must Be Printed In Color ,,. DATE:04-20-18 MASTER PERMIT: PERMIT NUMBER:o1s1.zole.ARBK ADDRESS:517 PARK CIRCLE PERMIT NUMBER:0161.2018.ARBK , ,.w_: COMMUNITY DEVELOPMENT DEPARTMENT II COMMUNITY DEVELOPMENT DEPARTMENT CITY OF ASPEN BUILDING PERMIT APPLICATION is o a,� Mu Orr a'ASIw , BUILDING PERMIT CONTACT SHEET III CITY NO.0161.2018.ARBK • - - _ PROPERTY INFORMATION ADoetsc 517 PARK CIRCLE eaina 273707401016 , Name BRIAN BEAZLEV phoney IU-CL3-3444 r.mail f8KIHNLdUJAKl:t11 I LU I O.UUM OWNER CITY OF ASPEN PARCELIDR FOR INSPECTI ADDRESS. - The City of Aspen 1 TRACT WAGER/DETWEILERSen.00sSION ADDRESS_ for BLOCK OR SUBDIWSION Name Phone E-mall 517 PARK CIRCLE OWNER NAME CITY OF ASPEN CELL 970-920-5000 EMA„info@oityotaspen.com - - - _ Theseplans must be keptat the h,orne VI I Y Vr HJYCIN Phoney r U-`JLV-D000 Cell Phone RESTCONTACT JASON BRADSHAW CELL 970-319-9298 EMAIL JEBRADSHAW@MAC.COM ram 130 S.GALENA ST. ASPEN CO 81611 PARCEL ID 273707401016 building site or inspection NAME ptltlress City sate 21P - delays may occur.Construction PROJECT DETAILS Addrelss DESERIPnon of shall conform to these plans.All woeK IN oenuI1 11 Unit Apartment building/(4)2-bedroom,((7)1-bedroom units/driveway and 11 parking spaces/trash enclosure changes shall be approved Name JASON BRADSHAW phoneyIU-3I`J-yLyO Cell Phone 9 PP by pRorECr uzains 228 EASTWOOD DRIVE ASPEN CO 81611 the building official. vALVAnoN 3,936,425 Use of Building Class of Work Fixture Counts Equipment Checklist Address city state ZIP 0 Commerical ❑.New _Toilets,Bidets forced Air/Gravity Systems ail JEBRADSHAW@MAC.COM S�FroF 9145 SF ❑O Multi-FamilyBathtub Address WORK AREA 0Addition ,— _Wall,Suspended,orumt Heaters ❑ Single Family ❑Alteration —Lavatory(Wash Basin) —Gas Log SEPARATE PERMITS ARE 9,145 SF ❑ Mixed-Use —shower Name SAME AS ARCHITECT Phone Cell Phone UNIT 54 FT ❑Repair —Kitchen Sink(*Disposal) App iancew FIRE REQUIRED FOR ELECTRICAL, LOT SIE 0 0 IF R Dishwasher —Appliance Vents Mailing Isa Fr�1a,45a ❑Tenant Finish —Laundry Bar,Utilitysink=Heat,Refit,Cooling,or Address City State ZIP PLUMBING,MECHANICAL,OR snueBED Will there be ❑Demolition —Clothes Washer AbmptionUnit -mail SPRINKLERS FIRE SPRINKLER WORK E%TERIOams any roof/wall ❑Change Order—Floor sink —Boilers(includes vent) ddress penetrations? ❑ —Floor Drain _Air Handling Unit NEW torn 9,145 SF El Yes Water_ Heater(Pan Req) Cooling Systems Name DAVID JHONSTON ARCHITECTS Phone U r U-UZ0-3444 cell Phone REQUIRED fl Gas Outlets 5Wp H UTIi.une 9,1 46.67 SF ❑No —Water Treatment _Ventilation Fans Mailing 119 S.SPRING ST. ASPEN CO 81611 IT Other g Address City State zIP _if of Gas System Outlets BRIAN@DJARCHITECTS.COM _ ZONE DISTRICT —Snowmelt System Sq Ft E-mail Aadress _ _ ,� 1 - .-.-+ Project Valuation:ne:Tot of quire f as ootage inaundeValuation Affidavit. N f work orpermit becomes Name ROARING FORK ENGINEERING Phoney/U-34V-413U cell Phone fl1 JI?) tJl Ilun'u/I Z Sq Ft of Unit Sq Total quarefootageof reaundergoingchange or reconfiguration. void if work orconrtrumanauthorizedl II D O Let Ft:GrossS Squarenot FAR,ofunit. Is not commenced ee,k,a Mt.].)perde or M3ding592 HIGHWAY 133 CARBONDALE CO 81623 Sq q a Footage, permitted ;f consoucdon or works suspended or AAEress qty state 21P a Lot uebedotal surveyed square footage ofprosafe abandoned fora period of 180 days et O PAIN I Z Disturbed Exterior Area:Square footage of lot affected by permit application. , anytime after work Is commenced. E-mail RICHARDG@RFENG.BIZ ILA/ 1U€L W New Sq R:Total added square footage for additions to net livable or net leasble space. Address _� / �J in Sq Ft of Rooms with Utility Work:Total square footage,not FAR,of all rooms with plumbing work. ----------...._ APPROVALS we v Name KL&A Phoneyf U-yZf-01/4 cell Phone SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES D wirewme"gnt n t`ew on r Appnved WA 215 N.12th St. CARBONDALE CO 81623 AU�reeE qry Sete CO ZONING_ __ Permit Fee PC KH rEooea E-mail DDOHERTY KLAA.COM _ .-- - - Plan Check 20,143.60 30,990.16 ParkslmpaR 47,267.85 Zoning x aPp ,o/4/,a Address @ __ - - 6 Engineering 15,251.67 Zoning(5°9'1 3,886.63 School Ded. 28,382.66 B"Peuilding x BM 9/25/1e Name SHAW CONSTRUCTION phone Cl U-L4q-LO I U Cell Phone — ALL OUTDOOR LIGHTING Zoning(SO%) 3,886.63 CMP(50%) 2,446.29 TDM Impact 5,290.53 Fire x wa Erma 4,11ires4760 HORIZON DRIVE,#201 g5GRAND JUNCTION stateCO zM 81506 MUST COMPLY WITH Engineering x y mme " Energy Code 4,648.53 REMP Ped.Amenity 0 CMP x a Eta g22.aaJAMISONNEYERS@SHAWCONSTRUCTION.NET THE CITY OF ASPEN LIGHTING CODE Plan Check Water SECTION 26.575.150 CMP(50%) 2,446.29 Housing Cash in Ueu 0 Stormwater x w ass a INSPECTIONS:The General Contractor must schedule inspections online. (Hourly) Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so. ^^•^•++•+• °°"`°M Zoning Sanitation Parks Review 216.87 Stormwater x Pm was I hereby certify that I have read and examined this application and know the same to be true and correct.All provisions of laws and (Hourly) Env.Health x e ordinances governing this type of work will be complied with whether specified herein or not.The granting of a permit does not Utility Review 25 Engineering city Use nec 40,282.46 parks Landscape x a, rwavle presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance r-, (Hourly) °.gym•."°^°'" county use Taz X R M of construction.It is my responsibility to review the approved plans and any comments that are contained thereon and see that the GI5 250 9,841.06 Efficiency structure and/or project is built in compliance with all applicable codes. ;15" \ -.d,�.,.A._" Approved leno-anor 4/25/2018 DAM 11/5/18 Signature Date Lot Area Deed Restricted To Issue SMOKE ALARMS AND / Check if you are a tested owner builder(single-family homes only).You must take a test and complete the owner/building affidavit. •• ". ----�/I Census Code #of Dwellings BBeaaa-e74.z°Plans Location Issuance ❑ (CITY USE ONLY)Owner builder a y: CARBON MONOXIDE approved b Date: Affidavit on file `-`"°"' CITY OF ASPENDecember2o17 130 S.GALENA ST ASPEN,CO 81611 DETECTORS REQUIRED .,_ - W •P° e"• .. CITY OF ASPENAnxna2q=/ 130 S. GALENA ST ASPEN,CO 81611 THROUGHOUT DWELLING UNIT PER CITY OF ASPEN C) . City of Aspen-Tree Planting Specifications ". .I MUNICIPAL CODE 8.15 Tree protection fencing is required at the deiplines of all trees shown. I PERMIT NUMBER: Thereialloactiviryalloweawithinthisfe,n`edarea,;nclu ding,butnotIimitedto:digging, COMMUNITY DEVELOPMENT DEPARTMENT storage of material,equipment,machinery,foot or vehicle traffic. Please contact the City Forester or his designee at 920.5120 for an inspection of this fencing BUILDING DESCRIPTION FORM—IRC&IBC4 Cr P_or to any activity. 71a Orr Amax a � aec SPECIAL INSPECTION REQUIRED: BUILDING CODE INFORMATION If the need arises to perform any activity in the tree protection area,please contact the City ■2015 IRC -Structural steel welding:Field 8 Shop Forester and you will be given specific instructions as to how to proceed to minimize ❑ 0 2015 IBC 0 2015 IEBC ❑Other(Please Explain) , Impacts to the tree root zone. Code Editions (As Adopted and Amended) (As Adopted and Amended) (As Adopted Architectural Engineering Consultants,Inc. -High strength bolting r and Amended) — - -Epoxy anchors -Intumescent paint :=7„`.1i Fire Sprinkler System I Existing?0 rvo I Required?la Ho I Type 0 NFPA 13 0 NFPA 13 R 0 NFPA 13 D An Office with LEED''M Accredited Professionals -Spray applied fire resistive materials April 23,2018 -Permanent micropiles Type Of Construction❑VA 0 VB M IV 0 ILIA 0 IIIB 0 ILA 0 LIB 0 IA❑IB I Fire Alarms Installed 0 Yes No Required Special Inspections❑High-Strength Bolting 0 Epoxy Anchors 0 Structual Steel Welding David Johnston David Johnston Architects Special inspection is required per 2015 IBC 0 Permanent Micropiles 0 Sprayed Fire-Resistants 0 Other 119 South Spring Street,Suite 203 section 1704.Inspector to verify that copy of " "A° •°,° Energy Code Compliance ❑Prescriptive Table ❑Other Aspen,CO 81611 agreement for inspection program to be on °."�.wg S RESCheck UA Alternative ❑COMCheck UA Alternative 1 priorperforming any Re: Aspen Affordable Housing-517 Park circle the ec site p erall Sp w""�°" r ,m,"M•"' inspections.A copy of all Special Inspector / Exterior Energy Use Total Approved On-Site Snowmelt Spa Pool Dear David, field reports to be on the job site for (Existing+New) inspectors'review if requested.Failure to Building Type/ I ❑A ❑B 0 F_ 0 E ❑D R_ This document is intended to show compliance of the new construction of the Aspen Affordable Housingcomply may result in denial of inspection. Occupancy Group B I ❑One Family ❑Two Family P ..., w 'r---� 'EE ❑B(A<50) 0 H_ ❑M ❑S_ R located at 517 Park Orcle,Aspen,CO with the 2015 International Energy Conservation Code(2015 IECC). E„" i '^°°�^".°""° C ❑I_ ❑U C ❑Townhouse We propose to use a prescriptive approach per sections 402.1402.3 and 403.2.1 of the 2015 IECC. " " City of Aspen-Tree Planting Specifications m.nu, _ UNIT DESCRIPTION AS PROPOSED Project Gross Area of Building:9,146.67 SF Gross Area of Unit: P External Energy Use Approved the following criteria must also be met with construction: ADU BUILDING DESCRIPTION The project at 517 Park Circle is the new construction of a multi-family residence with a floor area of Occupant Load:R 7700 sf.For heat load calculations,please refer to the Appendix.The heat load calculations are ® RREMP El CREMP .7 ❑Yes all trees on site and any tree canopy from neighboring property. 1 ❑No performed using the Carrier Hourly Analysis Program and provides a more detailed and accurate load This will serve as the tree protection zone(TPZ).This fence is to #Stories Above Grade 3 #Stories Below Grade #Living Rooms than Manual J. 0161.2018. 9/25/18 PERMIT#: AIME: be constructed in such a manner that the area inside the dripline' Attached Garage Detached Garage Carport #Kitchens Building Envelope protected.AN INSPECTION OF THIS FENCE MUST BE Parking Spaces Parking Spaces Parking Spaces #Full Baths SNOWMELT: 0 #Bedrooms 15 #Full Baths 15 Deck Area 2037 #3/4 Baths The following table lists the mandatory minimum insulation and fenestration requirements for the project PERFORMED BEFORE ANY CONSTRUCTION OR DEMOLITI #1/2 Baths POOL: 0 (ACTIVITIES BEGIN.PLEASE ARRANGE THIS INSPECTION #3/4 Baths #1/2 Baths #Bedrooms climate zone(7). All new assemblies will meet the following requirements. SPA: 0 WITH BEN CARLSEN AT 429-2034. #Kitchens 11 #Wood Fireplaces #Other Rooms(List) Fenestration Ceiling R- Wood frame Floor Basement wall Slab n/a ➢No materials may be stored in the TPZ,including but not limite #Gas Appliances— #Gas Logs— U-factor value wall R-value R-value R-value R-value REMP SHEET: n/a to,construction backfill,construction traffic,or any other ` Code Minimums 0.28(1) 49 20+5 or 13+10 38(2) 15/19(3) 10(4) MINIMUM BOILER AFUE: 'construction materials. BUILDING ROOMS AND USES BY LEVEL AS PROPOSED(Include Mechanical&Storage) none , Notes: 1)Fenestration SHGC requirements do not apply in climate zone(7) OFFSET: ➢No excavation,grading or trenching may occur within the TPZ Basement WALK-OUT-(3)1-BEDROOM APARTMENTS/(1)STORAGE AREA/MECH.ROOM 2)Or insulation sufficient to fill the framing cavity,R-19 minimum without the consent of the City of Aspen Forester or his designee 3)R-15 continuous insulation on the interior or exterior or R-19 cavity insulation on the interior of REVIEWED BY: ➢No parking of vehicles or equipment may occur in the TPZ. Bonn;aM Main Level(4)2-BEDROOM APARTMENTS the basement wall. Can be satisfied with cavity plus R-5 continuous. ➢No dumping of any waste products may occur in the TPZ. 4)4 ft deep and R-15 edge insulation for heated slabs SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S. ➢Any roots cut during excavation shall be pruned with sharp 5)R-10 continuous insulation or R-13 cavity insulation. nlnsny oon;l::yo:0 the s shalllght of Pet the folio be following: separate zone.A ROW loppers/pruners back to the soil line.The roots will further be 2nd Floor(4)1-BEDROOM APARTMENTS permit and Permanent Encroachment License are required. 'protected by burlap draped over the side of the excavation Sincerely, ,R10 insulation shall be installed under the area to be snow melted or R5 covering the exposed roots.This burlap shall be kept moist until 3rd Floor insulation shall be installed under and et me slab edges.(Ordinance n -Autos atic c the excavation is backfilled. F�--'S/ .Alaomanccontmlainstalled for system shut off when pavement I➢Pruning to provide clearance for construction activities shall o 000 temperatures above 50°F and no precipitation;s falling.(2009 IECC be done under the direction of an arborist. Additional Dan Findley Sec.403.8 8 503.2.4.5) Mechanical Engineer -Automatic or manual controls installed for system shut off when outdoor 3,Site inspections shall be performed on a weekly basis,to ensure temperatures above 40°F.(2009 IECC Sec.403.8 8 503.2.4.5) the above listed conditions are met. I - - d EEIVED -Inspection by testing hydrostatically at 1%times max system design I➢Anyunapproved improvements or activities outside of those Reviewed B: Date: 40801 US Hwy 6&24,Suite 214,Eagle-Vail,CO 81620 Post Office Box 8489,Avon,C I pressure,but not less than 100psi,Mr 15minutes.(20091MC Sec. PP P Y' 1208.1) approved within this permit will be subject to mitigation in the fib CITY OF ASPENsenuaryaasi 130 S.GALENA ST I ASPEN,CO 81611 phone:970-748-8520 email:stan(a2aec-vail.com web:www.aec-vail.com 06/12/2018 of restoration. J ➢This permit must be posted on site during the construction ASPEN 'process. BUILDING DEPARTMENT 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written procedural and quality control manuals and periodic auditing of fabrication practices by an approved special inspection agency. 5. Provide Final Inspection Report.The special inspector shall submit a written final 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator �TJ report documenting required special inspections and correction of any discrepancies shall submit certificate of compliance to the building officialc stating that the work was no Clone AVM 11=4_ performed in accordance with the approved construction documents. SPECIAL INSPECTION AND TESTING AGREEMENT noted m the inspections prior to the final building inspection. B.Owner Responsibilities.The project owner,the engineer or architect or record,or an agent of the G. Building Department Responsibilities To permit applicants of project requiring special inspection and\or testing per Section 1704 of the responsible for l special-inspection The special ins tor\a hall International Building Code(IBC). owner is the employ employing sped pec ion services. pecia pec granny s I. Approve apecian sod spoon program.The building department shall approve all not be in the employ of the contractor,subcontractor or material supplier.[IBC Sec 1704.1]In special inspectors and special-inspection requirements. Project Address: 517 Park Cir Permit Number: 0161.2018.ARBK case of an owner contractor,the special inspector\agency shall be employed as specified by the building official. 2. Enforce special inspection.Work requiring special inspection and the building BEFORE A PERMIT CAN BE ISSUED:The owner,or the engineer or architect of record,acting as the C.Engineer or Architect of Record Responsibilities inspector shall monitor the performance of special inspectors.His'Her approval,in owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing addition to that of the special inspector,must be obtained prior to placement of concrete, Schedule,including the required acknowledgments.A pre-construction conference with the parties covering of structural steel,or other similar materials. involved maybe required to review the special-inspection re uirements and procedures. 1. Prepare special inspection program.The engineer or architect of record shall list the equireq proce items for which special inspection is required;and shall indicate any items for which the 3. Review Inspection reports.The building official should review s IBC or the building official approves periodic inspection and the frequency of such PB pedal inspection APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the progress and final reports. projects for which they provide special inspections.Special inspectors shall be approved by the building inspections. department prior to performing any duties.Special inspectors shall submit their qualifications and are 4. Perform final inspection.The building official should perform the final inspection and s j personalpre-q Specialp display approved2. Respond to field discrepancies.The engineer or architect of record shall respond to ub cat to interviews for pre-qualification. inspectors shall die la approval fora project[IBC Sec.109.3.1]after the final special-inspection report has been identification,as stipulated by the building official,when performing the function of special inspector. uncorrected field discrepancies in design,material,or workmanship observed by the reviewed and approved. special inspector. Special inspection and testing shall meet the minimum requirements of the International Bolding Code 3. Review shopdrawingsand submit design changes.The engineer or architect of record 517 Park Cir 0161.2018.ARBK Section 1704.The following conditions are also applicable: g g g Project Address: Permit Number: shall acknowledge and review for conformance with the construction drawings those A.Duties and Responsibilities of the Special Inspector shop drawings that may detail structural information,shall submit to the building official and to the special-inspection agency written documentation of any verbally authorized ACKNOWLEDGMENTS 1. Signify presence at job site.Special inspectors should notify contractor personnel of deviations from the approved construction documents,and shall submit revised their presence and responsibilities at the job site.If required by the building official,they documents for building official approval as required. I have read and agree to comply with the conditions of this agreement. shall sign in on the appropriate form posted with the building permit. D.Contractor Responsibilities Special p p Inspection Agency: Signature: Printed Name: Date: 2. Observe ssigned work.The special inspector shall observe assigned work for conformance with the building department approved(stamped)design drawings, 1. Notify the special inspector.The contractor is responsible for notifying the special specifications,and applicable workmanship provisions of the International Building inspector or agency regarding individual inspections for items listed on the attached Code.Architect\engineee.reviewed shop drawings may be used only as an aid to schedule and as noted on the building department approved plans.Adequate notice shall Owner: Signature: Printed Name Date inspection. be provided so the special inspector has time to become familiar with the project. For continuous special-inspection,the special inspector shall be on site at all times 2. Provide access to approved plans.The contractor is responsible for providing the observing the work requiring special inspection.Periodic inspections,if any,must have special inspector access to approved plans. Engineer/Architect: Signature: Primed Name: Date: prior approval based on a separate written plan reviewed and approved by the building David Johnston Architects /-� D.Bose Bexziey 04-20-18 department and the engineer or architect of record. 3. Retain special inspection records.Upon request,the contractor is also responsible for .�✓ retaining,at the job site,all special inspection records completed by the special inspector. 3. Report nonconforming items.The special inspector shall bring nonconforming items to Contractor: Signature: Printed Name: Date: the immediate attention of the contractor and note all such items in the daily report.If E.Inspection of Fabricators �. �^ �1 p any item is not resolved in a timely manner or is about to be incorporated in the work,the _v` S N Nw r'd k Si Av z h ro N B, Neta,rt S �.�' L special inspector shall immediately notify the building department by telephone or in 1. Fabrication of structural assemblies and members.Where fabrication of structural pars ,notify the engineer or architect,and post a discrepancy notice. load-bearing members and assemblies is being performed on the premises of a Approved Fabricator: tgnature: Printed Name: Date: fabricator's shop,IBC Section 1704.2 shall require special inspection of the fabricated 4. Provide timely reports.The special inspector shall complete written inspection reports items. - fee each inspection visit and provide the reports ec a timely basis determined by the 2. Fabrication and implementation procedures.The special inspector shall verify that Inspected Fabricator: Signature: Prim Ds Printed Name: ac. building official.The special inspector or inspection agency shall famish these reports the fabricator maintains detailed fabrication and quality control procedures that provide a directly to the building official,engineer or architect of record,and others as designated. basis for inspection control of the workmanship and the fabricator's ability to conform to [IBC Sec.1704.1.2]These reports should be organized on a daily format and maybe construction documents and reference standards.The special inspector hall submitted week) at the option of the buildingofficial.These reports should include: approvedpecia pec or s y p oreview the procedures for completeness and adequacy relative to code requirements for circle one) Signature: Printed Name: Woe a.Description of daily inspections and tests made with applicable locations, proce p 4 Y 4 CITY OF ASPEN b.Listing of nonconforming items, fabricator's scope of work. PITKIN COUNTY: c.Report on how nonconforming items were resolved or unresolved as F.Approved Fabricator Responsibilities applicable, 3 d.Itemized changes authorized by the architect,engineer,and building official if 1. Fabrication exempt inspections.Special inspections are not required where work is not included in nonconforming items. done on the premise of a fabricator registered and approved to perform such work without special inspection. 1 2 2. Approval of fabricator.Approval shall be based upon review of the fabricator's writes 2. A Approval u f the fabricator's written procedural and quality control manuals and periodic auditing of fabrication practices by Approval of fabricator. pprov shell he based port review o an approved special inspection agency. procedural and quality control manuals and periodic auditing of fabrication practices by an approved special inspection agency. 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator shall submit certificate of compliance to the building official stating that the work was shall submit certificate of compliance to the building official slating that the work was performed in accordance with the approved construction documents. performed in accordance with the approved construction documents. G. Building Department Responsibilities G. Building Department Responsibilities 1. Approve special-inspection program.The building department shall approve all I. Approvespecial-inspection The buildin de t shell approve all special inspectors and special-inspection requirements. ppprogram. g penmen pp special inspectors and spaniel-inspection requirements. 2. Enforce special inspection.Work requiring special inspection and the building 2. Enforce special inspection.Work requiring special inspection and the building inspector shall monitor the perfommance of special inspectors.Hin\Her approval,in inspectoaddition to that of the special inspector,must be obtained prior to placement of concrete, addition to monitor the performance of special inspectors.His laaeHer approval,in covering of structural steel,or other similar materials. to that of the special inspector,must be obtained prior to placement of concrete, covering of structural steel,or other similar materials. 3. Review inspection reports.The building official should review special-inspection 3. Review inspection reports.The building official should review special-inspection progress and final repons. progress and final reports. 4. Perform final inspection.The building official should perform the final inspection and 4. Perform final inspection.The building official should perform the final inspection and approval for a project[IBC Sec.109.3.1]after the final special-inspection report has been reviewed and approved. approval fora project[IBC Sec.109.3.1]after the final special-inspection report has been reviewed and approved. Project Address: Permit Number: Project Address: Permit Number: ACKNOWLEDGMENTS ACKNOWLEDGMENTS I have read and agree to comply with the conditions of this agreement. I have mad and agree to comply with the conditions of this agreement. Special Inspection Agency: ature: Printed Name: Date: Special Inspection Agency: Signature: Printed Name: Date: CTk./ es^(14ee rTtac. � i p e 3..mes"))-1411,35 gE, 9 lzti Loss Owner. Sig ature: Printed Name Date Owner: Signature: Printed Name Date Engineer/Architect: Signature: Printed Name: Date: Engineer/Architect: Signature: Printed Name: Date: Contractor: Signature: Printed Name: Date: Contractor. Signature: Printed Name: Date: Approved Fabricator: Signature: Printed Name: Date: Approved Fabricator. Signature: Printed Name: Date: Inspected Fabricator. Signature: Printed Name: Date: Inspected Fabricator: Signatu Printed Name: Date: 3S'fo ttt Jtfkr_ JOE (,JZL-Sb- Ci/;c4 A e, (circle one) Signature: Printed Name: Date: CITY OF ASPEN (circle one) Signature: Printed Name: Date: CITY OF ASPEN PITKIN COUNTY: CITY COUNTY: 3 3