HomeMy WebLinkAboutFile Documents.1130 Black Birch Dr.0046.2019 (11).ARBK e %
DATE:02.22.2019 MASTER PERMIT:0096.2019.ARBK PERMIT NUMBER:0046.2019.ARBK
COMMUNITY DEVELOPMENT DEPARTMENT �'ii► x Field Plan Set Must Be Printed In Color .
\��;;i
BUILDING PERMIT APPLICATION
c:ITyo,SPEN
i1
PROPERTY INFORMATION
ADDRESS 1130 BLACK BIRCH UNITa PARCEL IDp 273501307009
13 BLOCK R SUBDIV T ORAR ISION BLACK BIRCH ESTATES SUBDIVISION /-
LOT
OWNER NAME RIVERFRONT FORK LLC CELL 806.543.3200 EMAILJOHN@DEPERMIAN.COM CITY'OF ASPEN
BEST CONTACT ANDREW DILLON CELL 970.319.6881 EMAIL ADILLON@FORUMPHI.COM The Clty Of Aspen
NAME PERMIT NO.0046.2019.ARBK,
PROJECT DETAILS(READ DEFINITIONS BELOW)DIMPLE cD"NiUTSENTIREiy n These plans must be kept at the
DESCRIPTIONOF / \ OWNER RIVERFRONT FORK LLC building site or inspection
WORK IN DETAIL DEMOLITION OF EXISTING HOUSE AND DETACHED GARAGE.CONSTRUCTION OF
NEW SINGLE FAMILY RESIDENCE delays may occur.Construction
PROJECT 8,084,775 Use of Building Class of Work Fixture Counts Important Review Triggers ADDRESS 1130 BLACKBIRCH shall conform to these plans.All
VALUATION ...
1❑ Commerical ❑.New Tonets,Bidets Major Engineering Review - changes shall antibeapproved prov p edy b
Bathtub .Pro t than 50%cting PARCEL=D27350137009 the building official.
sg Fr of ❑ Multi-Family El Addition — Projects ass
0 M Single Family —Lavatory(wash Basin) •h Projctsinvlrdscape area and less than 50%
WORK AREA g Y ❑Alteration shower 75%or t of n
❑ Mixed-Use ❑IF air — greater q
UNIT SOFT 8'S09 ❑ ❑IP�jf Kitchen Sink(+Disposal)•%haProrscape area grndtwork
0 Tenant Finish =Dishwasher 50%ling 50%ape and work
20,253 Laundry Bar,Utility Sink affecting or greater of unit
tea-ME Will there be El Demolition Clothes washer SEPARATE PERMITS ARE
SA LT OF SOIL 20,253 any roof/wall 0 Change Order=Floor sink •oil disturbance
involving 1,000+sgft of FIRE
DISTURBANCE penetrations? 0 Floor Drain soil disturbance area REQUIRED FOR ELECTRICAL,
El Yes —Water Heater(Pan Req) PLUMBING,MECHANICAL,OR
NEW So FT 8,509 0 No a Gas Outlets Water Efficient Landscaping
water Treatment •Projects that trigger a major FIRE SPRINKLER WORK
BUILDING 3,915 =Other engmeeringreview
SPRINKLERS FOOTPRINT NOTICE:const construction
authorized
is n tc and lice if within
•pfOje[ts involving interior
or authoction r world commencedended or alterations affecting 50%or more
AARR�DSQIPE 2,760 180doned for s period of180works any
suspended or g
abandoned for a period omm days at amv time after of exislong gross square footage REQUIRED
work is rommenree.
EA. RJO ' D 0 0
p�,,W��L�oyd��o
Project Valuation:Cost of project as defined;n Valuation Affadav;t. t�ll,D1n7 Ego i
2 Sq Ft of Building Work Area:Total square footage of interior area undergoing change or reconfiguration.
O Unit Sq Ft:Gross square footage,not FAR,of permitted unit.
H Lot Size:Total surveyed square footage of property. APPROVALS
Sq Ft of Soil Disturbance:Exterior area of the lot where the ground is disturbed apaewing at,Reviewer gate ZONING
�New Sq Ft:Total added square footage for additions to net livable or net leasable space. Hment Jew s1gn-oe ,,,,proved
LL BuildingFootprint:Grade foors are footage of thepermitted structure. �" -
9u B PC x LL 2/26I2019
C1 Hardscape Area:Square footage of impervious lot surface.
Zone District:Underlying zone district of permitted parcel. Zoning x aN a/vzela ill
HPC External Energy Use Approved
Building x TF 5/24/19
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Fire I] RREMP ❑ CREMP I —
Building Building Engineering
x MR 5/24/19 See Change Order ALL OUTDOOR LIGHTING
25 00 Park Impact $672.26 2 for up to date I MUST COMPLY WITH
Review Permit FeeCMP -----PENT# 0046.2019.ARBK DATE 4/4/2019
REMP info THE CITY OF ASPEN LIGHTING CODE
Engineering Zoning School Lands O Water
Review Review(50%) Dedication
Stormwater SNOWMELT 60 SECTION 26.575.150
Zoning CMP I50%) TDM Impact $75.24 Sanitation
Review(50%) POOL 41Sgfi Reviewed by Engineering
Energy Code REMP Pedestrian Env.Health
Review Payment Amenity 0 Parks x Dr 4/26/201.c SPA
CMP 50% GIS Housing Cash in Lieu 8.asi.sa Landscape bSIk known
at the r PM
( ) g P X It should be known that this review shall not
City Use Efficiency RM 3/11/19 REMP SHEET: A004 rareve the applicant of Weir responsibility.r
Parks Review Tax Water Tap any,�plF'rr'�_r���k,.�g�yyL./�•P� comply with the is of the Coyf
ty is
County Use ToI Issue I •ef L•!•8�40 O �pen.The offla offered to assstt the appld approval icant'the s
utiliWReview Tax sanitation OFFSET: tip ,,pica Engineering
Issuancerequirements,"
understanding fthea applicable En
L/L to/L V on re co structlon documents and other data shell
`(CITY OF ASPEN....„.. 130 S.GALENA ST I ASPEN,CO 81611J REVIEWED BY: tonyf not prevent the City of Aspen from requidng the
correction of errors in the construction
BUILDING DEPARTMENT SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S. documents and other data.
All snowmen systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone.A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
Insulation shall be installed under and at the slab edges.(Ordinance 11 SEE NOTES#1 PLANS
Series 2011)
-Automatic controls installed for system shut off when pavement
temperatures above 50°F and no precipitations falling.(20091ECC
Sec.403.8 8.53.2.4.5)
-Automatic or manual controls installed for system shut off when outd
temperatures above 40°F.(20091ECC Sec.403.8g 503.2.4.5) SHEAR WALL
-Inspection by testing hydrostatically at 1%time x system design
180 pressure,but not less than 100psi,for 15minutes.(2009lMC Sec. INSPECTION
36 sf fife and safety exempt 2760 SM sf 2796 total sf REQUIRED
City Development Engineer's Comments
1.Encroachments:Any existing or planned encroachments into the public
right-of-way,including temporary construction trailers and dumpsters,must be
applied for licensing at City Engineering(920-5080).Five dans advance
notice is required to obtain a temporary encroachment license.
2.Right-of-way Permits:Approval of these plans by the City Building Dept.is
for work on private property only.Design approvals for proposed work
(including landscaping)in the public right-of-way(ROW)must be obtained
from City Engineering Dept.(920-5080)and Parks Dept.(920-5120).A
permit for work in the public right-of-way must be obtained from the City
Engineering Dept.five days in advance of when the permit is needed.
3.Mud,dirt and debris may not be tracked onto the adjacent public ROW,
and the adjacent ROW must be clean at the end of eachworkday.Construct
mud rack if needed.Trucks hauling demolished materialsmust becovered.
4.Utilities in ROW:No utility pedestals,meters,or electric transformers can
be installed in the public right-of-way.Provide utility easements on private
property as needed.
5.Certificate of Occupancy(CO)Inspection:Engineering CO Inspection
includes but is not limited to:(a)witnessing that all property corners
havemonuments,(b)drainage improvements were installed as approved,(c)
easements are documented,(d)no unapproved ROW encroachments exist,
and(e)the ROW has been restored.Call 429-2750 to arrange CO inspection.
6.Snowmelt Driveways:(i)Snowmelt runoff from driveway cannot flow into
street.A grate or swale must intercept runoff before street.(ii)Snowmelt
installation in the public ROW requires an encroach-ment permit.
7.Drainage Issues:(i)Foundation drains cannot go to a dry well receiving
other drainage flows.(ii)City must be notified of drainage plan changes.(iii)
Plan approval assumes no ground water.If ground water is encountered,call
the Senior Dev.Engineer at 920-5080.Call for an open hole inspection prior
to placement of the drywell.
8.No Loose Material Storage allowed in R.O.W.
9.Neighbor Notification:For all excavation,the Contractor must comply with
neighbor notification requirements per Section 3307 of the 2003 International
Building Code(IBC)