Loading...
HomeMy WebLinkAboutFile Documents.1130 Black Birch Dr.0046.2019 (11).ARBK e % DATE:02.22.2019 MASTER PERMIT:0096.2019.ARBK PERMIT NUMBER:0046.2019.ARBK COMMUNITY DEVELOPMENT DEPARTMENT �'ii► x Field Plan Set Must Be Printed In Color . \��;;i BUILDING PERMIT APPLICATION c:ITyo,SPEN i1 PROPERTY INFORMATION ADDRESS 1130 BLACK BIRCH UNITa PARCEL IDp 273501307009 13 BLOCK R SUBDIV T ORAR ISION BLACK BIRCH ESTATES SUBDIVISION /- LOT OWNER NAME RIVERFRONT FORK LLC CELL 806.543.3200 EMAILJOHN@DEPERMIAN.COM CITY'OF ASPEN BEST CONTACT ANDREW DILLON CELL 970.319.6881 EMAIL ADILLON@FORUMPHI.COM The Clty Of Aspen NAME PERMIT NO.0046.2019.ARBK, PROJECT DETAILS(READ DEFINITIONS BELOW)DIMPLE cD"NiUTSENTIREiy n These plans must be kept at the DESCRIPTIONOF / \ OWNER RIVERFRONT FORK LLC building site or inspection WORK IN DETAIL DEMOLITION OF EXISTING HOUSE AND DETACHED GARAGE.CONSTRUCTION OF NEW SINGLE FAMILY RESIDENCE delays may occur.Construction PROJECT 8,084,775 Use of Building Class of Work Fixture Counts Important Review Triggers ADDRESS 1130 BLACKBIRCH shall conform to these plans.All VALUATION ... 1❑ Commerical ❑.New Tonets,Bidets Major Engineering Review - changes shall antibeapproved prov p edy b Bathtub .Pro t than 50%cting PARCEL=D27350137009 the building official. sg Fr of ❑ Multi-Family El Addition — Projects ass 0 M Single Family —Lavatory(wash Basin) •h Projctsinvlrdscape area and less than 50% WORK AREA g Y ❑Alteration shower 75%or t of n ❑ Mixed-Use ❑IF air — greater q UNIT SOFT 8'S09 ❑ ❑IP�jf Kitchen Sink(+Disposal)•%haProrscape area grndtwork 0 Tenant Finish =Dishwasher 50%ling 50%ape and work 20,253 Laundry Bar,Utility Sink affecting or greater of unit tea-ME Will there be El Demolition Clothes washer SEPARATE PERMITS ARE SA LT OF SOIL 20,253 any roof/wall 0 Change Order=Floor sink •oil disturbance involving 1,000+sgft of FIRE DISTURBANCE penetrations? 0 Floor Drain soil disturbance area REQUIRED FOR ELECTRICAL, El Yes —Water Heater(Pan Req) PLUMBING,MECHANICAL,OR NEW So FT 8,509 0 No a Gas Outlets Water Efficient Landscaping water Treatment •Projects that trigger a major FIRE SPRINKLER WORK BUILDING 3,915 =Other engmeeringreview SPRINKLERS FOOTPRINT NOTICE:const construction authorized is n tc and lice if within •pfOje[ts involving interior or authoction r world commencedended or alterations affecting 50%or more AARR�DSQIPE 2,760 180doned for s period of180works any suspended or g abandoned for a period omm days at amv time after of exislong gross square footage REQUIRED work is rommenree. EA. RJO ' D 0 0 p�,,W��L�oyd��o Project Valuation:Cost of project as defined;n Valuation Affadav;t. t�ll,D1n7 Ego i 2 Sq Ft of Building Work Area:Total square footage of interior area undergoing change or reconfiguration. O Unit Sq Ft:Gross square footage,not FAR,of permitted unit. H Lot Size:Total surveyed square footage of property. APPROVALS Sq Ft of Soil Disturbance:Exterior area of the lot where the ground is disturbed apaewing at,Reviewer gate ZONING �New Sq Ft:Total added square footage for additions to net livable or net leasable space. Hment Jew s1gn-oe ,,,,proved LL BuildingFootprint:Grade foors are footage of thepermitted structure. �" - 9u B PC x LL 2/26I2019 C1 Hardscape Area:Square footage of impervious lot surface. Zone District:Underlying zone district of permitted parcel. Zoning x aN a/vzela ill HPC External Energy Use Approved Building x TF 5/24/19 SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Fire I] RREMP ❑ CREMP I — Building Building Engineering x MR 5/24/19 See Change Order ALL OUTDOOR LIGHTING 25 00 Park Impact $672.26 2 for up to date I MUST COMPLY WITH Review Permit FeeCMP -----PENT# 0046.2019.ARBK DATE 4/4/2019 REMP info THE CITY OF ASPEN LIGHTING CODE Engineering Zoning School Lands O Water Review Review(50%) Dedication Stormwater SNOWMELT 60 SECTION 26.575.150 Zoning CMP I50%) TDM Impact $75.24 Sanitation Review(50%) POOL 41Sgfi Reviewed by Engineering Energy Code REMP Pedestrian Env.Health Review Payment Amenity 0 Parks x Dr 4/26/201.c SPA CMP 50% GIS Housing Cash in Lieu 8.asi.sa Landscape bSIk known at the r PM ( ) g P X It should be known that this review shall not City Use Efficiency RM 3/11/19 REMP SHEET: A004 rareve the applicant of Weir responsibility.r Parks Review Tax Water Tap any,�plF'rr'�_r���k,.�g�yyL./�•P� comply with the is of the Coyf ty is County Use ToI Issue I •ef L•!•8�40 O �pen.The offla offered to assstt the appld approval icant'the s utiliWReview Tax sanitation OFFSET: tip ,,pica Engineering Issuancerequirements," understanding fthea applicable En L/L to/L V on re co structlon documents and other data shell `(CITY OF ASPEN....„.. 130 S.GALENA ST I ASPEN,CO 81611J REVIEWED BY: tonyf not prevent the City of Aspen from requidng the correction of errors in the construction BUILDING DEPARTMENT SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S. documents and other data. All snowmen systems shall meet the following: -Any portions in the Right of Way must be on a separate zone.A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 Insulation shall be installed under and at the slab edges.(Ordinance 11 SEE NOTES#1 PLANS Series 2011) -Automatic controls installed for system shut off when pavement temperatures above 50°F and no precipitations falling.(20091ECC Sec.403.8 8.53.2.4.5) -Automatic or manual controls installed for system shut off when outd temperatures above 40°F.(20091ECC Sec.403.8g 503.2.4.5) SHEAR WALL -Inspection by testing hydrostatically at 1%time x system design 180 pressure,but not less than 100psi,for 15minutes.(2009lMC Sec. INSPECTION 36 sf fife and safety exempt 2760 SM sf 2796 total sf REQUIRED City Development Engineer's Comments 1.Encroachments:Any existing or planned encroachments into the public right-of-way,including temporary construction trailers and dumpsters,must be applied for licensing at City Engineering(920-5080).Five dans advance notice is required to obtain a temporary encroachment license. 2.Right-of-way Permits:Approval of these plans by the City Building Dept.is for work on private property only.Design approvals for proposed work (including landscaping)in the public right-of-way(ROW)must be obtained from City Engineering Dept.(920-5080)and Parks Dept.(920-5120).A permit for work in the public right-of-way must be obtained from the City Engineering Dept.five days in advance of when the permit is needed. 3.Mud,dirt and debris may not be tracked onto the adjacent public ROW, and the adjacent ROW must be clean at the end of eachworkday.Construct mud rack if needed.Trucks hauling demolished materialsmust becovered. 4.Utilities in ROW:No utility pedestals,meters,or electric transformers can be installed in the public right-of-way.Provide utility easements on private property as needed. 5.Certificate of Occupancy(CO)Inspection:Engineering CO Inspection includes but is not limited to:(a)witnessing that all property corners havemonuments,(b)drainage improvements were installed as approved,(c) easements are documented,(d)no unapproved ROW encroachments exist, and(e)the ROW has been restored.Call 429-2750 to arrange CO inspection. 6.Snowmelt Driveways:(i)Snowmelt runoff from driveway cannot flow into street.A grate or swale must intercept runoff before street.(ii)Snowmelt installation in the public ROW requires an encroach-ment permit. 7.Drainage Issues:(i)Foundation drains cannot go to a dry well receiving other drainage flows.(ii)City must be notified of drainage plan changes.(iii) Plan approval assumes no ground water.If ground water is encountered,call the Senior Dev.Engineer at 920-5080.Call for an open hole inspection prior to placement of the drywell. 8.No Loose Material Storage allowed in R.O.W. 9.Neighbor Notification:For all excavation,the Contractor must comply with neighbor notification requirements per Section 3307 of the 2003 International Building Code(IBC)