Loading...
HomeMy WebLinkAboutFile Documents.905 Chatfield Rd.0111.2018 (153).ARBK N ADDRESS:905 Chatfield Road PERMIT NUMBER:0111.2018.ARBK , PERMIT Nit ��� (� I a DATE:4/26/2018 MASTER PERMIT: PERMIT NUMBER:o111so1a.ARRK field Plan S e Must B e P NPA o l o r COMMUNITY DEVELOPMENT DEPARTMENT COMMUNITY DEVELOPMENT DEPARTMENT Ilk COMMUNITY DEVELOPMENT DEPARTMENT C� PE BUILDING PERMIT APPLICATION BUILDING PERMIT CONTACT SHEET T 0 ix Asrzx BUILDING DESCRIPTION FORM-IRC&IBC 1HscryoF,wN PERMIilh T NO.0111.2018.ARBK aB THE of Asrry - PROPERTY INFORMATION Name cage Reese phone y/U-yL/-@yLO E..„gleeseogtccyalcriuecos.coRl BUILDING CODE INFORMATION O 2015 IRC ❑2015 IBC ❑2015 IEBC ID Other(Please Explain) OWNER SILVERSTEIN ADDRESS WOSChatheld Road,Aspen C0 81611 UNIT0 PARCEL IDR 273502402004 O W d cru-o44-1883 Ie yi iwoous.com Code Editions (As Adopted and Phone E-moos 91..9 P Amended) (AS Adopted and Amended) Amend ADDRESS. LOT 4.fill"g a BLOCK oP5u6Dwn1ON Weat'Pe" Name ton °° and Amended) 905 CHATFIELD ROAD Jiiverstein isaryn an0 vvlglam /IS-MO-VOIA - The City of Aspen OWNER NAME Silverstein,KarynS William CELL EMAIL Name Phone cen phone Fire Sprinkler System I Existing?too No I Required?nNo I Type 0 NFPA 13 0 NFPA 13 R O NFPA 13 D ,,,,tut 1569 Forest Ave Highland Park IL 60035 -R E ID � NAMEANTACT Gage Reese CELL EMAIL graaea00cyarchtecta.com city 9 seaee rip Type Of Construction❑VA O VB❑IV❑IIIA 0 IIIB❑IIA 0 IIB❑IA 0 IB'Fire Alarms Installed ❑a Yes El No --.- ---- - - These plans must be kept at t, ntle es5 bsilverstein@mainholdingsllc.com External EnergyUse A roved 4PROJECT DETAILS Required Special Inspections 0 High-Strength Bolting O Epoxy Anchors O Structual Steel Welding pp building site or inspection a/U-044-less ❑Permanent Micro Iles ❑Sprayed Fire-Resistants 0 Other ❑ RREMP ❑ CREMP delays may occur.Construction DETION OF ' Name OF Woods C"natmmbn/Greg Woods Phone Cell Phone Px shall conform to these plans.All WORK Tam Demolition of existing single family residence and replacement with new single family residence ndireu430 E.Hyman Ave.Suite 1 Ory Aspen State CO Z1p 81611 Energy Code Compliance El Prescriptive Table ❑Other El RESCheck UA Alternative 0 COMCheck UA Alternative PERMIT#:0111.2018.ARBK DATE:8/27/18 I changes shall be approved by t726ATION 5'7m' 'ro Use of Building Class of Work Fixture Counts Equipment Checklist gng.greg@gfwoods.com ❑ Commerical ❑a New LTollets,Bidets 1 Forced Alr/GravltySystems163a os.r 05.f. the building official. W RKAREA 5,031 ❑ Multi-Family Bathtub Exterior Energy Use Total Approved On-Site Snowmelt Spa Pool SNOWMELT: 1633 SF total(905 new,728 existing cb Y ❑Addition 1-Wall,suspended,or Unit Heaters Name cage cease Phoney/V-aL/-4`JLtl cell Phone O Single Family ❑Alteration Lavatory(Wash Basin) 'rGas Log (Existing+New) POOL: to be replaced) UNIT sq FT6052 0 Mixed-UseShower 1- lOru 0 Repair 1 Kitchen Sink(+Disposal)-Gas Appliancew psersa Box 529/228 Midland Avenue qt Basalt sob CO ZIP 81621 Building Type/ I 0 A_0 B ❑F_ ❑E 0 R_ I o7sl E ❑ ❑IFFR Dishwasher Appliance Vents y Occupancy Group g ❑One Family ❑Two Family SPA: Iso FTf 14,810.4 El Tenant Finish Laundry Bar,Utility Sink}_Heat,Rehig,Cooling,or Aaearelsa Breese@ccyarchitects.com ❑B(A<50) ❑H_ ❑M ❑5- R SEPARATE PERMITS ARE C C El Townhouse REQUIRED FOR ELECTRICAL, DISTURBED Will there be O Demolition clothes Washer Absorption Unit ❑I- ❑U REMP SHEET: A101 EKTERIORAREA 17,610 any roof/wall 0 Change Order Floor Sink , Boilers(includes vent) PLUMBING,MECHANICAL,OR penetrations? ❑ 2I- rain Air Handling Unit None eBea^OVe phone cell Phone _ UNIT DESCRIPTION AS PROPOSED MINIMUM BOILER AFUE: 95% FIRE SPRINKLER WORK NEW Sq FT 1021 El - WaterWeter Yes Heater(Pan Reg)_Cooling Systems nailing s ❑No c} BGas Outlets Ventilation Fans caress City state ZIP Gross Area of Building:6007 Gross Area of Unit: OFFSET: 7.52 kW Solar System 9s FroFRooea ggg U Water Treatment t- ADU BUILDING DESCRIPTION ECIAL INSPECTION REQUIRED: TH u7tuTy woRK Other -Range Hood E-r,;l occupant Load: T833 new-f28 exg. -It of Gas System Outlets Address p Is there an ADU? ❑Yes JH ZONE DISTRIR R-15 =I les Net Snowmelt system sq Ft+N>+=��tm El No REVIEWED BY: Name High Country.Engineering t Romeo Bay.. Phoney/U-S40-80/0 Cell phone SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S. -Structural steel welding:Field&Shop #Stories Above Grade 2 #Stories Below Grade 1 #Living Rooms -High strength bolting L Project Valuation:Cost Of project as defined in Valuation ANadavit. ("NOTICE:This permit becomes null and, ma 1517 Blake Ave. Ste 101 Glenwood Springs CO 81601 #Kitchens All snowmelt systems shall meet the following: 9 9 9 2$ Ft of Work Area:Totals footage area undergoing change reconfiguration. void if work or,rd eetse authorized Atltlress city State ZIP Attached Garage Detached Garage ParkOft -Any portions in the Right of Way must be on a separate zone.A ROW -Epoxy anchors G q square g B gc g g not commenced within ISO days, Parkin 5 aces= Parkin S aces a Parkin Spaces 5 #Full Baths - p Y I Unit Sq Ft:Gross Square Footage,not FAR,of permitted unit. permit and Permanent Encroachment License are required. I_ &construrnon or work is suspended or E-mail rbaylosis@hceng.com g p g P P Intumescent paint ZLot Size:Total surveyed square footage of property. abandoned for a period of tan days at Address #Bedrooms 5 #Full Baths Deck Area 4Os.f. #3/4 Baths -Rio insulation shall be installed under the area to be snow melted or Disturbed Exterior Area:Square footage of lot affected by permit application. k any time after work is commenced. #1/2 Baths insulation shall be installed under and at the slab edges.(Ordinance 11 ray applied fire resistive materials It-New Sq Ft:Total added square footage for additions to net livable or net leasble space. a y/U-a[/-ql/4 #3/4 Baths 5 #1/2 Baths 1 #Bedrooms Series 2011) rmaeent micropiles ja Sq Ft of Rooms with Utility Work:Total square footage,not FAR,of all rooms with plumbing work. Re Name Kcan l Dori Doherty Phone Cell Phone 1 0 -Automatic controls installed for system shut off when pavement APPROVALS we M'line 215 N.12th Street,Unit E Carbondale CO 81623 #Kitchens #Wood Fireplaces #Other Rooms(List) temperature is above 50°F and no precipitation is falling.(2009IECC Reviewing Needs viewer Date Address [Iry State 21P SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Departmem Reytew 'Oft APProvea #Gas Appliances 1 _ #Gas Logs 1 Sec.403.8 or risen.4.5) coal inspection is required per that2015 copy E-dl ddoherty@klaa.com a -Automatic or manual controls'installed for system shut off when outdo Baton 1704.Inspector to verify co of Permit Fee PC KH 4/26/2018 Adorers PPY BUILDING ROOMS AND USES BY LEVEL AS PROPOSED(Include Mechanical&Storage) temperature is above 40°F.(20091ECC Sec.403.8&503.2.4.5) Plan check 52,735.19 81,131.07 Park Impact 231.63 Zoning x an a -Inspection by testing hydrostatically at 1%times max system design agreement for inspection program to be on Greg Woods y/U-044-1883 zoning (50%) HPC Name Gr wooed c"nmmaion/ Phone Cell Phone Basement Crawlspace,3Bedrooms,3-3/4 baths,Laundry Room,Mechanical Room pressure,but not less than 100psi,for 15minutes.(20091MC Sec. the job site prior to performing any Engineering 31,929.90 5,144.20 School Ded. 0 1208.1) Building X JH 2/26/1g Aae:eu 430 E.Hyman Ave.Suite 1 city Aspen store CO ZIP 81611 inspections.A copy of all Special Inspector Zoning(50%) CMP ISO%) TDM Impact 25.93 Fire x Is ow::, Gare e,Master Bedroom,Full Beth,Long Room,Dining Room,Wtchen,Den,Powder Bath,Entry,Mud Room field reports to be on the job site for 5,144.20 3,237.82 Engineering x Sc e,a,,rs Addass greg@gfwoods.wm Main Level s inspectors'review if requested.Failure to d Energy Code 12,169.66 REMP 32389.47 Pe.AmenityO CMP x Tx 2:Nte GAS LOG comply may result in denial of inspection. e Water x .. vazetg INSPECTIONS:The General Contractor must schedule inspections online. 2nd Floor Office,2 Bedrooms,2-3/4 Bath Plan Check Please visit www.as en Itkin.com De artments Communi -Develo merit-Forms to do so. CMP(SO%) 3,237.82 (H99riy) Housing Cash in Lieu 3,425.99 Stormwater x .R ,fora P P / p / ty P / 2015 IFGC Section 602: I hereby certify that I have read and examined this application and know the same to be true and correct.All provisions of laws and Zoning Sanitation x PM satin ordinances this fworkwillbecom dwithwhethers fiedhereinornot.The grantingofpermitdoesnot 3rd Floor NA Install per manufacturer's instructions Parks Review 444.30 Stormwater governing type pie specified o (Hourly) Env.Health presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance Utility Review 5,023.25 Engineering City Use Tax 59,648.50 Parks x Dr 2/26/19 y responsibility approvedplans andany comments Sec 634: of construction.It is a bco compliance review the that are contained thereon and see that the (Hourly) Landscape Additional Non habitabie«awispace below Basement structure and/or project is built in compliance with all applicable codes. Permanently open damper GIs County Use Tax x or conmaa 4.18.18 500 14,452.02 Efficiency - senaure Dae Ew��rEA h; Sec 501.15: Approved RECEIVE) ❑ Check if you are a tested owner builder(single-family homes only).You must take a test and complete the owneR{ 'M1MIh 'fait. EI-`j 44 0a4Acres Lot Area "o Deed Restricted To Issue (CITY USE ONLY)Owner builder approved by: Date: Affidavit on le Flue passageway, 1 sq in per 2000 btu/hr ALL OUTDOOR LIGHTING Reviewed By: _Date: Census Code 1 #of Dwellings 127-959-099 Plans Location Issuance OA 2G/2^1 OA/9C/ rI input MUST COMPLY WITH (CITY OF ASPENDe¢ember2B17 LG/26/1V,,a (CITY OF ASPENAagaat29=7 130 S.GALENA ST ASPEN,CO 816�1� CITY OF ASPEN January 130 S.GALENA ST ASPEN,CO 8111� HE CITY OF ASPEN LIGHTING CODE 130 S.GALENA ST I ASPEN,CO 816111 •SAe Sr Sec 409.1: SECTION 26.575.150 BUILDINGDEPARTMENT BUILDINGDEPARTMEN BUILDING DEPARTMENT Shutoff valve req'd 2015 IRC Section R1001.5, R1004: Firebox walls of masonry construction or factory built. FIRE 2015 IECC RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM PV WORKSHEET Sec R1001.9,R1001.10: SPRINKLERS CITY OF ASPEN VERSION113 UPDATED DECEMBER 13,2017 CITY OF ASPEN VERSION113 UPDATED DECEMBER 13.2017 Hearth and Extension supported by PROJECT ADDRESS: 905 Chatfield Rd.Aspen,CO 81611 PROJECT ADDRESS:905 Chatfield Rd.Aspen,CO 81611 non-combustible construction.Minimum REQUIRED Parcel ID(it 273502402004 Permit Number: 0111.2018.ARBK Parcel IDS: 2735na4e2004 Permit Number: 0111.2018ARBK dimensions:CONTACT INFORMATION Collector Solar <6 sgft opening: 16"deep,8"each side. Reviewed by Engineering DEW POINT CALCULATION Collector Tilt, Orientation ® Owner: ASPea,Degrees Degrees From Adjustment DC side capacity Inverter capacity kW for kW MMgatIon >=6 - ' i 02coos 9:00:55 AM JOB NAME Silverstein Name: Bill Bgown Silverstein City: Highland Park from Trn.$ppih credit Credit sqft opening:20"deep, 12' each side °It should be known that this review shall not F--_ ENGINEERING•CONSORT SYSTEMRADERS., Horizontal Factor (kW) (kW) relieve the applicant of their responsibility to JOB NUMBER: 17085.00 Collector Group 165 as ozone AAA m es4 752 kw Sec R1006: Aspen The co mply revthiew Boa apmoyaable v me City Address: 1589 Forest Ave State: Illinois Collector Group3 87.00% 0 0.00 kW Exterior air supply req'd. Intake no higher offered only to assist the applicant's Collector sou 3 87.00% go pp Engineering DATE: 4/19/18 P 0 0.00 kW understanding finea ceofa permit e Email: bsilverstein@mainholdingsllccem Zip Code: 60035 Collector Groups 87.00%/ 0 0.00 kW requiremucton The issuance andoher dita shell CALCS BY: JAH Collector Soups a/.00% 0 0.00 k04 than firebox pracanoOn.documents Ion other data shall Phone: Cell Phone: 773-505-0807 Collector Group 87.00% 0 0.00 kW on prevent the City of Aspen from requiring the Collector Group? 87.00% 0 0.00 kw 2015 IECC Section R402.4.2: correction orerrorsmthe construction DP@ DP@ DP@ DP@ DP@ ' ash Owner's Rep,000esaeva: Collector Group 87.00% 0 0.O0 kW - r documents and other data. oQpDOticepig CollectorGroup9 87.00% 0 0.00 kW Flue sentinel or tight fitting door req'd 20%RH 25%RH 30%RH 35%RH 45%RH 0`' ••p�7 soli Collector Group 10 87.00% 0 0.00 kW f c., o p••o rf Name: CCY Architects:Gage Reese City: Basalt Collector Group ll 87.00% 0 0.00 kw City Development Engineer's Comments 30 33 37 41 48 ' ;f. %c' er Collector croup 12 87.00% 0 0.00 kW 1.Encroachments:Any existing or planned encroachments into the public i .Y 4/19/18 01 / Address: 228 Midland Ave Box 529 State: Colorado Collector Group 13 87.00% 0 0.00 kW - right-of-way,.w 'tit. / g y,including temporary construction trailers and dumpsters,must be l 50 02 Collector Group 14 87.00% 0 0.00 kw applied for licensing at City Engineering(920-5080).Five days advance y q:• Email: greese(5ccyarchitects.com Zip Code: 81621 Collector Group 15 87.00% 0 0.00 kW Outdoor design temperature(ODT) -20 / .'4' Collector Group 16 87.00% 0 0.00 kw notice is required to obtain a temporary encroachment license. Indoor design temperature(IDT) 70 dif�go• •�1 3- Phone: 970-9274925 Cell Phone: Collector Group 17 87.00% 0 0.00 kW 2.Right-of-way Permits:Approval of these plans by the City Building Dept.is 11s SS;N 17 .A t - Collector Group 18 87.00% 0 0.00 kW for work on private property only.Design approvals for proposed work Delta T=IDT-ODT 90 1hxA,,�-. Collector Group 19 87.00% 0 0.00 kW (including landscaping)in the public right-of-way(ROW)must be obtained A.RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM Collector Group 20 87.00% 0 0.00 kW from City Engineering Dept. 920-5080 and Parks Dept. 920-5120 A Sheets showing snowmelt,pool,spa,and solar/GSHP information:I M001,M101 Total: 7.52 kW Toobtam sign on from the EnginwinpOepaNMNMBN tY 9 9 P.( ) p.( ) $Mitigation Credit:$ 51,605.24 certificate of occupancy(Col the ldloialgnpaK omtaa met permit for work in the public right-of-way must be obtained from the City Thermal Resistance of Proposed Roof Assembly Do you have snowmelt ore spa that has been exempted by the buiding official? Oyes tenter soft below on the exempt row) OO No Engineering Dept.five days in advance of when the permit is needed. Y Hydro snowmelt Electric Snowmen Pool Spa Minor Drainage Reviews 3.Mud,dirt and debris maynot be tracked onto the adjacent public ROW, Layer R-value Instructions: 1 Y (All Areas must be landscaped or stabilized per the approved plan. Existing 0.00 sgft 0.00 sgft 0.00 sqft 0.00 sgft 1)Determine how many collector groups you have.Groups are used to differentiate between collectors p and the adjacent ROW must be clean at the end of eachworkday.Construct Outside air layer 0.17 •All drainage features most be installed per the approved plans including wales Y • To be Demoed 728.00 sqft 0.00 sgft 0.00 sqft 0.00 sgft (panels)with different tilts,aspects,sizing,or inverters.If all your collectors are installed similarity,you g mud rack if needed.Trucks hauling demolished matedalsmust becovered. might have just one group. •All temporary erosion control devices must be(¢moved 2"rigid insulation(R-5/in) 10.00 Existing to Remain -72e.00 sgft _ 0.00 son 0.00 sgft 0.00 sgft _ 4.Utilities in ROW No utility pedestals,meters,or electric transformers can 2)Enter the aspect and tilt for each group.The solar orientation adjustment factor is automatically Major Dnie9a.views: 5/8"plywood 0.77 New(non-exempt) 1633.00 sgft 0.00 sgft 0.00 sgft 0.00 sgft calculated. wM'nalsaalpyel mew ededamwtNmeL be installed in the public right-of-way.Provide utility easements on private New(exempt) 0.00 sgft 0.00 agfl 0.00 sgft 3)DC side capacity is the total tabled panel output kW in a soup. •Sdat$a abtalaeneg dalidWeigtiomitessehe prowls property as needed. 7.5"spray foam insulation(R-6.53/in) 49.00 Total New 1633.00 sgft 0.00 sqft 1 0.00 sqft 0.00 sgft _ 4)Inverter capacity is the recommended input power in kW or your Inverter(s). ,DbdlagmngtolD.LIEyrCKDRobaylybipaEstUanCRamd, 5.Certificate of Occupancy(CO)Inspection:Engineering CO Inspection Total on site 905.005gft 0.00 sgft _ 0.005gft coo sgft _ 5)You will be given credit for the lesser of the labeled panel output or the inverter. .DEltdael6plh DNn tea ljderytamNtipnmdalotlla0ihjr includes but is not limited to:(a)witnessingthat all property corners A:point of Condensation analysis Total Snowmelt on site 905.00 sgft 6)The kW for credit is multiplied by the solar onedation adjustment factor to get kW mitigation credit. p p Y Boger Efficiency ss.o e I 100% 95.0% 100.0% ])The kW mitigation credit is[totalled and multiplied by$6885.32IkW to get the$Mitigation Credit DM1OnKdaeDeahN'FKK tlecaarNnbda gsdndigwake. havemonuments,(b)drainage improvements were installed as approved,(c) na in 1/2"plywood 0.638)The mitigation credit will be automatically entered into your RREMP or CREMP form.If your project has both RREMP and •Nbam OpaamsardMM aame RFnAgwnd wne signal bydaO . easements are documented,(d)no unapproved ROW encroachments exist, Mitigation Payment, $32,389.47 $ - $ i CREMP,twtll automatically divide the credits up,with priorttygmen to mitigating the CREMP payment. 5/8"gypboard 0.56 Total Payment for Mitigation: $ 3z,aes.47 IOghldeayintgowranb including sides*.turban(gutter,and As and(e)the ROW has been restored.Call 429-2750 to arrange CO inspection. B.ON-SITE RENEWABLE CREDITS Espateaea,npg be compete 6.Snowmelt Driveways:(i)Snowmelt runoff from driveway cannot flow into Inside air layer 0.61 Supplemental System REMP Credit PREPARED BY: Data: street.A grate or swale must intercept runoff before street.(ii)Snowmelt R-Total 61.74 Use PV Worksheet Photovoltaic System $ 51,605.24 Print Name: ARadl reeled d*melts haw bnn suteilted,a findlnspeeNnhnm installation in the public ROW requires an encroach-ment permit. R-value at A 1.80 Use Thermal Worksheet Hot Water Panels $ - the Engineering Depan.nfan be requestedAMMO. 7.Drainage Issues:(i)Foundation drains cannot go to a dry well receiving • Use GSHP Cert Ground Source Heat Pump $ - Signature: Other Approved System $ - aoe:TMaine.yMarithe iaMdd.q iremmwoottla lrg(et6. otherl pova ows.()City must w notified of drainage plan changes.ere.,(c) Total Mitigation Credits: $ 51,605.24 Phone&EMaIL OtlladapamnwtaylmradtlAiatdlagtpaarbwoNitEgaCO. Plan approval assumes no ground water.If ground water is encountered,call TA=Temperature at point A ensee Renewal',onsets: How manywrowaeo ofPV(solar e/eclric)woord l need? 4.72 REVIEWED: Date: the Senior Dev.Engineer at 920-5080.Call for an open hole inspection prior TA=IDT-(R-value at A)/(R-Total)'(Delta T) 67 or now many square feet of SHIN(solar hot wafer)mould'need? 144.18 to placement of the drywell. 8.No Loose Material Storage allowed in R.O.W. DPA=Dew point at point A(35%RH) 41 R-REMP payment: $ - 9.Neighbor Notification:For all excavation,the Contractor must comply with Is TA warmer than the DPA? YES Amount Previously Paid on This Permit:( neighbor notification requirements per Section 3307 of the 2003 International TOTAL R-REMP PAYMENT: $ - Building Code(IBC) Refund(includes minus$750):$ - Note:To minimize the potential for condensation problems, C. PREPARED BY: Date: 10/9/2018 Tmg7 humidity levels within the home must be properly controlled �P O 4 • +`.-����y{eft.,�A Iy ff1,.��a�� :n and adjusted based on outdoor temperatures. Print Name: Jeff Herschel u t 1{EA 4yi/^ Signature: a•/A^ w�.WjS(\Yl1802 11l6/ 11�� %PI 1Wk1h7/�i.8 J 02/26/2019 ydi RECEIVED Phone&EMail: 970-845-7910 x304-jell@raderengineenng.com FOR Colt amvuilliCe REVIEWED: JH Date: 1/22/19 ZONIKII'' justinh 04/26/2018 ASPEN BUILDING DEPARTMENT REScheck Software Version 4.6.4 1r/owe st Be Printed In Color - / licrtificate 19/2019 Gross AreCavity Cont. Z V Assembly a R Value R Value U Factor UA • /IQ KLA �oa � Perimeter justinh Above Grade Stone Wall:Wood Frame,16"o.c. 286 35.0 10.0 0.028 7 Engineers&Builders _ ,rrA Window:Wood Frame:Double Pane with Low-E 20 0.320 6 _ Project Silverstein Residence =oQPOO,,fCFy 111 Above Grade Concrete Wall:Solid Concrete or Masonry:Exterior Insulation 108 0.0 10.0 0.077 8 &A,Inc. i G5.',A'H64•;p4llr 1/4"Sloped Roof:Cathedral Ceiling 964 49.0 10.0 0.018 17 215 N.12.Street,Unit E Energy Code: 2015 IECC % jq,.4T 10/9/18 _•e rni, 3/4"Sloped Roof:Cathedral Ceiling 1,845 49.0 10.0 0.018 33 Carbondale,Colorado 81623 The City of Aspen Location: Aspen,Colorado x Construction Type: 51n le-famll g y {w 5 02 ern ,I Telephone:(970)927-5174 j Cono/lance Statement:The d building design described here is consistent with the building Tans,specifications,and other Project Type: New Construction / : 4F P propose g gn g p peel Theseplans must be keptat the //�',, ,.'W calculations submitted n .6.with the permit application.The pry requi building sts been designed REScheck k meet the 2015 IECC requirements in Conditioned Floor Area:5,010 ft2 I O k• REScheck Version 4.6.4 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. January 24,2019 Glazing Area 46% nh�Fss p•titENG`�' building site or inspection Climate zone: 7 (9922 HDD) hgr`N`__, Joshua Westerlind-Mechanical Engineer 9'^v✓r t b2 4,;,j 10/9/18 Gage Reese delays may occur.Construction Permit Date: ,, Name-Title Signature Date CCV Architects shall conform to these plans.All Permit Number: project Notes: 228 Midland Ave changes shall be approved by Construction Site: Owner/Agent: Designer/Contractor: Calcs By:Joshua Westerlind-Rader Engineering(970)-845-7910 Basalt,CO 81621 the building official. 905 Chatfield Rd Bill&Karyn Silverstein Gage Reese Aspen,CO 81611 905 Chatfield Rd. ccy architects Re:905 Chatfield Residence-Wood framinggrade Aspen,CO 81611 228 Midland Avenue near Basalt,CO 81621 970-927-4925 SEPARATE PERMITS ARE greese@ccyarchitects.com REQUIRED FOR ELECTRICAL, Dear Gage, PLUMBING,MECHANICAL,OR FIRE SPRINKLER WORK Compliance:Passes using UA trade-off The purpose of this letter is to document the requirements for moisture protection of wood Compliance:6.2%getter Than Code Maximum UP: 1278 Your UA:1200 framing near grade on the above referenced project.The following requirements shall be The%utter or Worse Than Cme Index reflects how close to comp Nance the house is based on cone erase-off rules. followed: It p n provide estimate of energy a b relative to mnimua n ome 1) All wood material within 6"of grad shall be preservative treated lumber. Envelope Assemblies 2) The exterior waterproofing membrane shall extend up walls a minimum of 6"above grade. Gross Area cavity coot. 3) Capillary break shall be used to separate concrete from wood materials. Assembly or R-Value R-Value U-Facr UA Perimeter to Please let me know if there are any questions. Floor Over Crawl Space:All-Wood Joist/Truss:Over Unconditioned Space 1,855 38.0 0.0 0.026 48Floo \\\\\\\\ Slabr Over Outside:All-Wood On Grade:Slab-On-G ade:U eated ver Outside Air 68 83 49 0 10.0 0.684 57 Sincerely, / ''''' DO 1�pD Fy�l , Insulation depth:6.0' J 1 ' Below Grade Wall:Solid Concrete or Masonry1,029 14.0 10.0 0.032 33 • Wall height:9.5' 42674 p4 Depth below grade:9.5' Dan Doherty,P.E. / Insulation depth:9.5' Below below pre(cn/duct):Solid Concrete or Masonry 244 0.0 10.0 0.051 12Wall rieWe Principal /�//�II 1,\O\A ``-2� kawiowe. Dept Insulation depth:9.5' 02/26/2019 iv Below rake: ail at Crawl Space:Solid Concrete or Masonry 95 14.0 0.0 0.049 514/2019Depth below grade:9.5' COLtG JMPJ ` Insulation depth:9.5' IFORCODEC MJANCE justinh Above Grade Wall:Wood Frame.16"o.c. 5,253 35.0 5.0 0.035 86 justinh Window:Wood Frame:Double Pane with Low-E 2,193 0.320 702 Glass Door:Glass 409 0.320 131 Solid Door:Solid 180 RECEIVED RECEIVED RECEIVED Project Title:Silverstein Residence Report d2ltQ/bPJ°�JP@18 Project Title:Silverstein Residence Report dxl[2/ti,00318 Data filename:J:\jobs\2017-jobs\17085.00-Silverstein Res\Mechanical\Calculations\REScheck\17085- Page 1 of10 Data filename:j:Uobs\2017-jobs\17085.00-Silverstein Res\Mechanical\Calculations\REScheck\17085- Page 2 of 10 02/14/2019 REScheck.rck ASPEN REScheck.rck ASPEN BUILDING DEPARTMENT BUILDING DEPARTMENT Page 1 of 1 ASPEN BUILDING DEPARTMENT he SPECIAL INSPECTION AND TESTING AGREEMENT 5. Provide Final Inspection Report.The special inspector shall submit a written final report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection. To permit applicants of project requiring special inspection andbr testing per Section 1704 of the ' ;lpprnvnl orhrhrilnrnr.Asican Well hrIwo,time iwenvof11i:lalun.am',u,w,w International Building Code(IBC). B.Owner Responsibilities.The project owner,the engineer or architect or record,or an agent of the pmsivinml mil qunldyermhal nmmmb soil p dddk:whim(ofCNlicnikm promo:bs owner is responsible for employing special-inspection services.The special inspector\agency shall an annoyed epo;i;l imrwninn ertm.y, Project Address: 905 Chatfield Permit Number:0111.2018.ARBK not be in the employ of the contractor,subcontractor or material supplier.[IBC Sec 1704.1]In .i. CMnpINlun nrnnwlcnno,.upon mn,phu,m nr nn„Irnunr.Ira•ggwnea Mk hasher case of an ownedcontractoq the special inspector\agency shall be employed as specified by the dull atoll eeninrnu.m'ea,rNlimmcI Ill.bnlldinl;,Afainl Mule drat Mcleod sma BEFORE A PERMIT CAN BE ISSUED:The owner,or the engineer or architect of record,acting as the building official. pufunnMi In nemalmn:wino pw rgmrnwd r,n,docrina Amvmrn owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing Schedule,including the required acknowledgments.A pre-construction conference with the parties C.Engineer or Architect of Record Responsibilities G.lialldloo Neperlmml llnp.slblllOn involved may be required to review the special-inspection requirements and procedures. 1. Prepare special inspection program.The engineer or architect of record shall list the I, Algnayenprelnl•hnperllan program.TIN huilI@delonmrnl sell swum ell APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the items for which special inspection is required;and shall indicate any items for which the .gaunl impe tan arid spxInl.hrpedlnn regoh=oanls. projects for which they provide special inspections.Special inspectors shall be approved by the building IBC or the building official approves periodic inspection and the frequency of such z. linnrrre npeedl bun=dbd,,wink n,pdrive sla,;iul inniacliaa ram leo building departmentpriorto performing any duties.Special inspectors shall submit their qualifications and are inspections. Inspe=mr shnlhrmliliirilm lethatimme ofspecinl insprmrs Itr:lliernpianw6 h, subject to personal interviews for pre-qualification.Special inspectors shall display approved aldilion I•Ihal of Ile Rweel imlreclrn,uorI be nldnhwil pirx to plaoaann nl'emn rib: identification,as stipulated by the building official,when performing the function of special inspector. 2. Respond to field discrepancies.The engineer or architect of record shall respond to manta];nrshngnml sun'c roller Smiler nmmurds. uncorrected field discrepancies in design,material,or workmanship observed by the Special inspection and testing shall meet the minimum requirements of the International Building Code special inspector. 1. Rrvlcm Inspallin rmnrkc'I On mrilrlinp ollleinl sbn°I I n:vlMvenevid iusp uric, Section 1704.The following conditions are also applicable: pq'Kmaml final locals. A.Duties and Responsibilities of the Special Inspector 3. Review shop drawings and submit design changes.The engineer or architect of record spec on, B polies.n, nail shall acknowledge and review for conformance with the construction drawings those 4. approval fora In II 1'lle l Oil al uthrdPMli Ie din Pool iagrmimrI opyiooa Mnlaor=dplllllc=.IIPl.1.Iprlln lbr PM rynJabiir.Fnion ulxxl lmr heel 1. Signify presence at job site.Special inspectors should notify contractor personnel of and drawings spe special-inspection may dettionil structural information,ocume shall submit to the building oauthorized mvinruteMlrygmmCn. theirand res onsibilities at the job site.If required b the building official,the and toat the from approve agency written documentation of any verbally authorized presence p J q y g o y deviations from the approved construction documents,and shall submit revised 905 Chatfield 0111.2018.ARBK shall sign in on the appropriate form posted with the building permit. documents for building official approval as required. I•rnjrci AAAresr,,,,. , _ „•,•_Irn,dl rcn,mhrr: _ 2. Observe assigned work.The special inspector shall observe assigned work for D.Contractor Responsibilities conformance with the building department approved(stamped)design drawings, p Al%NfINLI?nCA1Y.81:5 specifications,and applicable workmanship provisions of the International Building 1. Notify the special inspector.The contractor is responsible for notifying the special - I lrnw•rend nnda:ru ,eply with lbcemdillrvn;,f OM nglrriasa, Code.Architect\engineer-reviewed shop drawings may be used only as an aid to inspector or agency regarding individual inspections for items listed on the attached inspection. schedule and as noted on the building department approved plans.Adequate notice shall i(tt:������(/�����•+'p�e�n�al I ape=f Agu .gnnmm: PrinMJ vaua: f�lion. be provided so the special inspector has time to become familiar with the project. '"`�rysG-GGW� ✓^f - /2�For continuous special-inspection,the special inspector shall be on site at all times 1n ��/ observing the work requiring special inspection.Periodic inspections,if any,must have 2. Provide access to approved plans.The contractor is responsible for providing the own 5ignuhr. Pr Inn Mm,w prior approval based on a separate written plan reviewed and approved by the building special inspector access to approved plans. 1_.'1' a f'Jg• o' department and the engineer or architect of record. _ _ ___ W t I M _ la 3. Retain special inspection records.Upon request,the contractor is also responsible for 3. Report nonconforming items.The special inspector shall bring nonconforming items to tolattheel 6raalow I4inmINwas Owe: retaining,at the job site,all special inspection records completed by the special inspector. • the immediate attention of the contractor and note all such items in the daily report.If KL&A,Inc CM V.I,A3 Dan Doherty 4/19/18 any item is not resolved in a timely manner or is about to be incorporated in the work,the E.Inspection of Fabricators ._ • special inspector shall immediately notify the building department by telephone or in 01,InmMM: Sign iwr: ••. Minot N.anc: . lbw person,notify the engineer or architect,and post a discrepancy notice. 1. Fabrication of structural assemblies and members.Where fabrication of structural / 1 /I I '/ r load-bearing members and assemblies is being performed on the premises of a r(j-b4.&i�r .]ihx,h. - _^"r+ ..,,,,,ill_____ .--'..i,: _--_.. 4. Provide timely reports.The special inspector shall complete written inspection reports fabricator's shop,IBC Section 1704.2 shall require special inspection of the fabricated r for each inspection visit and provide the reports on a timely basis determined by the Anauw+Ala lunar. Si °' x14Nlnn•,: pc. _ building official.The special inspector or inspection agency shall furnish these reports items. directly to the building official,engineer or architect ofrecord,and others as designated. 2. Fabrication and implementation procedures.The special inspector shall verify that n ThMIc� % -rt�I//t--L____ "' [IBC Sec.1704.1.2]These reports should be organized on a daily format and may be the fabricator maintains detailed fabrication and quality control procedures that provide a iupuexvl',abdomen Sigioure. Pi nlnl tiarm: - Mr submitted weekly at the option of the building official.These reports should include: basis for inspection control of the workmanship and the fabricator's ability to conform to a.Description of daily inspections and tests made with applicable locations, approved construction documents and reference standards.The special inspector shall - ..-- ..- - b.Listing of nonconforming items, review the procedures for completeness and adequacy relative to code requirements for I Atoms I4imel thaw Dub c.Report on how nonconforming items were resolved or unresolved as fabricator's scope of work. fc i=' applicable, I," JH Justin Hahn 1/22/1�jr/r►•E111EC�d.Itemized changes authorized by the architect,engine ,and building official if F.Approved Fabricator Responsibilities ---------- EfAsyneger))not included in nonconforming items. 1, Fabrication exempt inspections.Special inspections are not required where work is •I 1 done on the premise of a fabricator registered and approved to perform such work 04126/w� EIVED 02/26/2019 without special inspection. KN FORCOOt.! LIANCE 2 RIRI min nPPaN M1,fr�13/2D18 s' ' justinh ASPEN BUILDING DEPARTMENT