HomeMy WebLinkAboutFile Documents.121 E Hyman Ave.0149.2018 (106).ARBK DATE:05-18-18 MASTER PERMIT: PERMIT NUMBER:0149.2018.ARBK Field Plan Set Must Be Printed In Color
COMMUNITY DEVELOPMENT DEPARTMENT li ADDRESS: 121 E.Hyman Avenue PERMIT NUMBER:
BUILDING PERMIT APPLICATION THE CGryoFAsrri COMMUNITY DEVELOPMENT DEPARTMENT CITY OF ASPEN
PROPERTY INFORMATION ' BUILDING PERMIT CONTACT SHEET T„r Car.AsEN PERMIT NO.0149.2018.ARBKIII \
000nrss 121 E.Hyman Avenue UNIT PARCEL MP 2735-124-71-002 Name Luis Menendez Phone 970544-4851 e.miR LAMoMenendezArchitects.com OWNER CAYTON ANDREA TRUST
LOT E&F BLOCK 69 ogRAsueolvlsloN Ute West Townhomes Lot:A
OWNER NAME Andrea Ceylon Trust CELL EMAIL andrea@cayton5.com same Tim O'Connell Phone 970-618-9482 c-man toconnelkWhansenhomecare,com ADDRESS 121 E HYMAN The City of Aspen
NAMEernacr Luis Menendez CELL 970-948-8347 EMAIL LAMtMenendezArchitects.com Name Andrea Carton Trust Phone CeRPhone PARCEL ID These plans must be kept at the
• Mailing
PROJECT DETAILS Addmss 2379 Earls Court cur Los Angeles state CA up 90077 273512471002
building site or inspection
wortlRciii orrnn Exterior and interior remodel resulting in 5 bedrooms,5 baths,1 powder room,storage,laundry,mechanical, naa°:I:: endrea(Oijcevlon5.com delays may occur.Construction
family room,garage,kitchen,living/dining,outdoor deck.Replace all finishes,insulation and windows. Name Luis Menendez phone 970-544-4851 Coll Phone 970-948-8347 ENCES FROM 2 shall conform to these plans.All
CV/A=crawls Ion required,sec.R4 quired,R408.4 changes shall be approved
vnwn(TON$4,132,000 Use of Building Class of Work Fixture Counts Equipment Checklist mares,715 W.Main Street,Suite 104 city Aspen sloth ne 8 81811 g pp by
0 Commerical 6 Toilets,Bidets EE=emergency escape required sec R310.1
❑New Forced the building official.
55Q0 nit as 4,132 ❑ Multi-Famy �eathtub E-all LAM@MenendezArchitects.com EU=enclosed usable space under stairs shall be'A"Gyp,sec R302.7
w0 EA IY 0Addition Wall,Suspended,or Unit Heaters Atldress
0 Single Family ®Alteration �Wvatory(Wash Basin) -Gas Log G/D=garage/dwelling separation,sec R302.5 and R302.6
uesnsarr 4,132 0 Mixed-Use 2shhower STC=Sound transmission class not less than 45 at dwellingseparations,a
❑Repair 1 Kitchen Sink(+Disposal)2-Gas Appliancew Name Architect Phone Cell Phone p Pp
Lorent ® Duplex 0 Tena Dishwasher 3 Appliance Vents Img K
Isg rTl 3,060/6,000 ❑Tenant Finish 2 Laundry Bar,utility sink 2 Heat,Refrig,Cooling,or ndVA my state ZIP RV=roof and rafter ventilation required,R806.1 SEPARATE PERMITS ARE
DISTURBED 2 800 Will there be 0 Demolition 2 Clothes Washer Absorption Unit A=attic access 22"x 30",30"headroom above,R807.1 REQUIRED FOR ELECTRICAL,
cerrnunAeEA any roof/wall ❑Change Order- Floor sink 2 Boilers(includes vent) nd`DE SA=smoke alarms installed to NFPA 72 requirements,sec R314 PLUMBING,MECHANICAL,OR
penetrations? ❑ Floor Drain Handling Unit CO=carbon monoxide detectorper CityOrdinance 41 series 2008
NEW SQ FT 0 ®Yes �1 water Heater(Pan Req)__-- Air Systerns FIRE SPRINKLER WORK
a Gas outlets 10 Ventilation Fans Name Luis Menendez phone 970-544-4851 co Phone 970-948-8347 SG=safety glazing required,sec R308A
s rror Rooms 718 ❑NO Water Treatment Iing GR=guardrails,36"min ht,4"max opening; at 30"drop
w9rx untm woRK 1 Range Hood g p g:req any point w/in 36"
_other atiaress 715 W.Main Street,Suite 104 c Aspen sue,CO op 81611
p of Gas System Ou[le -- ^y horizontally,sec R312
ZONE DISTRICT RMF -1-Snowmelt System Sq Ft 280 ga2;ela: LAMQMenandezArchitects.com WFP=window fall protection-operable window<24"AFF&>72"above SMOKE ALARMS AND
grade:use opening control device listed to ASTM F2090,sec R312.2 CARBON MONOXIDE
H Projectraluata l
Cost of project as defined in Valuation Affadavit. NOTICE:This penult becomes null and v Name Pinnacle Design(Hans Brucker) phone 970-963-2170 con Phone 970-618-4427 HR=handrails 34"-38"ht,sec R311.7.8 DETECTORS REQUIRED
Z Sq Ft of Work Area:Total square footage of area undergoing change or reconfiguration. void if work or construction authorized - Si=stairway illumination,sec R303.7
0 ttS Ft:Gross Foota tFAR,of tted unit. i:nmcommenced within[eodays,orng 0805 Buck Point Road THROUGHOUT DWELLING
q garde ge,no perm' it construction or work is suspended or Srnaeress _el Carbondale state CO ZIP 81623 PD=protect against decay,sec R317
Lot Slxe:Total surveyed square footage of property. abandoned for a period of too days at REFERENCES FROM 2015 IMC UNIT PER CITY OF ASPEN
? Disturbed Exterior Area:Square footage of lot affected by permit application. y e after work is commenced., -all innaCledesi n so rls.nel
ENew Sq Ft:Total added squarefootage for additions to net livable or net leasble s address P 9 R P V=bathroom and balanced whole house mechanical ventilation req.q g pace. an time q MUNICIPAL CODE 8.15
p Sq Ft of Rooms with Utility Work:Total square footage,not FAR,of all rooms with plumbing work. Re- Ordinance 40,2016
APPROVALS viewer same Ernest Kollar Engineers Phone 970-963-3223 cell Phone DE=clothes dryer exhaust,sec 504.Makeup air req'd if over 200 CFM
,ng nerds s DMe Iling SPECIAL INSPECTION REQUIRED:
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES o oarcmhnt aewew In 05/2 3 neamss 320 Main Street,Suite 203 clry Carbondale state CO ZIP 81623 AS=make and service space he for exhausts
re ter th,sec 306
PC X SV OS/23/ 18 MA=make up air required if hood exhausts greater than 400 CFM,sec 505.2
Plan Check Permit Fee Parks Impact 0 n5reiss erniekollar@sopris.net ET=exhausts terminate 3'from prop line and openings,10'from intakes, Structural steel welding:Field&Shop
91876.25 64425.00 zoning x BN 3/7/20-9 501.3.1 -High strength bolting
Zoning(so%) 1 IT=intake openings 10'from lot line&contaminant sources(vents,
Engineering school Ded. 0 HPC Name Hansen Construction Phone 970-920-1558 cannon,970-618-9482streets), -Epoxy anchors
5555.21 3202.30 Building X TF 3/13/13 401.4
CMP(50%) Fire X TF 3/13/1/ ^dare 310 Aspen Business Center cue Aspen sate CO z,. 81611 Do fasten and seal all ductwork per 603.9 -Intumescent paint
Zoning(50%) TDM Impact 0
3202.30 2210.62 Engineering x di 3/19/1 I E-mall REFERENCES FROM 20151FGC -Spray applied fire resistive materials
Ped.Amenity Address toconnell(Oi3hansenhomecare.com DV=direct vent req'd,sec 303.3 -Permanent micro files
Energy Code REMP O CMP X TK 3/22/1 3q P
9663.75 Water X SW 3/25/13 CA=combustion air not taken from bedrooms,bathrooms or
Plan Check INSPECTIONS:The General Contractor must schedule inspections online. storage sec 303.3
CMP(so%) Housing Cash m Lieu g Stormwater X AR O 5/31/_8 9 Special inspection is required per 2015 IBC
2210.62 (Hourly) Please visit www.aspenpttkin.com/Departments/community-Development-Forms/to do so. OD=outdoor appliances must be listed for outdoor use,sec 303.6
Zoning Sanitation X PM 06/07/ 18 !hereby certify that I have read and examined this application and know the same to be true and correct.All provisions of laws and section 1704.Inspector to verify that copy of
Parks Review Stormwater ordinances thistype of work will be complied with whether specified herein or not.The granting f apermit does not REFERENCES FROM 2015 IECC
91.80 (Hourly) Env.Health governing piegran'ng D F=new or replacement glazing shall not exceed 0.28 U-Value,NFRC label agreement for inspection program to be on
Engineering Parks X DR 3/21/1'i presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance the job site prior to performing an
Utility Review City use Tax et construction.It Is m required,Ordinance 40,2016 1 P P 9 y
500.00 (Hourly) 42336.OC y responsibility to review the approved plans and any comments are contained thereon and see that the
Landscape L=75%of lamps in permanently installed lights must be high efficacy,sec inspections.A copy of all Special Inspector
GIs County Use Tax 10330.OQ Efficiency X RM sCtor structure
and/or r t' tin cam fiance with all applicable codes. R404.1 field reports to be on the job site for
Approved Ignature PS c,LInh L,/{ 115 C�k7$:4 05-18-18 � �ED SE=Continuous air barrier required;all exterior joints,cracks,and holes to be
'thf"'�' it
check if u fy tic rs'review if requested.Failur
6,000I3,060Lot Area Deed Restricted To Issue .F ❑ You are a tested o single-family homes on ).You must take a tes complete the owner/ caulked,gasketed,sealed,table R402.4.1.1
(CITY USE ONLY)Owner builder approved by: Date: Affidavi REFERENCES FROM 2014 NEC y result in denial of in
9 39 Census Code #of Dwellings BB Plans Location Issuance _ EP=electric panel'happy space'30"x36"x78",not in storage,sec 110.26
(CITY OF ASPEN December auuT 130 S.GALENA ST ASPEN, CO 816111 CITY OF ASPENAuguesaour 130 S.GALENA ST ASPEN,COV1411.1-8 S0.1 structural steel,high-strength bolting
BUILDING DEPARTMENT BUILDING DEPARTMENT
FIRE External ergy Use Approv
SPRINKLERS 0 RREMP ❑ CREMP
REQUIREDPERMIT#: 0149.2018.arbk DATE:3/7/2019
SNOWMELT:1324 existing,585 new,1909 total on site
POOL: 0
SPA: 55 sgft
REMP SHEET: A701
MINIMUM BOILER AFUE: 95%
OFFSET: 0
REVIEWED BY: TF
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be one separate zone.A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow meted or R5
insulation shall be installed under and at the slab edges.(Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50"F and no precipitation is falling.(2009 IECC
Sec.403.E&503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40.F.(20091ECC Sec.403.8&503.2.4.5)
-Inspection by testing hydrostatically at VA times max system design
pressure,but not less then 100psi,for 15minutes.
1208.1)
Call for inspection to document area of existing snowmelt
The following criteria must also be met with construction: after piping is exposed.
➢A construction fence must be erected along the entire dripline of Tree protection fencing is required at the drlplines of all trees shown.
all trees on site and any tree canopy from neighboring property. There is NO activity allowed within this fenced area,in<ludin&but not
(This will serve as the tree protection zone(TPZ).This fence is to limited to:digging,storage of material,equipment,machinery,foot or
be constructed in such a manner that the area inside the dripline is vehicle traffic.
protected.AN INSPECTION OF THIS FENCE MUST BE
PERFORMED BEFORE ANY CONSTRUCTION OR DEMOLITION Please contact the City Forester or his designee at 9205120 for an
(ACTIVITIES BEGIN.PLEASE ARRANGE THIS INSPECTION Inspection of this fencing Prior to any activity.
WITH BEN CARLSEN AT 429-2034. If the need arises to perform any activity in the tree protection area,please
➢No materials may be stored in the TPZ,including but not limited contact the C;ry Forester and you will bet given specific instructions as as
to,construction backfill,construction traffic,or any other
how to proceed to minimize impacts to the tree root zone.
'construction materials.
➢No excavation,grading or trenching may occur within the TPZ
without the consent of the City of Aspen Forester or his designee.
I➢No parking of vehicles or equipment may occur in the TPZ. ,,,.,,,,,,R _ ..„_".e°.°,:/ 47„.,. _ .,e. �".
➢No dumping of any waste products may occur in the TPZ. � .""min p
➢Any roots cut during excavation shall be pruned with sharp ._min":.�,
loppers/pruners back to the soil line.The roots will further be
'protected by burlap draped over the side of the excavation •YM . 'it °"°0°°,,CC1 ,
covering the exposed roots.This burlap shall be kept moist until „, ,y`� yy ,,, •-""^_°^^•-
the excavation is backfilled. .wa u `'
Eialr
I➢Pruning to provide clearance for construction activities shall only ""- Fik s y':"�Yy
be done under the direction of an red ont >w.�=o=' \ n��
-,,
�' 0.m...
➢Site inspections shall be performed a weekly basis,to ensur ----a,,,;; ----1 a
the above listed conditions are met. I _ '�
➢Any unapproved improvements or activities outside of those
approved within this permit will be subject to mitigation in the form '��' \ I -����„,( �s-.
of restoration. _•_ ' _,,,,„„ ,
➢This permit must be posted on site during the construction °""°'" ♦ C;ryor Aspen-Tree PlannngsPecmcannhs °°�
�/ ,mow
'process. \l City of Aspen-Tree Protection Zone „„,Z,s„°,P
RECEIVED
5/23/2018
ASPEN
BUILDING DEPARTMENT
m ist Be Printed In Color
2. Approval of fabricator.Approval shall be baud upon review of the fabricator's written t-'-
En Omni ASPEN SPECIAL INSPECTION AND TESTING AGREEMENT 411 procedural and quality control manuals and periodic auditing of fabrication practices by 2. Approval of fabricator.A al shall be based upon review of the fabricator's written
an approved special inspection agency. ocedua ppmv p
To permit applicants of project requiring special inspection anchor testing per Section 1704 of the procedural sandectialrmspeuty tion agency.
rol Is and periodic auditing of fabrication practices by
International Building Code(IBC). 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator an approvedp pact g y. \."-
shall submit certificate of compliance to the building official stating that the work was 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator \
Project Address: 121 E.Hyman Avenue Permit Number: 0149.2018.arbk performed in accordance with the approved construction documents. shall submit certificate of compliance to the building official stating that the work was
performed in accordance with the approved construction documents.
BEFORE A PERMIT CAN BE ISSUED:The owner,or the engineer or architect of record,acting as the G. Building Department Responsibilities
The City of Aspen
owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing G. Building Department Responsibilities
Schedule,including the required acknowledgments.A pre-construction conference with the parties I. Approve special-inspection program.The building department shell approve all
special inspectors and special-inspection requirements.
involved may be required to review the special-inspection requirements and procedures. 1. Approve special-inspection program.The building department shall approve all These plans must be kept at the
2. Enforces special Inspection.Work requiring I ins d the building special inverters and special-inspection requirements.
APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the P P q gecial i ctors.n an g building site or inspection
inspectoroto
monitor the al inspector,
of special inspectors.to pi cr approval,in 2. Enforce Oral inspection.Work requiring special inspection and the building projects for which they provide special inspections.Special inspectors shall be approved by the building addition to that of the special impactor,must be obtained prior to placement of concrete, a spa sp gming spa p g delays may occur.Construction
department prior to performing any duties.Special inspectors shall submit their qualifications and are comingof structural steel,or other similar materials. inspector shall monitor the performance of special inspectors.His\Her approval,in
subject to personal interviews for pre-qualification.Special inspectors shall display approved addition to that of-the special inspector,must be obtained prior to placement of concrete, shall conform t0 these plans.All
p p` q P P u y PP covering of structural steel,or other similar materials. changes shall be approved by
idantification,as stipulated by the building official,when performing the function of special inspector. 3. Review inspection reports.The building official should review special-inspection
progress and final reports. 3. Review ins tion reports.The building official should reviewspecial-inspection
the building official.
Special inspection and testing shall meet the minimum requirements of the International Building Code pec poi g o
Section 1704.The following conditions are also applicable: 4. Perform final Inspection.The building official should perform the final inspection and progress and final reports.
approval for a project[IBC Sec.109.3.1]after the final special-inspection report km been 4. Perform final inspection.The building official should perform the final inspection and
A. Duties and Responsibilities of the Special Inspector reviewed and approved. fora Pct[IBC Sec.109.3.1afterheSoulspecial-inspection rthasbeen SEPARATE PERMITS ARE
approvalproject ] repo
1. Signify at site.Special actors should Anti tractor personnel reviewed and approved. REQUIRED FOR ELECTRICAL,
g ypresennd 1 pecia p notify con personae Project Addreu: 121 E.Hyman Avenue Permit Number: 0149.2018.arbk PLUMBING,MECHANICAL,OR
their presence and responsibilities at the job site.If required by the building official,they
shall sign in on the appropriate form posted with the building permit. Project Address: 121 E.Hyman Avenue Permit Number: 0149.2018.arbk FIRE SPRINKLER WORK
2. Observe assigned work.The special inspector shall observe assigned work for ACKNOWLEDGMENTS
conformance with the building department approved(stamped)design drawings, I have read and agree to comply with the conditions of this agreement. ACKNOWLEDGMENTS
specifications,and applicable workmanship provisions of the International Building
Code.Architect\emgineer-reviewed shop drawings may be used only as an aid to Special Inspection Agency: Signature' Printed Name: Date: 1 have read and agree to comply with the conditions of this agreement.
inspection.
Special Inspection Agency: Signature: Printed Name: Date:
For continuous special-inspection,the special inspector shall be on site at all times n o I o 0� m I}
observing the work requiring special inspection.Periodic inspections,if any,must have Owner: S' Printed Name Date _ f'I.�U Ulf O U IS
prior approval based on a separate written plan reviewed and approved by the building Andrea Cayton Trust Andrea Ceylon 'LLL'JJJ"LLLJJJ['
department and the engineer or architect of record. Yt 05-18-18 _ Owner: Signature: Printed Name Date OI�I1,1117/ 9 J
3. Report nonconforming items.The special inspector shall bring nonconforming items to Engineer/Architect: ignature: Printed Name: Date: Andrea Ceylon Trust Andrea Cayton OS-18-18 F
the immediate attention of the contractor and note all such items in the daily report.If Ernest Kollar Engineers Ernest Kollar 05-18-18 ZONING
any item is not resolved in a timely manner or is about to be incorporated in the work,the Engineer/Architect: Signature: Printed Name: Date:
special inspector shall immediately notify the building department by telephone or in Ernest Kollar Engineers Ernest Kollar 05-18-18
person,notify the engineer or architect,and post a discrepancy notice. Contractor. Signature: Printed Name: Date:
Hansen Construction Tim O'Connell 05-18-18 Contractor: Signature: Printed Name: Date:
4. Provide timely reports.The special inspector shall complete written inspection reports
for each inspection visit and provide the reports on a timely basis determined by the Approved Fabricator: Signature: Printed Name: Date: Hansen Construction '' / Tim O'Connell 05-18-18 •OUTDOOIGHTIN
building official.The special inspector or inspection agency shall furnish these reports
directly to the building official,engineer or architect of record,and others as designated. Approved Fabricator: sigaatnm: Printed Na+tie: Data: MUST COMPLY WITH
[IBC Sec.1704.1.2]These re should be organized on a daily format and may be pprove
parts s ou ganize y y t _-- --- r p
submitted weekly at the option of the building official.These reports should include: Inspected Fabricator: Signature: Printed Name: Date: £CopfsP / I ✓ - ---___- -S/7° 1 --
Description of daily inspections and tests made with applicable locations, g" ' <-�""-'� Y _ THE CITY OF ASPEN LIGHTING CODE
b. Listing of nonconforming items, Inspected Fabricator: S'n ( Printed Name: Dare: SECTION 26.575.150
c. Report on how nonconforming items were resolved or unresolved as ,,,,__/'// ,y� �, /
applicable, (circle one) Signature: Printed Noma Dale: ND��IAA01)lMJ SCGfT�./z.CA.C(1(J/,SS//(Q(/g
d. Itemized changes authorized by the architect,engineer,and building official if/'� �y
not included in nonconforming items. RECEIVED (cirele o1re�"1 , Sig
nature: Printed Name: Date:
5/23/2018 , RECEIVED Pass RECEIVED
5/23/2018
ASPEN 3 5/23/2018
BUILDING DEPARTMENT ASPEN
BUILDING DEPARTMENT ASPEN
BUILDING DEPARTMENT
2. Approval of fabricator.Approval shall be based upon review of the fabricator's written
5. Provide Final Inspection Report.The special inspector shall submit a written final procedural and quality control manuals and periodic auditing of fabrication practices by
report documenting required special inspections and correction of any discrepancies an approved special inspection agency.
noted in the inspections prior to the final building inspection. 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written
3. Completion of fabrication.Upon completion of fabrication,the approved fabricator procedural and quality control manuals and periodic auditing of fabrication practices by
B. Owner Responsibilities.The project owner,the engineer or architect or record,or an agent of the shall submit certificate of compliance to the building official stating that the work was an approved special inspection agency.
owner is responsible for employing special-inspection services.The special inspector\agency shall performed in accordance with the approved construction documents.
not be in the employ of the contractor,subcontractor or material supplier.[IBC Sec 1704.11 In 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator
case of an owner\contractor,the special inspector\agency shall be employed as specified by the G. Building Department Responsibilities - shall submit certificate of compliance to the building official stating that the work was
building official. performed in accordance with the approved construction documents.
1. Approve special-inspection program.The building department shall approve all
C. Engineer or Architect of Record Responsibilities special inspectors and special-inspection requirements. G. Building Department Responsibilities
1. Prepare special inspection program.The engineer or architect of record shall list the 2. Enforce special inspection.Work requiring special inspection and the building 1. Approve special-inspection program.The building department shall approve all
items for which special inspection is required;and shall indicate any items for which the inspector shall monitor the performance of special inspectors.His\Her approval,in special inspectors and special-inspection requirements.
IBC or the building official approves periodic inspection and the frequency of such addition to that of the special inspector,must be obtained prior to placement of concrete,
inspections. covering of structural steel,or other similar materials. 2. Enforce special inspection.Work requiring special inspection and the building
inspector shall monitor the performance of special inspectors.His\Her approval,in
2. Respond to field discrepancies.The engineer or architect of record shall respond to 3. Review inspection reports.The building official should review special-inspection addition to that of the special inspector,must be obtained prior o placement of concrete,
uncorrected field discrepancies in design,material,or workmanship observed by the progress and final reports. covering of structural steel,or other similar materials.
special inspector. 3. Review inspection reports.The buildingofficial should reviewspecial-inspection
4. Perform final inspection.The building official should perform the final inspection and pec poi o
3. Review shop drawings and submit design changes.The engineer or architect of record approval for a project[IBC Sec.109.3.1]after the final special-inspection report has been progress and final reports.
shall acknowledge and review for conformance with the construction drawings those reviewed and approved.
shop drawings that may detail structural information,shall submit to the building official 4. Perform final inspection.The building official should perform the final inspection and
approval for a project[IBC Sec.109.3.11 after the final special-inspection report has been
and to the special-inspection agency written documentation of any verbally authorized reviewed and approved.
deviations from the approved construction documents,and shall submit revised Project Address: 121 E.Hyman Avenue Permit Number: ppro
documents for building official approval as required.
Project Address: 121 E.Hyman Avenue Permit Number: 0149.2018.ARBK
D. Contractor Responsibilities ACKNOWLEDGMENTS
1. Notify the special inspector.The contractor is responsible for notifying the special I have read and agree to comply with the conditions of this agreement. ACKNOWLEDGMENTS
inspector or agency regarding individual inspections for items listed on the attached
schedule and as noted on the building department approved plans.Adequate notice shall Special Inspection Agency: Signature: Printed Name: Date: I have read and agree to comply with the conditions of this agreement.
be provided so the special inspector has time to become familiar with the project.
Special Inspection Agency: S'n Printed Name: Date:
2. Provide access to approved plans.The contractor is responsible for providing the x-t� ,,,,__//// ,yt_
special inspector access to approved plans. Owner: Signature: Printed Name Date ` Z14W NOC _ Jeth".L.ri blgie//,.'0,146
3. Retain special inspection records.Upon request,the contractor is also responsible for Owner:` Signature: Printed Name Date
retaining,at the job site,all special inspection records completed by the special inspector. Andrea Cayton Trust Andrea Cayton 05-18-18
Engineer/Architect: Signature: Printed Name: Date:
E. Inspection of Fabricators Ernest Kollar Engineers,Inc. frneat Kollar' Ernest Kollar 5/18/2018 Engineer/Architect: Signature: Printed Name: Date:
1. Fabrication of structural assemblies and members.Where fabrication of structural Ernest Kollar Engineers Ernest Kollar 05-18-18
load-bearing members and assemblies is being performed on the premises of a Contractor: Signature: Printed Name: Date:
fabricator's shop,IBC Section 1704.2 shall require special inspection of the fabricated Contractor: Signature: Printed Name: Date:
items.
Hansen Construction Tim O'Connell 05-18-18
2. Fabrication and implementation procedures.The special inspector shall verify that Approved Fabricator: Signature: Printed Name: Date:
the fabricator maintains detailed fabrication and quality control procedures that provide a Approved Fabricator: Signature: Printed Name: Dale:
basis for inspection control of the workmanship and the fabricator's ability to conform to _ ///��� - T
approved construction documents and reference standards.The special inspector shall ,a cOq r f S( /✓ s✓C / -��_/Mcg�_-_ S /e /
review the procedures for completeness and adequacy relative to code requirements for Inspected Fabricator: Signature: Printed Name: Date: - /_// -
fabricator's scope of work. Inspected Fabricator: Si�iah' Printer'Name: Date:
F. Approved Fabricator Responsibilities _._ _M. •�n_ - - •- '�
(chap - Signature: Printed Name: Date: :" '/' /� f
1. Fabrication exempt inspections.Special inspections are not required where work is a - • (circle\re)h Signature: ,/ Printed Name: Date:
done on the premise of a fabricator registered and approved to perform such work r PI •• a' Y: RF.( F��F D Q�fY OF ASPEN 3/12/19
without special inspection. RECEIVED PITKIN COUNTY: DAM DENIS MURRAY
2 5/23/2018 3 5/23/2018 3
ASPEN
ASPEN BUILDING DEPARTMENT
BUILDING DEPARTMENT