HomeMy WebLinkAboutFile Documents.520 E Hyman Ave.0158.2018 (50).ARBK Field Plan Set Must Be Printed In Color
DATE:ov3v2o1s MASTER PERMIT: PERMIT NUMBER:oss l .zote.ARax (PERMIT NUMBER: ADDRESS:520 E.Hyman ;R
COMMUNITY DEVELOPMENT DEPARTMENT II COMMUNITY DEVELOPMENT DEPARTMENT w-
BUILDING PERMIT APPLICATION Tat C,v OF Aornv BUILDING PERMIT CONTACT SHEET TYE.C7ry OFAsrelb ,)
•
PROPERTY INFORMATION
.-
Na me Bryce Olson Phone 920.1558 ext.127 E-mail bolsonOhansenconsi cool
ADURESs 520 E.HYMAN AVE UNIT.3AB PARC.°St 2 7 37182 51014 CITY.OF ASPEN
LOT BLOCK OR&DIVISION Name Bryce Olson Phone S20-1 OS ext.., E-mail bolson@hansenconstcom
OWNER NAME Sea Parks West LLC CELL EMAIL PERMIT NO _ The Cityof As en
0158.2018.ARBK P
Name Salt Parka West LLC efo Don Carpenter Phone Cell Phone PM)908-9905
N-EOenacnBryanMay CELL(Wo1544-9o0e EMAIL Smayemwana5mb0htonoom paining 30 E.71st Street New York NY 10021 OWNER Theseplans must be keptat the
A acre:: airy State zlv SALT PARKS WEST LLC
PROJECT DETAILS - kddrlss don@projectresourceco.com - '
PROJECT
D a revise e 520 E HYMAN AVE#3AB building site or inspection
w ADDRESS delays may occur.Construction
Name Don Carpenter piton Cell Phone 10,0)908-9905 shall conform to these plans.All
°® a cow o,n ro,ce.„� g,.n ,m�ti oxo��a:t�w;.m� ;,�fon 237 Holland Thompson Dr. E�Carbondale sate CO 21P81623 273718251D14 changes shall be approved by
tipOIESt sa000,000 aw am Use of Building Class of Work Fixture Counts Equipment Checklist PARCEL ID
UATION the building official.
❑ Commerical Toilets,Bidets 53giLdon@projectresourceco.com
Sp ROF ❑New Force♦Airendd,r Unit H A,tE�esz
WORK AREA 4,000 ❑ Multi-Family ❑Addition B2 htub Wall,Suspended,or Unit Heaters
❑ Single Family ❑.Alteration 4Showery
(Wash Basin) Z-Gas Log REST REFERENCES FROM 2015 IBC
UNR SQ FT 3,000 O Mixed-Use Shower Name Bryce Olson Phone 920-1358 exL127 Cell Phone 309-2518
❑Repair 1 Kitchen Sink(♦Disposal)-Gas Appliancew CV/CS=crawl sp sec.1203.4. 18"x 24"access required
SIZE ❑ ❑IFFR Dishwasher -Appliance Vents Mailing P.O.Box 10493 As en CO 81612 1209.1 SEPARATE PERMITS ARE
1 Laundry Bar,Utility Sink- um city P State
LP prequiredREQUIRED FOR ELECTRICAL,
scm ❑Tenant Finish Heat,Refrig,Cooling,or EE=emergencyesca e sec 1030
MgrAREA Will there be ❑Demolition Clothes Washer Absorption Unit E-mail bolson@hansenconst.com EU=enclosed usable space under stairs shall be 1-hr construction or stair
E)REWOR AREA any roof/wall ❑Change Order Floor Sink Boilers)includes vent) Aaaedo P PLUMBING,MECHANICAL,OR
❑ Floor Drain enclosure rating.No access from stair enclosure.'/:"gypsum permitted for
penetrations? - �Aooling Systems
FIRE SPRINKLER WORK
NEWSO FT Oyes Water Heater(Pan Reg/ Cooling Systems Name Rowland+Broughton Phone Cell Phone stairs inside single dwelling unit.rquired1011.7.3.
120
❑No 3_4 Gas outlets Ventilation Fans RV=roof and rafter ventilation required 1203.2
w9Tx UTILITY WORK Water Treatment -Range Hood aed°eu 234 E.Hopkins Ave. CM,Aspen state CO av 81611 A=Attic Access 20"x 30"1209.2
-Other -g of Gas System Outlets SA=smoke alarm(NFPA 72)required sec 907.2.11 -
ZONE DISTRICT CC ail
-snowmelt system SR Ft Mg. CO=carbon monoxide detector req.per Aspen Municipal Code 8.15 B o I0 D
SG=safety glazing required sec 2406 "I UU 0 U
to Project Valuation:Cost of project as defined in Valuation Affidavit. NOTICE:This permit becomes null and, a Name Phone Cell Phone V=mechanical ventilation required sec 1203.1&IMC 403(bath fans and 'Lill"IL[JI
Z Sq Ft of Work Area:Total square footage of area undergoing change or reconfiguration. void if work or construction authorized .Tin whole house ventilation) 1i1('Li/ .8 J
SqUnitR:Groats Footage, Is net commenced within 180 days,or g
f Aware not FAR,of permitted unit. if construction or work is suspended or address City state ZIP GR=guards,42"min ht,4"max opening.Guards within dwelling unit 36"min
Lot size:Total surveyed square footage of property. abandoned fora period of 180 days a1 ht sec 1015
3 Disturbed Exterior Area:Square footage of lot affected by permit application. any time after work Is commenced. , pAiess ZONING
"-38"ht sec 1014
aLL New Sq Ft:Total added square footage for additions to net livable or net leasble space. HR=handrails 34 Sq Ft of Rooms with Utility Work:Total square footage,not FAR,of all rooms with plumbing work. Re-
APPROVALS =Draft stopping/fire blocking 718
APPROVALS Name KL&A,Inc.,Rebecca Faverty phone(303)384-9910 Cell Phone 1720)831-7478
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES oeoartmem I"S`ew y onef Apnp:oted Mailing 1717 Washington Avenue,Suite 100 Golden CO 80401 ST= Sound drainage s 150o.4
aaaresz 9 city sate zIP STC=Sound transmission class not less than 50 at dwelling separations,sec
PC KH 6/8(18 1207
Permit Fee e-mail Rebecca Favertyrfavert klaa.com> SI=Stairway Illumination 1205.4 Plan Check 32,678.75 50,275 Parks Impact 0 Zoning x BN 12nens caress y y ALL OUTDOOR LIGHTING
PD=protect against decay,sec 2304.12
Zoning(sow,) HPC a. „a,a REFERENCES FROM 20151MC MUST COMPLY WITH
Engineering 487,50 School Ded. 0 Name Hanson Construction,Inc Phone 52(I-1S� Cell phone
Building en 1a0r19 DE=clothes dryer exhaust,sec 504.Makeup air req'd if over 200 CFM THE CITY OF ASPEN LIGHTING CODE
CMP(50%) Fire e. uw,, Mailing P.O.Box 10493 Aspen CO 81612 AS=access and services ace for maintenance req'd,sec 306
Zoning(50%) 487.50 2,140 TOM Impact 0 Address airy P state zlv P 9 SECTION 26.575.150
Engineering MA=make up air required if hood exhausts greater than 400 CFM,sec 505.2
Energy Code 7,541.25 REMP Ped.Amenity 0 CMP x Tx 12a7r1e ken.elsa bolson@hansenconst.com ET=exhausts terminate 3'from prop line and openings,10'from intakes,
Plan Check
Water sun w 1e 501.3.1
CMP OM) 2,140 Housing Cash In Lieu 0 INSPECTIONS:The General Contractor must schedule inspections online. IT=intake openings 10'from lot line&contaminant sources(vents,streets),
our,) Stormwater
(H Please visit x R,1 .4449 www.aspenpitkin.com/Departments/Community-Development-Forms/to do so. 401.4
zoning sanitationI hereby certify that I have read and examined this application and know the same to be true and correct.All provisions of laws and D=fasten and seal all ductwork per 603.9
Parks Review 12D stormwater
(Hourly) Env.Health ordinances governing this type of work will be complied with whether specified herein or not.The granting of a permit does not REFERENCES FROM 2015 IFGC
Engineering Parks x Dr 6/12/18
Utility Review city Use Tax 30,450 presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance DV=direct vent recta,sec 303.3
(Hourly) Landscape of construction.It is my responsibility to review the approved plans and any comments that are contained thereon and see that the CA=combustion air not taken from bedrooms,bathrooms or
GIs county use Tax 7,500 Efficiency structure and/or project is built in compliance with all applicable codes. storage sec 303.3
Approved Contractor Or oa,aasrep�n`ma 4-24-18 �I ,I�A OD=outdoor appliances must be listed for outdoor use,sec 303.6
PProve signature nm. tin DMe I ►d�WVREV Lot Area Deed Restricted To Issue RErEIVE 0 Check if you are a tested owner builder(single-family homes only).You must take a test and complete the own¢Ir�na'ii■nq• REFERENCES FROM 20ceed 0
Census Code #of Dwellings ee.4t0-£mobs Plans Location Issuance (CITY USE ONLY)Owner builder approved by: Date: Affidavit on le F=new or replacement fenestration shall not exceed 0.28 U-factor,NFRC
g V6/11/LV 0641/20 label required,Ordinance 40,2016
(CITY OF ASPENDerember2D17 130 S.GALENA ST I ASPEN,CO 81611j (CITY OF ASPENAagaa201J 130 S.GALENA ST I ASPEN,CO 810.11 L=75%of lamps in permanently installed lights must be high efficacy,sec
1/4 6CPEN / t r3,-. • R404.1
BUILDING DEPARTMENT BUILDING DEPARTMENT SE=Continuous air barrier required;all exterior joints,cracks,and holes to be
caulked,gasketed,sealed,table R402A.1.1
REFERENCES FROM 2014 NEC
EP=electric panel'happy space'30"x36"x78",not in storage,sec 110.26
READ THIS OR FAIL YOUR INSPECTION!
5. Provide Final Inspection Report.The special inspector shall submit a written final External Energy Use Approved
�pnrm� report documenting required special inspections and correction of any discrepancies 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written Furred&Dropped Ceilings,Soffits,and Walls
''t0umne$��aa noted in the inspections prior to the final building inspection, peocedmal and quality cornet mnaaeiu and periodic auditing of fabrication practices by 20015 IBC 803.13 ® RREMP CREMP
ma CIA' '° an approved special inspection agency. This applies to the attachment of finishes or furring to any
SPECIAL INSPECTION AND TESTING AGREEMENT M.":= E B. Owner Responsibilities.Theproject owner,the en ear or architect or record,or an agent of the ! DATE: 1/24/19
ponsi gin g assemblies that are required to be either fire-rated or PERMIT#:0158.2018.ARBK
owner is responsible for employing special-inspection services.The special inspector\agency shall 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator I non-combustible and is Separate from the fire-rated
To permit applicants of project requiring special inspection andlor testing per Section 1704 of the not be in the employ of the contractor,subcontractor or material supplier.[BC Sec t704.1]In shall submit certificate of compliance to the building official stating that the work was
International Building Code(IBC). case of an owner\contractor,the special iris ectorla enc hall be employed as s specified bythe performed in acconlance with the roved coestruction documents. assembly requirement. SNOWMELT: 11 HR of
P P g YsP WP
building official. POOL: 0 sf
Project Address: 520 E.Hyman Permit Number: G. Building Department Responsibilities l Walls,Ceilings&Soffits:If furred 1 a/4 inches or 43 sf
C. Engineer or Architect of Record Responsibilities less,do one of the following: SPA:
BEFORE A PERMIT CAN BE ISSUED:The owner,or the engineer or architect of record,acting as the I. Approve special-inspection program.The building department shall approve all l 4.Fill spaces with Class A material. REMP SHEET: AO.4
owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing 1. Prepare special inspection program.The engineer or architect of record shall list the special inspectors and special-inspection requirements.
Schedule,including the required acknowledgments.A pre-construction conference with the parties items for which special inspection is required;and shall indicate an items for which the 5.Fill spaces with inorganic or non-combustible material. 85%
p PY MINIMUM BOILER AFUE:
involved may be required to review the special-inspection requirements and procedures. IBC or the building official approves periodic inspection and the frequency of such 2. Enforce spectal inspection.Work requiring special inspection and dm building 6.Fire block 8 feet in all directions.
inspector shall monitor the performance of special inspectors.HiMer approval,in OFFSET:
inspections. addition to That of the special Inspector,must he obtained rior to placement of concrete, ^a^e
APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the pP P Walls:If set out(furred)greater than 1%Inches, BM
projects for which they provide special inspections.Speciai inspectors shall be approved by the building 2. Respond to field discrepancies.The engineer or architect of record shall respond to covering a structural steel,or ether similm Innen:lab.
department into performing an duties.5 cialinsectorsshallsubmittheir qualifications P P g P i do one of the following: REVIEWED BY:
p eri p g y Special p q uncorrected inspector.
field discrepancies in design,material,or workmanship observed by the 3. Review inspection t The building official shoed review
subject to personal interviews for pre-qualification.Special inspectors shell display approved special inspector. pn:son reports. g special-inspection house a Class A finish material(Such as drywall). SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REp'B.
identification,as stipulated by the building official,when performing the function of special inspector. progress and final reports. 5.Use non-combustible framing. All snowmen systems shall meet the following:
3. Review shop drawings and submit design changes.The engineer m architect of record ', 6.Protect both sides with fire sprinklers. -Any portions in me Right of way must be on a separate zone.A Row
Special inspection and testis shall meet the minimum requirements of the International Building Code 4. Perform final Inspection.TheIg9.3,building official should perform the final inspection and permit and Permanent Encroachment License are required.SnOtl.
P P g req S shall acknowledge and review for conformance with the construction drawings those -Ric insulation shall be installed under me area to be snow melted or Rs
Section 1704.The followingconditions are also applicable: approval fora project[IBC Sec.109.3.1]after the final special-inspection report has been
con PP shop drawings that may detail structural information,shah submit to the building official reviewed and approved. Ceilings&Soffits:If dropped(furred)greater insulation shall be installed under and at the slab eager.(Ordinance 11
and to the special-inspection agency written documentation of any verbally authorized Series 2011)
A. Duties and Responsibilities of the Special Inspector deviations from the approved construction documents,and shall submit revised than 1 s/4 inches: -Automatic controls installed for system shut off when pavement
520 E.Hyman Framing members,hangers,and other assembly temperature is above 50°F and no precipitation is falling.(2009 IECC
documents for building official approval as required. Project Address: y Permit Number: Sec.403.8&503.2.4.5)
1. Signify presence at job site.Special inspectors should notify contractor personnel of - members must be non-combustible.You may not
their presence and responsibilities at the job site.If required by the building official,they D. Contractor Responsibilities use wood. -Automatic
emperate temp or erature
above
controls0°F.( l09t ECClled S system.403 n shut off w451 outdoor
shall sign m on the appropriate formposted with the building permit. P -empection y♦sting 40°F.s2009IECC S.times
m&system.d)
g ppropri g p ACKNOWLEDGMENTS -Inspection by testing hydrostatically at 1/times max system design
In Type III and V construction only,you may use fire
1. Notify the specialpeen inspector.The contractor is responsible for notifying the special pressure,but not less than 100psi,for 15minutes.(2009IMC Sec.
2. Observe assigned warts The special inspector shall observe assigned work forretardant treated wood or non-combustible framing. ,zee.,gne pe p gninspector or agency regarding individual inspections for items listed on the attached I have read and agree to comply with the conditions of this agreement. )
conformance with the building department approved(stamped)design drawings, schedule and as noted on the building department approved plans.Adequate notice shall - ' r
specifications,and applicable workmanship provisions of the International Building be provided so the special inspector has time to become familiar with the project. Speelnl Inspection Agency: Signalpru: /� Prill,�ed Nnn : Date:
Code.Architectlengineer-reviewed shop drawings may be used only as an aid to ( 1 r,I ^( M ,,r ,-{l I I)\4�^ I 4 r! 1,/ q / ..,mom q
inspection. 2. Provide access to approved tans.The contractor is responsible for providing the III "}'1 Lr'•'[•ftJ,y�••"0-„ry'.j"A❑In'� 1'1�11.1,E rWl ,r, ! S-// a' i
PP P P p g �tl (•' �I YY/.�l �llL �� 2015 IBC 601 Fire Resistive Requirements for
special insIn coo access to approved plans.
For continuous special-inspection,the special inspector shall be on site at all times I Owner:if q✓rx4•{`10 Signature Printed Name Date `'+'^,o;y„ Type of Construction: VA
observing the work requiring special inspection.Periodic inspections,if any,must have 3. Retain special inspection records.Upon request,the contractor is also responsible for I •p "`""""®` Primary Structural Frame: 1 hr
prior approval based on a separate written plan reviewed and approved b the building I �(1*t-i .OVH-L�C' - _ �M -'f^� r7•�'�"•Ig
p" pp pain a wri p pp y fig retaining,at the site,all special inspection records completed by the special inspector. } -- (columns,beams,nudes,etc)
department and the engineer orarchtectofrecord. Exterior Bearing Walls: 1 hr
E. Inspection of Fabricators Engineer/Architect: Signature: Printed Name: Date:
3. Reportnonconformingitems.Thespecialinspectorshallbringnonconformingitemsm • SPECIAL INSPECTION REQUIRED: Interior Bearing Walls: 1 hr
the immediate attention of the contractor and note all such items in the daily report.If I. Fabrication of structural assemblies and members.Where fabrication of structural 4./,• •• Z^ rE�/-�Y tee AVer. QJ ''��f�' Floors/CeilingS:1 hr
any item is not resolved in a timely manner or is about Lobe incorporated in the work,the load-bearing members and assemblies is being performed an the premises of a \ -Structural steel welding:Field&Shop Roof:1 hr
s ecial ins ector shall immediate] noti the buildin de artmentb tele hone or in Cot clot. SigllaNre: ����JJJ Printed NMne: l7aat •
P P Y notify 8 P Y P fabricator's shop,BC Section 1704.2 shall require special inspection of fabricated �.-�/i �j 4',. p -High strength bolting Unless noted otherwise for occupancy separation or fire
person,notify the engineer or architect,and poste discrepancy notice. items. (��q,i)�R jt //-. 0µ16 /7�8 -Epoxy anchors separation distance.
4. Provide timelyreports.The s l inspector shall complete written inspection reports 1 p PPPP��• ! _ -Intumescent paint
patio p p p eP 2. Fabrication and implementation procedures.The special inspector shall verify that Approved Fabricator. Si 1�, � ~ Nin1e0NNne: Dam: applied fire resistive materials
for each inspection visit and provide the reports on a timely basis determined by the the fabricator maintains detailed fabrication and quality control procedures that provide a �l�I � / r n � -Spray PP
building official.The special inspector or inspection agency shall furnish these reports basis for inspection control of the workmanship and the fabricator's ability to conform to 1 gas 4 CD t '. "s`""" y. /^-14w ,51/rf/l� -Permanent micropiles
directly to the building official,engineer or architect of record,and others as designated. approved construction documents and reference standards.The special inspector shall
[I1C Sec.1704.1.2]These reports should be organized on a daily format and may be review the procedures for completeness and adequacy relative to code requirements for l4 Inspected Fabricator: Signature; Printed Name: Date: Special inspection is required per 2015 IBC
submitted weekly at the option of the building official.These reports should include: fabricator's scope of work. I section 1704.Inspector to verify that copy of
a. Description of daily inspections and tests made with applicable locations,
b. Listing of nonconforming items, F. Approved Fabricator Responsibilities t - agreement for inspection program to be on
c. Report on how nonconforming items were resolved or unresolved as the job site prior to performing any
(circle one) Signature: Printed Name: Dam:
applicable, n 1. Fabrication exempt inspections.Special inspections are not required where work is CITY OF ASPEN . Inspections.A copy of all Special Inspector
d. Itemized changes authorized by the architect,engineer,and building offici A FIVE L1 done es the premise of a fabricator registered and approved to perform such wink REr EIVED FITKIN COUNTY: .' ... - . field reports to be on the job site for
not included in nonconforming items. ,! without special inspection. RECEIVED
PB P .� inspectors'review if requested.Failure to
12/27/2018 12/27/2018 { 3 12/27/2018 comply may result in denial of inspection.
I 2
ASPEN ASPEN •
BUILDING DEPARTMENT BUILDING DEPARTMENT€ ASPEN
BUILDING DEPARTMENT