Loading...
HomeMy WebLinkAboutFile Documents.1130 Black Birch Dr.0096.2018 (65).ARBK , PERMIT NUMBER:0096.2018.ARBK MASTER PERMIT: DATE:04.20.2018 Field Plan Set Must Be Printed In Color 1730 BLACK BIRCH DRIVE ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT1111 COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT APPLICATION mcvvice tre BUILDING PERMIT CONTACT SHEET Reviewed byEngveering FIRE • lteoreaeAo,u 11/16/2018 8:51 40 AM PROPERTY INFORMATION oR PIAN Review nursrlolus °n Should be known mat Ibis review shall not Name ANDREW DILLON oho"970.319.888/ E-mall ADILLONSFORUMPHI.COM relieve the applicant of theirresponsibility SPRINKLERS ADDRESS 1130 BLACK BIRCH DRIVE UNIT 9 ppgeEL07.a ar inns me comply with me requirement of me city of 13 TRACT BLACK BIRCH ESTATES SUBDIVISION Aspen.The review and approval by the City is / LOT BLOCK IfInAg ,,,,oN Name KORA:ROGER SHUGART SJIM GOHERV 970.983.057] fferetlonly to assist me applicants I DEMOLITION OF EXISTING HOUSE AND DETACHED GARAGE,CONSTRUCTION OF NEW SINGLE FAMILY RESIDENCE M10"e E-mNI ROGER�KORULTO.COM understanding of applicable REQUIRED DESCRIPTION OF go ppica gineenng The City of Aspen WORKIN DETAIL requirements"The issuance of a penny based Y p Name RIVERFRONT FORT(LLC phone Cell phone 808.543.3200 on construction documents and other data shall M IIn not prevent the City of Aspen from requiring the BESTCONTARCELLA�dre 1401BALLINGERSTREET FORT WORTH correction of errors in the construction CIAL INSPECTION REQUIRED: These plans must be kept at the NAME ANDREW DILLON 970.319.6881 EMAIL ADILLON@FORUMPHI.COM Ory State TX zip 78107 documents and other data. p.)fells JOHN@DEPERMIAN.COM building site or inspection OWNER NAME RIVERFRONT FORK LLC CELL 806.543.3200 EMAIL JOHN@DEPERMIAN.COM -Structural steel welding:Field&Shop delays may occur.Construction a Name STEEV WILSON Phone Cell Phone 970.27931109 City Development Engineer's Comments -Nigh strength bolting shall conform to these plans.All PROJECT DETAILS ht II" 715 W.MAIN STREET 1.Encroachments:Anyexistingorplanned encroachments into the public -Epoxy anchors e Addrefs ASPEN PROIER cRr stale co sr gs,+ than es shall be a roved b vnwnnoN a,oea,77s Use of Building Class of Work Fixture Counts Equipment Checklist all right-of-way,including temporary construction trailers and dumpsters,must be -Intumescent paint g pp y S W ILSON@FORUM PH I.COM ❑ Commerical El New I`7 Toilets,Bidets u ported Air/Gravity Systems EnSdres4 applied for licensing at City Engineering(920-5080).Five days advance Spray applied fire resistive materials the building official. 1906,9,511.5 SF ❑ Multi-FamilyBathtub ID U wall,suspended,or Unit Heater: notice is requiredobtain a temporary encroachment license. -Permanent micro files O Single Family El Alteration Lavatory(Wash Basin) U Gas Log Name ANDREWDILLONP UNITia FT 9511.5 SF 0 Mixed-Use ❑Re air shower Phone taw phone 87o.3tB.8B87 for work Right-of-waynriPerrop:rty only. ofsign these is the CityseddingDept.is p TKitchen Sink I+Disposal)7-Gas Appliancew n ISIe55 715 W.MAIN STREET A5P09 on private property only.Design approvals for proposed work IWaif ❑ ❑IFFR Dishwasher r Appliance vents dd Ory stale CO z1P 81811 (includinglandscaping)In the ublic right-of-way(ROW)must be obtained Special inspection is required per 2015/BC SEPARATE PERMITS ARE se F*1 20,253 ❑Tenant Finish T V Heat,Md.Cooling, p 9) p g Y Laundry Bar,Utility sink_ Rag.SWILSO FORUMPHI.COM from CityEngineering Dept.(920-5080)and Parks Dept. 920-5120 A section 1704.Inspector to verify that c» of Will there be O Demolition rClothes washer Absorption Unit nr Tess g g li i ( ) P ty copy REQUIRED FOR ELECTRICAL, 5 FT OF WND-8,2280E permit for work in thepublic right-of-way must be obtained from the City s PE WORK any roof/wall ❑Change Order UFloor Sink c Boilers(includes vent) l P 9 Y agreement for inspection program to be on penetrations? ❑ �ffFloor Drain o PLUMBING,MECHANICAL,OR Air Handling Unit Name FORUM PHI:STEEV WILSON Engineering Dept.five days in advance of when the permit is needed. the job site prior to performing an NEW SOFT 9,5110E U shower V phone MlPhwm 970279.41W 1 P f 9 y l7 Yes � cooling systems 3.Mud,dirt and debris may not be tracked onto the adjacent public ROW, FIRE SPRINKLER WORK Wafer Heater(Pan Req)i r/ II:: inspections.A copy of all Special Inspector ay;OF ROOMS 0 No -NCR.,0 onoomit becomes null ands�g Gas Outlets Ventilation Fans • p1fA fs]15 W.MAIN STREET ASPEN pP 81611 and the adjacent ROW must be clean at the end of eachworkday.Construct WNW.4,573 SF void if work or construction authorized - Range Hood mg sae CQ field reports to be on the job site for is not commenced within leg days,or -water Treatment mud rack if needed.Trucks hauling demolished electricalsmust transformersred. 1 g of Gas System Outlets VOLLSON@FORUMPHI.(bM 4.Utilities in ROW:No utility pedestals,meters,or can inspectors' q if construction or work is suspended or other A�ressreview if requested.Failure to abandoned for a period of 180days at - �snowmelt System Sq Ft YSMOKE ALARMS AND any time after work la commenced. , be installed in the public right-of-way.Provide utility easements on private comply may result In denial of Inspection. e Name ROAMING FORK ENGINEERING,INC.:O/WIEL BTEWART 9T0.310A730 CARBON MONOXIDE Details Term Defininons Phone Cell Phone 9]0.829.5878 property as needed. Project Valuation:Cost of project as defined in Valuation Affadavit. CIlls 592 HIGHWAY 133 CARBONDALE 5.Certifcate of Occupancy(CO)Inspection:Engineering CO Inspection structural steel high strength bolting DETECTORS REQUIRED Sq Ft of Work Area:Total square footage of area undergoing change or reconfiguration. PC-KH My State CO amp 81623 includes but is not limited to:(a)witnessing that all property comers Rf S-100 THROUGHOUT DWELLING unit Sq Ft:Gross Square Footage,not FAR,of permitted unit. APPROVALS Liz„DANNYS@RFENG.BIZ havemonuments,(b)drainage improvements were installed as approved,(c) UNIT PER CITY OF ASPEN Lot Size:Total surveyed square footage of property. 9 P PP Sq Ft of Landscapeded quare footage of disturbed exterior area. Revlewing Review Reviewer Date easements are documented(d)no unapproved ROW encroachments exist, MUNICIPAL CODE 8.15 New Sq Ft:Total added square footage for additions to net livable or net leasble space. Depar tit Required Inmals Approved Name STUDIO NIL:TED GODFREY Phone�B a "45 Cell Phone and(e)the ROW has been restored.Call 429-2750 to arrange CO inspection. Sq Ft of Rooms with Utility Work:Total square footage,not FAR,of all rooms with plumbing work. Zoning X BN 9/21/18 M IIn 6.Snowmelt Driveways:(i)Snowmelt runoff from driveway cannot flow into ABdreji3 2995 BASELINE ROAD Ory BOULDER State CO 21p 00303 street.Agrate or Swale must intercept runoff before street. II Snowmelt SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES HPC P () REFERENCES FROM 20151RC Plan Check 63.96]03 Permit Fee 98.410.81 Parks Impact h0 95 g XMIL TGODFREY�STUDIONYL.COM installation in the public ROW requires an encroach-ment permit. CV/A=crawls ace ventilation required,sec.R408.1 Access required,R408.4 Building TF 11/16P 1 A�ressP q q 7.Drainage Issues:(i)Foundation drains cannot go to a dry well receiving EE=emergency required sec R310.1 Energy Code 14,761.62 REMP School Ded. bass Fire X TF 11/20/1 I g y escape Mama KORU'ROGERSHUGART SJIM GOHERY phone 9T0.8B3.0577 other drainage flows.(ii)City must be notified of drainage plan changes.(iii) EU=enclosed usable space under stairs shall be+/a"Gyp,sec R302.7 Zoning(s0%1 Plan Check TDM Impact Engineering x MH 11/16/' cell Phone Plana covet assumes noground water.Ifground water is encountered,call 8085.20 leourl 1 784.78 M IIn approval G/D=garage/dwelling separation,sec R302.5 and R302.6 y CMP x PH 10/17/1 quire 417 MAIN STREET,SUITE Y thy CARBONDALE stele Co 7,p 81823 the Senior Dev.Engineer at 920-5080.Call for an open hole inspection prior STC=Sound transmission class not less than 45 at dwelling separations,app Engineering Review 32202.13 Zoning(Hourly) Ped.Amenity n MH 11/16/1 E all to placement of the drywell. K CMP(5051 5086 92 Engineering Housing Cash in Lieu Utilities X sw ntl�res3 ROGER�KORULTD.COM 8.No Loose Material Storage allowed in R.O.W. RV=roof and rafter ventilation required,R806.1 leoudyl �'"Water x s/2srtd 9.Neighbor Notification:For all excavation,the Contractor must comply with A=attic access 22"x 30",30"headroom above,R807.1 Parks Review 607.s9 Zoning(5096) 8086.20 Stormwater Stormwater x AR 11An/ 3 INSPECTIONS:The General Contractor must schedule inspections online. neighbor notification requirements per Section 3307 of the 2003 International SA=smoke alarms installed to NFPA 72 requirements,sec R314 Utility Review 8384.00 CMP(5046) 5088.92 City Use Tax 93,84>14 Sanitation x PM 5/7/18 Please visit www.aspenpitkln.com/Departments/Community-Development-Forms/to do so. Building Code(IBC) CO=carbon monoxide detector per City Ordinance 41 series 2008 Other electrical County Use Tax 20,21104 I hereby certify that I have read and examined this application and know the same to be true and correct.All provisions of laws and SG=safety glazing required,sec oR308.4 open' Env.Health ordinances governing type of work will be complied with whether specified herein or not The granting of a permit does not GR=guardrails,36"min ht,4"max opening;req at 30"drop any point w/in 36" Plumbing GIS 500 g gthis Mechanical Sanitation Parks X Dr 11/20 presume to give authority to violate or cancel the provisions of other state or local law regulating construction or the performance horizontally,sec R312 of construction.it is m res siblll to review the approvedplans and an comments that are contained thereon and see that the WFP=window fall protection-operable window<24"AFF&>72"above Landscape Y POR ry PP v 20.253 Lot Area x x = structure and/opprolect in-built Incompliance with all applicable codes. Efficiency Ste, grade:use opening control device listed to ASTM F2090,sec R312.2 '5,'-`T-!D HR=handrails 34"-38"ht,sec R311.7.8 aa° Zone District Approved DAM n/2U/', t"r" w^--r' Dam ,. EivEII SI=stairway illumination,sec R 311. Deed Restricted RE �E0 ❑ Check if you areatesteduildrr builder(single-faintly homesonlyl.Youmusttakeatestandcompletethecomer/bull PD=protect against decay,sec R3.7 TO Issue R C CITY USE ONLY Owner builders approved 9 Census Code `. ( ) PP v: Date: Affidavit PLANS LOCATION BB#217-712-412 Issuance REFERENCES FROM IMC #of Dwellings ^ I (CITY OF ASPEN...." 130 S.GALENA ST I ASPEN,CO 01��%018 V=bathroom and balanced whole house mechanical ventilation req. I CITY OF ASPENaass eose 130 S. GALENA ST ASPEN,CO 81611 Ordinance 40,2016 ASPEN DE=clothes dryer exhaust,sec 504.Makeup air req'd if over 200 CFM 3'uIL'JiiJG J-rkF ioi'o'VT BUILDING DEPARTMEN AS=access and service space for maintenance req'd,sec 306 MA=make up air required if hood exhausts greater than 400 CFM,sec 505.2 ET=exhausts terminate 3'from prop line and openings,10'from intakes, 501.3.1 IT=intake openings 10'from lot line&contaminant sources(vents,streets), 401.4 D=fasten and seal all ductwork per 603.9 REFERENCES FROM 2015 IFGC DV=direct vent req'd,sec 303.3 CA=combustion air not taken from bedrooms,bathrooms or storage sec 303.3 OD=outdoor appliances must be listed for outdoor use,sec 303.6 REFERENCES FROM 2015 IECC F=new or replacement glazing shall not exceed 0.28 U-Value,NFRC label required,Ordinance 40,2016 L=75%of lamps in permanently installed lights must be high efficacy,sec R404.1 SE=Continuous air barrier required;all exterior joints,cracks,and holes to be caulked,gasketed,sealed,table R402.4.1.1 REFERENCES FROM 2014 NEC EP=electric panel'happy space'30"x36"x78",not in storage,sec 110.26 I External Energy Use Appro ❑ RREMP 0 CREMP PERMIT#:0096.2018.arbk DATE: 8/22/18 See Change Order SNOWMELT: 2911 2 for up to date POOL' o REMP info, increased to 3006 ---- SPA: o -.. .e.„.a,M11=1 ` a mm .„ sq.ft.Snowmelt and REMP SHEET: A-004&M 7,001 45 sq.ft.non-exempt The following criteria must also be met with construction: , - .=* --, spa. MINIMUM BOILER AFUE: 75% ➢A construction fence must be erected along the entire dripline of �,�i=ti. _,M.. OFFSET: none all trees on site and any tree canopy from neighboring property. la ,This will serve as the tree protection zone(TPZ).This fence is to I t " t , ...rtrz.,_ REVIEWED BY: TF be constructed in such a manner that the area inside the dripline is SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S. protected.AN INSPECTION OF THIS FENCE MUST BE All Snowmelt systems shall meet the followingrooe . PERFORMED BEFORE ANY CONSTRUCTION OR DEMOLITION s"�', AA+ ,, permit and 'man nRi Encht roachment achWay mntLit e on are re required.rate Allow 'ACTIVITIES BEGIN.PLEASE ARRANGE THIS INSPECTION ",„_,, R10insuatioonshalllbeinstalledund theaeatodslnow melted orR5 WITH BEN CARLSEN AT 429-2034. �.,: _ insulation shall be installed under and at the slab edges.(Ordinance 11 Series 20 ) ➢No materials may be stored in the TPZ,including but not limited 51°. Tree protection fencing is Automatic controls installed for system shut off when pavement to,construction backfill,construction traffic,or any other ?- required at the driplines of temperature is above 50°F and no precipitation is falling.(20091E 'construction materials. em,iw,,, all trees shown. Sec.403.8&503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor ➢No excavation,grading or trenching may occur within the TPZ City c0 Aspen-Tree lm0tectio0 Zone temperature is above 40°F.(20091ECC Sec.403.8&503.24.5) There is NO activity allowed -Inspection b testing hydrostatically a without the consent of the City of Aspen Forester or his designee. ��' °" r ea mg ydrostaecao t 1 r times max system design within this fenced area,including, pressure,but not less than 100psi,for 15minutes.(20091MC Sec. I➢No parking of vehicles or equipment may occur in the TPZ. <wn 1208.1) but not limited tel digging,storage ➢No dumping of any waste products may occur in the TPZ. of material,equipment, ➢Any roots cut during excavation shall be pruned with sharp machinery,foot or vehicle traffic. loppers/pruners back to the soil line.The roots will further be ,„,„,", 'protected by burlap draped over the side of the excavation = Please contact the City Forester or covering the exposed roots.This burlap shall be kept moist until his designee at 920.5120 for an I' \ p o the excavation is backfilled. a., .� inspection of this fencing Prior to j I j'P V O ➢Pruning to provide clearance for construction activities shall only .�.....•".d any activity. I'LLfffL'JJI be done under the direction of an arborist. okik2h7/ 8 D If the need arises to perform any ➢Site inspections shall be performed on a weekly basis,to ensure `, , activity in the tree protection the above listed conditions are met. ../ _,, area,please contact the City ZONING I➢Any unapproved improvements or activities outside of those �,,, Forester and you will be given w", mP�a approved within this permit will be subject to mitigation in the form :" t"c' specific instructions as to how to of restoration. �pq --- „o,,,, proceed to minimize impacts to ➢This permit must be posted on site during the construction s ♦ cirynfAap -TreeP Planting Specifications ." the tree root zone. 'process. r Field Plan Set Must Be Printed In Color k _I 5. Provide Final Inspection Report.The special inspector shall submit a written final \---- I report documenting required special inspections and correction of any discrepancies nfr crrv«.wcN A noted in the inspections prior to the final budding inspection SPECIAL INSPECTION AND TESTING AGREEMENT 21 To t applicants of t requiring al ins ectlon and\or testing Section 1704 of the B.Owner Responsibilities.The project owner,the engineer or architect or record,or an agent of the fermi pp project q g spec p g per owner is responsible for employing special-inspection services.The special inspector\agency shall International Building Code(IBC). not be in the employ of the contractor,subcontractor or material supplier.[IBC Sec 1704.1]In / Project Address: Permit Number: case of an owner\contractor,the special inspector\agency shall be employed as specified by the building official. The City of Aspen BEFORE A PERMIT CAN BE ISSUED:The owner,or the engineer or architect of record,acting as the C.Engineer or Architect of Record Responsibilities owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing Schedule,including the required acknowledgments.A pm-construction conference with the parties 1. Prepare special inspection program.The engineer or architect of record shall list the These plans must be kept at the involved maybe required to review the special-inspection requirements and procedures. items for which special inspection is required;and shall indicate any items for which the building site or inspection IBC or the building official approves periodic inspection and the frequency of such APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the delays may occur.Construction projects for which they provide special inspections.Special inspectors shall be approved by the building inspections. department prior to performing any duties.Special inspectors shall submit thew qualifications and are shall conform to these plans.All 2. Respond to field discrepancies.The engineer, at or material, m record shall respondby to changes shall be approved by subject to personal interviews for pre-qualification.Special inspectors shall display approved uncorrected field discrepancies in design,material,or workmanship observed by the g pp identification,as stipulated by the building official,when performing the function of special inspector. special inspector. the building official. Special inspection and testing shall meet the minimum requirements of the International Building Code 3. Review shop drawings and submit design changes.The engineer or architect of record Section 1704.The following conditions are also applicable: shall acknowledge and review for conformance with the construction drawings those A.Duties and Responsibilities of the Special Inspector shop drawings that may detail structural information,shall submit to the building official SEPARATE PERMITS ARE and to the special-inspection agency written documentation of any verbally authorized REQUIRED FOR ELECTRICAL, 1. Signify presence at job site.Special inspectors should notify contractor personnel of deviations from the approved construction documents,and shall submit revised PLUMBING,MECHANICAL,OR their presence and responsibilities at the job site.If required by the building official,they documents for building official approval as required. FIRE SPRINKLER WORK shall sign in on the appropriate form posted with the building permit. D.Contractor Responsibilities 2. Observe assigned work.The special inspector shall observe assigned work for 1. Notify the special inspector.The contractor is responsible for notifying the special conformance with the building department approved(stamped)design drawings, inspector or agency regarding individual inspections for items listed on the attached specifications,and applicable workmanship provisions of the International Building schedule and as noted on the building department approved plans.Adequate notice shall Code.Aechitect\engineer-reviewed shop drawings maybe used only as an aid to be provided so the special inspector has time to become familiar with the project. inspection. City of Aspen Residential Ventilation Calculator For continuous special-inspection,the special inspector shall be on site at all times 2. Provide access to approved plans.The contractor is responsible for providing the va a as amended by ordinance 40,2016 observingthe work requiring l inspection.Periodic inspections,if any,must have special inspector access to approved plans. modified e uanpaa q g specie p pee prior approval based on a separate written plan reviewed and approved by the building 3. Retain special inspection records.Upon request,the contractor is also responsible for department and the engineer or architect of record. retaining,at the job site,all special inspection records completed by the special inspector. 1.Enterne now main square Caroline smeneafumf m question. 3. Report nonconforming items.The special inspector shall bring nonconforming items to E.Inspection of Fabricators r.m< n.n<amnMn. anl.,ca,�mnnnn,sa�,a.. a. the immediate attention of the contractor and note all such items in the daily report.If any item is not resolved in a timely manner or s about to be incorporated in the work the 1. Fabricationof structural assemblies and members.Where fabrication of structural „rim<unn,„<.nr,<m<�m<a<sn<a nemnn,.<nnl,nnn„t<wgs<nnmx�nrnou,nwm n«atn,nn<.<„4 nnn.o<�na. nt<,m�n<nt .n< special inspector shall immediately notify the building department by telephone or in load-bearing members and assemblies is being performed on the premises of a person,notify the engineer or architect,and post a discrepancy notice. fabricator's shop,IBC Section1704.2 shall require special inspection of the fabricated Floor Area(Moor) a of Bedrooms(Mr) Number or occupants Required Continuous Balanced 4. Provide timely reports.The special inspector shall complete written inspection reports items. outdoor ventilation Rate Iw) for each inspection visit and provide the reports on a timely basis determined by the 2. Fabrication and implementation procedures.The special inspector shall verify that 9,691 soft 7 8 118 efm building official.The special inspector or inspection agency shall fundsh these reports the fabricator maintains detailed fabrication and quality control procedures that provide a directly to the building official,engineer or architect of record,and others as designated. basis for inspection control of the workmanship and the fabricator's ability to conform to [IBC Sec.1704.1.2]These reports should be organized on a daily format and maybe approved construction documents and reference standards.The special inspector shall submitted weekly at the option of the building official.These reports should include: Desired number of hours Required Intermittent Balanced each a.Description of daily inspections and tests made with applicable locations, review the procedures for completeness and adequacy relative to code requirements for operci b.Listing of nonconforming items, fabricator's scope of work, tes m ahogr pesos Outdoor venouoan sate c.Report on how nonconforming items were resolved or unresolved as F.Approved Fabricator Responsibilities 1.33 hrs 353 efm applicable, OR d.Itemized changes authorized by the architect,engineer,and building official if 1. Fabrication exempt inspections.Special inspections are not required where work is Desired intermittent not included in nonconforming items. done on the premise of a fabricator registered and approved to perform such work balanced outdoor Requires number of Hours operated without special inspection. ventilation rate each 4npvr ferias i 362 efm 1.30 hrs 2 4r-pm x Moor)*I7.5 x(NC+1)11 x Sc or=ventilation now rate,cubic feet per minute(MC Afloor=floor area In square feet la2) Nbr a number of bedrooms,not less than one Sc=035(system coefficient for balanced systems) cited and provided this software solely as a reference.Users should obtain assistance from a qualified < pr1ofesslona.verify accuracy and applicability before proceeding.The City of Aspen makes no express or implied warranty with respect o this software or any Information contained herein.To the full extent permissible by law,the City damn disclaims all 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written responsibilityfor any damages or losses(including,withoutlimitation,structural damage,building defeat,financial loss, procedural and quality control manuals and periodic auditing of fabrication practices by damages for lorsin carcass projects,loss of profits or other consequential losses)arising in contract,tort or otherwise hour the an approved special inspection agency. use of or inability to use this sofnsa,e,or from any action or decision taken as a result of using this software. 2. Approval of fabricator.Approval shall be based upon review date fabricator's written 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator • procedural and quality control manuals and periodic auditing of fabrication practices by shall submit certificate of compliance to the building official stating that the work was an approved special inspection agency. performed in accordance with the approved construction documents. 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator shall submit certificate of compliance to the building official stating that the work coos G. Building Department Responsibilities performed in accordance with the approved construction documents, 1. Approve special-inspection program.The building department shall approve all G. Building Department Responsibilities special inspectors and special-inspection requirements. I. Approve special-Inspection program.The building department shall approveglI 2. Enforce special inspection.Work requiring special inspection and the building special inspectors and special-inspection requirements. • inspector shall monitor the performance of special inspectors.His\Her approval,in 2. Enforce special inspection.Work requiring special inspection and the building addition to that of the special inspector,must be obtained prior to placement of concrete, p P g covering of structural steel,or other similar materials. inspector shall monitor the performance ofspeciai inspectors.I IiAlier approval,In addition to that of the special inspector,most be obtained prior to placement of concrete, covering of structural sleek or other similar materiels. 3. Review inspection reports.The building official should review Special-inspection progress and final reports. 3. reports. Review final final Inspection reports.Die building official should review special-inspection 4. Perform inspection.The building official should perform the final inspection and • approval for a project[IBC Sec.109.3.1]after the final special-inspection report has been 4. Perform final Inspection,The building official should perform the fuel inspection and reviewed and approved. approval fora project[IBC Sec,109.3.1]after the final special-inspection report has been ' reviewed and approved. Project Address: 1130 BLACK BIRCH DRIVE Permit Number: Project Andress: 11a0 RACK BIRCH antis Permit Numbers ACKNOWLEDGMENTS ACKNOWLEDGMENTS I have read and agree to comply with the conditions of this agreement. I have read and to comply with the conditions of this agreement. Special Inspection Agency: Signature: Printed Name: Date: Special Inspection Agency: Sign Printed Name: Date: / • J / Printed Narita Date Owner. Signature: Printed Name Date Omer. Signature; FORUM PHI STEEV WILSON 12.03.18 PngirWw/Architect: Signature: Printed Name: Date: Engineer/Arehitect•. Signature: Printed Name: Date: yryyro+.lit l_S1.1 C .�°o- n8ka..ati -- -NRN I.INE1/,-,, 3\Iti (2o/8 Nam sEEnB - • �- Cf. QE 33333 Contractor: Signature:,,. Printed Name: Dale: Contractor: Signature: Printed Name: Date: v U2\)l UTP �w �F;,t`�tw�'1� _..03'i S'l el Approved Fabricator: Signature: 'r Printed Name:: Dale: Approved Fabricator: Signature: Printed Name: Date: SAME AS INSPECTED FABRICATOR i • Inspected Fabricator: Sign •.... Printed Nama Dale: C Inspected Fabricator: Signature: Printed Name: Date: Aid_ 5�4ke 'd N - -- cr~w:w Ssval4 3/ ifig' (circle one) Signature: Printed Name: Date: ' ' CITY OF ASPEN (circle one) Signature: Printed Name: Date: PtfKIN COUNTY: -_ . _ _ _ CITY OF ASPEN Denis Murray 12/4/18 PITKIN COUNTY: DAM 3 Field Plan Set Must Be Printed In Color k, Colorado Department of Public Health and Environment Colorado Department of Public Health and Environment Air Pollution Control Division-Indoor Environment Program-Asbestos/IAQ Air Unit Air Pollution Control Division-Indoor Environment Program-Asbestos/IAQ Air Unit \--) . 4300 Cherry Creek Drive South,APCD-IE-B1 4300 Cherry Creek Drive South,APCD-IE-B1 Denver,Colorado 80246-1530 Denver,Colorado 80246-1530 Phone: 303-692-3100-Fax: 303-782-0278 Phone: 303-692-3100-Fax: 303-782-0278 E-mail: asbestos@state.co.us E-mail: asbestos@state.co.us The City of Aspen DEMOLITION APPROVAL NOTICE DEMOLITION APPROVAL NOTICE These plans must be kept at the This approval notice is granted subject to Colorado Air Quality Control Commission Regulation This approval notice is granted subject to Colorado Air Quality Control Commission Regulation building site or inspection No.8,Part B,adopted December 21,2007,and effective January 30,2.000 and the Colorado Air No.8,Part B,adopted December 21,2007,and effective January 30,2008 and the Colorado Air delays may occur.Construction Pollution Prevention and Control Act C.R.S.(25-7-101 and 25-7-501 et seq). This notice signifies Pollution Prevention and Control Act C.R.S.(25-7-101 and 25-7-501 et aeq). This notice signifies shall conform to these plans.All that the structure was inspected for asbestos,luminous exit signs(containing radioactive material), that the structure was inspected for asbestos,luminous exit signs(containing radioactive material), changes shall be approved by and Ozone-Depleting Refrigerants and the demolition contractor has properly notified the and Ozone-Depleting Refrigerants and the demolition contractor has properly notified the the building official. Colorado Department of Public Health and Environment pursuant to Regulation No.8,Part B. Colorado Department of Public;Health and Environment pursuant to Regulation No.8,Part B. As a contractor,you may subject to other demolition licenses and permits,depending on the As a contractor,you may be subject to other demolition licenses and permits,depending on the SEPARATE PERMITS ARE requirements of the county and municipality in which the'work is being performed. The Colorado requirements of the county and municipality in which them is being perforated.The Colorado REQUIRED FOR ELECTRICAL, Department of Public Health and.Environmept,Air Pollution Control Division,strongly suggests Department of Public Health and Environment,Air Pollution Control Division,strongly suggests PLUMBING,MECHANICAL,OR that you check with county and municipal authorities in order to determine any other local that you check with county and municipal authorities in order to determine any other local FIRE SPRINKLER WORK building/permitting requirements that must be met building/permitting requirements that must he met. Please note that certain asbestos-containing materials(ACM)may remain in the structure Please note that certain asbestos-containing materials(ACM)may remain in the structure during demolition.Therefore,any demolition debris left behind after the completion of post- during demolition.Therefore,any demolition debris left behind after the completion of post- demolition site cleanup may constitute a"reason to know of asbestos-contaminated soir at demolition site cleanup may constitute a"reason to know of asbestos-contaminated soil"at the site,subject to the requirements of Section 5.5 of the Solid Waste Regulations(6 CCR the site,subject to the requirements of Section 5.5 of the Solid Waste Regulations(6 CCR 1007-2,Part 1). 1007-2,Part 1). THE ORIGINAL APPROVAL NOTICE MUST BE POSTED ON SITE AT ALL TIMES. THE ORIGINAL APPROVAL NOTICE MUST BE POSTED ON SITE AT ALL TIMES. Immediately notify the Asbestos L4Q Unit of project modifications by fax(number above)or e-mail Immediately notify the Asbestos/IAQ Unit of project modifications by fax(number above)or e-mail (address above)and the appropriate county health department by fax.Project modifications include (address above)and the appropriate county'health department by fax.Project modifications include changes in the scope of work or the scheduled work dates,etc. - changes in the scope of work or the scheduled work dates,etc. This demolition approval notice is valid beginning 11/1/2018. This demolition approval notice is valid beginning 11/1/2018. The actual scheduled work dates are from 11/1/2018 through 11/30/2018. The actual scheduled work dates are from 11/1/2018 through 11/30/2018. Approval issued on:9/21/2018 Approval issued on:9/21/2018 Record number:141761 Fee Paid:$55.00 Record number:141760 Fee Paid:$65.00 Notice Number:18P16046D •Check number:1967 Notice Number:18P16045D Check number:1967 For the location specified below: For the location specified below: Asbestos Building Inspector: Asbestos Building Inspector: Garage Structure House Structure Douglas A.Claw Douglas A.Close 1130 Black Birch Dr. Cerificadon No.: 2930 1130 Black Birch Dr. Cer,tcat,on No.: 2930 Aspen Aspen Pitkin County Inspection Date: 11/27/2017 Pitkin County Inspection Date: 11/27/2017 This notice has been issued to: This notice has been issued to: Kern,Ltd. Korn,Ltd. 417 Main St.Suite Y 417 Main St.Suite Y Carbondale,CO 81623 Issued b: i Carbondale,CO 81623 Issued by:JW 01 ASPEN LINE GRADE VERIFICATION FORM *I Verification of Building Location by Building Contractor For Building and Permit Information,please refer to our website at: THE CITY OF ASPEN http://www.aspenpitkin.com/depts/41/ Exemption A City verification of building location is not needed when the project creates less the 200 square feet of new floor area. PART A: Complete and Submit as part of the Building Permit Application o Building/Job Address or Location: 1130 BLACK BIRCH DRIVE,ASPEN,CO 81611 o Your Name(Person Completing Part A):ANDREW DILLON o Your Company:FORUM PHI ARCHITECTURE o Plans must show horizontal dimensions that'tie'the building to the property boundary. Are building ties shown? (circle one) es `No' o An elevation benchmark needs to be established on the site by a licensed surveyor and shown on the plans.What is the elevation of this benchmark? 7755.51' o If the garage is located within 10 feet of the roadway or sidewalk,provide spot elevation on the on the roadway or sidewalk. Is a spot elevation shown? `Yes' `No' CO o Provide the equation comparing site(surveyed)elevation to structure/architectural plan elevation: (i.e.,100'first floor elev=7962.50') 100'MAIN FLOOR ELEV.7752.5' PART B:Complete prior to first Foundation Inspection,by a licensed surveyor or an individual prequalified by the City o Do field measured building ties to property match building ties shown on the plan? (circle one):`Yes' `No' o Surveyor needs to confirm that one spot on the top of the foundation wall is at the same elevation shown on the approved building plans. o What is the field measured elevation of top of foundation wall relative to the site bench mark? o According to the building plans,what was the design elevation for the same place on the foundation wall? o Was the elevation of the building adjusted in field? (circle one): `Yes' `No' o If yes,why? The undersigned qualified individual certifies that the information in Part B is accurate- Signature: Date: Printed Name: Contact ph.#: Company: RECEIVED Webpage: http://www.aspenpitkin.com/pdfs/depts/41Ainegradeverificationform.pdf R04 /2018 ASPEN BUILDING DEPARTMENT