Loading...
HomeMy WebLinkAboutFile Documents.517 Park Cir.0161.2018 (12).ARBK �+ow�o,No 4 aec4r fMBEP Architectural Engineering Consultants, Inc. An Office with LEEDTM Accredited Professionals April 23, 2018 David Johnston David Johnston Architects 119 South Spring Street, Suite 203 Aspen, CO 81611 Re: Aspen Affordable Housing — 517 Park circle Dear David, This document is intended to show compliance of the new construction of the Aspen Affordable Housing located at 517 Park Circle, Aspen, CO with the 2015 International Energy Conservation Code (2015 IECC). We propose to use a prescriptive approach per sections 402.1-402.3 and 403.2.1 of the 2015 IECC. Project The project at 517 Park Circle is the new construction of a multi-family residence with a floor area of 7700 sf. For heat load calculations, please refer to the Appendix. The heat load calculations are performed using the Carrier Hourly Analysis Program and provides a more detailed and accurate load than Manual J. Building Envelope The following table lists the mandatory minimum insulation and fenestration requirements for the project climate zone (7). All new assemblies will meet the following requirements. Fenestration Ceiling R- Wood frame Floor Basement wall Slab U-factor value wall R-value R-value R-value R-value Code Minimums 0.28 (1) 49 20+5 or 13+10 38 (2) 15/19 (3) 10 (4) Notes: 1) Fenestration SHGC requirements do not apply in climate zone (7) 2) Or insulation sufficient to fill the framing cavity, R-19 minimum 3) R-15 continuous insulation on the interior or exterior or R-19 cavity insulation on the interior of the basement wall. Can be satisfied with R-13 cavity plus R-5 continuous. 4) 4 ft deep and R-15 edge insulation for heated slabs 5) R-10 continuous insulation or R-13 cavity insulation. Sincerely, [2,_1(2,±Dan Findley Mechanical Engineer 40801 US Hwy 6 &24, Suite 214, Eagle-Vail, CO 81620 Post Office Box 8489,Avon, CO 81620 phone: 970-748-8520 email: stannaec-vail.com web: www.aec-vail.com 0 6 12 2 018 ASPEN BUILDING DEPARTMENT