Loading...
HomeMy WebLinkAboutFile Documents.955 Chatfield Rd.0172.2018 (18).ARBK irREScheck Software Version 4.6.4 Compliance Certificate Project Chatfield Renovation Energy Code: 2015 IECC Location: Aspen, Colorado Construction Type: Single-family Project Type: Alteration Climate Zone: 7 (9922 HDD) Permit Date: Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 955 Chatfield Road Brandt Bowden David Rosenfeld Aspen, CO 81611 955 Chatfield Road CCA Aspen, CO 81611 610 E. Hyman 713.580.1203 Aspen, CO 81611 bbowden@hanoverco.com 970.925.5590 davidr@cunniffe.com Compliance: Passes using prescriptive requirements for alteration projects Envelope Assemblies Gross Area Cavity Cont. Assembly or R-Value R-Value U-Factor UA Perimeter Ceiling 1: Other Ceiling --- --- --- --- --- Exemption: Neither sheathing nor insulation is exposed. Wall 1: Other Framed Wall --- --- --- --- --- Exemption: Framing cavity filled with insulation Window 1: Metal Frame:Double Pane with Low-E 428 0.280 120 Door 1: Glass 237 0.280 66 Door 2: Solid 21 0.210 4 Floor 1: Other Floor: Over Unconditioned Space --- --- --- --- --- Exemption: Framing cavity not exposed. Crawl 1: Solid Concrete or Masonry --- --- --- --- --- Wall height: 0.0' Depth below grade: 0.0' Insulation depth: 0.0' Exemption: Framing cavity not exposed. Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IECC requirements in REScheck Version 4.6.4 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. David Rosenfeld •Project Architect 06/01/18 Name-Title Signature Date RECEIVED Project Title: Chatfield Renovation Report 45E/2ST-21618 Data filename: P:\1801 Chatfield\3_Public Agency\06_Building\Chatfield RESCheck.rck Page 1 of 1 ASPEN BUILDING DEPARTMENT