Loading...
HomeMy WebLinkAboutFile Documents.735 Castle Creek Dr.0167.2019 (4).ARBK l 735 Castle Creek Unit 1 Change Order 1 To Whom it May Concern, We are submitting 735 Castle Creek Dr. Unit 1 for a Change Order. Attached are specifically the sheets affected by the change order, including an updated structural drawing set. From the previously permitted iteration, the changes are as follows: Lower Level: The stairs will be over framed to being one full tread earlier. Main Level: The location of the master bathroom fixtures and master closet have been reorganized. A structural column has been removed from the kitchen, and is mitigated in the structural plans. Second Level: This will now be considered a bedroom and bathroom. Fixtures have been added, and confirmation of a window that meets egress requirements is confirmed. Please reach out for any clarification on these items. Thank you, Alexis Petre Project Manager Aspen:715 W. Main St,#04 Aspen, CO 81611 85 4EIVED Carbondale:36 N.4th Street Carbondale,CO 81623 07 10/2019 ASPEN BUILDING DEPARTMENT