HomeMy WebLinkAboutFile Documents.735 Castle Creek Dr.0167.2019 (4).ARBK l 735 Castle Creek Unit 1
Change Order 1
To Whom it May Concern,
We are submitting 735 Castle Creek Dr. Unit 1 for a Change Order. Attached are specifically the sheets affected by the change order,
including an updated structural drawing set.
From the previously permitted iteration, the changes are as follows:
Lower Level: The stairs will be over framed to being one full tread earlier.
Main Level: The location of the master bathroom fixtures and master closet have been reorganized. A structural column has been
removed from the kitchen, and is mitigated in the structural plans.
Second Level: This will now be considered a bedroom and bathroom. Fixtures have been added, and confirmation of a window that
meets egress requirements is confirmed.
Please reach out for any clarification on these items.
Thank you,
Alexis Petre
Project Manager
Aspen:715 W. Main St,#04 Aspen, CO 81611 85 4EIVED
Carbondale:36 N.4th Street Carbondale,CO 81623
07 10/2019
ASPEN
BUILDING DEPARTMENT