Loading...
HomeMy WebLinkAboutFile Documents.1130 Black Birch Dr.0096.2018 (85).ARBK CONTINUE SNOWMELT TO END OF DRIVEWAY. O N ORGANIZE LOOPS WITHIN SETBACK AREA TO BE O ISOLATED IN THE EVENT OF CONSTRUCTION. pp SEE FULL AREAIN ARCHITECTURAL SITE PLAN. CO 6 GENERAL NOTES: ) l2 © 0 0 1. OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK,LIGHTS,AND LL 3 a 3 a 0 .1 3 LL 3 O C p STRUCTURE.COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE o o - y—U STRUCTURAL ENGINEER. rc - - - W N C z x z z 0 O 2. 2.ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE o'o o 2. o 0 0 0 o O 12 O S U LL ° V A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY. -3 r`) 3 g 3 a 3 g w y o__c.1 C oz oz oz E 3.ALL MECHANICAL PIPING SHOWN DASHED SHALL BE LOCATED BELOW o o ______---- z o 0 0 C a)a)N W O Sa a1v_ THE FLOOR DECK OR BELOW GRADE. 05 SETBACK LINE 0 U L N�6 4.VERIFY FINAL LOCATIONS OF ALL MANIFOLDS WITH THE G.C.CONTACT I N � ENGINEER IF MANIFOLDS MOVE MORE THAN 10'FROM LOCATIONS O V O- SHOWN ON PLANS. I C Q a)d 5.LOCATION OF ALL THERMOSTATS AND FLOOR SENSORS ARE Sc ) N O C APPROXIMATE,COORDINATE EXACT LOCATIONS WITH THE ARCHITECT. I W T O ILOCATE FLOOR SENSORS EQUIDISTANT BETWEEN RADIANT LOOPS,AND OSI— W J=NDO NOT LOCATE WHERE THEY MAY LIKELY BE COVERED BY FUTURE Ir — — — — , Goo To EXTERIOR FACE( `,,_ VCS W- RUGS OR FURNITURE. aii OF NEW FOUNDATION WALL�J L ,>0 F 6.ALL PIPING SIZED FOR TYPE L COPPER.CONTACT ENGINEER FOR ANY 0 I I 1 r' r U V U c) CHANGE TO PEX FOR NECESSARY PIPE SIZING AND/OR PUMP CHANGES. co 725 SF 0 I I covBREo FRONT RorscB I Lisk�' I I I co 0 t O 7.INSULATE ALL PIPE LEADERS PASSING THROUGH ADJACENT ZONES. DRIVEWAY I45BF I I a G �QCO Sc Sc SO I BED-••M 1 C) V G �' a H f_,1 m I Q co I SHEET DETAIL NOTES: I 1 — • ;°`` I ` 1 �1 JI 265SF GRID TO EXTERIOR FACE 0 m O • r L J=1^ of NEW FOUNDATION WALL F a 0 CONNECT 1 Y"SMS/R TO SM-1 IN LANDSCAPING BOX.SEE SHEET M.2.011 ® 1 — J RM-5 FC-5 1 / FOR ROUTING CONTINUATION,&SHEET M.7.004 FOR SNOWMELT Ir MANIFOLD DETAIL. Sc 620 I !I�u I ZD-8 A8 8A OCONNECT 1"SMS/R TO SM-2,SM-3,SM-4&SM-5 IN LANDSCAPING BOX. I I ENTRY AB�BA F SEE SHEET M.2.011 FOR ROUTING CONTINUATION,&SHEET M.7.004 FOR r ____ I 101 Try L J SNOWMELT MANIFOLD DETAIL. O4 © I II I I . ® I TTo.RLv 350 SF v 03 ROUTE RADIANT FLOOR TUBING THRU SHOWER BENCH. I I I 'QO I Tour. ,J� m0'-r^ CL00 04 SNOW&ICE SENSOR INTERLOCKED WITH TEKMAR CONTROLLER. I — — / _ _ I RM-5 oN zaR r I�IL�J -1 GRID TO EXTERIOR FACE LOCATE BETWEEN TUBING LOOPS&ENSURE SENSOR IS NOT LOCATED0 ti — -; EVi I —I —f�� w a� of NEW FOUNDATION WALLOUNDER OVERHANG OR OTHERWISE SHIELDED FROM SNOW I , �- 1041 rI I IiSi-AIIRi 17� I \'ACCUMULATION. thi, -------- IT RM-5 OS ENSURE SNOWMELT AREA HAS EDGE INSULATION TO PREVENT HEAT I I I /J I I M�i� © I I — — ,S� ZD-9 BLEEDING AND POOR PERFORMANCE. - I r RA I ns N� I I I I ' I BEDROOM 2 I . I I B RM-7 I / 160SF I � I I '° I °- - - I 1 I= 1 0S 1 0000E ® _ O N 450 SF I 1 J 260 SF 1°o°o °o°o°o m I I I ,EEB0B0 9 SF sC Co) 5 i © I I B� ,SLOPE a SLOP s II■ ■II-11� I . 3,"C�S/R DN I I 11 IJ 4® I I N 14%SLOPES RM 7► ", 11, Nem! I1-liIll----....H I V 6- ELEV Ozr SLOP ®I L I t17T� J L �� I T OBSTRUCT.SLAB 0-' I L 141 r. J III• I M l L_ J r 'I —I W �l� 1 '© qpy FINISH SLAB 1 — AM....TNYNJ AM In.':'r:�I]::, 1 I 1 8 1 ill I L BREAK N FOLOOR ON AVIDE LLASIDE OF L 1 125S OFFICE I I ® I 0 F � S I 11� WINE ROOM I 111 I s:. PATIO m I O5 U 0 S 160 SF j ± Ei J I I— _ _ IIII 1 I FRM-6 C-6 1 ioo-i" (196 SF TOTAL) 1 CU RM-6 1 I RA ZD-12�j1! L._1 ��® 1� 1/�jrJ}/-/ 1 I OF NEW FOUNDATION WALL W eL es, I 1oorivF.2 S RM-7 I O I /��,.✓ I I"SMS/R 0 CO a ® — — — —J I FC-3 DINING ROOM - © — — — I FAMILY ROOM KITCHEN I 110 O ..... p�t NG RO•© 1n 11 J L 17y�� 150 SFna Q 40 r 1 m �L-6 f _ / CO 1 i 1 545 SF 680 SF I 1 l RE®ES ka Io� �;(e, a 1 /9 SF I_ ,II"wI r I MASTER B Sc �, 113 f-`y T I I TALL I 1 �'II 1 o�,e Sc Too.c F., I 400 S' SC AEC PROJECT#: 18002 02'. ' L I �� = OI O _ _ / I ASTER HA I \��)L GRID TO EXTERIOR FACE DATE: ISSUE: O -rO TT 3O r 'Yy1 l 9 of NEW 500c50TION WALL O y 1oa-z•° �� L �12 RM6 ^�4 04-09-18 PERMIT ® IJ I I FCC-61 © sc 06-05-18 PROGRESS 11— 4855SSF Sc I � - 1 08-10-18 PROGRESS 0 L J I I 1' '!,- - 1�.1 08-31-18 95%CD SET ° GRID FOUNDATION NDATIION FACE Cl �,{ oo, — — I 1 -L (7— — — — /® of NEwTO EXTERIOR O 01-24-19 SNOWMELT REVISION -14-18 PERMIT SET 1 I 100- T` RM-6 / _^ ,pgapp 9 SF I Iy FC-6 v O I I� SG- I I ZD-10 MASTER BED I All I .® I ® I oo\ I ® I O1 23© I I 315 SF I ,, (, Drawn By: Checked By: Li I 1 1 KBW TOC 01 I�' O ®_ L _ _ I SG A _1G TO EXTERIOR G MAIN LEVEL rF F PATIO I MECHANICAL r PIPING PLAN kORTH85SF MAIN LEVEL MECHANICAL PIPIN I PLAN L\ _- rower)) 4 SCALE 34kkr'- SCALE:3/16"=1'0" �/ 404/2019� ,' O' 4 0 FORCOOt nyCf211W1JAi10E 4(28 />����r^� <'� JO ePRIG.o„RR 10 aG EE0e5 TN,=.INC 0 N O O BOILER SCHEDULE OR EQUIVALENT PUMP SCHEDULE OR EQUIVALENT co g CAPACITY(MBH)@ GAS PRESSURE GAS RELIEF ELECTRICAL STACK OPER. DIMENSIONS UNIT MANUFACTURER& TOTAL ELECTRICAL DATA C (/) y @ UNIT MANUFACTURER& SERVICE LOCATION 7350'ASL (IN WC) VALUE FLOW MAX PD PRESS EVYF LVYF DATA DIA WF. REMARKS SERVICE LOCATION TYPE GPM HEAD REMARKS �+ •U(6 0 TAG MODEL NO. (GPM) (FT) (°F) (°F) TAG MODEL NO. (FT) V/PH/Hz HPW CO O IN OUT MIN MAX (BTU/CF) (PSI) WPM/Hz (IN) (LBS) L(IN) H(IN) W(IN) = S. 0 LOCHINVAR 1,3,GRUNDFOS MAGNA40-80 PUMP TO BE INCLUDED WITH BOILER AND OPERATE OFF 0-10 CO (0N C B-1 LOCHINVPR HEATING MECH ROOM 400.0 364.0 8 14 770 26.0 2.8 30 110 140 120/1/60 4 435 22.5 53.5 26.25 1,3,4,5,6.7 P-1 PUM20077 BOILER 1 MECH 024 INLINE 26.0 12.0 115/1/60 276 W VDC SIGNAL FROM BOILER. o C a, 0 FOR-400 Q B)2 >O LOCHINVAR 1,3,GRUNDFOS MAGNA40-80 PUMP TO BE INCLUDED WITH BOILER AND OPERATE OFF 0-10 U NdQN LOCHINVAR P-2 BOILER 2 MECH 024 INLINE 26.0 12.0 115/1/60 276W EC B-2 FTXL 400 HEATING MECH ROOM 400.0 364.0 8 14 770 26.0 2.8 30 110 140 120/1/60 4 435 22,5 53.5 26,25 1,3,4,5,6,7 PUM20077 VDC SIGNAL FROM BOILER. CI-O 00 C 1-OUTDOOR RESET,2-50%P.G.,3-30%P.G.,4-FLOW SWITCH,5-LOW LIMIT CUTOUT,6-E.P.O.SWITCH,7-POLYPROPYLENE VENT PIPING P-3a&b GRUNDFOS WATER HEATERS MECH 024 INLINE 48.0 110 115/1 l60 1/6 1,DUTY STPNDBV,SPEED 3 Ca y�V UPS 43-100F 'L t N2�,_ GRUNDFOS HEATING O U O P-4a&b MECH 024 INLINE 29.0 25.0 230/1/60 450W 1,3,DUTYSTANDBY a JQN�(0, MAGNA40-120 DISTRIBUTION AIR COOLED CHILLER SCHEDULE OR EQUIVALENT - �2 ..a) GRUNDFOS _ P-5 FC-3/MUA MECH 024 INLINE 15.0 25.0 115/1/60 1/6 1,LOCATE AFTER MIXING VALVE ADJACENT TO FC-3.SEE PIPING DIAGRAM.SPEED 2CU EVAPORATOR ELECTRICAL DATA DIMENSION UPS 26-150 F @ L O C UNIT MANUFACTURER& NOMINAL NOISE OPER. C U SERVICE LOCATION EWi LOOT PD REMARKS • LLJ T O TAG MODEL NO. TONS GPM V/PH/Hz MOP L(IN) H(IN) D(IN) (dba) WF.(LBS) P 6 GRUNDFOS SNOVMNELT MECH 024 INLINE 40.5 22.0 115/1/60 480 W 2,SPEED 2 w U LLl 3 C. (°F) (°F) (FT) UPS 40-80/2 PRIMARY _a)J= N CH-1 JTS-U-W-10D FAN COILS MECH 8.2 10.0 55 45 24.0 5.4 115/1/60 15 42 36 12 - 150 1,2,30%P.G.INTERLOCKS WITH CU-1&CU-2 GRUNDFOS SNOWMELT (� U1 i(n 0) P-7 MAGNA32-100 SECONDARY MECH 024 INLINE 33 35.0 230/1/60 1350 W 2,SPEED 1 @ F 1,2,30%PG.INTERLOCKS WITH CU-3.LEAVE - a"r U a)O CH-2 JTS-U-W-IUD FAN COILS MECH 8.2 10.0 55 45 12.0 5.4 115!1/60 15 42 36 12 - 150 2ND CIRCUIT FOR POSSIBLE FUTURE CU-4 P-8 GRUNDFOS V C V co CHILLER 1 MECH 024 INLINE 15.0 25.0 115/1/60 1/6 1,SPEED 2 UPS 26-150 F 4) @ O 1-FLEXIBLE PIPE CONNECTIONS,2-LOW AMBIENT KIT .= C 0.1.GRUNDFOS O C Cs)j P-9 CHILLER 2 MECH 024 INLINE 15.0 25.0 115/1/60 1/6 1,SPEED 2 - UPS 26-150 F L M Q V GRUNDFOS CHILLED WATER CO AIR COOLED CONDENSING UNIT SCHEDULE OR EQUIVALENT P10 MAGNA40-180 DISTRIBUTION MECH 024 INLINE 30 400 230/1 l60 600W 1,3 Q XO COMPRESSOR DATA ELECTRICAL DATA DIMENSIONS OPER. 1-30%PROPYLENE GLYCOL,2-50%PROPYLENE GLYCOL,3-VARIABLE SPEED CO UNIT MANUFACTURER& O TAG MODEL NO. SERVICE LOCATION NOM. TOTAL SENSIBLE COMPR. SEER REFRIG. AMB. V/PH/Hz MCA FUSE L(IN) H(IN) W(IN . REMARKS TONS CAP(MBH) CAP(MBH) TYPE TYPE TEMP (LBS) CU-1 CARRIER24AHA4 SPLIT CHILLER UTILITY 50 49.7 49.7 SCROLL 14.0 R-410A 85 230/1/60 31.1 50 44.5 432 175 245 LINKED UNTH CH-1 INMECHANICAL 024.PROVIDE JTS HEAT EXCHANGER SCHEDULE OR EQUIVALENT ENCLOSURESOUND BAFFLE. PRIMARY SIDE SECONDARYSIDE UTILITY LINKED IMTH CH-1 IN MECHANICAL 024.PROVIDE JTS UNIT MANUFACTURER& TOTAL DIMENSIONS CU-2 CARRIER24AHA4 SPLIT CHILLER ENCLOSURE 5.0 49.7 49.7 SCROLL 14.0 R-410A 85 230/1/60 31.1 50 44.5 43.2 17.5 245 SOUND BAFFLE. TAG MODEL NO. SERVICE LOCATION MBH EWF°F LINT°F GPM PD EWF°F LINT°F GPM PD(FT) (W�xH REMARKS ( ) ( ) (� ( ) ( ) ( ) ) UTILITY LINKED WITH CH-2 IN MECHANICAL 024.PROVIDE JTS CU-3 CARRIER 24AHA4 SPLIT CHILLER ENCLOSURE 50 49.7 49.7 SCROLL 14.0 R-410A 85 230l1/60 31.1 50 44.5 432 175245 SOUND BAFFLE. FIX-1 TRIANGLE TUBE SNOWMELT SOUTH MECH ROOM 385.0 140 120 40.5 3.7 106 130 36.0 3.0 15.2 x34.5 x5,6 BRAZED PLATE HEAT EXCHANGER.PROVIDE INSULATION IN FIELD. TTP10-50 HOT WATER GENERATOR SCHEDULE OR EQUIVALENT GLYCOL FEEDER SCHEDULE OR EQUIVALENT STORAGE BOILER MINIMUM PRESS. BOILER WATER TEMP. DOM.WATER TEMP. GPH @ DIMENSIONS UNIT MANUFACTURER& OPER. TANK DIMENSIONS ELECTRICAL DATA OPER. SERVICE LOCATION CAPACITY OUTPUT BOILER DROP 100°FAT REMARKS UNIT MANUFACTURER& FREE FLOW TAG MODEL NO. ( ) (MBH) GPM (FT) IN(°F) OUT(°F) IN(°F) OUT(°F) (S.L.) DIA(IN) H)IN) WI.(LBS) TAG MODEL NO. SERVICE LOCATION VOLUME L(IN) W(IN) H(IN) (GPM) W V/PH/Hz WEIGHT LOCATION (GAL) (LBS) I WH 1 TRIANGLE TUBE HOT WATER MECH 024 95 360 24.0 2.0 180 160 40 140 295 26 78 1365 - SMART 100 GF-1 AXIOM-MF300 HEATING MECH 024 17 11.75 11.75 36.00 0.7 50 120/1/60 160 30%PROPYLENE GLYCOL VVH 2 TRIANGLE TUBE HOT WATER MECH 024 95 360 24.0 2.0 180 160 40 140 295 26 78 1365 - U SMART 100 GF-2 AXIOM-MF200 SNOWMELT MECH 024 66 11.75 11.75 16.00 0.7 50 120/1/60 65 50%PROPYLENE GLYCOL GF-3 AXIOM-MF300 CHILLED WATER MECH 024 17 11.75 11.75 36.00 0.7 50 120/1/60 160 30%PROPYLENE GLYCOLII RADIANT SCHEDULE OR EQUIVALENT TUBE ACTIVE TOTAL W MANIFOLD ZONE MANUFACTURER& SERVICE AREA(SD BTUHI SQ SURFACE TUBE DIA SPACING NUMBER LEADER LOOP LOOP GPM GPM/ZONE PD Remarks TAG TAG MODEL NO. FT) FT FINISH (IN) (IN) LOOPS LENGTH LENGTH LENGTH LOOP (FT) EXPANSION TANK SCHEDULE OR EQUIVALENT NM- TANK ACCEPT DIMENSIONS CHARGE OPERAT. RELIEF OPER. �( W 1A UPONOR hePEX 003 Laundry 55 13 CERAMIC TILE 1/2" 9 1 10 73 93 0.2 1,2 UNIT MANUFACTURER& WATER y SERVICE LOCATION VOLUME VOLUME PRESSURE PRESSURE PRESSURE WEIGHT REMARKS TAG MODEL NO. (GAL) (GAL) DIA(IN) H(IN) (PSI) (PSI) (PSI) TEMP(°F) (LBS) 1B UPONOR hePEX 004 Bunk Room 1 220 8 WOOD FLOORING 1/2" 9 2 5 146 156 0.2 1,2,3 r l ET-1 AMTROL HEATING MECH 024 20.0 11,3 15.375 32.5 12 12 30 180 200 30%PROPYLENE GLYCOL �J EXTROL SX-40V 1 iC UPONOR hePEX 006 Bunk Bath 80 6 CERAMIC TILE 1/2" 9 1 10 106 126 0.1 1.2 0.4 1,2,3 ET-2 AMTROL SNOWMELT MECH 024 14.0 11.3 15.375 21 12 12 30 130 118 50%PROPYLENE GLYCOL 1D UPONOR hePEX 007 Bunk Room 2 230 9 WOOD FLOORING 1/2" 9 2 10 153 173 0.2 1,2,3 EXTROL 90 1 11 ET-3 AMTROL CHILLED WATER MECH 024 4.4 25 11 155 12 12 30 70 30 30%PROPYLENE GLYCOL LL 1E UPONOR hePEX 008 Bunk Bath 2 90 7 CERAMIC TILE 1/2" 9 1 20 120 160 0.1 1,2,3 EXTROL 30 CO CO 011 Rec Room,Stair,Game Room, 2 2 UPONOR hePEX Bar 1030 7 WOOD FLOORING 1/2" 9 6 5 228 238 0.3 1.5 1.1 1..2,3 O 3A UPONOR hePEX D13 Bedroom 3 215 9 WOOD FLOORING 1/2" 9 2 5 143 153 0.2 1,2,3 SNOWMELT SCHEDULE OR EQUIVALENTCO : TUBE ACTIVE TOTAL 3B UPONOR hePEX 014 Bath 100 7 CERAMIC TILE 1/2" 9 1 10 133 153 0.1 1,2,3 ZONE MANUFACTURER& SERVICE AREA BTUH/ SURFACE TUBE DIA SPACING NUMBER LEADER LOOP LOOP GPM/ GPM/ PD(FT) REMARKS 3 1.1 0.4 TAG MODEL NO. (SQ FT) SO FT FINISH (IN) LOOPS LENGTH LOOP MANIFOLD (IN) LENGTH LENGTH 3C UPONOR hePEX( 015 Bedroom 4 210 9 WOOD FLOORING 1/2" 9 2 10 140 160 0.2 1,2,3 1 WIRSBO hePEX DRIVEWAY 725 125 CONCRETE 5/8 9 6 15 161 191 1.4 8.5 6.6 1,2,3,ROUTE FROM SM-1 30 UPONOR hePEX 016 Bath 75 6 CERAMIC TILE 1/2" 9 1 20 100 140 0.1 1,2,3 2 WIRSBO hePEX WEST PATIO 620 125 CONCRETE 5/8 9 5 5 165 175 1.4 7.2 6.4 1,2,3,ROUTE FROM SM-1 3 WIRSBO hePEX SOUTH PATIO 455 125 CONCRETE 5/8 9 4 5 152 162 1.3 5.3 5.0 1,2,3,ROUTE FROM SM-2 4A UPONOR hePEX( 018 Card Room 160 6 WOOD FLOORING 1/2" 9 1 10 213 233 0.2 1,2,3 4 WIRSBO hePEX FAMILY ROOM PATIO 485 125 CONCRETE 5/8 9 4 5 162 172 1.4 5.7 6.0 1,2,3,ROUTE FROM SM-3 5 WIRSBO hePEX GREAT ROOM PATIO 230 125 CONCRETE 5/8 9 2 5 153 163 1.3 2.7 5.2 1,2,3,ROUTE FROM SM-4 4 48 UPONOR hePEX 020Theater 340 6 WOOD FLOORING 1/2" 9 2 10 226 i 246 0.2 02 06 1,2,3 6 WIRSBO hePEX MASTER BED PATIO 85 125 CONCRETE 5/8 9 1 5 113 123 1.0 1.0 2.3 1,2,3,ROUTE FROM SM-4 AEC PROJECT#: 18002 7 WIRSBO hePEX OFFICE PATIO/WINDOWS 196 125 CONCRETE 5/8 9 4 10 100 120 0.9 3.5 1.8 1,2,3,ROUTE FROM SM-5 4C UPONOR hePEX( 022 Gym 295 7 CARPET 1/2" 9 2 10 196 216 0.2 1.2.3 1-50%PROPYLENE GLYCOL,2-LEADER PIPING TO BE INSULATED-CONTACT ENGINEER IF THESE DISTANCES ARE EXCEEDED,3-INSTALL TUBING IN REVERSE RETURN LAYOUT,SEE MANUFACTURER DETAILS DATE: ISSUE: 5A UPONOR hePEX( 101 Entry,Stair 350 20 WOOD FLOORING 1/2" 9 3 5 155 165 0.5 1,2,3 Q 04-09-18 PERMIT 06-05-18 PROGRESS 56 UPONOR hePEX 103 Bedroom 265 20 WOOD FLOORING 1/2" 9 2 5 176 186 0.6 1,2,3 _ 08-10-18 PROGRESS 5 5C UPONOR hePEX( 104 Bath 1 45 26 CERAMIC TILE 1/2" 9 1 5 60 70 0.2 4.0 3.1 1,2,3 08-31-18 95%CD SET 09-14-18 PERMIT SET 5D UPONOR hePEX 106 Bedroom 260 20 WOOD FLOORING 1/2" 9 2 10 173 193 0.5 1,2,3 01-24-19 SNOWMELT REVISIONQ 5E UPONOR hePEX 108 Bath 45 8 CERAMIC TILE 1/2" 9 1 10 60 80 0.1 1,2,3 6A UPONOR hePEX 110 Dining,Great Room 680 20 WOOD FLOORING 1/2" 9 5 10 181 201 0.6 1,2,3 6B UPONOR hePEX 1110fice 125 20 WOOD FLOORING 1/2" 9 1 10 166 186 0.5 1,2,3 6 6C UPONOR hePEX 113 Master Bath 200 25 CERAMIC TILE 1/2" 9 2 10 133 153 0.5 6.0 3.3 1,2,3 Drawn By: Checked By: KBW TOC 60 UPONOR hePEX 114 Dressing Room 50 20 WOOD FLOORING 1/2" 9 1 10 87 87 0.2 1,2,3 6E UPONOR hePEX 115 Master Bed,Hall 315 20 WOOD FLOORING 1/2" 9 3 10 140 160 0.4 1,2,3 MECHANICAL 7A UPONOR hePEX 116 Kitchen,Family Room 545 20 WOOD FLOORING 1/2" 9 4 10 181 201 06 1,2,3 SCHEDULES 7 7B UPONOR hePEX 119 Mudroom,Pantry,Powder 160 17 WOOD FLOORING 1/2" 9 1 10 213 233 0.6 5.0 4.8 1,2,3 7C UPONOR hePEX( 120 Garage 450 22 CONCRETE 1/2" 9 3 10 200 220 0.7 1,2 1-30%PROPYLENE GLYCOL,2-PROPERLY INSULATE ALL LEADERS-CONTACT ENGINEER IF DISTANCES SHOWN ARE EXCEEDED,3-FLOOR SENSOR 49 r -,,,,,, �4 li II 04/2019 `'9 iti tonyf o IZaf o`e -0 COPYRIGHT 2017 RRCHTECNR>L a iaeEERING*TAHT5.INC..-