Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.1130 Black Birch Dr.0096.2018 (85).ARBK
CONTINUE SNOWMELT TO END OF DRIVEWAY. O N ORGANIZE LOOPS WITHIN SETBACK AREA TO BE O ISOLATED IN THE EVENT OF CONSTRUCTION. pp SEE FULL AREAIN ARCHITECTURAL SITE PLAN. CO 6 GENERAL NOTES: ) l2 © 0 0 1. OFFSET PIPING AS REQUIRED TO AVOID ALL DUCTWORK,LIGHTS,AND LL 3 a 3 a 0 .1 3 LL 3 O C p STRUCTURE.COORDINATE ALL STRUCTURAL PENETRATIONS WITH THE o o - y—U STRUCTURAL ENGINEER. rc - - - W N C z x z z 0 O 2. 2.ALL PIPING PASSING THROUGH FIRE-RATED ASSEMBLIES SHALL INCLUDE o'o o 2. o 0 0 0 o O 12 O S U LL ° V A FIRE-RATED PIPE SEALANT RATED TO MATCH THAT OF THE ASSEMBLY. -3 r`) 3 g 3 a 3 g w y o__c.1 C oz oz oz E 3.ALL MECHANICAL PIPING SHOWN DASHED SHALL BE LOCATED BELOW o o ______---- z o 0 0 C a)a)N W O Sa a1v_ THE FLOOR DECK OR BELOW GRADE. 05 SETBACK LINE 0 U L N�6 4.VERIFY FINAL LOCATIONS OF ALL MANIFOLDS WITH THE G.C.CONTACT I N � ENGINEER IF MANIFOLDS MOVE MORE THAN 10'FROM LOCATIONS O V O- SHOWN ON PLANS. I C Q a)d 5.LOCATION OF ALL THERMOSTATS AND FLOOR SENSORS ARE Sc ) N O C APPROXIMATE,COORDINATE EXACT LOCATIONS WITH THE ARCHITECT. I W T O ILOCATE FLOOR SENSORS EQUIDISTANT BETWEEN RADIANT LOOPS,AND OSI— W J=NDO NOT LOCATE WHERE THEY MAY LIKELY BE COVERED BY FUTURE Ir — — — — , Goo To EXTERIOR FACE( `,,_ VCS W- RUGS OR FURNITURE. aii OF NEW FOUNDATION WALL�J L ,>0 F 6.ALL PIPING SIZED FOR TYPE L COPPER.CONTACT ENGINEER FOR ANY 0 I I 1 r' r U V U c) CHANGE TO PEX FOR NECESSARY PIPE SIZING AND/OR PUMP CHANGES. co 725 SF 0 I I covBREo FRONT RorscB I Lisk�' I I I co 0 t O 7.INSULATE ALL PIPE LEADERS PASSING THROUGH ADJACENT ZONES. DRIVEWAY I45BF I I a G �QCO Sc Sc SO I BED-••M 1 C) V G �' a H f_,1 m I Q co I SHEET DETAIL NOTES: I 1 — • ;°`` I ` 1 �1 JI 265SF GRID TO EXTERIOR FACE 0 m O • r L J=1^ of NEW FOUNDATION WALL F a 0 CONNECT 1 Y"SMS/R TO SM-1 IN LANDSCAPING BOX.SEE SHEET M.2.011 ® 1 — J RM-5 FC-5 1 / FOR ROUTING CONTINUATION,&SHEET M.7.004 FOR SNOWMELT Ir MANIFOLD DETAIL. Sc 620 I !I�u I ZD-8 A8 8A OCONNECT 1"SMS/R TO SM-2,SM-3,SM-4&SM-5 IN LANDSCAPING BOX. I I ENTRY AB�BA F SEE SHEET M.2.011 FOR ROUTING CONTINUATION,&SHEET M.7.004 FOR r ____ I 101 Try L J SNOWMELT MANIFOLD DETAIL. O4 © I II I I . ® I TTo.RLv 350 SF v 03 ROUTE RADIANT FLOOR TUBING THRU SHOWER BENCH. I I I 'QO I Tour. ,J� m0'-r^ CL00 04 SNOW&ICE SENSOR INTERLOCKED WITH TEKMAR CONTROLLER. I — — / _ _ I RM-5 oN zaR r I�IL�J -1 GRID TO EXTERIOR FACE LOCATE BETWEEN TUBING LOOPS&ENSURE SENSOR IS NOT LOCATED0 ti — -; EVi I —I —f�� w a� of NEW FOUNDATION WALLOUNDER OVERHANG OR OTHERWISE SHIELDED FROM SNOW I , �- 1041 rI I IiSi-AIIRi 17� I \'ACCUMULATION. thi, -------- IT RM-5 OS ENSURE SNOWMELT AREA HAS EDGE INSULATION TO PREVENT HEAT I I I /J I I M�i� © I I — — ,S� ZD-9 BLEEDING AND POOR PERFORMANCE. - I r RA I ns N� I I I I ' I BEDROOM 2 I . I I B RM-7 I / 160SF I � I I '° I °- - - I 1 I= 1 0S 1 0000E ® _ O N 450 SF I 1 J 260 SF 1°o°o °o°o°o m I I I ,EEB0B0 9 SF sC Co) 5 i © I I B� ,SLOPE a SLOP s II■ ■II-11� I . 3,"C�S/R DN I I 11 IJ 4® I I N 14%SLOPES RM 7► ", 11, Nem! I1-liIll----....H I V 6- ELEV Ozr SLOP ®I L I t17T� J L �� I T OBSTRUCT.SLAB 0-' I L 141 r. J III• I M l L_ J r 'I —I W �l� 1 '© qpy FINISH SLAB 1 — AM....TNYNJ AM In.':'r:�I]::, 1 I 1 8 1 ill I L BREAK N FOLOOR ON AVIDE LLASIDE OF L 1 125S OFFICE I I ® I 0 F � S I 11� WINE ROOM I 111 I s:. PATIO m I O5 U 0 S 160 SF j ± Ei J I I— _ _ IIII 1 I FRM-6 C-6 1 ioo-i" (196 SF TOTAL) 1 CU RM-6 1 I RA ZD-12�j1! L._1 ��® 1� 1/�jrJ}/-/ 1 I OF NEW FOUNDATION WALL W eL es, I 1oorivF.2 S RM-7 I O I /��,.✓ I I"SMS/R 0 CO a ® — — — —J I FC-3 DINING ROOM - © — — — I FAMILY ROOM KITCHEN I 110 O ..... p�t NG RO•© 1n 11 J L 17y�� 150 SFna Q 40 r 1 m �L-6 f _ / CO 1 i 1 545 SF 680 SF I 1 l RE®ES ka Io� �;(e, a 1 /9 SF I_ ,II"wI r I MASTER B Sc �, 113 f-`y T I I TALL I 1 �'II 1 o�,e Sc Too.c F., I 400 S' SC AEC PROJECT#: 18002 02'. ' L I �� = OI O _ _ / I ASTER HA I \��)L GRID TO EXTERIOR FACE DATE: ISSUE: O -rO TT 3O r 'Yy1 l 9 of NEW 500c50TION WALL O y 1oa-z•° �� L �12 RM6 ^�4 04-09-18 PERMIT ® IJ I I FCC-61 © sc 06-05-18 PROGRESS 11— 4855SSF Sc I � - 1 08-10-18 PROGRESS 0 L J I I 1' '!,- - 1�.1 08-31-18 95%CD SET ° GRID FOUNDATION NDATIION FACE Cl �,{ oo, — — I 1 -L (7— — — — /® of NEwTO EXTERIOR O 01-24-19 SNOWMELT REVISION -14-18 PERMIT SET 1 I 100- T` RM-6 / _^ ,pgapp 9 SF I Iy FC-6 v O I I� SG- I I ZD-10 MASTER BED I All I .® I ® I oo\ I ® I O1 23© I I 315 SF I ,, (, Drawn By: Checked By: Li I 1 1 KBW TOC 01 I�' O ®_ L _ _ I SG A _1G TO EXTERIOR G MAIN LEVEL rF F PATIO I MECHANICAL r PIPING PLAN kORTH85SF MAIN LEVEL MECHANICAL PIPIN I PLAN L\ _- rower)) 4 SCALE 34kkr'- SCALE:3/16"=1'0" �/ 404/2019� ,' O' 4 0 FORCOOt nyCf211W1JAi10E 4(28 />����r^� <'� JO ePRIG.o„RR 10 aG EE0e5 TN,=.INC 0 N O O BOILER SCHEDULE OR EQUIVALENT PUMP SCHEDULE OR EQUIVALENT co g CAPACITY(MBH)@ GAS PRESSURE GAS RELIEF ELECTRICAL STACK OPER. DIMENSIONS UNIT MANUFACTURER& TOTAL ELECTRICAL DATA C (/) y @ UNIT MANUFACTURER& SERVICE LOCATION 7350'ASL (IN WC) VALUE FLOW MAX PD PRESS EVYF LVYF DATA DIA WF. REMARKS SERVICE LOCATION TYPE GPM HEAD REMARKS �+ •U(6 0 TAG MODEL NO. (GPM) (FT) (°F) (°F) TAG MODEL NO. (FT) V/PH/Hz HPW CO O IN OUT MIN MAX (BTU/CF) (PSI) WPM/Hz (IN) (LBS) L(IN) H(IN) W(IN) = S. 0 LOCHINVAR 1,3,GRUNDFOS MAGNA40-80 PUMP TO BE INCLUDED WITH BOILER AND OPERATE OFF 0-10 CO (0N C B-1 LOCHINVPR HEATING MECH ROOM 400.0 364.0 8 14 770 26.0 2.8 30 110 140 120/1/60 4 435 22.5 53.5 26.25 1,3,4,5,6.7 P-1 PUM20077 BOILER 1 MECH 024 INLINE 26.0 12.0 115/1/60 276 W VDC SIGNAL FROM BOILER. o C a, 0 FOR-400 Q B)2 >O LOCHINVAR 1,3,GRUNDFOS MAGNA40-80 PUMP TO BE INCLUDED WITH BOILER AND OPERATE OFF 0-10 U NdQN LOCHINVAR P-2 BOILER 2 MECH 024 INLINE 26.0 12.0 115/1/60 276W EC B-2 FTXL 400 HEATING MECH ROOM 400.0 364.0 8 14 770 26.0 2.8 30 110 140 120/1/60 4 435 22,5 53.5 26,25 1,3,4,5,6,7 PUM20077 VDC SIGNAL FROM BOILER. CI-O 00 C 1-OUTDOOR RESET,2-50%P.G.,3-30%P.G.,4-FLOW SWITCH,5-LOW LIMIT CUTOUT,6-E.P.O.SWITCH,7-POLYPROPYLENE VENT PIPING P-3a&b GRUNDFOS WATER HEATERS MECH 024 INLINE 48.0 110 115/1 l60 1/6 1,DUTY STPNDBV,SPEED 3 Ca y�V UPS 43-100F 'L t N2�,_ GRUNDFOS HEATING O U O P-4a&b MECH 024 INLINE 29.0 25.0 230/1/60 450W 1,3,DUTYSTANDBY a JQN�(0, MAGNA40-120 DISTRIBUTION AIR COOLED CHILLER SCHEDULE OR EQUIVALENT - �2 ..a) GRUNDFOS _ P-5 FC-3/MUA MECH 024 INLINE 15.0 25.0 115/1/60 1/6 1,LOCATE AFTER MIXING VALVE ADJACENT TO FC-3.SEE PIPING DIAGRAM.SPEED 2CU EVAPORATOR ELECTRICAL DATA DIMENSION UPS 26-150 F @ L O C UNIT MANUFACTURER& NOMINAL NOISE OPER. C U SERVICE LOCATION EWi LOOT PD REMARKS • LLJ T O TAG MODEL NO. TONS GPM V/PH/Hz MOP L(IN) H(IN) D(IN) (dba) WF.(LBS) P 6 GRUNDFOS SNOVMNELT MECH 024 INLINE 40.5 22.0 115/1/60 480 W 2,SPEED 2 w U LLl 3 C. (°F) (°F) (FT) UPS 40-80/2 PRIMARY _a)J= N CH-1 JTS-U-W-10D FAN COILS MECH 8.2 10.0 55 45 24.0 5.4 115/1/60 15 42 36 12 - 150 1,2,30%P.G.INTERLOCKS WITH CU-1&CU-2 GRUNDFOS SNOWMELT (� U1 i(n 0) P-7 MAGNA32-100 SECONDARY MECH 024 INLINE 33 35.0 230/1/60 1350 W 2,SPEED 1 @ F 1,2,30%PG.INTERLOCKS WITH CU-3.LEAVE - a"r U a)O CH-2 JTS-U-W-IUD FAN COILS MECH 8.2 10.0 55 45 12.0 5.4 115!1/60 15 42 36 12 - 150 2ND CIRCUIT FOR POSSIBLE FUTURE CU-4 P-8 GRUNDFOS V C V co CHILLER 1 MECH 024 INLINE 15.0 25.0 115/1/60 1/6 1,SPEED 2 UPS 26-150 F 4) @ O 1-FLEXIBLE PIPE CONNECTIONS,2-LOW AMBIENT KIT .= C 0.1.GRUNDFOS O C Cs)j P-9 CHILLER 2 MECH 024 INLINE 15.0 25.0 115/1/60 1/6 1,SPEED 2 - UPS 26-150 F L M Q V GRUNDFOS CHILLED WATER CO AIR COOLED CONDENSING UNIT SCHEDULE OR EQUIVALENT P10 MAGNA40-180 DISTRIBUTION MECH 024 INLINE 30 400 230/1 l60 600W 1,3 Q XO COMPRESSOR DATA ELECTRICAL DATA DIMENSIONS OPER. 1-30%PROPYLENE GLYCOL,2-50%PROPYLENE GLYCOL,3-VARIABLE SPEED CO UNIT MANUFACTURER& O TAG MODEL NO. SERVICE LOCATION NOM. TOTAL SENSIBLE COMPR. SEER REFRIG. AMB. V/PH/Hz MCA FUSE L(IN) H(IN) W(IN . REMARKS TONS CAP(MBH) CAP(MBH) TYPE TYPE TEMP (LBS) CU-1 CARRIER24AHA4 SPLIT CHILLER UTILITY 50 49.7 49.7 SCROLL 14.0 R-410A 85 230/1/60 31.1 50 44.5 432 175 245 LINKED UNTH CH-1 INMECHANICAL 024.PROVIDE JTS HEAT EXCHANGER SCHEDULE OR EQUIVALENT ENCLOSURESOUND BAFFLE. PRIMARY SIDE SECONDARYSIDE UTILITY LINKED IMTH CH-1 IN MECHANICAL 024.PROVIDE JTS UNIT MANUFACTURER& TOTAL DIMENSIONS CU-2 CARRIER24AHA4 SPLIT CHILLER ENCLOSURE 5.0 49.7 49.7 SCROLL 14.0 R-410A 85 230/1/60 31.1 50 44.5 43.2 17.5 245 SOUND BAFFLE. TAG MODEL NO. SERVICE LOCATION MBH EWF°F LINT°F GPM PD EWF°F LINT°F GPM PD(FT) (W�xH REMARKS ( ) ( ) (� ( ) ( ) ( ) ) UTILITY LINKED WITH CH-2 IN MECHANICAL 024.PROVIDE JTS CU-3 CARRIER 24AHA4 SPLIT CHILLER ENCLOSURE 50 49.7 49.7 SCROLL 14.0 R-410A 85 230l1/60 31.1 50 44.5 432 175245 SOUND BAFFLE. FIX-1 TRIANGLE TUBE SNOWMELT SOUTH MECH ROOM 385.0 140 120 40.5 3.7 106 130 36.0 3.0 15.2 x34.5 x5,6 BRAZED PLATE HEAT EXCHANGER.PROVIDE INSULATION IN FIELD. TTP10-50 HOT WATER GENERATOR SCHEDULE OR EQUIVALENT GLYCOL FEEDER SCHEDULE OR EQUIVALENT STORAGE BOILER MINIMUM PRESS. BOILER WATER TEMP. DOM.WATER TEMP. GPH @ DIMENSIONS UNIT MANUFACTURER& OPER. TANK DIMENSIONS ELECTRICAL DATA OPER. SERVICE LOCATION CAPACITY OUTPUT BOILER DROP 100°FAT REMARKS UNIT MANUFACTURER& FREE FLOW TAG MODEL NO. ( ) (MBH) GPM (FT) IN(°F) OUT(°F) IN(°F) OUT(°F) (S.L.) DIA(IN) H)IN) WI.(LBS) TAG MODEL NO. SERVICE LOCATION VOLUME L(IN) W(IN) H(IN) (GPM) W V/PH/Hz WEIGHT LOCATION (GAL) (LBS) I WH 1 TRIANGLE TUBE HOT WATER MECH 024 95 360 24.0 2.0 180 160 40 140 295 26 78 1365 - SMART 100 GF-1 AXIOM-MF300 HEATING MECH 024 17 11.75 11.75 36.00 0.7 50 120/1/60 160 30%PROPYLENE GLYCOL VVH 2 TRIANGLE TUBE HOT WATER MECH 024 95 360 24.0 2.0 180 160 40 140 295 26 78 1365 - U SMART 100 GF-2 AXIOM-MF200 SNOWMELT MECH 024 66 11.75 11.75 16.00 0.7 50 120/1/60 65 50%PROPYLENE GLYCOL GF-3 AXIOM-MF300 CHILLED WATER MECH 024 17 11.75 11.75 36.00 0.7 50 120/1/60 160 30%PROPYLENE GLYCOLII RADIANT SCHEDULE OR EQUIVALENT TUBE ACTIVE TOTAL W MANIFOLD ZONE MANUFACTURER& SERVICE AREA(SD BTUHI SQ SURFACE TUBE DIA SPACING NUMBER LEADER LOOP LOOP GPM GPM/ZONE PD Remarks TAG TAG MODEL NO. FT) FT FINISH (IN) (IN) LOOPS LENGTH LENGTH LENGTH LOOP (FT) EXPANSION TANK SCHEDULE OR EQUIVALENT NM- TANK ACCEPT DIMENSIONS CHARGE OPERAT. RELIEF OPER. �( W 1A UPONOR hePEX 003 Laundry 55 13 CERAMIC TILE 1/2" 9 1 10 73 93 0.2 1,2 UNIT MANUFACTURER& WATER y SERVICE LOCATION VOLUME VOLUME PRESSURE PRESSURE PRESSURE WEIGHT REMARKS TAG MODEL NO. (GAL) (GAL) DIA(IN) H(IN) (PSI) (PSI) (PSI) TEMP(°F) (LBS) 1B UPONOR hePEX 004 Bunk Room 1 220 8 WOOD FLOORING 1/2" 9 2 5 146 156 0.2 1,2,3 r l ET-1 AMTROL HEATING MECH 024 20.0 11,3 15.375 32.5 12 12 30 180 200 30%PROPYLENE GLYCOL �J EXTROL SX-40V 1 iC UPONOR hePEX 006 Bunk Bath 80 6 CERAMIC TILE 1/2" 9 1 10 106 126 0.1 1.2 0.4 1,2,3 ET-2 AMTROL SNOWMELT MECH 024 14.0 11.3 15.375 21 12 12 30 130 118 50%PROPYLENE GLYCOL 1D UPONOR hePEX 007 Bunk Room 2 230 9 WOOD FLOORING 1/2" 9 2 10 153 173 0.2 1,2,3 EXTROL 90 1 11 ET-3 AMTROL CHILLED WATER MECH 024 4.4 25 11 155 12 12 30 70 30 30%PROPYLENE GLYCOL LL 1E UPONOR hePEX 008 Bunk Bath 2 90 7 CERAMIC TILE 1/2" 9 1 20 120 160 0.1 1,2,3 EXTROL 30 CO CO 011 Rec Room,Stair,Game Room, 2 2 UPONOR hePEX Bar 1030 7 WOOD FLOORING 1/2" 9 6 5 228 238 0.3 1.5 1.1 1..2,3 O 3A UPONOR hePEX D13 Bedroom 3 215 9 WOOD FLOORING 1/2" 9 2 5 143 153 0.2 1,2,3 SNOWMELT SCHEDULE OR EQUIVALENTCO : TUBE ACTIVE TOTAL 3B UPONOR hePEX 014 Bath 100 7 CERAMIC TILE 1/2" 9 1 10 133 153 0.1 1,2,3 ZONE MANUFACTURER& SERVICE AREA BTUH/ SURFACE TUBE DIA SPACING NUMBER LEADER LOOP LOOP GPM/ GPM/ PD(FT) REMARKS 3 1.1 0.4 TAG MODEL NO. (SQ FT) SO FT FINISH (IN) LOOPS LENGTH LOOP MANIFOLD (IN) LENGTH LENGTH 3C UPONOR hePEX( 015 Bedroom 4 210 9 WOOD FLOORING 1/2" 9 2 10 140 160 0.2 1,2,3 1 WIRSBO hePEX DRIVEWAY 725 125 CONCRETE 5/8 9 6 15 161 191 1.4 8.5 6.6 1,2,3,ROUTE FROM SM-1 30 UPONOR hePEX 016 Bath 75 6 CERAMIC TILE 1/2" 9 1 20 100 140 0.1 1,2,3 2 WIRSBO hePEX WEST PATIO 620 125 CONCRETE 5/8 9 5 5 165 175 1.4 7.2 6.4 1,2,3,ROUTE FROM SM-1 3 WIRSBO hePEX SOUTH PATIO 455 125 CONCRETE 5/8 9 4 5 152 162 1.3 5.3 5.0 1,2,3,ROUTE FROM SM-2 4A UPONOR hePEX( 018 Card Room 160 6 WOOD FLOORING 1/2" 9 1 10 213 233 0.2 1,2,3 4 WIRSBO hePEX FAMILY ROOM PATIO 485 125 CONCRETE 5/8 9 4 5 162 172 1.4 5.7 6.0 1,2,3,ROUTE FROM SM-3 5 WIRSBO hePEX GREAT ROOM PATIO 230 125 CONCRETE 5/8 9 2 5 153 163 1.3 2.7 5.2 1,2,3,ROUTE FROM SM-4 4 48 UPONOR hePEX 020Theater 340 6 WOOD FLOORING 1/2" 9 2 10 226 i 246 0.2 02 06 1,2,3 6 WIRSBO hePEX MASTER BED PATIO 85 125 CONCRETE 5/8 9 1 5 113 123 1.0 1.0 2.3 1,2,3,ROUTE FROM SM-4 AEC PROJECT#: 18002 7 WIRSBO hePEX OFFICE PATIO/WINDOWS 196 125 CONCRETE 5/8 9 4 10 100 120 0.9 3.5 1.8 1,2,3,ROUTE FROM SM-5 4C UPONOR hePEX( 022 Gym 295 7 CARPET 1/2" 9 2 10 196 216 0.2 1.2.3 1-50%PROPYLENE GLYCOL,2-LEADER PIPING TO BE INSULATED-CONTACT ENGINEER IF THESE DISTANCES ARE EXCEEDED,3-INSTALL TUBING IN REVERSE RETURN LAYOUT,SEE MANUFACTURER DETAILS DATE: ISSUE: 5A UPONOR hePEX( 101 Entry,Stair 350 20 WOOD FLOORING 1/2" 9 3 5 155 165 0.5 1,2,3 Q 04-09-18 PERMIT 06-05-18 PROGRESS 56 UPONOR hePEX 103 Bedroom 265 20 WOOD FLOORING 1/2" 9 2 5 176 186 0.6 1,2,3 _ 08-10-18 PROGRESS 5 5C UPONOR hePEX( 104 Bath 1 45 26 CERAMIC TILE 1/2" 9 1 5 60 70 0.2 4.0 3.1 1,2,3 08-31-18 95%CD SET 09-14-18 PERMIT SET 5D UPONOR hePEX 106 Bedroom 260 20 WOOD FLOORING 1/2" 9 2 10 173 193 0.5 1,2,3 01-24-19 SNOWMELT REVISIONQ 5E UPONOR hePEX 108 Bath 45 8 CERAMIC TILE 1/2" 9 1 10 60 80 0.1 1,2,3 6A UPONOR hePEX 110 Dining,Great Room 680 20 WOOD FLOORING 1/2" 9 5 10 181 201 0.6 1,2,3 6B UPONOR hePEX 1110fice 125 20 WOOD FLOORING 1/2" 9 1 10 166 186 0.5 1,2,3 6 6C UPONOR hePEX 113 Master Bath 200 25 CERAMIC TILE 1/2" 9 2 10 133 153 0.5 6.0 3.3 1,2,3 Drawn By: Checked By: KBW TOC 60 UPONOR hePEX 114 Dressing Room 50 20 WOOD FLOORING 1/2" 9 1 10 87 87 0.2 1,2,3 6E UPONOR hePEX 115 Master Bed,Hall 315 20 WOOD FLOORING 1/2" 9 3 10 140 160 0.4 1,2,3 MECHANICAL 7A UPONOR hePEX 116 Kitchen,Family Room 545 20 WOOD FLOORING 1/2" 9 4 10 181 201 06 1,2,3 SCHEDULES 7 7B UPONOR hePEX 119 Mudroom,Pantry,Powder 160 17 WOOD FLOORING 1/2" 9 1 10 213 233 0.6 5.0 4.8 1,2,3 7C UPONOR hePEX( 120 Garage 450 22 CONCRETE 1/2" 9 3 10 200 220 0.7 1,2 1-30%PROPYLENE GLYCOL,2-PROPERLY INSULATE ALL LEADERS-CONTACT ENGINEER IF DISTANCES SHOWN ARE EXCEEDED,3-FLOOR SENSOR 49 r -,,,,,, �4 li II 04/2019 `'9 iti tonyf o IZaf o`e -0 COPYRIGHT 2017 RRCHTECNR>L a iaeEERING*TAHT5.INC..-