Loading...
HomeMy WebLinkAboutFile Documents.1130 Black Birch Dr.0046.2019 (15).ARBK DATE:02.22.2019 MASTER PERMIT:0096.2018.ARBK PERMIT NUMBER:0046.2019.ARBK • COMMUNITY DEVELOPMENT DEPARTMENT ���p HO BUILDING PERMIT APPLICATION 41. ` CITY OF ASPE N PROPERTY INFORMATION ADDRESS 1130 BLACK BIRCH UNIT# PARCEL ID# 273501307009 LOT 13 BLOCK TR SUBDIVISION BLACK BIRCH ESTATES SUBDIVISION OOWNER NAME RIVERFRONT FORK LLC CELL 806.543.3200 EMAIL JOHN@DEPERMIAN.COM BEST CONTACT ANDREW DILLON CELL 970.319.6881 EMAIL ADILLON@FORUMPHI.COM NAME PROJECT DETAILS (READ DEFINITIONS BELOW) COMPLCTIONMUSTBE COMPLETED IN ITS ENTIRETY % DESCRIPTON OF WORK INIDETAIL DEMOLITION OF EXISTING HOUSE AND DETACHED GARAGE. CONSTRUCTION OF NEW SINGLE FAMILY RESIDENCE PROJECT 8,084,775 Use of Building Class of Work Fixture Counts Important Review Triggers VALUATION ❑ Commerical ❑■ New 13 Toilets,Bidets Major Engineering Review SQFTOF 0 Multi-Family El Addition 6 Bathtub •Projects involving less than 50% WUORKIAREA 0 0 Single Family 0 Alteration 16 Lavatory(Wash Basin) hardscape area and work affecting 0 Mixed-Use 0 Repair 9 Shower 75%or greater of unit sq ft 8,509i Kitchen Sink(+Disposal) •Projects involving greater than UNIT SQ FT 0 0 IFFR 2 Dishwasher 50%hardscape area and work LOT SIZE El Tenant Finish 1 Laundry Bar,Utility Sink affecting 50%or greater of unit (SQ FT) 20,253 Will there be 0 Demolition Clothes Washer sq ft SQFTOFSOIL 20,253 any roof/wall 0 Change Order o Floor Sink •Projects involving 1,000+sq ft of DISTURBANCE penetrations? 0 10 Floor Drain soil disturbance area ❑■ Yes 2 Water Heater(Pan Req) NEW SQ FT 8,509 0 No 8 #Gas Outlets Water Efficient Landscaping Water Treatment •Projects that trigger a major BUILDING 3,915 Other engineering review FOOTPRINT NOTICE: This permit becomes null and void if work •Projects involving interior or construction authorized is not commenced within affecting 50%or more HARDSCAPE 2,760 180 days,or if construction or work is suspended or alterations e ngross square footage AREA abandoned for a period of 180 days at any time after g q g ZONE R-30 work is commenced. DISTRICT •. i Project Valuation:Cost of project as defined in Valuation Affadavit. Sq Ft of Building Work Area:Total square footage of interior area undergoing change or reconfiguration. O Unit Sq Ft:Gross square footage, not FAR,of permitted unit. H Lot Size:Total surveyed square footage of property. APPROVALS Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbed Reviewing Needs Reviewer Date Z New Sq Ft:Total added square footage for additions to net livable or net leasable space. Department Review Sign-Off Approved w Building Footprint:Grade floor square footage of the permitted structure. PC X LL 2/26/2019 0 Hardscape Area:Square footage of impervious lot surface. Zone District:Underlying zone district of permitted parcel. Zoning x BN 3/5/2019 HPC Building x TF 5/24/19 SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Fire Building Building Engineering x MH 5/24/19 Review Permit Fee 25 00 Parks Impact $672.26 CMP Engineering Zoning School Lands O Water Review Review(50%) Dedication Stormwater Zoning CMP(50%) TDM Impact $75.24 Sanitation Review(50%) Energy Code REMP Pedestrian Env. Health 0 Review Payment Amenity Parks x Dr 4/26/2019 CMP(50%) GIS Housing Cash in Lieu $6,851.98 Landscape City Use Efficiency X RM 3/11/19 Parks Review Water Tap Tax Approved 11 DAM 5/24/19 County Use To Issue Utility Review Tax Sanitation Issuance ( CITY OF ASPEN January2019 CO1. s,/1u 130 S. GALENA ST ASPEN, O 81611