Loading...
HomeMy WebLinkAboutFile Documents.905 Chatfield Rd.0111.2018 (173).ARBK 2015 IECC RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM CITY OF ASPEN VERSION 11.3 UPDA T.ED DEC.EMBER 13 2017 PROJECT ADDRESS: 905 Chatfield Rd.Aspen, CO 81611 Parcel ID#: 273502402004 Permit Number: CONTACT INFORMATION : Owner: Name: Bill&Karyn Silverstein City: Highland Park Address: 1569 Forest Ave State: Illinois Email: bsilverstein@mainholdingsllc.com Zip Code: 60035 Phone: Cell Phone: 773-505-0807 Owner's Representative: Name: CCY Architects:Gage Reese City: Basalt Address: 228 Midland Ave Box 529 State: Colorado Email: greese@ccyarchitects.com Zip Code: 81621 Phone: 970-927-4925 Cell Phone: A. RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM Sheets showing snowmelt, pool,spa, and solar/GSHP information:I M001, M101 Do you have snowmelt or a spa that has been exempted by the buiding official? OYes(enter sqft below on the exempt row) ®No Hydro Snowmelt Electric Snowmelt Pool Spa Existing 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft To be Demoed 728.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft Existing to Remain -728.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft New(non-exempt) 1633.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft New(exempt) 0.00 sqft 0.00 sqft 0.00 sqft Total New 1633.00 sqft 0.00 sqft I 0.00 sqft 0.00 sqft Total on site 905.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft Total Snowmelt on site 905.00 sqft Boiler Efficiency 95.0% I 100% 95.0% 100.0% Mitigation Payment $32,389.47 $ - $ - Total Payment for Mitigation: $ 32,389.47 B. ON-SITE RENEWABLE CREDITS Supplemental System REMP Credit Use PV Worksheet Photovoltaic System $ 51,605.24 Use Thermal Worksheet Hot Water Panels $Use GSHP Cert Ground Source Heat Pump $ - Other Approved System $ - Total Mitigation Credits: $ 51,605.24 Onsite Renewable Offsets: How many Kilo Watts of PV(solar electric)would I need? 4.72 or How many square feet of SHW(solar hot water)would I need? 144.18 R-REMP Payment: $ - Amount Previously Paid on This Permit:I I TOTAL R-REMP PAYMENT: $ - Refund(includes minus$750): $ - C. PREPARED BY: Date: 10/9/2018 Print Name: Jeff HerschelNauxhat �'��Signature: �' 1,9 Phone&EMail: 970-845-7910 x304-jeff@raderengineering.com REVIEWED: JH Date: 1/22/19 PV WORKSHEET CITY OF ASPEN VERSION 11.3 UPDATED DECEMBER 13, 2017 PROJECT ADDRESS: 905 Chatfield Rd.Aspen,CO 81611 Parcel ID#: 273502402004 Permit Number: 0111.2018.ARBK Collector Solar Aspect,Degrees Collector Tilt, Orientation from True South Degrees From Adjustment DC side capacity Inverter capacity kW for kW Mitigation Horizontal Factor (kW) (kW) credit Credit Collector Group 1 165 3.6 87.00% 8.64 10 8.64 7.52 kW Collector Group 2 87.00% 0 0.00 kW Collector Group 3 87.00% 0 0.00 kW Collector Group 4 87.00% 0 0.00 kW Collector Group 5 87.00% 0 0.00 kW Collector Group 6 87.00% 0 0.00 kW Collector Group 7 87.00% 0 0.00 kW Collector Group 8 87.00% 0 0.00 kW Collector Group 9 87.00% 0 0.00 kW Collector Group 10 87.00% 0 0.00 kW Collector Group 11 87.00% 0 0.00 kW Collector Group 12 87.00% 0 0.00 kW Collector Group 13 87.00% 0 0.00 kW Collector Group 14 87.00% 0 0.00 kW Collector Group 15 87.00% 0 0.00 kW Collector Group 16 87.00% 0 0.00 kW Collector Group 17 87.00% 0 0.00 kW Collector Group 18 87.00% 0 0.00 kW Collector Group 19 87.00% 0 0.00 kW Collector Group 20 87.00% 0 0.00 kW Total: 7.52 kW $Mitigation Credit: $ 51,605.24 Instructions: 1) Determine how many collector groups you have.Groups are used to differentiate between collectors (panels)with different tilts,aspects,sizing,or inverters. If all your collectors are installed similarily,you might have just one group. 2) Enter the aspect and tilt for each group.The solar orientation adjustment factor is automatically calculated. 3) DC side capacity is the total labled panel output kW in a group. 4) Inverter capacity is the recommended input power in kW of your inverter(s). 5)You will be given credit for the lesser of the labeled panel output or the inverter. 6) The kW for credit is multiplied by the solar orientation adjustment factor to get kW mitigation credit. 7) The kW mitigation credit is totalled and multiplied by$6865.32/kW to get the$Mitigation Credit 8) The mitigation credit will be automatically entered into your RREMP or CREMP form. If your project has both RREMP and CREMP,it will automatically divide the credits up,with priority given to mitigating the CREMP payment. PREPARED BY: Date: Print Name: Signature: Phone&EMail: REVIEWED: Date: