Loading...
HomeMy WebLinkAboutFile Documents.121 E Hyman Ave.0149.2018 (120).ARBK 2. Approval of fabricator. Approval shall be based upon review of the fabricator's written procedural and quality control manuals and periodic auditing of fabrication practices by an approved special inspection agency. 3. Completion of fabrication. Upon completion of fabrication,the approved fabricator shall submit certificate of compliance to the building official stating that the work was performed in accordance with the approved construction documents. G. Building Department Responsibilities 1. Approve special-inspection program. The building department shall approve all special inspectors and special-inspection requirements. 2. Enforce special inspection. Work requiring special inspection and the building inspector shall monitor the performance of special inspectors. His\Her approval,in addition to that of the special inspector,must be obtained prior to placement of concrete, covering of structural steel,or other similar materials. 3. Review inspection reports. The building official should review special-inspection progress and final reports. 4. Perform final inspection. The building official should perform the final inspection and approval for a project[IBC Sec. 109.3.1]after the final special-inspection report has been reviewed and approved. Project Address: 121 E. Hyman Avenue 0149.2018.ARBK Permit Number: ACKNOWLEDGMENTS I have read and agree to comply with the conditions of this agreement. Special Inspection Agency: S• n t Printed Name: Date: Owner: "1 Signature: Printed Name Date Andrea Cayton Trust Andrea Cayton 05-18-18 Engineer/Architect: Signature: Printed Name: Date: Ernest Kollar Engineers Ernest Kollar 05-18-18 Contractor: Signature: Printed Name: Date: Hansen Construction Tim O'Connell 05-18-18 Approved Fabricator: signature: Printed Name: Date: Streoy 5-//b Inspected Fabricator: Si Printe''Name: Date: (circle o%ie) 1 Signature: Printed Name: Date: CITY OF ASPEN 3/12/19 PITKIN COUNTY: DAM DENIS MURRAY 3