Loading...
HomeMy WebLinkAboutFile Documents.735 Castle Creek Dr.0196.2018 (27).ARBK 2. Approval of fabricator. Approval shall be based upon review of the fabricator's written procedural and quality control manuals and periodic auditing of fabrication practices by an approved special inspection agency. 3. Completion of fabrication. Upon completion of fabrication,the approved fabricator shall submit certificate of compliance to the building official stating that the work was performed in accordance with the approved construction documents. G. Building Department Responsibilities 1. Approve special-inspection program. The building department shall approve all special inspectors and special-inspection requirements. 2. Enforce special inspection. Work requiring special inspection and the building inspector shall monitor the performance of special inspectors. HissHer approval,in addition to that of the special inspector,must be obtained prior to placement of concrete, covering of structural steel,or other similar materials. 3. Review inspection reports. The building official should review special-inspection progress and final reports. 4. Perform final inspection. The building official should perform the final inspection and approval for a project[IBC Sec. 109.3.1]after the final special-inspection report has been reviewed and approved. Project Address: 3 (ihi 1 / (,y C t is Pl's Permit Number: ACKNOWLEDGMENTS I have read and agree to comply with the conditions of this agreement. Special Inspection Agency: Signature: Printed Name: Date: \Hi I Owner: Signature: Printed Name Date Macky Morris ����' �yL- 12/10/2018 Engineer/Architect: Signature: Printed Name: Date: Forum Phi -Steev Wilson �' a)thOW., Steev Wilson 12-10-2018 Contractor: Signature: Printed Name: Date: • Cornerstone Construction Jason Schmidt 10/26/2018 Approved Fabricator: Signature: Printed Name: Date: _ Inspected Fabricator: Signature: Printed Name: Date: 1 of Ocheotv G/ lac-0-- /,2 2c' (circle one) Signature: Printed Name: Date: CITY OF ASPEN PITKIN COUNTY: 3 02/19/2019 ASPEN BUILDING DEPARTMENT