Loading...
HomeMy WebLinkAboutFile Documents.1130 Black Birch Dr.0096.2018 (88).ARBK Markup Summary Cloud+ 5-1 -2018 1130 Black Birch 0096.2018.ARBK Cloud+ (5) i,A ,\ 1 Subject: Cloud+ k. '� I Page: [10] C9 EROSION CONTROL PLAN Please indicate tracking pad and t % ' r1 Checkmark: Unchecked concrete washout locations i Author: aaronr Date: 5/1/2018 4:07:16 PM Vehicle tracking pad has `'1 Creation Date: 5/1/2018 3:57:50 PM ;:t -_vikai,ate Color. • been added to erosion ,., . .�. File Name: Civil Drawings.1130 Black Birch.2018.04.pdf control sheet. See CMP for concrete washout location Subject: Cloud+ ., "" Page: [10] C9 EROSION CONTROL PLAN Please Add: Concrete Wash out s - . Checkmark: Unchecked detail, tracking pad detail, Author: aaronr statement or detail related to }- Date: 5/1/2018 3:57:14 PM temporary toilet anchors. mi Creation Date: 5/1/2018 3:56:20 PM A vehicle tracking pad • -_ color: ■ g Birch.2018.04.pdf 1 1 - -c File Name: Civil Drawings.1130 Black Birch.2018.04. df detail and concrete T — --_.. washout detail has been added to the detail sheet. Subject: Cloud+Th— %!,. Please ensure the wattles are „_ /,,//--—--— Page: [10] C9 EROSION CONTROL PLAN positioned in a manner that Checkmark: Unchecked i'�: ------ -_m-"" _ Author: aaronr provide ponding. / Date: 5/1/2018 3:36:08 PM Z / 1 Creation Date: 5/1/2018 3:34:53 PM Wattles are positioned — color: ■ in a manner to provide ..... File Name: Civil Drawings.1130 Black Birch.2018.04.pdf •o, ponding. '''. .., Subject: Cloud+ Page: [10] C9 EROSION CONTROL PLAN Additional structures may be Checkmark: Unchecked required, to be determined Author: aaronr based upon effectiveness in the Fditi°°e�stru°t°res field.meydYtetera required,to Date: 5/1/2018 4:02:34 PM ue ed based P°fieffe°t the field , Creation Date: 5/1/2018 4:01:00 PM . Color: • File Name: Civil Drawings.1130 Black Birch.2018.04.pdf ) 4. Subject: Cloud+ Page: [10] C9 EROSION CONTROL PLAN Please locate stockpile locations Checkmark: Unchecked as far away from waters of the Author: aaronr state as possible,this includes Date: 5/1/2018 4:00:49 PM the Roaring Fork/Castle Creation Date: 5/1/2018 3:58:24 PM Creek/open ditches. k°nclu0,. a e Color: ■ See CMP for material moll File Name: Civil Drawings.1130 Black Birch.2018.04.pdf 4 stockpile location �tet��iyai`i RECEIVED 11/05/2018 ASPEN BUILDING DEPARTMENT