Loading...
HomeMy WebLinkAboutFile Documents.1130 Black Birch Dr.0096.2018 (89).ARBK Markup Summary Callout 5-1 -2018 1130 Black Birch 0096.2018.ARBK Callout (1) i Subject: Callout Page: [10] C9 EROSION CONTROL PLAN Please add additional physical I se Checkmark: Unchecked barrier(construction fence)at € Please add additional stream margin setback if / physical barrier Author: aaronr (construction fence) Date: 5/1/2018 4:05:50 PM possible. This will help ensure � ! at stream margin setback if eble. there is no disturbance within the setback l fpossi le.re Creation Date: 5/1/2018 4:04:29 PM there Is no setback. 1 • `� disturbance within the Color: i setback. File Name: Civil Drawings.1130 Black Birch.2018.04.pdf � r / See CMP for ' .�1 construction fence location RECEIVED 11/05/2018 ASPEN BUILDING DEPARTMENT