HomeMy WebLinkAboutFile Documents.1130 Black Birch Dr.0096.2018 (89).ARBK Markup Summary Callout 5-1 -2018 1130 Black Birch 0096.2018.ARBK
Callout (1)
i Subject: Callout
Page: [10] C9 EROSION CONTROL PLAN Please add additional physical
I se Checkmark: Unchecked barrier(construction fence)at
€ Please add additional stream margin setback if
/ physical barrier Author: aaronr
(construction fence) Date: 5/1/2018 4:05:50 PM possible. This will help ensure
� ! at stream margin
setback if eble. there is no disturbance within the
setback
l fpossi le.re Creation Date: 5/1/2018 4:04:29 PM
there Is no setback.
1 • `� disturbance within the Color:
i setback. File Name: Civil Drawings.1130 Black Birch.2018.04.pdf
� r / See CMP for
' .�1 construction fence
location
RECEIVED
11/05/2018
ASPEN
BUILDING DEPARTMENT