Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Sub Permit.395 Thunderbowl Ln.0153.2017.ARBK
11/30/24, 11:16AM 0002-2020-BCHO—Salesforce-Enterprise Edition • Close Window salesforce • Print This Page • Expand All I Collapse All 0002-2020-BCHO Number 0002-2020-BCHO Record Type Change Order Address 395 THUNDERBOWL LN Owner Sydney Fallon Original Number 19-2709 Status Closed-Final Type Change Order Reason for Cancel or Compl. See separate email.Plans not stamped. Review Fail Applicant ROGER HALL Aspen Internal? No Account DAVID JOHNSTON ARCHITECTS Required Bond Amount Project Total Available Bond Amount Land Use Planning Application Bluebeam Project Id 547-347-048 Master Building Permit 0153.2017.ARBK HPC-ZON-EH-UTIL Review Permit Contractor STRUCTURAL ASSOCIATES COMPANY INC. HPC-ZON-EH-UTIL Review-2 Valid Business License on Eng Review Util Rev,Eng-Wtr Rev, Account Imported Parks-Prkng-San Review Parks Rev,Water-LSE Rev,San Rev, Required Submissions Conditional Inspections Documents Resubmitted Conditional Final lnsp Approved Covid-19 Plan Action Items Hold All Reviews Create Fees ./ Hold Reason Create Fees 2 ,/ Conditional Flat Fee Formula Price Book 2020 Conditional Tiered Fee Formula Applicant is a Nonprofit? No Conditional Tiered SqFt Fee Discount All Fees(%) Formula Fee Discount Reason Queue Score Project Designation Milestone Current Days in Applicant Hand Queue Designation Milestone Current Days in City Hands Queue Score 0 Milestone-Total Days in Applicant Hand Last Date Received from Applicant Milestone-Total Days in City Hands Dates New Application Date 12/18/2019 TCO Issuance Date Application Complete Date 1/21/2020 Close/CO Issuance Date 10/11/2022 Application Accepted Date 1/21/2020 Last Activity Date Issue Date 5/4/2020 Expiration Date Days to Issue 104 Due Date Override Expiration Date Basic Information Description Addition of: Census Code 101-Single Family Residences 1.Exterior Mechanical pads/enclosures 2.Sub-grade Pool equipment Vault 3.Decorative rock swale&drywell overflow Pipe 4.Additional sq ft of exterior snowmelt 5.Revisions to quantity,type&locations of plantings 6.Clarifications to sand filter Use of Building Single Family Use Class Residential Class of Work New Permit Comments Job Location Address 395 THUNDERBOWL LN,ASPEN:273514310007 Lot 7 Site Address Display on Map Legal Description Subdivision:ASPEN HIGHLANDS VILLAGE PUD Block:A Lot: 7 https://cityofaspen.my.salesforce.com/a033s00000nAWHDAA4/p 1/16 11/30/24, 11:16AM 0002-2020-BCHO—Salesforce-Enterprise Edition Historic Property? No Eden Address Historic District? No HPC-Planning-Zoning Details Zone District R-30 HOA/Covenant HOA/Covenant Approval Acquired Is There an ADU? No HPC Certificate of Appropriateness? ADU Sq Ft Work Involves a Land Use No Approval? Deed Restricted? Located in a PD? No #of Dwellings Adds/Changes Floor Area? Category of Zoning Fee Change Order Occupancy or Use Change? No Zoning Work Level Work Affects Exterior of Building? Building Project Details Valuation $15,000.00 Lot Size Sq.Ft. 6,666 Reason for Valuation Change Soil Disturbance Sq Ft 0 Unit Sq.Ft. Affected Area Sq Ft 0 Building Footprint Sq Ft Existing Hardscape Footprint Sq 0 Ft Sq Ft of Building Work Area 0 Existing Hardscape%of Lot 0% Building Fire Area Sq Ft Con Mit Sq Ft Total 0 Utility Review Sq.Ft. 0 Utility Review Sq Ft Total 0 of Interior being Altered 0% New Sq.Ft. 0 Scope of Work Details Work Changes Building Footprint? No Work Affects Tree/Drip Line? Yes Work Changes Fenestration/Thrml No Located Within City Mall No Envelop? Boundaries? Requires Asbestos Test? No Adjacent to City Open Space? No Photovoltaic Installation No Impacts City Trails/Parks? No Work Adds/Removes/Changes Yes Work Subject to Water Efficient Yes Plumbing Fixt? L.O.? Restaurant/Food Service No Involves Impact on Sewer? Yes Involved? Change of Restaurant Ownership? No Prevents Access to Sewer Main? No Affects Parking/Alleys/Loading? No Sewer Easements Affected? No Utility Water Details Already on City Water? Class of Service Customer Utility Account Number Water Service Area Water Service Agreement Is There Well or Wells on the Required? Property? Common Building Name Abandon Existing Well Abandon Existing Tap Acre-feet of Water Currently by Well Date of Existing Tap Acre-feet of Water Rights to be Conveyed Existing Tap Modifications? Existing ECU Count New Tap? If Residential App,Estimated New ECUs Date of New Tap Final ECU Count Does Project Involve Outdoor Size of Existing Domestic Water Irrigation? Line Irrigated Area Sq Ft Number of Meters Proposed Identify ALL Sources of Water Size of Existing Fire Suppression Line Is There a Pool,Spa or Water Size of Proposed Domestic Water Feature? Line Summary of Prior Water Fees Paid Size of Proposed Fire Suppression Line Building Description Code Editions 2015 IRC Required Special Inspections Other Code Editions Energy Code Compliance Building Type(IRC) Total Snowmelt Sq Ft Construction Type VB Total Spa Sq Ft Fire Sprinkler Existing? Total Pool Sq Ft https://cityofaspen.my.salesforce.com/a033s00000nAWHDAA4/p 2/16 11/30/24, 11:16 AM 0002-2020-BCHO—Salesforce-Enterprise Edition Fire Sprinkler Required? Yes Amount of Onsite Renewable Generation? Fire Sprinkler Type NFPA 13 D CO Description Fire Alarms Installed? Basement #Wood Fireplaces 1st Floor #Gas Log Fireplaces 2nd Floor #Gas Appliances 3rd Floor Open Text Field For Comments Additional Financials Total Fees $17,852.04 Total Payments $17,852.04 Total Balance $0.00 System Information Number 0002-2020-BCHO Community Visibility ,/ Created By ROGER HALL,12/18/2019 11:15 AM Contact IDs 0033s00000zPbD6AAK,0036A00000ZPoLhOAL Last Modified By Aspen Avocette,9/28/2024 1:33 AM VIP Form Tool VIP 12/18/2019 VIP Permit Application Submitted 11:44 AM Form Template VIP VIP [("parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvPUAS"}, Foreign Template ("parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvNUAS"), Language Status ("parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000iWidUAE"), ("parentCategoryld":null,"isSu bm it":null,"isCurrent":nul I,"categoryStatusLabels":nul I,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvVUAs"}, ("parentCategoryld":null,"isSu bm it":null,"isCurrent":nul I,"categoryStatusLabels":nul I,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvKUAS"), ("parentCategoryld":null,"isSu bm it":null,"isCurrent":nul I,"categoryStatusLabels":nul I,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvXUAs"}, ("parentCategoryld":null,"isSu bm it":null,"isCurrent":nul I,"categoryStatusLabels":nul I,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvaUAC"), ("parentCategoryld":null,"isSu bm it":null,"isCurrent":nul I,"categoryStatusLabels":nul I,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvZUAS"), ("parentCategoryld":null,"isSu bm it":true,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000Ux1 dUAC"), ("parentCategoryld":"a2 E6A000000 UwvaUAC","isSu bmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"","categoryld":"a2E6A000000UxFOUAo")] Action Items View/Print Permit Link Attachment Activity History Email:COA Building Department Staff Changes Type Billable Assigned To AnnMarie Prince Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 6/2/2022 Days in Applicant's Hands Comments To:roger@djarchitects.com CC: BCC: Attachment:--none-- Subject:COA Building Department Staff Changes Body: Dear Salesforce Applicant, The Building Department has had a change of staffing and would like to let you know that your Permit Owner for permit number 0002-2020-BCHO may have changed. Emmy Garrigus has moved to the position of Plans Examiner and is no longer the owner of many permits.Sydney Fallon is now taking on much of this role as the new Building Support Specialist. Please contact the appropriate owner for questions related to this specific permit (the owner is identified under the permit details.) Moving forward,please contact Sydney Fallon,Building Support Specialist I (970)309-5894 I buildingsupport@aspen.gov for the following: https://cityofaspen.my.salesforce.com/a033s00000nAWHDAA4/p 3/16 11/30/24, 11:16AM 0002-2020-BCHO—Salesforce-Enterprise Edition All new applications Schedule a pre-submittal meeting Permit application requirements or completeness review questions Help submitting responses to comments and change orders Please contact your reviewers directly for any questions regarding their comments. Reviewers can be viewed in Salesforce following the instructions here. And remember,Permit Status information is available 24/7 via the Salesforce Portal.For instructions click here. Thank you. "DO NOT REPLY TO THIS EMAIL" Email:Permit Fees Due Type Billable Assigned To Denis Murray Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/6/2020 Days in Applicant's Hands To:roger@djarchitects.com CC: BCC: Attachment:--none-- Subject:Permit Fees Due Body: If you have not already paid the fees due on your permit or land use application 0002-2020-BCHO,at 395 THUNDERBOWL LN,ASPEN:273514310007,please log into the Aspen Permits and Land Use Application Portal to pay them.If you pay online,be aware that credit card transaction fees will apply.If you have already paid your fees due,please disregard this message. Comments Current Amount Due: Instructions to see detail of fees due: -Log in to the Portal here:https://cityofaspen.force.com/applicantportal and click on Permits menu -Open the permit by clicking on the permit number link -Click on the Related tab(next to Details tab)and scroll down to Fees section -If all fees are not visible,click the"View All"link -To filter fees,click on the black funnel icon at the top right.(Example:to only see the fees due at permit submission,select"Complete Pending Submittal Fees" under Permit Fees Due At section and then click Apply button.) Thank you! City of Aspen Email:395 Thunderbowl/Change Order Permit No.0002-2020-BCHO Type Billable Assigned To Bob Narracci Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 3/31/2020 Days in Applicant's Hands To:roger@djarchitects.com CC:john.barker@cityofaspen.com;bob.narracci@cityofaspen.com BCC: Attachment:--none-- Subject:395 Thunderbowl/Change Order Permit No.0002-2020-BCHO Comments Body: Roger: I have signed-off on Change Order 2 for zoning. Thank you, Bob Narracci Email:Building Comments-0002-2020-BCHO-395 THUNDERBOWL LN Type Billable Assigned To Nick Thompson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 3/23/2020 Days in Applicant's Hands Comments To:roger@djarchitects.com CC:denis.murray@cityofaspen.com https://cityofaspen.my.salesforce.com/a033s00000nAWHDAA4/p 4/16 11/30/24, 11:16 AM 0002-2020-BCHO—Salesforce-Enterprise Edition BCC: Attachment:0002-2020-BCHO_BuildingComments_2.pdf Subject:Building Comments-0002-2020-BCHO-395 THUNDERBOWL LN Body: Hello ROGER HALL, I've reviewed your permit application;please see the attached comment list.Please contact me directly if you have any questions on the comments.You may resubmit your responses online when you have received comments or approval from all applicable review agencies.Please be sure to reach out to your permit coordinator to ensure you've received all applicable comments prior to uploading responses.Once you have uploaded you comments online,please email your permit coordinator directly to notify them as they will not receive an automated email from our system. Address:395 THUNDERBOWL LN Permit Number:0002-2020-BCHO Permit Coordinator:John Barker These design documents have been reviewed for conformance to the International Codes as adopted and amended by the City of Aspen.State and Federal regulations are administered where applicable.You can find a copy of all adopted codes,ordinances,and policies on our website. The attached corrections are required to be addressed.Revise and redraw the plans to clearly respond to the attached comments and resubmit this comment letter with your written response to each comment on this list.Indicate which detail or specification page shows the required information.Responses such as"will comply with code"are not adequate.Revised drawings must clearly show code compliance. Building plan check is only one part of the often complex process by which projects are reviewed for approval.These parts are interrelated and are sometimes conflicting.It is ultimately the applicant's responsibility to coordinate these requirements. Nick Thompson Plans Examiner Community Development 130 S Galena St. Aspen,CO 81611 p:970.429.2757 c:970.456.5165 www.cityofaspen.com www.aspencommunityvoice.com Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contain in the email are based on current zoning and/or applicable building code regulations which are subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email:Building Comments-0002-2020-BCHO-395 THUNDERBOWL LN Type Billable Assigned To Nick Thompson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 2/28/2020 Days in Applicant's Hands Comments To:roger@djarchitects.com CC:denis.murray@cityofaspen.com BCC: Attachment:0002.2 020-B C H O_B u i l d i n g C o m m e n ts_1.p df Subject:Building Comments-0002-2020-BCHO-395 THUNDERBOWL LN Body: Hello ROGER HALL, I've reviewed your permit application;please see the attached comment list.Please contact me directly if you have any questions on the comments.You may resubmit your responses online when you have received comments or approval from all applicable review agencies.Please be sure to reach out to your permit coordinator to ensure you've received all applicable comments prior to uploading responses.Once you have uploaded you comments online,please email your permit coordinator directly to notify them as they will not receive an automated email from our system. Address:395 THUNDERBOWL LN Permit Number:0002-2020-BCHO Permit Coordinator:John Barker These design documents have been reviewed for conformance to the International Codes as adopted and amended by the City of Aspen.State and Federal regulations are administered where applicable.You can find a copy of all adopted codes,ordinances,and policies on our website. The attached corrections are required to be addressed.Revise and redraw the plans to clearly respond to the attached comments and resubmit this comment letter with your written response to each comment on this list.Indicate which detail or specification page shows the required information.Responses such as"will comply with code"are not adequate.Revised drawings must clearly show code compliance. Building plan check is only one part of the often complex process by which projects are reviewed for approval.These parts are interrelated and are sometimes conflicting.It is ultimately the applicant's responsibility to coordinate these requirements. Nick Thompson Plans Examiner Community Development 130 S Galena St. Aspen,CO 81611 p:970.429.2757 c:970.456.5165 www.cityofaspen.com www.aspencommunityvoice.com Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions https://cityofaspen.my.salesforce.com/a033s00000nAWHDAA4/p 5/16 11/30/24, 11:16AM 0002-2020-BCHO—Salesforce-Enterprise Edition contain in the email are based on current zoning and/or applicable building code regulations which are subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email:WELS Approval-Building Permit#0002-2020-BCHO,Address 395 THUNDERBOWL LN,ASPEN:273514310007 Type Billable Assigned To Rick Magill Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 2/3/2020 Days in Applicant's Hands To:roger@djarchitects.com CC:john.barker@cityofaspen.com;samuel@bluegreenaspen.com BCC: Attachment:--none-- Subject:WELS Approval-Building Permit#0002-2020-BCHO,Address 395 THUNDERBOWL LN,ASPEN:273514310007 Body: Dear ROGER HALL, I have approved the minor changes to the previously approved WELS plans for the above-referenced project. Please contact me with any questions. Comments Best,Rick Address:395 THUNDERBOWL LN,ASPEN:273514310007 Permit Number:0002-2020-BCHO Permit Coordinator:John Barker The WELS review is only one part of the often-complex process by which projects are reviewed for approval.These parts are interrelated and are sometimes conflicting.It is ultimately the applicant's responsibility to coordinate these requirements. The Water Efficient Landscaping Standards requires a third-party certified irrigation audit prior to the issuance of a Certificate of Occupancy.The City of Aspen Parks Department also reserves the right to conduct an inspection prior to issuance of a C.O.Please refer to the WELS Standards for these criteria. Email:395 Thunderbowl/Change Order Permit No.0002-2020-BCHO Type Billable Assigned To Bob Narracci Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 1/24/2020 Days in Applicant's Hands To:roger@djarchitects.com CC:john.barker@cityofaspen.com;bob.narracci@cityofaspen.com BCC: Attachment:0002.2020-BCHO_Zoning_1.pdf,0002-2020-BCHO_Zoning Cover Letter_1.docx Subject:395 Thunderbowl/Change Order Permit No.0002-2020-BCHO Body: Comments Good Morning Roger: Please find,attached,zoning comments and red-marked plan sheets. Contact me at(970)429-2754 with any questions. Thank you, Bob Narracci Email:Your Building Permit Application Has Been Received...Here's What to Expect Type Billable Assigned To John Barker Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 1/21/2020 Days in Applicant's Hands Comments To:roger@djarchitects.com CC: BCC: Attachment:--none-- Subject:Your Building Permit Application Has Been Received...Here's What to Expect Body: Dear ROGER HALL: I have received your permit application.I will be your Permit Coordinator.The City of Aspen permit process works as follows: Completeness Review:I will be reviewing your permit application for completeness in the next 5 business days.I will follow up with you directly if I need any additional information. https://cityofaspen.my.salesforce.com/a033s00000nAWHDAA4/p 6/16 11/30/24, 11:16 AM 0002-2020-BCHO—Salesforce-Enterprise Edition Submittal Fees:Once your permit is deemed complete,I will provide you with a list of all permit submittal fees that are due.Your permit will not be placed into our review queue until payment of all submittal fees is received. Permit Review:Your permit will be placed in our review queue on the date that the submittal fee payment is received.Each review agency triggered for the review will either approve the permit or issue comments that you are required to address prior to their approval.You can see the status of all reviews by going into your permit on the portal,clicking on'Related,'and scrolling down to'Reviews.' Comment Response:Once you have addressed all agency comments,both in writing and on your plans,you will resubmit all documents via the portal.Just go into your permit,scroll down to the bottom of the page,and use the'Add more'button.You must notify me when you have uploaded your files for me to know that you have resubmitted.You can use the portal's Chatter feature(see below). Issuance:Once all agencies have approved your permit,you will be notified that it is time to pay your permit issuance fees.Once you do so,your approved plans and permit documents will be sent to you electronically. Additional Important Information: Only after I perform a completeness review and submittal fees are paid will your permit be accepted into our system as a formal submission.At that time,it will be put into the permit work queue. I may need to meet with you—either in person,over the phone,or via a virtual meeting—before I can finish my completeness review to ensure that I have a full understanding of your project's scope. If you need to contact me about your permit,I encourage you to use the Chatter feature on your permit on the applicant portal.When you use Chatter,I get an email,but it also gets attached to the permit record in the back office.So,anyone looking at the permit can see the conversations.This will be very helpful if someone else needs to get involved with your permit.To use Chatter: Open your permit on the portal. In the'Share an update...'box,type @,then start typing my name.My name will appear.Just click on it then add your message. Please let me know if you have any questions. Regards, John Barker City of Aspen Community Development Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contain in the email are based on current zoning,and/or applicable building code regulations which is subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email:City of Aspen-Application Status:Completeness Review Failed Type Billable Assigned To John Barker Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 1/6/2020 Days in Applicant's Hands To:roger@djarchitects.com CC: BCC: Attachment:--none-- Subject:City of Aspen-Application Status:Completeness Review Failed Body: Dear ROGER HALL, Comments Your Permit Application#19-2709 for 395 THUNDERBOWL LN,ASPEN:273514310007 is in the"Completeness Review Failed"Status because of the following: See separate email.Plans not stamped. Please contact John Barker with any questions at john.barker@services.cityofaspen.com. Thank you, City of Aspen Email:395 Thunderbowl Change Order Completeness Review Type Billable Assigned To John Barker Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 1/6/2020 Days in Applicant's Hands Comments To:roger@djarchitects.com CC: BCC: Attachment:--none-- Subject:395 Thunderbowl Change Order Completeness Review Body: Dear Roger, Good afternoon.I have reviewed your change order application for completeness.Just a few minor things In advance of submittal,please provide the following: https://cityofaspen.my.salesforce.com/a033s00000nAWHDAA4/p 7/16 11/30/24, 11:16AM 0002-2020-BCHO—Salesforce-Enterprise Edition -The structural sheet is not stamped,please revise -Civil Set is not completely stamped,please revise -Structural Details are not stamped,please revise Permit Review Type Building Billable ✓ Assigned To Nick Thompson Number of Hours 3.00 Total Cost $975.00 Fee Generated Date 4/2/2020 Start Date Completed Date 4/1/2020 Days in Applicant's Hands Comments Permit Review Type Zoning Billable ✓ Assigned To Bob Narracci Number of Hours 2.00 Total Cost $650.00 Fee Generated Date 4/1/2020 Start Date Completed Date 3/31/2020 Days in Applicant's Hands Comments Permit Review Type Building Billable Assigned To Nick Thompson Number of Hours 3.00 Total Cost $975.00 Fee Generated Date Start Date Completed Date 2/28/2020 Days in Applicant's Hands Comments Permit Review Type Engineering Billable Assigned To Phil LeHue Number of Hours 0.25 Total Cost $81.25 Fee Generated Date Start Date Completed Date 2/11/2020 Days in Applicant's Hands Comments Permit Review Type Zoning Billable Assigned To Bob Narracci Number of Hours 4.00 Total Cost $1,300.00 Fee Generated Date Start Date Completed Date 1/24/2020 Days in Applicant's Hands Comments Contacts ROGER HALL Account DAVID JOHNSTON ARCHITECTS Type Applicant Active Contractor License Count 0.00 Number 0023821 SHANE B EVANS Account STRUCTURAL ASSOCIATES COMPANY INC. Type Contractor Active Contractor License Count 0.00 Number 0023822 Fees 0045567 Type Change Order Fee Total $25.00 https://cityofaspen.my.salesforce.com/a033s00000nAWHDAA4/p 8/16 11/30/24, 11:16AM 0002-2020-BCHO—Salesforce-Enterprise Edition Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full V. Fee Paid Date/Time 0048184 Type Zoning Hourly Fee Total $650.00 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0048205 Type REMP Fee Total $16,202.04 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0048214 Type Building Hourly Review Fee Total $975.00 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time Files 0002-2020-BCHO_BuildingComments_2 0002-2020-BCHO_BuildingComments_1 Last Modified 3/23/2020 7:58 PM Last Modified 2/28/2020 10:48 AM Created By Nick Thompson Created By Nick Thompson 0002-2020-BCHO_Zoning Cover Letter_1 0002-2020-BCHO_Zoning_1 Last Modified 1/24/2020 9:04 AM Last Modified 1/24/2020 9:04 AM Created By Bob Narracci Created By Bob Narracci Permit Application 2019-12-18 18:44:46.pdf Last Modified 12/18/2019 11:44 AM Created By ROGER HALL Milestones Review Round 1-0002-2020-BCHO Status Not Approved Due Date Created Date 1/21/2020 Review Round 2-0002-2020-BCHO Status Approved Due Date Created Date 3/19/2020 Open Activities Permit Review Type Building Status In Progress Assigned To Nick Thompson Start Date Completed Date Comments Payments PY-005849 Related To 0002-2020-BCHO Amount $17,852.04 Created Date 5/4/2020 Payment Source R-0005551 https://cityofaspen.my.salesforce.com/a033s00000nAWHDAA4/p 9/16 11/30/24, 11:16AM 0002-2020-BCHO—Salesforce-Enterprise Edition Receipt-Amount Remaining R-0005551:$0 Reviews REV-012067 Milestone Review Round 2-0002-2020-BCHO Status Approved Type Zoning Due Date Completed Date 3/31/2020 9:30 AM Owner Alias bnarr On Hold Created Date 3/19/2020 REV-012068 Milestone Review Round 2-0002-2020-BCHO Status Approved Type Building Due Date Completed Date 3/23/2020 7:58 PM Owner Alias NThom On Hold Created Date 3/19/2020 REV-010968 Milestone Review Round 1-0002-2020-BCHO Status Approved Type Parks Due Date Completed Date 2/4/2020 8:51 AM Owner Alias DRade On Hold Created Date 1/21/2020 REV-010969 Milestone Review Round 1-0002-2020-BCHO Status Approved Type Water Efficient Landscaping Due Date Completed Date 2/3/2020 10:42 AM Owner Alias rmagi On Hold Created Date 1/21/2020 REV-010970 Milestone Review Round 1-0002-2020-BCHO Status Approved Type Sanitation Due Date Completed Date 1/23/2020 1:35 PM Owner Alias CStra On Hold Created Date 1/21/2020 REV-010971 Milestone Review Round 1-0002-2020-BCHO Status Approved Type Engineering Water Due Date Completed Date 2/11/2020 9:47 AM Owner Alias plehu On Hold Created Date 1/21/2020 REV-010972 Milestone Review Round 1-0002-2020-BCHO Status Closed-Not Needed Type Fire Due Date Completed Date 2/28/2020 10:48 AM Owner Alias Fire-Review On Hold Created Date 1/21/2020 REV-010973 Milestone Review Round 1-0002-2020-BCHO Status Closed-Re-Review Created Type Zoning Due Date Completed Date 1/24/2020 9:05 AM Owner Alias bnarr https://cityofaspen.my.salesforce.com/a033s00000nAWHDAA4/p 10/16 11/30/24, 11:16AM 0002-2020-BCHO—Salesforce-Enterprise Edition On Hold Created Date 1/21/2020 REV-010974 Milestone Review Round 1-0002-2020-BCHO Status Closed-Re-Review Created Type Building Due Date Completed Date 2/28/2020 10:48 AM Owner Alias NThom On Hold Created Date 1/21/2020 Submissions 395 THUNDERBOWL-CO2 Rnd 2-Responses-MECH DRAWINGS.pdf Actions Submission Date 4/1/2020 9:16 AM Status Required Description 395 Thunderbowl-CO-2 Rnd 2-Responses-Building(Written).pdf Actions Submission Date 4/1/2020 9:15AM Status Required Description 395 THUNDERBOWL-CO2 Rnd 2-Responses-ARCH DRAWINGS.pdf Actions Submission Date 4/1/2020 9:15AM Status Required Description 395 THUNDERBOWL-CO2 Rnd 2-Responses-MECH DRAWINGS.pdf Actions Submission Date 4/1/2020 1:21 PM Status Required Description Building Permit Application-Front Page.pdf Actions Submission Date 12/18/2019 11:41 AM Status Required Description Contact Sheet.pdf Actions Submission Date 12/18/2019 11:41 AM Status Required Description HOA COMPLIANCE FORM.pdf Actions Submission Date 12/18/2019 11:41 AM Status Required Description Zoning Compliance Form.pdf Actions Submission Date 12/18/2019 11:41 AM Status Required Description Lot 7 approval of screening and sound mitigation 10.30.2019.pdf Actions Submission Date 12/18/2019 11:41 AM Status Required Description 395 Thunderbowl Ln-CHANGE ORDER 2-NARRATIVE OF CHANGES.pdf Actions https://cityofaspen.my.salesforce.com/a033s00000nAWHDAA4/p 11/16 11/30/24, 11:16AM 0002-2020-BCHO—Salesforce-Enterprise Edition Submission Date 12/18/2019 11:41 AM Status Required Description 395 Thunderbowl Ln-CHANGE ORDER 2-ARCHITECTURAL.pdf Actions Submission Date 12/18/2019 11:41 AM Status Required Description 395 Thunderbowl Ln-CHANGE ORDER 2-CIVIL.pdf Actions Submission Date 1/17/2020 8:53 AM Status Required Description 395 Thunderbowl Ln-CHANGE ORDER 2-IRRIGATION.pdf Actions Submission Date 12/18/2019 11:41 AM Status Required Description 395 Thunderbowl Ln-CHANGE ORDER 2-LANDSCAPE.pdf Actions Submission Date 12/18/2019 11:41 AM Status Required Description 395 Thunderbowl Ln-CHANGE ORDER 2-MECHANICAL.pdf Actions Submission Date 12/18/2019 11:41 AM Status Required Description 395 Thunderbowl Ln-CHANGE ORDER 2B-REMP CALCS.pdf Actions Submission Date 12/18/2019 11:41 AM Status Required Description 395 Thunderbowl Ln-CHANGE ORDER 2-PREFAB POOL VAULT.pdf Actions Submission Date 12/18/2019 11:41 AM Status Required Description 395 Thunderbowl Ln-CHANGE ORDER 2-STRUCTURAL.pdf Actions Submission Date 1/17/2020 8:56 AM Status Required Description 191003 395 THUNDERBOWL-CO2-STRUCTURAL-DETAILS SDA-14-SDA-16.pdf Actions Submission Date 1/17/2020 8:56 AM Status Required Description 191003 395 tHUNDERBOWL-CO 2-STRUCTURAL-DETAILS-SDA-02.pdf Actions Submission Date 12/18/2019 11:41 AM Status Required Description 395 Thunderbowl Ln-CHANGE ORDER 2-STRUCTURAL.pdf Actions Upload Submission Date https://cityofaspen.my.salesforce.com/a033s00000nAWHDAA4/p 12/16 11/30/24, 11:16AM 0002-2020-BCHO—Salesforce-Enterprise Edition Status Required Description 191003 395 THUNDERBOWL-CO 2-STRUCTURAL-DETAILS-SDA-02.pdf Actions Upload Submission Date Status Required Description 191003 395 THUNDERBOWL-CO2-STRUCTURAL-DETAILS SDA-14-SDA-16.pdf Actions Upload Submission Date Status Required Description 395 Thunderbowl Ln-CHANGE ORDER 2-STRUCTURAL.pdf Actions Upload Submission Date Status Required Description 191003 395 THUNDERBOWL-CO 2-STRUCTURAL-DETAILS-SDA-02.pdf Actions Upload Submission Date Status Required Description 395 Thunderbowl Ln-CHANGE ORDER 2-STRUCTURAL.pdf Actions Upload Submission Date Status Required Description 191003 395 THUNDERBOWL-CO 2-STRUCTURAL-DETAILS-SDA-02.pdf Actions Upload Submission Date Status Required Description 191003 395 THUNDERBOWL-CO2-STRUCTURAL-DETAILS SDA-14-SDA-16.pdf Actions Upload Submission Date Status Required Description 395 Thunderbowl Ln-CHANGE ORDER 2-STRUCTURAL.pdf Actions Upload Submission Date Status Required Description 191003 395 THUNDERBOWL-CO 2-STRUCTURAL-DETAILS-SDA-02.pdf Actions Upload Submission Date Status Required Description 191003 395 THUNDERBOWL-CO2-STRUCTURAL-DETAILS SDA-14-SDA-16.pdf Actions Upload Submission Date Status Required Description 395 Thunderbowl Ln-CHANGE ORDER 2-CIVIL.pdf Actions Upload Submission Date Status https://cityofaspen.my.salesforce.com/a033s00000nAWHDAA4/p 13/16 11/30/24, 11:16AM 0002-2020-BCHO—Salesforce-Enterprise Edition Required Description 191003 395 THUNDERBOWL-CO2-STRUCTURAL-DETAILS SDA-14-SDA-16.pdf Actions Upload Submission Date Status Required Description 395 Thunderbowl Ln-CHANGE ORDER 2-CIVIL.pdf Actions Upload Submission Date Status Required Description 395 Thunderbowl-CO 2 Responses-Building(Written Responses).pdf Actions Upload Submission Date Status Required Description 395 Thunderbowl-CO-2-Zoning-Cover Letter-Written Responses.pdf Actions Upload Submission Date Status Required Description 395 Thunderbowl-CO-2-Zoning-Written Responses.pdf Actions Upload Submission Date Status Required Description 395 THUNDERBOWL-CO2 Responses-ARCH DRAWINGS.pdf Actions Upload Submission Date Status Required Description 395 Thunderbowl-CO 2 Responses-Landscape Drawings.pdf Actions Upload Submission Date Status Required Description 395 Thunderbowl-CO 2 Responses-REMP Calcs.pdf Actions Upload Submission Date Status Required Description 395 THUNDERBOWL-CO2 Responses-Fire Pit-Clearance Sheet.pdf Actions Upload Submission Date Status Required Description 395 Thunderbowl-CO 2 Responses-Building(Written Responses).pdf Actions Upload Submission Date Status Required Description 395 Thunderbowl-CO-2-Zoning-Cover Letter-Written Responses.pdf Actions Upload Submission Date Status Required https://cityofaspen.my.salesforce.com/a033s00000nAWHDAA4/p 14/16 11/30/24, 11:16AM 0002-2020-BCHO—Salesforce-Enterprise Edition Description 395 Thunderbowl-CO-2-Zoning-Written Responses.pdf Actions Upload Submission Date Status Required Description 395 THUNDERBOWL-CO2 Responses-ARCH DRAWINGS.pdf Actions Upload Submission Date Status Required Description 395 Thunderbowl-CO 2 Responses-Landscape Drawings.pdf Actions Upload Submission Date Status Required Description 395 Thunderbowl-CO 2 Responses-REMP Calcs.pdf Actions Upload Submission Date Status Required Description 395 THUNDERBOWL-CO2 Responses-Fire Pit-Clearance Sheet.pdf Actions Upload Submission Date Status Required Description 395 Thunderbowl-CO 2 Responses-Building(Written Responses).pdf Actions Submission Date 3/19/2020 10:38 AM Status Required Description 395 Thunderbowl-CO-2-Zoning-Written Responses.pdf Actions Submission Date 3/19/2020 10:39 AM Status Required Description 395 THUNDERBOWL-CO2 Responses-Fire Pit-Clearance Sheet.pdf Actions Submission Date 3/19/2020 10:42 AM Status Required Description 395 Thunderbowl-CO-2-Zoning-Cover Letter-Written Responses.pdf Actions Submission Date 3/19/2020 10:39 AM Status Required Description 395 THUNDERBOWL-CO2 Responses-ARCH DRAWINGS.pdf Actions Submission Date 3/19/2020 10:40 AM Status Required Description 395 Thunderbowl-CO 2 Responses-REMP Calcs.pdf Actions Submission Date 3/19/2020 10:41 AM Status Required Description https://cityofaspen.my.salesforce.com/a033s00000nAWHDAA4/p 15/16 11/30/24, 11:16AM 0002-2020-BCHO—Salesforce-Enterprise Edition 395 Thunderbowl-CO 2 Responses-Landscape Drawings.pdf Actions Submission Date 3/19/2020 10:40 AM Status Required Description Copyright©2000-2024 salesforce.com,inc.All rights reserved. https://cityofaspen.my.salesforce.com/a033s00000nAWHDAA4/p 16/16