HomeMy WebLinkAboutFile Documents.395 Thunderbowl Ln.0002-2020-BCHO 0002-2020-BCHO_BuildingComments_1
395 Thunderbowl Ln - CHANGE ORDER 2 -ARCHITECTURAL.pdf(4)
Subject: PlanCheck Electric meters and means of
Page:A-7.22 ELECTRICAL EQUIPMENT ENCLOSURE AND CONDENSER ENCLOSURE disconnect may not be enclosed
Page Index: 2 unless you can clearly detail the
Author: nickt enclosure to not encroach on the
Color: • working space and dedicated
File Name: 395 Thunderbowl Ln-CHANGE ORDER 2- equipment space requirements
ARCHITECTURAL.pdf of 2017 NEC 110.26.
L Subject: PlanCheck
� 'E,, At all equipment screens,
Page:A-7.22 ELECTRICAL EQUIPMENT ENCLOSURE AND
11=1 CONDENSER ENCLOSURE provide and dimension the
pnw;eoupe^^tlone5zp' i�' Page Index: 2 following per 2015 IMC 306:
Author: nickt
• Color: • 1. 30"x30"clear working space
...
File Name: 395 Thunderbowl Ln-CHANGE ORDER 2- in front of the control side of
each piece of equipment for
ARCHITECTURAL.pdf
service access. 306.1
2. Provide a door that when
opened, provides a minimum 24"
clearance, provided the
equipment can be removed
without dismantling the screen.
Otherwise, make the door wide
enough to remove the appliance.
306.2
3. Provide clearances as
required by manufacturer's
installation instructions.
Subject: PlanCheck
Page:A-7.29 NORTH PATIO AND POOL PLAN Provide pool and spa drawings
Page Index: 6 complying with the 2015 ISPSC
- ' Author: nickt
(International swimming pool
Color: • and spa code). Provide
111I= File Name: 395 Thunderbowl Ln-CHANGE ORDER 2- completed APSP-15 worksheets
for the pool and spa. Worksheet
MIMI2 ARCHITECTURAL.pdf
'L•_��is can be found here:
■ = - https://www.apsp.org/portals/0/Fi
IeDownloads/APSP-15%20Com
pliance%201nformation%20Shee
t.pdf
Subject: PlanCheck
Page:A-7.29 NORTH PATIO AND POOL PLAN Treads must be the same
Page Index: 6 dimension unless broken up by
Author: nickt a landing (landing minimum
Color: • depth 36"). Stairways with 4 or
File Name: 395 Thunderbowl Ln-CHANGE ORDER 2- more risers must have at least
ARCHITECTURAL.pdf
one handrail (with ends
p
.. returning). 2015 IRC R311.7.5.2,
��s�� � R311.7.6, R311.7.8
395 Thunderbowl Ln - CHANGE ORDER 2 - LANDSCAPE.pdf(3)
Subject: PlanCheck Revise snowmelt extents on
fr
` LEGEND Page: [4] BG-Thunderbowl-L Series_FINAL-L100 LAYOUT landscape plan to match
Page Index: 1
• �v;„o f,•_n, mechanical drawings and REMP
\.--" Author: nickt
NOT s
Color: • worksheet(or remove it from
File Name: 395 Thunderbowl Ln-CHANGE ORDER 2- landscape drawings).
®°'°' LANDSCAPE.pdf
:It.. L100
„
Subject: PlanCheck
................ Page: [5] BG-Thunderbowl-L Series_FINAL-L200 Provide sheet L800
--- — MATERIALS
Page Index: 2
• I • Author: nickt
�. �� ;� Color: ■
File Name: 395 Thunderbowl Ln-CHANGE ORDER 2-
LANDSCAPE.pdf
•
�. , ,\
Subject: PlanCheck
Page: [5] BG-Thunderbowl-L Series_FINAL-L200 Provide installation instructions
MATERIALS for fire feature showing required
Page Index: 2 clearances to combustibles and
Author: nickt demonstrate on your plans that
Color: • you meet the requirements.
jit,M File Name: 395 Thunderbowl Ln-CHANGE ORDER 2
LANDSCAPE.pdf
395 Thunderbowl Ln - CHANGE ORDER 2B - REMP CALCS.pdf(1)
Subject: PlanCheck
a.„„ „d„ _m µ, „ , ,,,, Page: 1 Per the mechanical plans,you
m
Page Index: 1 have 4563 sqft of non exempt
,m Author: nickt plus 18 of exempt for a total of
Color: • 4581.28.
�..� o• File Name: 395 Thunderbowl Ln-CHANGE ORDER 2B-
='' REMP CALCS.pdf