Loading...
HomeMy WebLinkAboutFile Documents.395 Thunderbowl Ln.0002-2020-BCHO 0002-2020-BCHO_BuildingComments_1 395 Thunderbowl Ln - CHANGE ORDER 2 -ARCHITECTURAL.pdf(4) Subject: PlanCheck Electric meters and means of Page:A-7.22 ELECTRICAL EQUIPMENT ENCLOSURE AND CONDENSER ENCLOSURE disconnect may not be enclosed Page Index: 2 unless you can clearly detail the Author: nickt enclosure to not encroach on the Color: • working space and dedicated File Name: 395 Thunderbowl Ln-CHANGE ORDER 2- equipment space requirements ARCHITECTURAL.pdf of 2017 NEC 110.26. L Subject: PlanCheck � 'E,, At all equipment screens, Page:A-7.22 ELECTRICAL EQUIPMENT ENCLOSURE AND 11=1 CONDENSER ENCLOSURE provide and dimension the pnw;eoupe^^tlone5zp' i�' Page Index: 2 following per 2015 IMC 306: Author: nickt • Color: • 1. 30"x30"clear working space ... File Name: 395 Thunderbowl Ln-CHANGE ORDER 2- in front of the control side of each piece of equipment for ARCHITECTURAL.pdf service access. 306.1 2. Provide a door that when opened, provides a minimum 24" clearance, provided the equipment can be removed without dismantling the screen. Otherwise, make the door wide enough to remove the appliance. 306.2 3. Provide clearances as required by manufacturer's installation instructions. Subject: PlanCheck Page:A-7.29 NORTH PATIO AND POOL PLAN Provide pool and spa drawings Page Index: 6 complying with the 2015 ISPSC - ' Author: nickt (International swimming pool Color: • and spa code). Provide 111I= File Name: 395 Thunderbowl Ln-CHANGE ORDER 2- completed APSP-15 worksheets for the pool and spa. Worksheet MIMI2 ARCHITECTURAL.pdf 'L•_��is can be found here: ■ = - https://www.apsp.org/portals/0/Fi IeDownloads/APSP-15%20Com pliance%201nformation%20Shee t.pdf Subject: PlanCheck Page:A-7.29 NORTH PATIO AND POOL PLAN Treads must be the same Page Index: 6 dimension unless broken up by Author: nickt a landing (landing minimum Color: • depth 36"). Stairways with 4 or File Name: 395 Thunderbowl Ln-CHANGE ORDER 2- more risers must have at least ARCHITECTURAL.pdf one handrail (with ends p .. returning). 2015 IRC R311.7.5.2, ��s�� � R311.7.6, R311.7.8 395 Thunderbowl Ln - CHANGE ORDER 2 - LANDSCAPE.pdf(3) Subject: PlanCheck Revise snowmelt extents on fr ` LEGEND Page: [4] BG-Thunderbowl-L Series_FINAL-L100 LAYOUT landscape plan to match Page Index: 1 • �v;„o f,•_n, mechanical drawings and REMP \.--" Author: nickt NOT s Color: • worksheet(or remove it from File Name: 395 Thunderbowl Ln-CHANGE ORDER 2- landscape drawings). ®°'°' LANDSCAPE.pdf :It.. L100 „ Subject: PlanCheck ................ Page: [5] BG-Thunderbowl-L Series_FINAL-L200 Provide sheet L800 --- — MATERIALS Page Index: 2 • I • Author: nickt �. �� ;� Color: ■ File Name: 395 Thunderbowl Ln-CHANGE ORDER 2- LANDSCAPE.pdf • �. , ,\ Subject: PlanCheck Page: [5] BG-Thunderbowl-L Series_FINAL-L200 Provide installation instructions MATERIALS for fire feature showing required Page Index: 2 clearances to combustibles and Author: nickt demonstrate on your plans that Color: • you meet the requirements. jit,M File Name: 395 Thunderbowl Ln-CHANGE ORDER 2 LANDSCAPE.pdf 395 Thunderbowl Ln - CHANGE ORDER 2B - REMP CALCS.pdf(1) Subject: PlanCheck a.„„ „d„ _m µ, „ , ,,,, Page: 1 Per the mechanical plans,you m Page Index: 1 have 4563 sqft of non exempt ,m Author: nickt plus 18 of exempt for a total of Color: • 4581.28. �..� o• File Name: 395 Thunderbowl Ln-CHANGE ORDER 2B- ='' REMP CALCS.pdf