HomeMy WebLinkAboutFile Documents.124 W Hyman Ave.0051.2019 (3).ARBK DATE: MASTER PERMIT: PERMIT NUMBER:0051.2019.ARBK
•
COMMUNITY DEVELOPMENT DEPARTMENT ��
HO
BUILDING PERMIT APPLICATION 41.
` CITY OF ASPE N
PROPERTY INFORMATION
ADDRESS 124 W. HYMAN AVENUE UNIT#2B PARCEL ID# 273512459008
TRACT COTTONWOOD CONDOMINIUMS
LOT BLOCK OR SUBDIVISION
OWNER NAME ALIX & CRAIG COHEN CELL 917-969-7422 EMAIL cscohen99@yahoo.com
BEST CONTACT KIM RAYMOND ARCHITECTS CELL 970-925-2252 EMAIL kim@krai.us or milo@krai.us
NAME
PROJECT DETAILS (READ DEFINITIONS BELOW) COMPLETIONMUSE T
COMPLETED IN ITS ENTIRETY
1
OF
WORK INION D TAIL INTERIOR REMODEL OF EXISTING CONDOMINIUM. REPLACEMENT OF FINISHES, GAS FIREPLACE TAKING
THE PLACE OF EXISTING WOOD FIREPLACE, NEW KITCHEN, ONE NEW BATHROOM SINK, ETC....
PROJECT $150,000 Use of Building Class of Work Fixture Counts Important Review Triggers
VALUATION
❑ Commerical ❑ New 2 Toilets,Bidets Major Engineering Review
SQFTOF ❑■ Multi-Family ❑■ Addition 1 Bathtub •Projects involving less than 50%
W UORKIAREA 1,068 sq ft 0 Single Family ❑■ Alteration 3 Lavatory(Wash Basin) hardscape area and work affecting
O Mixed-Use 0 Repair Shower 75%or greater of unit sq ft
1 068 sqftKitchen Sink(+Disposal) •Projects involving greater than
UNITSQFT ❑ 0 IFFR 1 Dishwasher 50%hardscape area and work
LOT SIZE El Tenant Finish o Laundry Bar,Utility Sink affecting 50%or greater of unit
(SQ FT) Will there be ❑■ Demolition 1 Clothes Washer sq ft
SC3FTOFSOIL any roof/wall ❑ Change Order a Floor Sink •Projects involving 1,000+sq ft of
DI TURBANCE penetrations? 0 o Floor Drain soil disturbance area
O Yes oWater Heater(Pan Req)
NEW SQ FT 0 0 No #Gas Outlets Water Efficient Landscaping
Water Treatment •Projects that trigger a major
BUILDING N/A Other engineering review
FOOTPRINT NOTICE: This permit becomes null and void if work •Projects involving interior
or construction authorized is not commenced within
HARDSCAPE alterations affecting 50%or more
AREA N/A 180 days,or if construction or work is suspended or
abandoned for a period of 180 days at any time after of exisiting gross square footage
ZONE R/MF work is commenced.
DISTRICT •. i
Project Valuation:Cost of project as defined in Valuation Affadavit.
Sq Ft of Building Work Area:Total square footage of interior area undergoing change or reconfiguration.
O Unit Sq Ft:Gross square footage, not FAR,of permitted unit.
H Lot Size:Total surveyed square footage of property. APPROVALS
Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbed Reviewing Needs Reviewer Date
Z New Sq Ft:Total added square footage for additions to net livable or net leasable space. Department Review Sign-Off Approved
w Building Footprint:Grade floor square footage of the permitted structure. PC X LL 3/11/2019
O Hardscape Area:Square footage of impervious lot surface.
Zone District:Underlying zone district of permitted parcel. Zoning x JRB 3/12/2019
HPC
Building X TF 4/17/19
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Fire X TF 4/17/19
Building Building Engineering
Review 3428.75 Permit Fee 5275.00 Parks Impact 0 CMP x tk 3/26/19
Engineering Zoning School Lands Water x
Review Review(50%) 325.00 Dedication 0 Stormwater
Zoning 325.00 CMP(50%) 571 .38 TDM Impact 0 Sanitation x PM 3/15/19
Review(50%)
Energy Code REMP Pedestrian Env. Health
Review Payment Amenity Parks
CMP(50%) 571.38 GIS Housing Cash in Lieu a Landscape
Parks Review CIty Tax Approved
525.00 Water Tap Efficiency
Approved
+ .,1'
Utility Review 160.65 Countxty Use 375.00 Sanitation To Issue
Issuance
144
( CITY OF ASPEN January2019 Z►3�J;1�1t.1
130 S. GALENA ST ASPEN, CO 81611