Loading...
HomeMy WebLinkAboutFile Documents.267 Roaring Fork Dr.0006-2019-BCHO Field Plan Set Must Be Printed In Color k.,. t---: DATE: MASTER PERMIT: PERMIT NUMBER:0006-2019-BCHO COMMUNITY DEVELOPMENT DEPARTMENT 40�Niii4W BUILDING PERMIT APPLICATION Y0F6S CTyOFASPEN SEE NOTES #1 PLANS PROPERTY INFORMATION The City of Aspen ADDRESS 267 Roaring Fork Dr UNIT PARCEL IOU LOT BLOCK OR SU TRADTBDIVISION These plans must be kept at the OWNER NAME CELL EMAIL building site or inspection BEST CONTACT Ben Fierstein CELL 913-494-3959 EMAIL delays may occur.Construction NAME • shall conform to these plans.All PROJECT DETAILS(READ DEFINITIONS BELOW)coMKE"/rE°D"/N/isENnRET' changes shall be approved by f DESCRIPTION r. woRKIN DETAIL Adding of washer and dryer.steam shower.and HVAC mini SDlit the building official. PROTECT 400o Use of Building Class of Work Fixture Counts Important Review Triggers VALUATION ❑ Commerical Toilets,Bidets Major Engineering Review spFrgF ❑ Multi-Family ❑New _Toilets, •Proectsinvolvin less than50% SEPARATE PERMITS ARE BUILDINGl ❑Addition l g Baz 0 Single Family _Lavatory(wash Basin) hardswpe area and work affecting REQUIRED FOR ELECTRICAL, WORKARFAg Y 0Repair Shower 75%or t f unit s n 0 Mixed-Use 0 Repair —Kitchen Sink(+Disposal)•projects involving greater than PLUMBING,MECHANICAL,OR UNIT sq FT ❑ 0 IFFR —Dishwasher 50%hardscape area and work FIRE SPRINKLER WORK `OT SIZE 0 Tenant Finish —Laundry Bar,Utility Sink affecting 50%or greater of unit Isopr1 Will there be 0 Demolition —clothes Washer sqn sc�FT or sou any roof/wall 0 Change Order—Floor Sink •Projects involving 1,000+sq ft of DITURBANCE penetrations? 0 _Floor Drain sot disturbance area ❑Yes Water Heater(Pan Req) NEW SOFT 0 No _N Gas Outlets Water Efficient Landscaping _Water Treatment •Projects that trigger a major BUILDING _Other engineering review FOOTPRINT NOTICE:This permit becomes null and voitl if work •Projects involving interior HARDSCAPE lr construction authorized is not commenced within alterations affecting SO%Or m0 AREA abandSO oned for construction of 180 days It anyti suspended orof existing gross square footage work Vza[anV Xmea ZONE work is commenced. DISTRICT ss C Project Valuation:Cost of project as defined in Valuation Affadavit. ZSq Ft of Building Work Area:Total square footage of interior area undergoing change or reconfiguration. 0 Unit Sq Ft:Gross square footage,not FAR,of permitted unit. F Lot Size:Total surveyed square footage of property. APPROVALS Sq Ft of Soil Disturbance:Exterior area of the lot where the ground is disturbed Reviewing Needs Reviewer Date �New Sq Ft:Total added square footage for additions to net livable or net leasable space. Department Review Sign-off Approved ua Building Footprint:Grade Floor square footage of the permitted structure. PC x a 11/19/2019 Ci Hardsoape Area:Square footage of impervious lot surface. Zone District:Underlying zone district of permitted parcel. Zoning 6 SV 11/25/19 HPC Building x lie 12/23/19 SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Fire Building Building 25.00 Parks Impact Engineering Review pen mi[FeeCMP Engineering Zoning School Lands Water x Review Review(50%) Dedication Stormwater Zoning CMP(50%) TDM Impact Sanitation Co 1v1en9 Review(50%1 Env.Health Energy Code REMP Pedestrian Review Payment Amenity Parks CMP(50%) GIS Housing Cash in Lieu Landscape City Use Efficiency Parks Review Tax Water Tap Approved RECEIVED a'r�p Utility Review County use Sanitation To Issue R�l�f�.a(�(�y{�/ Issuance (CITY OF ASPENceeaeenaose 130 S.GALENA ST I ASPEN,Cblfi ii— • ACI'LN ' BUILDING DEPARTMENT