HomeMy WebLinkAboutFile Documents.267 Roaring Fork Dr.0289.2018 (6).ARBK r DATE: MASTER PERMIT: PERMIT NUMBER: 0289.2018.ARBK Field Plan Set Must Be Printed In Color
ADDRESS: PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT COMMUNITY DEVELOPMENT DEPARTMENT w
BUILDING PERMIT APPLICATION tRL n, BUILDING PERMIT CONTACT SHEET ,;n`,•
PROPERTY INFORMATION L v
e Michael r ro.asl.an I nncnaelvyanusuc.com
ADDRESS 267 Roaring Fork Drive,Aspen CO 81611 UNIT0 mecums 2737113122005 rvam _ phone E-mall
LOT 2 atom 2 OPSUeaioisioN Knollw°°d same T.B.D. Phone E-mall ,CITY.OF ASPEN
OWNER NAME Harold and Heather Kroeger CELL EMAIL The City of Aspen
Name nawlu anti neamel nloeger Phone Cell Phone 0289.2018.ARBK
PERMIT NO,
NAMEONTAET Michael Edinger _ CELL 719.331.9211 EMAIL mithaelefaliuSdC.Com Admi,267 Roaring Fork Drive Cit,Aspen NCO zip
81611 These plans must be kept at the
PROJECT DETAILS - an OWNER KROEGER HAROLD R&HEATHER
nadir:: building site or inspection
DESCRItr,n of garage WO0.K IN OFTAIL Construction W new two W!
N e Michael Edinger r IV.J31.7ZI I ADDRESS delays may ocou theseCo plans.All
am Phone c<II Phen< 267 ROARING FORK DR
Ma Tna 1331 East Sopris Creek Road Basalt CO 81621 shall conform to plans.All
PROIsr 215252.06 Use of Building Class of Work Fixture Counts Equipment Checklist Aamesc P 0L5 stm nP
VALUATION I
5p El commerical p New Togec:,eleec: Forced Air/GravlrySystems n ad'�„ changes shall be approved by
WORKAREA 959 Sq.N. ❑ Multi-Famlly Addition 1 Bathtub _Gas
suspended,or Unit He,,. PARCEL ID 273718122005
the building official.
M Single Family g Alteration _Lavatory(Wash Basin) -Gas Log
0 Mixed-Use - Name Michael Edinger(see above) Phone Cell Phone
uNns¢R ❑Re air I KShouterkchen Sink Pr-Disposal) APPllan5WY
tOT SI ❑ ElIFFR DIShWasher Appliance Vents Addrez Eve state aP
snFr{E ❑Tenant Finish -LaundryBar,Utility Sink-Hem,Rorie,Cooling,or SEPARATE PERMITS ARE
DISTURBED Will there be B Demolition -Clothes Washer Absorption unit - ei REQUIRED FOR ELECTRICAL,
E1OTER10RAREA 479 any roof/wall Change Order_Floorsink _Boilers(include:vent) add,e„
penetrations? ❑ =Floor Drain Air Handling unit REFERENCES FROM 2015 IRC PLUMBING,MECHANICAL,OR
newsacnne9 ®Yes -water Heater(Pan Regl_coolingsy:terns rvame Michael Edinger(Alms Design Corps)President see above Pnon cell Phone CV/A=crawl space ventilation required,sec.R408.1 Access required,R408.4 FIRE SPRINKLER WORK
e Gas Outlets
No -ventilation Fans EE=emergency escape required sec R310.1
sp FT OF ROOMS g Water Treatment flailing
WITN UTILITY WORK -_Other Range Hood dare:: City_ sine DP EU=enclosed usable space under stairs shall be%"Gyp,sec R302.7
-aof Gas system Outlets G/D= arm a/dwellin se oration,sec R302.5 and R302.6
ZONE DISTRICT 15B -Sn0wmeE System Sq Ft nodes, 9 g g P
STC=Sound transmission class not less than 45 at dwelling separations,app
At Project Valuation:Cost of ct as defined in Valuation Affadavit. NOTiCh This Parma becomes null and rvame Nrn Phone_ cell Phone KR806.1
SPECIAL INSPECTION REQUIRED:
C Sq Ft of Area:Total square footage of area undergoing change or reconfiguration. nomrewk e,wnei,nted mm�181iWned eaI'nss C RV=roof and rafter ventilation required,above,
A=attic access 22"x 30",30"headroom above,R807.1
Unit Sq Ft:Gross Square Footage,not FAR,of permitted unit. if construction or work is orseaa ser A fe City State av -Structural steel welding:Field&Shop
E Lot size:Total surveyed square footage of property. SA=smoke alarms installed to NFPA 72 requirements,sec R314
abandoned nme for is commenced. -High strength bolting
E- DisturbedFt Exterior Arm sdareSquare footage additions
affected by permit or net leas any nme after*is commenced. nddail CO=carbon lazing equdetector per City Ordinance 41 series 2008 - 9 h 0
0 New S FL Total added square footage for fo t to net livable or netoms span. re:: SG=safety glazing required,sec R308.4 -Epoxy anchors
p Sq Ft of Rooms with utility Work:Total square footage,not FAR,of all rooms with plumbing work., M- oaao En a/U-e4o-I UUb GR=guardrails,36"min ht,4"max opening;req at 30"drop any point w/in 36" -Intumescent paint
APPROVALS .ewer Nam< gineering phone Cell Mane horizontally,sec R312
Reviewing a"e.d: sip,- one ,I -Spray applied fire resistive materials
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES oePanment <„w OR APP.oved gAdliau 13 Cooper Avenue,Suite 200 OW Glenwood S. StateCO av 81601 WFP=window fall protection-operable window<24"AFF&>72"above
PC xe PL 12/12/_8 grade:use opening control device listed to ASTM F2090,sec R312.2 -Permanent micropiles
Plan Check 4,489,09 IPermit Fee 6,906.30 parks Impact 3558.85 Zoning x SV 7.19 nTgss HR=handrails 34"-38"ht,sec R311.7.8
567.74 zoning(so%l Si=stairway illumination,sec R303.7 Special inspection is required per 2015/BC
Engineering 671.30 School Ded. 998.81 Building x BM 7/15/19 Name Hendrickson Construction phone y/U.L r 4.03L4 Cell Phone PD=protect against decay,sec R317 section 1704.Inspector to verify that copy of
CMP(50%) Fire g 130 Primrose Path AS en CO 81611 REFERENCES FROMme han51MC
Zoning(SW 671.30 513.07 TDM Impact Malling agreement for inspection program to be on
3 98.33 M 7/22/ Aaa.<u cHv P State av V=bathroom and balanced whole house mechanical ventilation req.
Engineering x nG 4/22/l9 Ordinance 40,2016 the job site prior to performing any
Energy Code 1,035.94 REMP Fed.Amenite CMP x AR 7/1/19 naar:n ehrisChendrieksonine.eom inspections.A copyof allS Special Inspector
DE=clothes dryer exhaust,sec 504.Makeup air req'd if over 200 CFM P P P
513.07 Plan Check Water x AS=access and service space for maintenance req'd,sec 306 field reports to be on the job site for
CMP(50%) (Hourly) Housing).1 CAT 2 FTE GENERATED St
orenwener INSPECTIONS:The General Contractor must schedule inspections online. MA=make up air required if hood exhausts greater than 400 CFM,sec 505.2 inspectors'review if requested.Failure to
Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so. ET=exhausts terminate 3'from propline and openings,10'from intakes, comply may result in denial of inspection.
Parks Review 9 62.00 zom"g starmwater Sanitation I hereby certify that I have read and examined this application and know the same to be true and correct.All provisions of laws and 501.3.1
(Hourly) Env.Health ordinances governing this type of work will be complied with whether specified herein or not.The granting of a permit does not IT=intake openings 10'from lot line&contaminant sources(vents,
Engineering Parks x Dr 6/26/201 d streets),
Utility Review 479.00 City Use Tax 1,210.15 presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance 401.4
(Hourly) •Landscape of construction.I is my responsibility to review the approved plans and any comments that are contained thereon and see that the D=fasten and seal all ductwork per 603.9
GI5 500.00 county use Tax 538.13 Efficiency x RM 2114/13 structure and/ p je is built in compliance with all applicable codes. REFERENCES FROM 2015 IFGC
_Approved RE EWE1D Egnnnr /y��t_ _ n..06/07/2018 Q�(���`I DV=direct vent req'd,sec 303.3
Lot Area Deed Restricted To Issue ,d 0 Check are tested owner builder(single-family homes only).You must take a test and complete the owne#'Sidir$aEFdgJR.E 303.3
CA a combustion air not taken from bedrooms,bathrooms or
434 Census Code 1 #of Dwellings Plans Location Issuance (CITY USE ONLY)Owner builder approved by: Date: Affidavit on file storage sec appliances g_r L1 J11 r 12/12/2 C OD=outdoor appliances must be listed for outdoor use,sec 303.6
I CITY OF ASPENDecemberzas7 130 S. GALENA ST I ASPEN, CO 816111 I CITY OF ASPENA,,x„,,==, 130 S. GALENA ST I ASPEN,CO 816111 REFERENCES FROM 2015 IECC
„a-E- F=new or replacement glazing shall not exceed 0.28 U-Value,NFRC label
3UILUING DtFik[MEN BUILDING DEPARTMENT required,Ordinance 40,2016 External Energy Use Approved
L=751 of lamps in permanently installed lights must be high efficacy,sec
R404,1 ❑ RREMP ❑ CREMP
SE=Continuous air barrier required;all exterior joints,cracks,and holes to be
caulked,gasketed,sealed,table R402.4.1.1 PERMIT DATE:
REFERENCES FROM 2014 NEC #:_0289.2018.ARBK
PERMIT NUMBER: EP=electric panel'happy space'30"x36"x78",not in storage,sec 110.26 SNOWMELT: 0
ASPEN LINE GRADE VERIFICATION FORM
COMMUNITY DEVELOPMENT DEPARTMENT Verification of Building Location by Building Contractor POOL: 0
BUILDING DESCRIPTION FORM-IRC& IBC SPA: 0
716na Aqo+
BUILDING CODE INFORMATION For Building and Permit Information,please refer to our website at: REMP SHEET: n/a
El 2015 IRC ❑2015 IBC ❑2015 IEBC ❑Other(Please Explain) a THE CITY OF ASPEN http://www.aspenpitkin.com/depts/41/
MINIMUM BOILER AFUE:
Code Editions (As Adopted and Amended) (As Adopted and Amended) (As Adopted OFFSET:
and Amended) Exemption
Fire Sprinkler System I Existing?lit I Required? Ho I Type ❑NFPA 13 ❑NFPA 13 R ❑NFPA 13 D A City verification of building location is not needed when the project creates less the 200 square feet of new floor area. REVIEWED BY: B M MANDATORY
wa
SNOWMELT SYSTEM AND EQUIPMENT MNDATO REQ'S.
Type Of Construction p VA 0 VB❑IV❑IIIA 0 IIIB 0 IIA❑IIB❑IA 0 IB'Fire Alarms Installed 0 Yes 0 No PART A: Complete and Submit as part of the Building Permit Application Allnsnowmelt systems shall meet the following.
y portions in the Right of Way must be on a separate zone.A ROW
Required Special Inspections 0 High-Strength Bolting IZI Epoxy Anchors 21 Structual Steel Welding permit and Permanent Encroachment License are required.
o Building/Job Address or Location: 267 Roaring Fork Drive -R10 insulation shall be installed under the area to be snow melted or R5
CI Permanent Micropiles 0 Sprayed Fire-Resistants •Other see structural ulation shall be installed antler and at the slab edges.(Ordinance 11
o Your Name(Person Completing Part A): Michael Edinger Series 2011)
Energy Code Compliance O Prescriptive Table ID Other o Your Company: A'D'C' -Automatic controls installed for system shut off when pavement
an
❑RESCheck UA Alternative 0 COMCheck UA Alternative P y. temperature is above 50°F and no precipitation is falling.(20091ECC
- 0 Plans must show horizontal dimensions 'tie'the building to the properly boundary. sec.403.8&503.2.4.5)
Are building ties shown? Circle one) `NO' -Automatic or manual controls installed for system shut off when outdoor
Exterior Energy Use Total Approved On-Site Snowmelt Spa Pool g ( temperature is above 40°F.(2009 IECC Sec.403.8&503.2.4.5)
(Existing+New) o An elevation benchmark needs to be established on the site by a licensed surveyor and shown on the plans.What is the -Inspection by testing hydrostatically at 1 i times max system design
Buildin T e/ elevation of this benchmark? 8105.5 pressure,but not less than 100psi,for 15minutes.(20091MC Sec.
g YP I ❑A_❑B ❑F_ 0 E p R_ I I E One Family ❑Two Family 1208.1)
Occupancy Group g 0 B(A<50) 0 H_ ❑M 0 S_ R
C C ❑Townhouse o If the garage is located within 10 feet of the rpadwtay or sidewalk,provide spot elevation on the on the roadway or sidewalk.
❑I_ ❑U Is a spot elevation shown? `Yes' `No' //�7
UNIT DESCRIPTION AS PROPOSED o Provide the equation comparing site(surveyed)elevation to structure/architectural plan elevation:
Gross Area of Building: Gross Area of Unit: ' (i.e.,100'first floor elev=7962.50') 100'-0"=8105.5
ADU BUILDING DESCRIPTION
Occupant Load:
Is there an ADU? 0 Yes
M No PART B:Complete prior to first Foundation Inspection,by a licensed surveyor or an individual prequalified by the City
#Stories Above Grade 1 #Stories Below Grade 1 #Living Rooms
P
AarkittachedngSpaces Garage Detached Garage Carport
Parking Spaces Parking Spaces #Kitchens
#Full Baths o Do field measured building ties to property match building ties shown on the plan? (circle one):`Yes' `No'
#Bedrooms #Full Baths 1 Deck Area #3/4 Baths o Surveyor needs to confirm that one spot on the top of the foundation wall is at the same elevation shown on the approved
#1/2 Baths building plans.
#3/4 Baths #1/2 Baths #Bedrooms
o What is the field measured elevation of top of foundation wall relative to the site bench mark?
#Kitchens #Wood Fireplaces #Other Rooms(List)) o According to the building plans,what was the design elevation for the same place on the foundation wall?
#Gas Appliances #Gas Logs_
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED(Include Mechanical&Storage) o Was the elevation of the building adjusted in field? (circle one): 'Yes' `No'
Basement none o If yes,why?
Main Level 9er 2 car garage,mudroom,storage,mechanical room,2 bedrooms,2 3/4 baths,lounge,laundry room The undersigned qualified individual certifies that the information in Part B is accurate-
� Signature: Date: _
2nd Floor Ra Loft,1 3/4 baths,2 bedrooms,2 full baths,kitchen,great room
Printed Name: Contact ph.#:
3rd Floor
Company:
Additional
Reviewed By: Bonnie Muhigirwe Date: 7/15/19
RECEIVE��' RECEIVED
12/12/2. f
ICITY OF ASP EN1anPantess 130 S.GALENA ST ASPEN,CO 81611� Webpage: http://www.aspenpitkin.com/pdfs/depts/41/linegradeverificationform.pdf RQ`Jft bat/2019
BUILDING DEPARTMENT ASPEN
BUILDING DEPARTMENT RECEIVED
1L/12/2018
ASPEN
BUILDING DEPARTMENT
5. Provide Final Inspection Report.The special inspector shall submit a written final
report documenting required special inspections and correction of any discrepancies
noted in the inspections prior to the final building inspection.
dc
eQ3�ne B.Owner Responsibilities.The project owner,the engineer or architect or record,or an agent of the . Approval of fabricator.Approval shall be hand upon review of Om fabricator's written
Tat[anor.anon _ owner is responsible far employing special-inspection services.The special inspector\agency shall ' punealural and quality aunlml manuals and periodic auditing of fabrication pr:wiice..by
—---- SPECIAL INSPECTION AND TESTING AGREEMENT not be in the employ of the contractor,subcontractor or material supplier.[IBC Sec 1704.1]In an approved special nnievh,m agency
case of an owner\contractor,the special inspector\agency shall be employed as specified by the a. Completion of fabrication.(Mon completion of fabrication,the approved fabricator
To permit applicants of project requiring special inspection and\or testing per Section 1704 of the building official. shall submit certificate i if compliance to the building official slating that the work was
International Building Code(IBC). performed in accordance with the approved contraction dominion.
267 ROARING FORK DRIVE C.Engineer or Architect of Record Responsibilities u. Building rat Responsibilities
Project Address: Permit Number: D269 201 R ARRK g Department p
1. Prepare special inspection program.The engineer or architect of record shall list the 1. A spacial-impaction men The budding department shall a all
BEFORE A PERMIT CAN BE ISSUED:The owner,or the engineer or architect of record,acting as the items for which special inspection is required;and shall indicate any items for which the Approve spec pat program. g cps approve a
owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing IBC or the building official approves periodic inspection and the frequency of such special inspector,and xpecial-inspection requirements.
Schedule,including the required acknowledgments.A pre-construction conference with the parties inspections. a. Enforce special inspection.Work requiring special inspection and the building
involved may be required to review the special inspection requirements and procedures. inspector shall monitor the performance of special inspectors.His\Her approval,in
2. Respond to field discrepancies.The engineer or architect of record shall respond to addition to that of the special inspector,must be obtained prior to placement of concrete.
APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the uncorrected field discrepancies in design,material,or workmanship observed by the covering of nmctual steel,or other similar materials.
projects for which they provide special inspections.Special inspectors shall be approved by the building special inspector.
department prior to performing anyduties.Special inspectors shall submit their qualifications and are 1. Review inspection poosa.'1 he budding official should review epeeiel inspeninn
P e r n % P P 9 progress and final reports.
subject to personal interviews for pre-qualification.Special inspectors shall display approved 3. Review shop drawings and submit design changes.The engineer or architect of record
identification,as stipulated by the building official,when performing the function of special inspector. shall acknowledge and review for conformance with the construction drawings those 4. Perform fine inspection.The building official should perform the final inspection and
shop drawings that may detail structural information,shall submit to the building official approval for a project pee Sec.109 1.11 after the Fusel speciel,rnpavnn report ha,been
Special inspection and testing shall meet the minimum requirements of the International Building Code and to the special-inspection agency written documentation of any verbally authorized reviewed and approved
Section 1704.The following conditions are also applicable: deviations from the approved construction documents,and shall submit revised
A.Duties and Responsibilities of the S 1 Ins Inspector
documents for building official approval as required. 207 Roaring Fork Dr.ASPt.N,CU-Rl6l�armn Number:
Special pe Project Address:
D.Contractor Responsibilities
1. Signify presence at job site.Special inspectors should notify contractor personnel of ACKNOWLEMMENTS
their presence and responsibilities at the job site.If required by the building official,they 1. Notify the special inspector.The contractor is responsible for notifying the special I have road and agree to comply with the conditions of this agreement
shall sign in on the appropriate form posted with the building permit. inspector or agency regarding individual impactions for items listed on the attached
schedule and as noted on the building department approved plans.Adequate notice shall Agency: '°'`e P d Nate: Date /' r
2. Observe assigned work.The special inspector shall observe assigned work for be provided so the special inspector has time to become familiar with the project. �j: ,0„, C, 4//1-44-
conformance with the building department approved(stamped)design drawings, 7' =L"�+-'� � � l,�
specifications,and applicable workmanship provisions b the International Building 2. Provide access r a approved plans.The contractor is responsible for providing the c Sr R:n, . i Date - C
Code.Architect\engineer-reviewed shop drawings maybe used only as an aid to special inspector access to approved plans fiwrtec Print, �.1� � .q
lion. ffaeNer*mot 1... t-4lC \ q - - 19
inspection. 3. Retain special inspection records.Upon request,the contractor is also responsible for npef- A - Cyr r I fj '
For continuous special-inspection,the special inspector shall be on site at all times retaining,at the job site,all special inspection records completed by the special inspector. s; G,�f /I ��Naore: Darn: Y/
observingthe work requiring al inspection.Periodic inspections,if any,must have hngmcv/Amhdeet. ,///v AH//
q g sped P P Y Oddo Engitroenp _6.�6/`-f� I i/
prior approval based on a separate written plan reviewed and approved by the building E.Inspection of Fabricators _ 9h aT d—__ �—
department and the engineer or architect of record. Name: ilea:
1. Fabrication of structural assemblies and members.Where fabrication of structural Contractor Signature aimed—d —
3. Report nonconforming items.The special inspector shall bring nonconforming items to load-bearing members and assemblies is being performed on the premises of a CHRIS HENDRICKSON - ---- ----
the immediate attention of the contractor and note all such items in the daily report.If fabricator's shop,IBC Section 1704.2 shall require special inspection of the fabricated ----
any -
item is not resolved in a timelymanner or is about to be incorporated in the work,the items. i Printed Name: Dale:
fit Approved fabricator SttSnswm:
special inspector shall immediately notify the building department by telephone or in
person,notify the engineer or architect,and post a discrepancy notice. 2. Fabrication and implementation procedures.The special inspector shall verify that - — __
the fabricator maintains detailed fabrication and quality control procedures that provide a print Date.
4. Provide timely reports.The special inspector shall complete written inspection reports basis for inspection control of the workmanship and the fabricator's ability to conform to mspccmd eshenmv,r ,'tone fF 1n 5�{aWkalen
for each inspection visit and provide the reports on a timely basis determined by the approved construction documents and reference standards.The special inspector shall Motor city Iron (�_IJ - _ July 13 2019
building official.The special inspector or inspection agency shall furnish these reports review the procedures for completeness and adequacy relative to code requirements for — — — Dom
directly to the building official,engineer or architect of record,and others as designated. fabricator's scope of work. (circle one} Signature: Primed Name.
[IBC Sec.1704.1.2]These reports should be organized on a daily format and may be CITY OF ASPEN sMlsof Bonnie Muhigirwa 7/1 B/19
submitted weekly at the option of the building official.These reports should include: F.Approved Fabricator Responsibilities ptTKIN COUNTY' V --- - —
a.Description of daily inspections and tests made with applicable locations,
b.Listing of nonconforming items, 1. Fabrication exempt inspections.Special inspections are not required where work is 1
c.Report on how nonconforming items were resolved or unresolved as done on the premise of a fabricator registered and approved to perform such work
applicable, without special inspection.
d.Itemized changes authorized by the architect,engineer,and building official if
not included in nonconforming items. 2
1
j4
The City of Aspen
..
--Spray foam hard to reach
f/ cavities before they are
•. closed up
:AI\
Sealant to be applied along the full Seal studs to plates where not _ '/
length of double plates and stud covered with spray foam Seal between double
packs. `plates
'— Spray foam all
cavities
A
oSSiSsiscsssississilf
po
•
Important areas to seal: Seal all penetrations of air barrier including:
0
-Caulk/glue/seal along the full length of double plates and Structural projections Z
stud packs. Exterior Receptacles
-Seal between all framing members not encapsulated with Exterior Outlets Seal between plate and floor sheathing
spray foam Vents Seal between double
-Apply spray foam in hard to reach areas before they are Wiring plates
Isometric showing areas to add sealant in addition to spray foam covered up or provide access holes to allow spraying PipesI J Q
Spray foam rim
joist I— O
W LL
0
Seal between double 0 <plates 7
CO
Q
W
'--- Spray foam all N
cavities Ld_
Q
Seal between double plates
Seal between plate and floor
i sheathing
Foundation gasket ----__________,
L
Spray foam rim
joist
Gasket sill plate to /7�
foundation F( E I E D
f
Detail of Foundation Connection Wall Section using Spray Foam
12/12 018
ASPEN
BUILDING DEPARTMENT