HomeMy WebLinkAboutFile Documents.333 Park Ave.0003.2019.ARBK DATE:12126118 MASTER PERMIT: PERMIT NUMBER: ADDRESS: PERMIT NUMBER: I-i 4€I F l a n Set M u t Be Printed In Color
�q
COMMUNITY DEVELOPMENT DEPARTMENT * COMMUNITY DEVELOPMENT DEPARTMENT ♦I COMMUNITY DEVELOPMENT DEPARTMENTill w,_:
BUILDING PERMIT APPLICATION TI BUILDING DESCRIPTION FORM-IRC&IBC �m��
or , BUILDING PERMIT CONTACT SHEET MI.C,,,n,.A,,,•I
PROPERTY INFORMATION ♦ BUILDING CODE INFORMATION
Aoonsss 333 PARK AVE.,ASPEN CO stone PARCEL ID 273718100017 Name Flynn Stewart-severy phone 970.987.2707 E-mail Flynn@fandnc h[ [com O 2015 IRC 0 2015 IBC ❑2015 IEBC 0 Other(Please Explain) ---
1 7 teAm SUNNY PARK Code Editions (As Adopted and Amended) (As Adopted and Amended) (As Adopted
LOT BLOCK OR SUBDIVISION Name Monty Thompson Phone 970379.5823 E-mail montyaspen@gmail.com and Amended)
OWNER NAME BMH INVESTMENTS LTD CELL EMAIL HENDRYBRIAN@MAC.COM The City of Aspen
Name BMH Investments Ltd phone Cell Phone - Fire Sprinkler System I Existing?R No I Required?it I Type 0 NFPA 13 0 NFPA 13 R 0 NFPA 13 D NAMECITY-OF ASPEN
sT fOStACT MONTY THOMPSON CELL 970.379.5823 EMAIL MONTYASPEN@GMAILCOM pairing ddfe251001 Fannin ST#3850 °ity Houston SLaa TX Z1p 77002 Type Of Construction❑VA pp ve❑IV 0 wA ❑RIB 0 uA❑RB 0 IA❑IB Fire Alarms Installed ❑Yes❑No These plans must be kept at the
PERMIT NO.0003.2019.ARBK
padaels hendrybrian@mac.com Required Special Inspections❑High-Strength Bolting ❑Epoxy Anchors ❑Structual Steel Welding -
PROJECT DETAILS . building site or inspection-
0E5CR1PT10NOFdelays mayoccur.Construction
woRKlNo o PROGRESSIVE DENOLTON AND REPAIRTOLOCKMAN°IDEm IDENTIFY RESOURCES PREPARING FOR LEAD AND ASBESTOS ABATEMENT 0 Permanent Micropiles 0 Sprayed Fire-Resistants 0 Other y
OWNER BMH INVESTMENTS LTD
Name Monty Thompson Phone Cell Phone 970.379.5823 shall conform to these plans.Allli"g P.O.Box 4841 Aspen CO 81611 Energy Code Compliance 0 Prescriptive Table 0 Other -
PROJECT Use of Building Class of Work Fixture Counts Equipment Checklist ncaress city p sate Zip 0 RESCheck UA Alternative ❑COMCheck UA Alternative changes shall be approved by
vawnno" ❑ Commerical 4 Toilets, el y p @g ADDRESS.333 PARK AVE the building official.
ID Forced Air/Gravity Systems - moot as en mail.com
w�ro SREA 4,623 ❑ Multi-Family ❑Addition 4 Bathtub Wan,Suspended,or Unit Heaters "tldfeSS Exterior Energy Use Total Approved On-Site Snowmelt Spa Pool • .. '
ID Single Family ID Alteration 4—avatory(Wash Basin) —Gas Log (Existing+
asz3 ❑ Mixed-Use shower — Name Monty Thompson-ThunderConstrudlon,Inc New) PARCEL ID
UNIT sq Fr ❑.Repair 4—Kitchen Sink(+Disposa0—Gas Appliancew Y Phone cell Phone 970.379.5823 273718100017
s;ZZE ❑ ❑ Dishwasher Appliance Vents Tam Building Type/ I ❑A_❑B ❑F_ ❑E ❑R_ I O One Family 0Two Family
Sq Frl 10,418 Tenant❑ Finish —LaundryBar,Utility Sink J—Heat,Refrig,Cooling or ddress P.O.Box 4841 °m Aspen staeCO Z1p 81611 Occupancy Group gSEPARATE PERMITS ARE
v ❑B(A<50) ❑H_ ❑M ❑5_ R
Will there be ❑Demolition —Clothes washer Absorption Unit C C ❑Townhouse REQUIRED FOR ELECTRICAL,
DISTURBED D E-mail montyaspen@gmail.com ❑1_ ❑u
E%TFRIORAREA any roof/wall ❑Change Order—Floor sink _Boilers(includes vent) Aaaress i PLUMBING,MECHANICAL,OR
penetrations? ❑ —Floor Drain Air Handling Unit
NEW SOFT 0 OYES —Water Heater(Pan Req)_Cooling Systems N,me Flynn Stewart-severy Phone Cell phone 970.987.2707 UNIT DESCRIPTION AS PROPOSED • FIRE SPRINKLER WORK
p Gas Outlets
FTOF ROOMS 287 ❑No —water Treatment —Ventilation Fans .i.ngGross Area of Building:4,623 SF Gross Area of Unit:4,623 SF
kW UTILITY woRKTaher HOT,. _Range Hood aaaress P.O.Box 6762 o�,Snowmass Village stag CO np81615 ADU BUILDING DESCRIPTION
BONE DISTRICT R-6 _1
— _p of Gas System outlets Occupant Load:
—Snowmelt System Sq Ft pddael flynn@fandmarchitects.com Is there an ADU? ❑Yes
I ❑No
N-Project valuation:Cost of project as defined in Valuation Affadauit. 'NOTICE:This permit becomes null and` Name Phone cell phone #Stories Above Grade 2 #Stories Below Grade 1 #Living Rooms
O▪Sq Ft of Work Area:Total square footage dame undergoing change or reconfiguration. void If work or connram^^aum<Nzed #Kitchens
O not commenced within 180 days, Attached Garage Paregegces a Car ort —
Unit Sq Ft:Gross Square Footage,not FAR,of permitted unit.
�La s:e:rocal surve ds foaa f n. iabamtmedfoa work of18enaaor ncc','e$ coy sere ZIP Parking SpacesP Parking Spaeesa Parking SpacesO #Full Baths
ye Squa gge flota y abandoned wok is ofrmenced0 days at
z New Ft Total added
squarefootage footage of sod affected td be permit application. anybmeaf[erworklscommenced. - ail #Bedrooms? #Full Baths 4 Deck Area 249.55E #1/2 Baths
LL New Sq Ft:Total addedfootage additions to net livable or net leasbleaaaress
g space. #1/2 Baths
p Sq Ft of Rooms with Utility Work:Total square footage,not FAR,of en rooms with plumbing work. Re- #3/4 Baths 1 #1/2 Baths 0 #Bedrooms
APPROVALS sewer Name Hein Brutsaert Phone 970.300.1003 Cell Phone #Kitchens 4 #Wood Fireplaces 2
ep swing x Vie viewer Date p #Other Rooms(List)
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES nment Review oR Apprmea nee�e:307 Aspen Airport Business Center,Suite N AS en CO 81611 1
PC PL city p sLaee zIP #Gas Appliances #Gas Logs_
Plan Check l PermisFee 25.00 Parks Impact 0 x „�,,,a — p-mail hero brutsaerten ineerin .tom
Zoning eareas @ g g BUILDING ROOMS AND USES BY LEVEL AS PROPOSED(Include Mechanical&Storage)
Engineering Zoning(50%) school Ded. HPC x srA ,nuts
g Building x dH 1n4n9 Name Thunder Construction,Inc Phone ten Phone 970.379.5823 Basement Includes:2 Bedrooms,2 3/4 Baths,2 Kitchens,2 Living rooms,1 Mechanical room,1 Hot tub
Zoning(SO%) CMP 150%) TDM Impact 0 Fire — safe:P.O.Box 4841 E;,yAspen sate CO Z1P 81611
Engineering Main Level Includes:2 Bedrooms,1 Bath,1 Dining Room,2 Kitchens,2 Living rooms
Energy Code REMP Ped.Amen,to 0 CMP x „00 p;;;ela0montyaspen@gmaiLeom
Water
CMP(50%l Plan Check 325.00 Housing Cash in Lieu 0 2nd Floor Includes:3 Bedrooms,1 Bath
IHourly) Stormwater INSPECTIONS:The General Contractor must schedule inspections online. I
Zoning Sanitation Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so.
Parks Review Stormwater I hereby certify that I have read and examined this application and know the same to be true and correct.All provisions of laws and
(Hourly) Env.Health 3rd Floor
Engineering Parks x Dr 1124119 ordinances governing this type of work will be complied with whether specified herein or not.The granting of a permit does not
Utility Review City Use Taxesume to y p y regulating p
(Hourly) pr give authority to violate or cancel the provisions of an other state or local law re ulatin constructlon or the performance
County use Tax Landscape of construction.It is my responsibility to review the approved plans and any comments that are contained thereon and see that the Additional
GIs Efficiency structure and/or project is built in compliance with all applicable codes.
Approved CCE4V 'R, Contractor
a a� C D
To Issue jJ signature Date ,/E, l !t {a�
Lot Area Deed Restricted ❑ Check if you area tested owner builder(single-family homes only).You must take a test and complete the owns JIL u
Census Code #of Dwellings Plans Location issuance Reviewed By:d" Date:'i24115
1/Y1/L6' (CITY USE ONLY)Owner builder approved by:_, Date: Affidavi��Tfl�z/ten r ns/n3/'2n q
(CITY OF ASPENDecember201T 130 S. GALENA ST I ASPEN,CO 81611J (CITY OF ASPEN.... 130 S. GALENA ST I ASPEN,CO//816111 [CITY OF ASPEN,--,.. 130 S. GALENA ST I ASPEN,CO 81611
3UiLiiiNGLL PAH I i,1LN i BUILDING DEPARTMENT ,-'L:ING DEPARTMENT
December 27,2018 PHASE C O N
ENVIRONMENTAL CONSULTANTS
City of Aspen Building Department
201 N.Mill-Garden Level
Aspen,CO 81611
December 26,2018
RE:Repair Building Permit for 333 Park Ave.,Aspen,CO 81611 To Whom It May Concern:
Location:333 Park Ave. Phase Con Environmental Consultants, LLC has been retained byThunder
Legal Description:Subdivision:Sunny Park.Lot:I
Parcel:273718100017 Construction to provide asbestos and Lead Based Paint(LBP)inspection/air
monitoring and consulting services for the planned asbestos and LBP
To Whom It May Concern: abatement to facilitate the moving and renovation of the historic house
structure located at 333 Park Avenue in Aspen,Colorado. Phase Con will
I will provide structural engineering services for the Repair Building Permit of 333 Park Ave.I will be consult on all aspects of the abatement process to aid in ensuring Asbestos
available to the architect,city,and the general contractor to review,comment and advise on the existing Containing Materials(ACMs)and LBP coated building components are properly
structure as components are removed during the repair/demo/abatement process.The work includes
the following: abated/addressed in the moving/renovation process.
I. Review of existing architectural plans.
2. Regular,on-site assessment of existing structure for vertical and lateral load per 2015 IBC. Due to the building being an historic structure extra care will be required to
3. Design and layout for new structural systems and bracing as needed. properly abate/remove the ACM and LBP coated components. As the primary
4. Specification of materials for all new construction. ACM present in the historic portion is interior plaster,which given the age of
5. Production of construction documents with submittals as follows: the building is an important component of the structural integrity for the
i.Permit construction drawings. building; this additional level of care will include the following important
ii.Post demolition construction drawings.
iii.Post building department commentary construction drawings. components:
iv.Construction details as necessary.
• Proper phasing of the abatement process including abatement of the
non-historic sections initially followed by abatement of the historic
I sections(multiple phases for the historic section to ensure structural
I1 22 IZ-I�-Ig integrity of the building is maintained - this means several air
STRUCTURAL ENGINEER By pvv♦ L yJrr asyr. clearances during the abatement process to allow non-abatement
Hein Brutsaert,Silver Town Structures personnel to inspect structural components).
• Removal of LBP coated historic trim,doors and cabinets by Thunder
Construction personnel prior to asbestos abatement. This will aid in
ensuring that these important components are not damaged in the
ement process.Thunder Construction personnel
use extra care
Q.p gpU s!C6�as= so as not to disturb the ACM plaster when removing these components.
a:�# 4`q>:tot
_ , • - The aim of these special steps is to accomplish the abatement while providing
�I 44ZZ5 for protection of the health of all personnel involved in the process and still
revAig
_�q-. L Ljyv.a ,- iprote - toric cture undergoing the process.
14
-'-F'rSIDNAL��G'. c4/2019 L Do s A.Close
FORCOI>aillPl1FIIG'E orado State ABI/MP/AMS/PD#2930
-justinh
RECEIVED RECEIVED
01/03/2019 01/03/2019
..I - I o r „ VESt0(flrr:.11E4 /+ nI
ASPEN ASPEN
BUILDING DE ARTMENT BUILDINGDEP RTMENT RECEIVED
ui/us/2019
ASPEN
BUILDING DEPARTMENT