Loading...
HomeMy WebLinkAboutFile Documents.201 Clubside Dr.0004.2019 (3).ARBK r DATE: MASTER PERMIT: PERMIT NUMBER:0009.2019.ARBK Field Plan Set Must Be Printed In Color COMMUNITY DEVELOPMENT DEPARTMENT ADDRESS: 201 Clubsitle Drive,Aspen CO PERMIT NUMBER: 201 CIubside Drive,Aspen CO PERMIT NUMBER: tie BUILDING PERMIT APPLICATION THE CITY Of A2,11\ COMMUNITY DEVELOPMENT DEPARTMENT COMMUNITY DEVELOPMENT DEPARTMENT IlkPROPERTY INFORMATION BUILDING PERMIT CONTACT SHEET TaaGnaAau BUILDING DESCRIPTION FORM-IRC&IBC CITYOFASPEN ADDRESS 201 CIubside Drive _ unn# PARCEL I. 273502310003 Tra Crrvor Asev, LOT 3 BLOCK ORSUBDIVISION CIubside at Maroon Creek Name.Lilies MF.rm rnss Ar,:rnlrcture+Plan nm0 PM 976925J755 tuna InrBDIE@hjll00aS rum BUILDING CODE INFORMATION OWNER NAME Simms FamilyTrust au hr's Laver:WHB Construction 970-925-2391 Emal chrlsawhbconstructioawm 20151RCOther Please Explain) /EMAIL me G_ L v s pone ❑edan IBC ❑20151EBC 0 ( p ) PERMIT NO:. 0004.2019.ARBK _ Code Editions (As Adopted and Amended) (As Adopted and Amended) and Adopted - The City of Aspen NAMEON racy Julie Maple -eccL 970-925-4755 EMAIL jmaple@billposs.com rem Simms Family Trust Phone Cell Phone and Amended) • i,t e9 9320 Wilshire BLVD.#300 py.Beverly Hills sm.CA ZIP 90212 OWNER PROJECT DETAILS __ Fire Sprinkler System I Existing?la'I Required?ONo I Type ID NFPA 13 ❑NFPA 13 R E NFPA 13 D SIMMS FAMILY TRUST Theseplans must be keptat the r scRlPrlorvoF MIL C/O Julie Marie Poss Architecture+Planning lmapleabillposs.com WORNIN DETAIL Remodel of existing duplex to include a new patio door,two retractable awnings,new pocket door at kitchen Type Of Construction❑VA®VB❑IV❑ILIA 0 LIB❑ILA❑LIB 0 IA 0 B Fire Alarms Installed ❑Yes DB No - building site or inspection New glass stair/guardrail,removed bidet at Master bath,enlarged/remodeled Mud&Laundry rooms name Julie Maple Poss Architecture+Planning p.m 970-925-4755 cell Phone Required Special Inspections SI High-Strength Bolting 0 Epoxy Anchors ®Structual Steel Welding delays may occur.Construction VALUATION$350,000.00 Use of Building Class of Work Fixture Counts Equipment Checklist Wu 605 E.Main Street ors Aspen nine Co ZIP 81611 ADORES 201 CLUBSIDE DR ❑Commerical ®New -Toilets,Bidets Fpmeeno-/Gmvirytytems ❑Permanent Micropiles 0 Sprayed Fire-Resistants ❑Other _ shall conform to these plans.All via pFE zoosF 0 Multi-Family ®Addition Bathtub -wa II,Suspended,or Unit Heaters 5.�a,Iajinaple@blllposs.com changes shall be approved by ® Single Family❑Alteration _Lavatory(wash eosin) -Gas Log Energy Code Compliance IN Prescriptive Table ❑Other a,227 SF ❑ Mixed-Use Shower the buildingofficial. uxlr sg PT ❑Reppair -Kitchen Sink(+Disposal)-Gas Appliancew Name Julie Maple Poss Architecture+Planning Phone 970-925-4755 Cell Phone ❑RESCheck UA Alternative ❑COMCheck UA Alternative PARCEL ID 2735°2310003 Imsl{E ❑ ❑IFFR Dishwasher -Appliance Vents rag 605 E.Main Street. tar Aspen sate CO no 81611 HIFTI 5,049 SF ID Tenant Finish -Laundry ear,Utility sink-Heat,Refrig,Cooling,or aaro Will there be ❑Demolition -Clothes washer Absorption Unit Exterior Energy Use Total Approved On-Site Snowmelt Spa Pool PIgEAIORAam 191 SF any roof/wall 0 Change Order-Floor sink _Boilers(includes vent) n al,Ia, imaole@billposs coin (Existing+New) 15 LF roof heat tape penetrations? ❑ -Floor Drain -AirHandlingUni[ SEPARATE PERMITS ARE NEW sct Fr 47 SF ®Yes -Water HeaterOutlets Req)-Cooling Systems mm�e Julie Maple Poss Architecture phone 970-925-4755 all phone Building Type/ [ ❑A_ ❑B ❑F_ ❑E ❑R_ I ®One Fam'I ❑Two Famil REQUIRED FOR ELECTRICAL, ❑No -#Gas outlets -ventilation Fans Occupancy Group g y y s Fr oP aoores water Treatment - Ilns ❑B(A<50) ❑H ❑M ❑S_ R PLUMBING,MECHANICAL,OR zos Unury WORx 0 SF onlyAt overhang -Other Range Hood Iva 605 E.Main Street en,Aspen state CO ZIP 81611 C C ❑Townhouse ZONE DISTRICT R/MF-A/PD - -#of Gash System Outlets mg. abill ss.com ❑l- ❑lJ No new fixtures snowmen asSystemOtl imaple po FIRE SPRINKLER WORK k 15 LF roof heat tape UNIT DESCRIPTION AS PROPOSED tiT Project Valuation:Cost of project as defined in Valuation Affidavit. •NOnnmce This permit becomes null and name N/A PM1onq sea Phone 2 square g rgoingc change or recongu2 v^ construction authorized :rid Gross Area of Building: Gross Area of Unit: O Sq Ft of Work Area:Totals footage area uncle Ban reconfiguration. ,s�no<mmenced within ran day.or nrg gro state en ADU BUILDING DESCRIPTION H Unit Sq FU Gross Square Footage,no[FAR,of permitted unit. ifmnstruction or work is suspended or Occupant Load: BLa sire:TOWlsurveyedsqufirefootfigeofProperty. abandoned for aperidof100 days at r-se. Is there an ADU? ❑Yes SPECIAL INSPECTION REQUIRED: Disturbed Exterior Area:Square footage of lot affected by permit application. x anytime won is commence 0,qo LL New Sq Ft Total added square footage for additions to net livable or net leasble space. a d ra Sq Ft of Rooms with Utility Work:Total square footage,not FAR,of all rooms with plumbing work. se- APPROVALS slave Peighlul _ photo 970-927-9510 all Phone #Stories Above Grade it Stories Below Grade #Living Rooms FIRE -Structural steel welding:Field&Shop n p aevlewdng needs s�nor ate Te Tres 298 Park Ave.#301 air easel[ sox CO no elszt Attached Garage Detached Garage Carport #Kitchens - SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES oeparcmem aewew on oyroe Parking Spaces Parking Spaces Parking Spaces #Full Baths -High strength bolting PC x LL 1/11/1 %a'lagIre sneichtal@sonris.net #3/4 Baths SPRINKLERS -Epoxy anchors Plan Check 6353.75 Permit Fee 9775.00 Parks Impact 0 #Bedrooms it Full Baths Deck Area -Intumescent paint Zoning x JRB 1/23/19 #1/2 Baths Zoning"0 HPC Name William H Raker CnnsvLlction phone 970-925-2391 all Phone #3/4 Baths #1/2 Baths #Bedrooms /�11 -Spray applied fire resistive materials Engineering 162.50 school Ded. 0 n 2 w p sun CO tip 81611 #Kitchens it Fireplaces 1 , -Permanent micropiles Building x DAM 2/14/19 l4,1 10AABCSuiteMM g gsen P #OtherRooms(List) REQUIRED Zoning(50%) 162.5D CMPI50%) TDM Impact D Fire x DAM L14/19 ndndt,bill@whbconstructIon.com St Gas Appliances #Gas Logs Engineering a Special inspection is required per 2015 IBC Energy code 1466.25 ReMP Ped.Amer,te D CMP x TK 2/1/15 INSPECTIONS:The General contractor must schedule Inspections online. P BUILDING ROOMS AND USES BY LEVEL AS PROPOSED(Include Mechanical&Storage) section 1704.Inspector to verify copy thatof Water Please visit www.aspenpltkln.cam/Departments/Community-Development-Forms/to do so. Plan Check Basement CMP(SO%) greement for inspection program to be on Housing Cash In Lieu 0 5tormwater IherebyceMfy that l have read and eamined Althis application and know the same be true and correct All provisions of laws and (Hourly) ordinances governing this type of work will becomplied with whethers fled herein or not.The tin of It does not the job site odor to performing any Zoning Sanitation P Pad granting perm Parks Review 5tormwater presume to give authority to violate or cancel tit-provisions of any other state or local law regulating construction or the performance inspections.A copy of at Special Inspector (Hourly) Env.Health elsenstruction.ltis y ibi'ty to revs the approved plans and any comments that are contained thereon and see that the Main Level feld reports to be on the job site for Engineering Parks Utility Review 169.85 City Use Tax 2625.00 structure and[r f IItI o pi with all applicable codes. (Hourly) Landscape m�1/ ,ice -/� rate /d�Tf,/�'p CC//►►����`I D inspectors'review if requested.Failure to county use tax y Check tested er builder(single-familyhomes onl You must take a test and com t the ownenlBLlfdAg�ed1E 2nd Floor comply may result in denial of inspection. GIS 875.00 Efficiency 0 you y). pee Approved a (CITY USE ONLY)Owner••!der approved by: Date: Affidavit on file 939 Lot Area Deed Restricted To Issuanue ce RECEIVE CITY OF ASPENAnannrmT t Census Code #of Dwellings Plans Location �� 130 S.GALENA ST I ASPEN,C 11 3rd Floor s�CITY OF ASPENsecemberease put/11,ril L Fla P 130 S.GALENA ST I ASPEN,CO 81y611) BuaDINCDEPAPibIFNT Additional BUILDING DEPARTMENT SMOKE ALARMS AND RECEIVED CARBON MONOXIDE ReviewedDETECTORS REQUIRED By: Date: n1/no/ririi.g THROUGHOUT DWELLING I CITY OF ASPEN,...,.. 130 S.GALENA ST I ASPEN, CO 811611� UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 ;DEPARTMENT 5. Provide Final Inspection Report.Thel inspector shall submit a written final 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written I�l pec epo specie pec procedural and quality control manuals and periodic auditing of fabrication practices by II T_ p ert documenting thei required so el inspections and pectionon of any discrepancies se approved special inspection agency. noted in the inspections prior to the final building inspection. TRaCmmAsnN SPECIAL INSPECTION AND TESTING AGREEMENT 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator B. Owner Responsibilities.The project owner,the engineer or architect or record,or an agent of the shall submit unificate of compliance to the building official stating that the work was To permit applicants ofpr project requiring special inspection and\or testing per Section 1704 of the weer is responsible for employing special-inspection services.The special inspector\agency shall performed in accordance with the approved construction documents. not be in the employ of the contractor,subcontractor or material supplier.[IBC Sec 1704.1]In International Building Code(IBC). case of an owner\contractor,the special intpector\agency shall be employed as specified by the G. Building Department Responsibilities Project Address:201 Clubside Drive,Aspen CO Permit Number: 0004.2019.ARBK building official. C. Engineer or Architect of Record Responsibilities 1. Approve special-inspection program.The building department shall approve all BEFORE A PERMIT CAN BE ISSUED:The owner,or the engineer or architect of record,acting as the special inspectors and special-inspection requirements. owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing 1. Prepare special inspection program.The engineer or architect of record shall list the Schedule,including the required acknowledgments.A pre-construction conference with the parties 2. Enforce special Inspection.Work requiring special inspection and the building items for which special inspection is required;and shall indicate any items for which the involved may be required to review the special-inspection requirements and procedures. IBC or the building official approves periodic inspection and the frequency of such inspector shall monitor the performance of special inspectors.HisVJer approval,in addition to that of the special inspector,must be obtained prior to placement of concrete, APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the inspections. covering of structural steel,or other similar materials. projects for which they provide special inspections.Special inspectors shall be approved by the building 2. Respond to field discrepancies.The engineer en architect of record shall respond to department prior to performing any duties.Special inspectors shall submit their qualifications and are uncorrected field discrepancies in design,material,or workmanship observed by the 3. Review inspection reports.The building official should review special-inspection subject to personal interviews for pre-qualification.Special inspectors shall display approved special inspector. progress and final reports. identification,as stipulated by the building official,when performing the function of special inspector. 3. Review shop drawings and submit design changes.The engineer or architect of record 4. Perform final inspection.The building official should perform the final inspection and Special inspection and testing shall meet the minimum requirements of the International Building Code approval for a project[IBC Sec.109.3.1]after the final special-inspection report has been Section 1704.The following conditions are also applicable: shall acknowledge and review for conformance with the constructiondrawings those reviewed and approved. shop drawings that may detail structural information,shall11submit tot the building official A. Duties and Responsibilities of the Special Inspector and to the special-inspection agency written documentation of any verbally authorized deviations from the approved construction documents,and shall submit revised Project Address: 201 CIubside Drive Permit Number: 0004.2019.ARBK 1. Signify presence at job site.Special inspectors should notify contractor personnel of documents for building official approval as required. their presence and responsibilities at the job site.If required by the building official,they D. Contractor Responsibilities shall sign in on the appropriate form posted with the building permit. ACKNOWLEDGMENTS 1. Notify the special inspector.The contractor is responsible for notifying the special 2. Observe assigned work.The special inspector shall observe assigned work for I have read a to comply with the conditions of this agreement. conformance with the building department approved(stamped)design drawings, inspector or agency regarding individual inspections for items listed on the attached schedule and as noted on the building department approved plans.Adequate notice shall specifications,and applicable workmanship provisions of the International Building Special Inspection Agency: Si Printed Name: Date: Code.Architect\engineer-reviewed shop drawings maybe used only as an aid to be provided so the special inspector has time to become familiar with the pr ject. ,,,/[ / inspection. r 0--a a^,A./fPW pf/Y/129 2. Provide access to approved plans.The contractor is responsible for providing the • c For continuous special-inspection,the special inspector shall be on site at all times special inspector access t4 approved plans. Owner. S Primal Name Date observing the work requiring special inspection.Periodic inspections,if any,must have ��, prior approval based on a separate written plan reviewed and approved by the building 3. Retain special inspection records.Upon request,the connector is also responsible for Simms Family Trust / �- ��N L7 A[A 1/L-iuti I d- -.2 a-2 0/8 department and the engineer or architect of record. retaining,at the job site,all special inspection records completed by the special inspector. Engineer/Architect: Si Printed Name: Date: 3. Report nonconforming items.The special inspector shall bringfonnin items to E. Inspection of Fabricators r pot g pecia p noncon g i Poss Architecture+Planning Kim Weil (I)a:cis a the immediate attention of the contractor and note all such items in the daily report.If 1. Fabrication of structural assemblies and members.Where fabrication of structural I any item is not resolved in g members and assemblies is being performed on the premises of a special inspector shall immediately timely manner or is about to be incorporated in the work,the load-bearing notify the building department by telephone or in Contractor: rgnalur. Printed Name: Dale: person,notify the engineer or architect,and post a discrepancy notice. fabricator's shop,IBC Section 1704.2 shall require special inspection of the fabricated items. William H.Baker Construction William H.Baker 4. Provide timelyreports.The special inspector shall complete written inspection reports I ���Y ALL OUTDOOR LIGHTING r p pecia p p p2. Fabrication and implementation procedures.The special inspector shall verify that MUST COMPLY WITH for each inspection visit and provide the reports on a timely basis determined by the ricamr: Signature: Printed Name: Date: THE CITY OF ASPEN LIGHTING COD buildingfficial.The special inspector or inspection agency shall furnish these reports the fabricator maintains detailed fabrication and quality control procedures that provide a o peci p pec g y po basis for inspection control of the workmanship and the fabricator's ability to conform to �7 / F' -4? ION zss75.1 so directly to the building official,engineer or architect of record,and others as designated. /-+SjJY�/1 u C(LZGHq((C htl KOki Iyr f01e0 /Z-29 [IBC Sec.1704.1.2]These reports should be organized on a daily format and may be approved construction documents and reference standards.The special inspector shall J J w the procedures for completeness and adequacy relative to code requirements for submitted weekly at the option of the building official.These reports should include: review Inspected Fabricator. Si Printed Name: Date: a. Description of daily inspections and tests made with applicable locations, fabricator's scope of work. / , I' 1-1\P .Pn0(I III I Ib. Listing of nonconforming items, A/V/7 Ui�e 14GHq((� .KD,O /Lt fD V0 /2-7 ArP I-'LJ J LIc. Report on how nonconforming items were resolved or unresolved asF. Approved Fabricator ResponsibiBtiesl1,`- Jw applicable, (circle one) I- - Printed Name: Data: ..41L.2137/1M'1 9 1. Fabrication exempt inspections.Special inspections are not required where work is RECEIVED l9LF ,ar YW 4 d. Itemized changes authorized by the architect,engineer,and building ofTi I CITY OF ASPEN /1 done on the premise of a fabricator registered and approved to perform such work not included in nonconforming items. 1, EIVED RECEIVED PMEIN COUNTY: DAM DENIS MURRAY 2/14/19 ,� � without special inspection. I 01/08/2019 2 01/08/2019 3 01/08/2019 __ 7ONIIRNG ASPEN ASPEN ASPEN BUILDING DEPARTMENT BUILDING DEPARTMENT BUILDING DEPARTMENT Field Plan Set Must Be Printed In Color 0004-2019-ARBK_BuildingComments_1 Response Comments 02.07.2019(in Blue) 201 Clubside_Plans.pdf(8) Page:A401 ENLARGED STAIR PLAN&SECTIONS Handrail ends must return to a _ File Name:201 Clubside Plans.pdf Page.A102.2 SCALE:MIDDLE LEVEL FLOOR PLAN Sub Subject:handrail returns wall,guard,newel post,or floor �r�tii- ®®® PROPOSED There are 2 dryers n the laundry j surface.2015 IRC R311.7.8.2. n• ,- room.Provide makeup air if the Author:nick[ -7, File Name:201 Clubside Plans pdf total exhausted airflow exceeds Color:■ e• TEE Subject:Dryer Makeup air 200c1m.(2015 IMC 504.6) _ © 0' Colo nick[ ,_I See Sheet A401 for revised handrail returns. G � �, Color:• '. The City of Aspen ,J- See Sheet A102.2 with added notation.Make-up air requirement to be evaluated Design/Build by GC&Mechanical Subcontractor once Dryer specification is clarified and These plans must be kept at the selective demolition confirms the existing mechanical system and tie-in for make-up air. System to be confirmed with building inspector prior to proceeding with construction. Page:A501 DETAILS building site or inspection File Name:201 Clubside_Plans.pdf Page:A102.2 SCALE MIDDLE LEVEL FLOOR PLAN Sub Subject:PlanCheck (Ordinance 40,2016)air sealing t notes.h delays may occur.Construction PROPOSED Indicate dryer vent duct length y - Auth 9 I_ File Name:201 Clubside Plans.pdf and termination location.2015 Y� _ Color: nickt shall conform to these plans.All ® sabject.Plancnack Mc s6a. changes shall be approved by Atm1 10. Author:n ckt - -._ See revised detail 6/A501 for added air bander. coley: .. the building official. 3 .t See Sheet A102.2 with added notation.Venting for new dryer to be addressed Design/Build u"� by GC&Mechanical Subcontractor once Dryer specification is clarified and selective aallle �- _ demolition confirms the existing dryer exhaust duct length. Final venting to be conf rmed '- e �' ,�• ' with building inspector prior to proceeding with construction. SEPARATE PERMITS ARE Jakti ile Name:A50 DETAILS Glass guards must comply with REQUIRED FOR ELECTRICAL, File Name: de_Plans.pdf Page:A702 2 SCALE.MIDDLE LEVEL FLOOR PLAN Subject:PlanCheck one of the following:Have a top PLUMBING,MECHANICAL,OR r� If the garage is not heated,the h pq PROPOSEDAuthor: ickl cap supported by at least 3 new waroll betweenry <_)= FIRE SPRINKLER WORK File Name:201 Clubs de_Plans.pdfColor.■ panes of glass have a top cap t. mudroom/laund and garage c subject:PlanCheck ry l g supported the of of the \i' becomes thermal envelope and Author:n ckt glass or in the case of no top '"— nrq Color.• must comply with the Insulation See Sheet A401 with revised glass panel elevations to cap be at least two plies of _ w and air sealing provisions of comply with required rail support by at least three equal thickness glass laminated ° 2015 IECC R402 - ?It��1 ki0� See Sheet A102.2 for added walls stem detail _ panels of glass.be noted,small sections of guardrail together.Provide details FI L�� y at 7&9/A401 to be self supported at the wall and floor demonstrating wmpliance with WI-1/A501 that includes insulation. once the existing finished are removed and the one of the above as well as existing structure is revealed.Connections will be method of attachment and designed bythe structural engineer to complywith 200 support.Must support a point Page:A703.2 UPPER LEVEL FLOOR PLAN PROPOSED g g load of.Must.Please note that Ordinance 40,2016 amended lb.design load.Supplemental structural details will be ® File Name:nC Clubside_Plans.pdf 9 PP many glass support the 2015 IECC to require vise U �"•" Subject:PlanCheck issued to the building department with structural manufacturers require a top cap; .- factor for fenestration.Revise. ppp priorRailing you exceed their design Author nick[ stamps for approval to installation. f g you I_IN►. Color:■ system selected to be C.R.Laurence CO GRS Railing will need a stamped engineered System per manufacturer information inserted below. design.(Ordinance 40,2016) See Sheet A703.2 for updated notation for Ordinance 40 IECC requirements. ,e,,,,,,, _ Page:A201.1 EXTERIOR ELEVATIONS United� ...,ae- a°°'„ p _ Ordinance 40,2016 amended ALUMINUM�,a�:,'!✓CR`;7,,,,,,o„�„,„w,,,,,,,,,,,,,,c, I _ = _ Flle Name:201 Clubside_Plans.pdf .�. wrcc,.w v.i�,c,n I = Subject:PlanCheck the 2015 IECC to require 0.28 U & A Author:nick[ factor for fenestration.Revise. .0. Color:■ — g. iZi -- I1II.,_ See Sheet A201.1 and for updated notation for Ordinance 40 IECC requirements. tp =is, 1 i-1151-112k .. , 14,4111 ctuit7" RECEIVED ..—E,A,,.;.,w.a --mu TYPICAL GLASS RAILING ELEVATION TYPICAL SECTION ED 02/12/2019 GRS FRAMELESS GLASS RAILING SYSTEM m - ASPEN 02 -204.9 I BUILDING DEPARTMENT / I '2"` INib GDEPARTMENT