HomeMy WebLinkAboutFile Documents.1432 Crystal Lake Rd.0025.2019 (3).ARBK lust Be Printed In Color
DATE: MASTER PERMIT: PERMIT NUMBER:0025.2019.ARBK ADDRESS:1432 Crystal Lake Rd.,Aspen,CO 81812 PERMIT NUMBER: PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT COMMUNITY DEVELOPMENT DEPARTMENT COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION Sara OP BUILDING PERMIT CONTACT SHEET AVeiT„rCmm BUILDING DESCRIPTION FORM-IRC&IBC T„,gymASPEN
- ructural steel welding:Field&Shop •
PROPERTY INFORMATION -Epoxy strength
oiling
rvama CARRIE TIRRELL u-/a-benb carve,vxa-Deal nworxs.com BUILDING CODE INFORMATION - p y
1432 Crystal Lake Rd., Phoneu/ e-man L. 9 ❑2015 IRCp /
.00.55 ryAspen,CO 81612 unng2-Bld.B ptutprupR 273718131017 0 2015 IBC ❑2015 IEBC 0Other(Please Explain) -Intumescent dint
Code Editions (As Adopted and Amended) (As Adopted and Amended
13A TMacT As en Club-Callahan Subdivision Name Scott Strickland vhone(a/u)ara/Jta E-mail SRODLSnSaSpen.COm ) (As Adopted -Spray applied fire resistive materials The City of Aspen
tor moo oa suebmsmu P and Amended) -Permanent micropiles
OWNERnararDMD 100 LLC-David Denholm cra949-500-2411 Emardenholm3@comcast.net ,me UMU I UU LL(.-Uavla Uennolm Phonen4e"Mice-z4 i I cell phone Ayes
Fire Sprinkler System I Existing?®No I Required?9n 1 Type ❑NFPA 13 0 NFPA 13 R 0 NFPA 13 D I Theseplans must be keptat the
ap,MEoen crKen Adler,KA Designworks cat970-948-9510 ry"'"s PO Box 3147 Mission Viejo CA 92690 Special inspection is required per 2015/SC
ry 9 emat ken@kit-designworks.com Hoare:: cav atom ZIP Type Of Construction®VA{n]'dffp IV 0 IIIA 0 IIIB❑HA 0 118 0 IA 0 IB(Fire Alarms Installed❑Yes❑No section 1704.Inspector to verify that copy building site or inspection
PROJECT DETAILS gddfelssdenholm3@eomeast.net Required Special Inspections❑e High-Strength Bolting ❑Epoxy Anchors 0 Structual Steel Welding agreement for inspection program to be on delays may occur.Construction
osscatmox orthe job site prior to performing any
wcaK w pEmR Interior remodel,exisgng windows,doom and skylights to be replaced with same size and geometry, Name Phone cell Phone ❑Permanent Micropiles❑Sprayed Fire-Resistants ❑Other shall conform to these plans.All
inspections.A copy of all Special Inspector changes shall be approved No sq,ft,added or removed. l;na Energy Code Compliance L Prescriptive Table ❑Other 9 pp by
He S% OW state zm field reports to be on the job site for
SrPRaE [�71 v ❑RESCheck UA Alternative 0 COMCheck UA Alternative
vawnnon 7) , Use of Building Class of Work Fixture Counts Equipment Checklist -,il inspectors'review if requested.Failure • the building official.
/ / ❑ Commerical ❑New 2_Bathtu,siaets Forced ar/Gravity systems naEresx
Eta., /, - Exterior Energy Use Total Approved On-Site Snowmelt Spa Pool comply mayresult in denial of ins
/c�sb O Multi-Family ❑Addition Lavator P Y P°
_Wall,Suspended,or Unit Heaters
❑ Single Use 0 Repair
Alteration Lavatory(Wash Basin) Gas tog ,me CARRIE TIRRELL hn,tes/u-a/daub cell Phones/D-JVa-/4e/ (Existing+New)
UNIT so Fr ❑ Mixed-Use ?_Shower 3-
❑Rep�lair 1_Kitchen Sink(+Disposal)-GasAppliancew IinH23400 Two Rivers Rd.,Ste.46 Basalt CO 81621 Building Type/ 1 0 A. ❑B ❑F_ 0 E ®R-2 , SEPARATE PERMITS ARE
mhf ❑ ❑IFFR Dishwasher ApplianceVenU Hodress c„Basalt zip Occupancy Grouplg Ili ❑One Family ❑Two Family READ THIS OR FAIL YOUR INSPECTION!
0 B(A<50) 0 H_ ❑M 0 S_ R REQUIRED FOR ELECTRICAL,
sit Fri ❑Tenant Finish -Laundry ear,usury Cork-Hea�Rerns,tuolmg,or ulij Carrie@kit-designworks.com c C ❑Townhouse PLUMBING,MECHANICAL,OR
a�srmsiaro Will there be ❑Demolition Or -amres Sink Washer Absorption Unit :area: ❑I- ❑U &Dropped Ceilings,Soffits,and Walls 03.13 FIRE SPRINKLER WORK
EXTERIOR AREA D Sq.R any roof/wall ❑Change Order-Floor sink Boilers(Includes vent) Furred IBC 8ropp
penetrations? 0 Floor Drain -Air Handling Unit Name Ken Adler Designworks 'Bone:/D-L/eaJD/ cell phone9/U-SOO-en lU UNIT DESCRIPTION AS PROPOSED
new sorr Osq,ft, ❑p Yes _water Heater(Pan Req)=coolmgsystems
❑No _R Gas Outlets ventilation Fans H hna This applies to the attachment of finishes or furring to any
Eror Rooms 445 water Treatment - ddress23400 Two Rivers Rd.,Ste.46 Basalt g„,•CO aP81621 Gross Area of Building: Gross Area of Unit:
w°hx UTIDTY WORN Range Hood ' ADU BUILDING DESCRIPTION assemblies that are required to be either fire-rated or
Diner N of Gas System Outlets e-mail ken@ka-des!gnworks.com Occupant Load: non-combustible and is separate from the fire-rated
ZOXEDisTWCT R-15/PD - :area:
Snowmelt System Sq Ft Is there an ADU. ❑Yes
0 No assembly requirement,
name
Project valuation:Cost of project as defined in Valuation Affadavit. cratrEo This permit becomes null and Phone cell phone it Stories Above Grade 2.5 #Stories Below Grade O.S #Living Rooms
o SgFtof Work Area:Ttal square footage of area undergoing change orreconfiguration. void 5work reconstruction authari.ee Hoa,gs city stare ZIP Attached Garage Detached Garage Carport if Kitchens I Walls,Ceilings&Soffits:If furred I5%inches or
Unitaq Ft:Gross Square Footage,not FAR,of permitted unit. not commenced within ISO Bays,or Parking Spaces Parking Spaces Parking Spaces #Full Baths less,do one of the following:
~Lot Size:Total surveyed foot: if consimcaon or work is suspended or
ye square footage of property. abandoned for period of ibo E-mail
2 Disturbed Exterior Area:Square footage of lot affected by permit application. y nine after work is commenced. Aaereaa #Bedrooms3 #Full Baths 2 Deck Area #3/48aths 4.Fi spaces with CassAmaterial.
E-New sq Ft:Total added square footage for additions to net livable or net leasble space. ai 1 #1/2 Baths
p Sq Ft of Roams with Utility Work:Total square footage,not FAR,a all rooms with plumbing work. #3/4 Baths #1/2 Baths] #Bedrooms S.Fill spaces with inorganic or non-combustible material.
Re- Name ERNEST KOLLAR ENGINEERS,INC.-Ernest Kollar Phone(9/UJ abJ-JLLJ cell Phone 1 D 6.Fire block 8 feet in all directions.
APPROVALS fewer Ii^g 320 Main Street,Suite 203 Carbondale CO 81623 #Kitchens #Wood Fireplaces #Other Rooms(List) y
O crewing Needs .we pate Hddress
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES nmem Rewew R milli' city smote ar #Gas Appliances 3 #Gas LogsO
P¢rmit F¢¢ PC x PL 2/1/1 f vaLerniekollar@gmail.com erniekollar@gmail.com Walls:If set out(furred)greater than 1 a/.inches,
Pun Check 7660.25 Parks Impact Hoare.: 'BUILDING ROOMS AND USES BY LEVEL AS PROPOSED(Include Mechanical&Storage) do one of the following:11,785.00 zoning x SV 4/3/19 N
Zoning HPc S&S CONSTRUCTION-Scott Strickland (s/u)b lugs-its (a/D)nIWMmO Dad,e,,,,r#3,Datl,#3,Closet#3,Du,eau Ruu,II,Lauudl Stu. 4.Use a Class A finish material(such as all
Engineering 325.00 school Ded. NamePhol,e CNl phone Basement y. 9adrywall).
Building x JH 5.7.19 Hoalresg PO Box 2526 e. Aspen sm.CO ,.81612 1 Bedroom,1 Full Bath,Laundry Room,Storage S.Use non-combustible framing.
CMP(50%) Fire X JH 5.7.19 zoning(so%) 325.00 989.75 TDM Impact 'ty - 6.Protect both sides with fire sprinklers.
Engineering E-all scoff@snsaspen-core Main Level 6edioum A2,Bath fF2,Closer#2,,Romer Room
Pea.Amenity aoa,eu
Energy code 1,767.25 REIM CMP x TB 3.27.19 1 Bedroom,1 Half Bath,1 3/4 Bath
Ceilings&Soffits:If dropped(furred)greater
Plan Check Water x SW 5/2/19 INSPECTIONS:The General Contractor must schedule inspections online, 2nd Floor than 1%inches:
CMP(50%) 989,75 (Hourly) Housing Cash In Lieu StprmWater Please visit www.aspeopitkin.com/Departments/tommunity-Development-Forms/
ty- pment-Farms/edoso. Living Room,Dining,Kitchen Framingmembers,hangers,and assemblyother sanitation I hereby certify that I have read and examined this application and know the same tobe true and correct.All provisions of laws and _ ___ ___ g
Parks Review (Hourly) smrmwater Env.Health ordinances governing this type of work will be complied with whether specified herein or not.The 3rd Floor m members must be non-combustible.You may not
p pe granting of permit does not
utility Review Engineering Parks presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance 1 Bedroom,1 Full Bath use wood.
467,25 City Use Tao
3680.25 Landscape of construction.It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
County Use Tit: structure and/orp tis build compliance w'h all applicable codes. Additional In Type 111 and V construction only,you may use fire
G'S 1126.25 Efficiency con,,,no, � //JJlt retardant treated wood or non-combustible framing.
Approved L/AM br/rl9 Signature !• S Ccosc Date 2////� 9 _.
Lot Area Deed Restricted To Issue ❑ Check if you are a tested owner builder(single-family homes only)-you must take a test and complete the owner/ RECEIVED
�� u��T
Census Code #of Dwellings Plans Location Issuance RECEIVED (CITY USE ONLY)Owner builder approved by: Date: Affidav EVE[ Reviewed By: JH Date: 517'19 t7 'MI 11111
(CITY OF ASPEN December20,e 130 S.GALENA ST I ASPEN,CO l 1L 19 I CITY OF ASPENARg,smtr 130 S.GALENA ST I ASPEN,COD8�V5 p1` (CITY OF ASPEN,annayrera 130 S.GALENA ST I ASPEN,CO)81 p19 I I�u�
ASPEN ASPEN ASPEN .,�^� '
BUILDING DEPARTMENT BUILDING DEPARTMEN BUILDING DEPARTMENT
FIRE DAMPERS/RADIATION DAMPERS REQUIRED
Ducts and air transfer openings in fire resistive floor/ceiling or
---.-.-.- ------ _. roof/ceiling assemblies shall be protected with approved fire dampers
installed in accordance with their listing(IBC 717.5.2 8 717.5.4)
el 5. Provide Final Inspection Report.The special inspector shall submit a written ilea luminaires installed FIRE RATED HATS REQUIRED
Where 9envelopeWhere floor/ceiling or roof/ceiling
r Air report documenting required special inspections and conection o£any discrepancies 2. Approval of fabricate Approval shall be bevel upon note.of the fabricator's xritn•II Recessed building thermal installed
g g
noted in the inspections to the fatal building C rpprv,ra nl manuals
p shall be sealed and IC-rated assemblies are required to have a
I, i -� pet prior g inspection. void and quality control manuals and periodic auditing of fabrication practices by q
-IECC sec R402.4.5 fire-resistive ratio recessed fixtures shall
-- SPECIAL INSPECTION AND TESTING AGREEMENT 'e''• an approved special inspection agency. 9,
e,ro.. B.Owner Responsibilities.The project owner,the engineer or architect or record,or an agent of the be installed such that the required fire
To permit applicants of project requiring special inspection and/or testing per Section 1704 of the owner is responsible for employing special-inspection services.The special inspector\agency shall 3. Completion of fabrication.I 1pon completion of lubrication.the approved Pahrirahe Any recessed light fixtures resistance will not be reduced(IBC 714.4.2)
International Building Code(IBC). not be in the employ of the contractor,subcontractor or material supplier.[IBC Sec 1704.1]In Sall submit...Nate of compliance to lire building official staling thaw the work was in contact with insulation
case of an ownerlcontractor,the special inspectoriagency shall be employed as specified by the performed in aam„rdceeo with the Improved construction documents. must be IC rated.
Project Address: 1432 Crystal Lake Rd Permit Number:0025.2019.ARBK building official.
i:. Building Department Responsibilities
BEFORE A PERMIT CAN BE ISSUED:The owner,or the engineer or architect of record,acting as the C.Engineer or Architect of Record Responsibilities I. Approve medal-inspection program.lire building department shall approve all
owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing special inspenon and apeoial•uupedlion requirumenb.
Schedule,including the required acknowledgments.A pre-construction conference with the parties 1. Prepare special inspection program.The engineer or architect of record shall list the
involved may be required to review the special-inspection requirements and procedures. items for which special inspection is required;and shall indicate any items for which the 2. Enforce special inspection.Rork requiring special inapoclion sad the building
IBC or the building official approves periodic inspection and the frequency of such I i:upectpr shall monitor sir pen-annance of spacial inspectors.I lis9ler approval.in
APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the inspections, i addition to that of ene sprawl'inspector.must be obtained prior to placement of convent,
projects for which they provide special inspections.Special inspectors shall be approved by the building covering of am,aeml steel.or Doha similar materials.
department prior to performing any duties.Special inspectors shall submit their qualifications and are 2. Respond to field discrepancies.The engineer or architect of record shall respond to
subject to personal interviews for pre-qualification.Special inspectors shall display approved uncorrected field discrepancies in design,material,or workmanship observed by the J. Review loci fn 1C•Fora.nIc building nnkint should review sPceivl-i,,.pec^^n
identification,as stipulated by the building official,when performing the function of special inspector. special inspector. pssareas sn p.,r,.
4. Perform Nod inspection.Ilia building official should palSmi the final inspection and
Special inspection and testing shall meet the minimum requirements of the International Building Code 3. Review shop drawings and submit design changes.The engineer or architect of record approval for a puled I111C Sec.109.3.11 after the final special-inspectionTenon has been
Section 1704.The following conditions are also applicable: shall acknowledge and review for conformance with the construction drawings those reviewed and approved.
shop drawings that may detail structural information,shall submit to the building official ,1
A.Duties and Responsibilities of the Special Inspector and to the special-inspection agency written documentation of any verbally authorized /c/Z�/S// / ry•a r)t[•-' "Tr�T f ('pak
deviations from the approved construction documents,and shall submit revised rrr,jen wdar�.: /✓ ry 2 •�'Di Permit Number:f A/ aL[rzsl,[C_/�)rx
1. Signify presence at job site.Special inspectors should notify cotractor personnel of documents for building official approval as required.their presence and responsibilities at the job site.If required by the building official,they scx.vo`'LEOistENT's
shall sign in on the appropriate form posted with the building permit. D.Contractor Responsibilities
2. Observe assigned work.The special inspector shall observe assigned work for y special inspector. responsible notifying special / I an a Had and ae_me to comply with the conditions of this aprear,eni. rEAIEVIIIEWIE
1. Notify the s 1 ins t The contractor is res bte for noti the L�1
conformance with the building department approved(stamped)design drawings, inspector or agency regarding individual inspections for items listed on the attached '' /Y;+xin Iespxt P nv'c c,{: Signature: , , Prim•d Name. Dow
U
specifications,and applicable workmanship provisions of the International Building schedule and as noted on the budding department approved plans Adequate notice shall Z �/' �,l7} / �, ..L •
[,e _ S�-2-� It 0 5/0 7/2 019 J
Code.Arclutecttengmeer reviewed shop drawings maybe used only as an aid to be provided so the special inspector has time to became familiar with the project. --/!^fiL(drel �1(..._ 'u/L--LiL L-Y;\.1 �rkpr�
inspection. f e �-nat P Me fame �aic II�DBCOOtf,XIMM AlICE
2. Provide access to approved plans.The contractor is responsible for providing the t nh
For continuous special-inspection,the special inspector shall be on site at all times special inspector access to approved plans. yW D'CO,_ � - f _ �Q(,(�_ /� 1 us i
OL ,/
observing the work requiring special inspection.Periodic inspections,if any,must have ee4���
prior approval based on a separate written plan reviewed and approved by the building 3. Retain special inspection records-Upon request,the contractor is also responsible for Ica:lo a,Aryl:its. +:tall t-
dartment and theengineer or architect of record. Primed Name: .0
/tY.fr/: G�-
e retaining,at the job site,all special inspection records completed by the special inspector.
Prenost Kriasr Engineers.Inc. f.td' Ernest Killer 1/28r2019r-,\ n mr��
3. Report nonconforming items.The special inspector shall bringnonconforming items to E.Inspection of Fabricators U' LJIJ 1 LJ II.E D
eP g P P g u Date:
r.:n S ,aru• /� Printed con
the immediate attention ofthe contractor and note all such items in the daily report If f ems, /
an rem is not resolved in a time] manner or is about to be incorporated in the work,the 1. Fabrication of structural assemblies and members.Where fabrication of structural / -v 7 - e f 17/-q2/ -_ _ amr 0b7/ 9
y i y mami rt by .i$ my L.s ... ..iS. r. -ass._._
special inspector shall immediately notify the building department by telephone or in load bearing members and assemblies is being performed on the premises of a - - - -� lLd�Y
person,notify the engineer or architect,and post a discrepancy notice. fabricator's shop,IBC Section 1704.2 shall require special inspection of the fabricated c.,1 ,mramor u Primed Name Dam:
items. ZONING
4. Provide timely reports.The special inspector shall complete written inspection reports -----
for each inspection visit and provide the reports on a timely basis determined by the 2. Fabrication and implementation procedures.The special inspector shall verify that -
building official.The special inspector or inspection agency shall finish these reports the fabricator maintains detailed fabrication and quality control procedures that provide a I.p,,_ed.sholcod.ir. Spars!
" Printed Varna: D:ac:
NO EXTERIOR LIGHTING
directlyto the buildingofficial,engineerarchitect of record,and others as designated. basis for inspection control of the workmanship and the fabricator's ability to conform to rr,,,,. t1dt.e I® J eI-- if i;l 1- -_ IN SCOPE OF WORK.
e or arc g OP' `!"7 u` `./ / III
[IBC Sec.1704.1.2]These reports should be organized on a daily format and may be approved construction documents and reference standards.The special inspector shall ., .___
submitted weekly at the option of the building official.These reports should include: review the procedures for completeness and adequacy relative to code requirements for tp:twat, Prinnvl'ri,oe; D"11:
a,Description of daily inspections and tests made with applicable locations, fabricator's scope of work.
b.Listing of nonconforming items, i l '� JH Justin Hahn 5l7/19
c.Report on how nonconforming items were resolved or unresolved as F.Approved Fabricator Responsibilities
applicable, 1- Fabrication exempt inspections.5 l ina ections are not required where work is RECEIVED
d,Itemized changes authorized by the architect,engineer,and building official if pSpecial p q
not included in nonconforming items. done on the premise of a fabricator registered and approved to perform such work ..I
without special inspection.
05/06/2019
1 2
ASPEN
-_-BOILDiNGDEPARTMENT