HomeMy WebLinkAboutFile Documents.1112 Waters Ave.0024.2019 (7).ARBK DATE: MASTER PERMIT: PERMIT NUMBER:°o24.2o19.ARBK ADDRESS: PERMIT NUMBER: Field Plan Set Must Be Printed In Color
COMMUNITY DEVELOPMENT DEPARTMENT 0% COMMUNITY DEVELOPMENT DEPARTMENT
�►�,r CITY OF ASPEN
BUILDING PERMIT APPLICATION �` BUILDING PERMIT CONTACT SHEET On Cm or Akr,
CITYOFASPEN
PROPERTY INFORMATION 1 U.4L .04 fmil
,U onarnlengzonegarCnneCTs.col PERMIT N0 DD242D19 ARBK
"ame-`''-' Phone a - �)/
AOOREss 1112 Waters Ave Aspen,CO 81611 UNIT If PARCEL 10a 2737-162-66-012 OWNER
u.011LOA. / �xmumeouimng.cam
9 OES0 Camerwood Subdivision vane orniOotlOins Pnon•x/ E-mall natexaegeoem IZEN INVESTMENT TRUST
LOT BLOCK oR suaplvlsloN _ . The City of Aspen
OWNER NARK'Eon Investment Trust(Mark Izen) cau.617-797-0023 EMAIL 4ibarn@gmail.com 1"dTe Will Oivestmenl i rust(Mars men) o1/.ro/.UU j ADDRESS"NO"' Cell Phone 1112 WATERS AVE
n ww PO Box 67512 Chestnut Hill MA 02467 REFERENCES FROM 2015 IRC These plans must be kept at the
NFSTcontacr Brendan Hamlet CELL 970.429.8470 EMAIL bhamlet@zone4architects.com dares: cILY sou MA - • -
NAME E.nl 4ibarn@gmail.com 273718266012 CV/A=crawl space ventilation required,sec.R408.1 Access required,R408.4 buildingsite or inspection
PROJECT DETAILS(READ DEFINITIONS BELOW)COIMPLE�TIEOD TIN ITS ENTIRETY Aaaress PARCEL ID EE=emergency escape required sec R310.1P
EU=enclosed usable space under stairs shall be%"Gyp,sec R302.7 delays may occur.Construction
WORKINIDCfAILR ri I infillofsmall addition of tin home "ame Phone Cell Phone G/D=garage/dwelling separation,sec R302.5 and R302.6
emo e e{grad carport,and S ma a di Onev l 0 STC=Sound transmission class not less than 45 at dwelling separations,app shall conform to these plans.All
>dprea, can State DP K changes shall be approved by
oafs 1,770,930 Use of Building Class of Work Fixture Counts Important Review Triggers RV=roof and rafter ventilation required,R806.1
VALUATION the building official.
i'
0 Commerical ❑New _Toilets,Bidets Major Engineering Review Aee,e=: - A=attic access 22"x 30",30"headroom above,R807.1
sp Frnr ❑ Multi-Family li Addition -Bathtub •Projects involving less than 50% SA=smoke alarms installed to NFPA 72 requirements,sec R314
BUILDIn° 2064.37 El Single Familylavatory(Wash Basin) hardscaand work affecting y -: - 0 0V,u.wcm.09/u Cell Phone
WORR AREA ❑Alteration pe area ,ame - CO=carbon monoxide detector per City Ordinance 41 series ZOOS
❑ Mixed-Use ❑IF shower 75%or is involving
unit ate
Repair -Kitchensink(+Disposal)•Projedsinvolvinggreaterthan g� PO Box2508 As n CO 81612 SG=safety glazing required,secR308.4 SEPARATE PERMITS ARE
UNIT Son 20�'sr ❑ ❑IFFR Dishwasher 50%hardscape area and work ndd.e es otr Mao zlv GR=guardrails,36"min ht,4"max opening;req at 30"drop any point w/in 36"
LOT9zE 8051 ❑Tenant Finish -Laundry Bar,utility sink affecting 50%or greater of unit . ail bhamlet@zone4architects.com horizontally,sec R312 REQUIRED FOR ELECTRICAL,
Ixim Will there be ❑Demolition somas warner sqk nadress
5p any roof/wall ❑Change Order, Floor Sink •Projects Involving 1,000+sq ft of WFP=window fall protection-operable window<24"AFF&>72"above PLUMBING,MECHANICAL,OR
DISTURBANCE 3530 penetrations? ID -Floor Drain soil disturbance area " --."'a:-',ms a/u.4CJA9/U grade:use opening control device listed to ASTM F2090,sec R312.2 FIRE SPRINKLER WORK
El Yes Water Heater(Pan Req) am' - 'hO"° Cell Phone HR=handrails 34,38"ht,sec R311.7.8
NEW SOFT 197.5 El No -#Gas Outlets Water Efficient Landscaping Adg PO Box 2508 Aspen state
.,81612 SI=stairway illumination,sec R303.7
Water Treatment •Projects that trigger a majoron M - PD=protect against decay,sec R317
FUILOING 1401.5 r _Other engineering review REFERENCES FROM 2015IMC SPECIAL INSPECTION REQUIRED:
OOTPRINT NOTICE:ThIs permit becomes null and cold if wins •Projects involving interior 4dLrelzs
authorizedntr o is nffior
commenced n whom alterations affecting 50%or more V=bathroom and balanced whole house mechanical ventilation reqor .HAROSCAPE 1193.07 abadoneforr a periodof no clays
or work at any time orOrdinance 40,2016 -Structural steel welding:Field&Shop
AREA abandoned a period ommenceda[anytime after ofe%(:icing gross square footage Cr..Ergimamp LLC Phoney/V.4L7.0L3/ Call Phone
ZONE R-15 work is commented. """'wee` DE=clothes dryer exhaust,sec 504.Makeup air req'd if over 200 CFM
DlsrRlcr c , i 557 N.Mill Street,Suite 201 Aspen CO 81611 -High strength bolting
Ads oty sot• rip AS=access and service space for maintenance req'd,sec 306
SQ FT OF SOIL DISTURBANCE-2395(this Permit not including existing footprint+storage at carport) -Epoxy anchors
MA=make up air required if hood exhausts greater than 400 CFM,sec 505.2
Project Valuation:Cost of project as defined in Valuation Affidavit. add.e=: ET=exhausts terminate 3'from prop line and openings,10'from intakes, -Intumescent paint
Z Sq Ft of Building Work Area:Total square footage of interior area undergoing change or reconfiguration. 501.3.1 -Spray applied fire resistive materials
O Unrt sq Ft:Gross square footage,not FAR,of permitted unit. "ame ^'O Bellview,a'^` `J/U.S4y. IT=intake openings 10'from lot line&contaminant sources(vents,streets), -Permanent micropiles
H Lot Size:Total surveyed square footage of property. APPROVALS Phone all Phone
Sq Ft of Soil Disturbance:Exterior area of the lot where the ground is disturbed Reviewing rveles Reviewer °ate '^ 315 UNIT F PO Box 2544 Crested Butte
CO 81224 401.4
z New Sq Ft Total added a flog footage for additions to net fitted s or net leasable space. Deparcmem Review sign-off Approves adore:: sty State nP D=fasten and seal all ductwork per 603.9 Special inspection is required
w Building Footprint:Grade Floor square footage fthe permitted structure. PC x JB 2/5/19 �g mike@coloradostructural.com REFERENCES FROM 2015 IFGC
P P q red per 2015/BC
O Hardscape Area:Square footage of impervious lot surface. - sa es, DV=direct vent req'd,sec 303.3 section 1704.Inspector to verify that copy of
Zone District:Underlying zone district of permitted parcel. Zoning a sv 5/18/19 E.ma, q
HPC Name Kaegeoe'r''''.m no.•e,re Phony/ualua/y/ all Phone CA=combustion air not taken from bedrooms,bathrooms or agreement for inspection program to be on
n li PO Box 1570 Carbondale CO 81623 storage sec 303.3 the job site nor to performing
Building x TF OD=outdoor appliances must be listed for outdoor use,sec 303.6 p p g any
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Fire .r ,w,,, dd rxy soo av pP REFERENCES FROM 2015 IECC inspections.A copy of all Special Inspector
Building Building Engineering a n wen ri natekaegebein@kfhomebuilding.COmAddress F=new or replacement glazing shall not exceed 0.28 U-Value,NFRC label field reports to be on the job site for
Review $21,507.82 permit Fee $33,088.95 Pak Imps 1,296.72 CMP x ph sanrmo required,Ordinance 40,2016 ins ectors'review if re uested.Failure to
Engineering zoning School Lands Water „. °,vm INSPECTIONS:The General Contractor must schedule Inspections online. L=75%of lamps in permanently installed lights must be high efficacy,sec pection.
Review $10,892.37 Re iew(sa%) $1,444.80 Dedication 14,120.91
Stormwater x PR 3,11rzate Please visit www.aspenpitkin.com/Departments/ munhy-Development-Forms/to do so. R404.1
zoning CMP MS) Sanitation x Cs e/1vzets I hereby certify that I have read and examined thi app cation and know the same to be true and correct.All provisions of laws and SE=Continuous air barrier required;all exterior joints,cracks,and holes to be
Review(so%) $1,444.80 $1,104.24 DM Impact 145.14 ordinances governing this type Of work will be mpli with whether specified herein or not.The granting of a permit does not caulked,gasketed,sealed,table R402.4.1.1 Structural steel,high strength bolting
Energy Code ROMP Pedestrian Env.Health
$4,963.34NA park x Dr w1e/2019 presume to give authority to violate or cancelfhe p visions of any other state or local law regulating construction or the performance REFERENCES FROM 2014 NEC
Review Payment Amenity of construction.It is my responsibility to review a approved plans and any comments that are contained thereon and see that the EP=electric panel'happy space'30"x36"x78",not in storage,sec 110.26 SMOKE ALARMS AND
CMP(50%) F1,100 GI5 ssoo Housing Cash in Lieu 13.70318 Landscape X R M 0610412019 structure o project is built in complia ith all applicable codes. CARBON MONOXIDE
Parks Review $241.53 C,ty USe $17,544.77 water Tap Efficiency aetr.R pale I.g.19 ocp `I DETECTORS REQUIRED
Tax Approved X RECEIVE) Check if you area tested owner der(single-family homes onl you must take a test and complete the ownet ding�ilNitED
Utility Review 5,485.20 COU"ty Um $4,427.33 sanitation TO Issue `�, 0 y g y y) External Energy Use Approved THROUGHOUT DWELLING
$ Tax (CITY USE ONLY)Owner builder approved by: Date: Affidavit on file UNIT PER CITY OF ASPEN
Issuance
CITY OF ASPEN January2019 '//1'../ 1t 1 1 CITY OF ASPEN",gn,=ootr 130 S.GALENA ST 1 ASPEN,eo 8161 � 0 RREMP ❑ CREMP MUNICIPAL CODE 8.15
130 S.GALENA ST ASPEN,CO AcrEN . Az.vkl-,
p�Ef4 BUILDING DEPARTMENT PERMIT#: 0024.2019.arbk DATE: 3/14/2019
BUILDING DEPARTMENT
is project's asbestos inspection report,your project
SNOWMELT: 934.85 oes not require a State asbestos abatement permit.
POOL: However,the following OSHA regulation must be
strictly adhered to:Standard Title 29,Part 1910.134,
SPA: 0 1910.1001,and 1926.1101 of the Code of Federal
Regulations.It is recommended that you familiarize
REMP SHEET: A103 yourself with these regulations and have a certified
PERMIT NUMBER: MINIMUM BOILER AFUE: 95% General Abatement Contractor(GAC)conduct the removal
of thender
COMMUNITY DEVELOPMENT DEPARTMENT engineering
Asbestos Containing toncMatere thel remM)vale
OFFSET: 0 engineering controls and that once the removal process is
completed,a visual inspection and clearance air
BUILDING DESCRIPTION FORM-IRC&IBC THE Cnyve ASPEN REVIEWED BY: TF monitoring be conducted by an independent,certified Air
Monitoring Specialist.Furthermore,identified ACM may
BUILDING CODE INFORMATION ssowMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S. be in areas which were either not covered in the scope of
All snowmell systems shall meet the following: the asbestos inspection or were inaccessible or hidden
El 2015 IRC ❑2015 IBC ❑2015 IEBC ID Other(Please Explain) -Any portions in the Right of Way must be on a separate zone.A ROW due to their application during the construction process
Code Editions As Adopted and Amended) Adopted2015 IEBO permit and Permanent Encroachment License are required.
( p (As Adopted and amended) (as and their subsequent enclosure or covering with building
-R10 insulation shall be installed under the area to be snow melted or RS
and Amended) Existing Building and finish materials.These areas should be inspected
insulation shall be installed under and at the slab edges.(Ordinance 11
Series 2011) when renovation or demolition activities are scheduled
Fire Sprinkler System I Existing?[VIZ I Required?l o I Type ❑NFPA 13 0 NFPA 13 R 0 NFPA 13 D -Automatic controls installed for system shut off when pavement isturb the materials within,or beneath these
temperature is above 50°F and no precipitation is faring.(2009 IECC
Type Of Construction El VA❑VBIi IV❑IIIA ❑IIIB❑IIA❑IIB El IA El IB(Fire Alarms Installed El YesID No Sec.403.8 8 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
Required Special Inspections CI High-Strength Bolting I7 Epoxy Anchors I Structual Steel Welding temperature is above 40.F.(2009 IECC Sec.403.8 8 503.2.4.5)
Tree protection fencing is required at the dripline:of an trees shown. -Inspection by testing hydrostatically at 1%times max system design
❑Permanent Micropiles ❑Sprayed Fire-Resistants 0 Other
pressure,but not less than 100psi,for 15minutes.(20091MC Sec.
There it NO activity allowed within this fenced area,including,but not =w=.im=a�•.a 1208.1)
vehicle
to:digging,storage of material,equipment,machinery,foot or Energy Code Compliance El PrescrRESCheck e UA I OtheCOM he"c"
vemdetraffm. ❑ AlternativeRESCheckUA ❑COMCheckUAAlternative
I SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ'S
Please contact the City Forester or his designee at 920.5120 for an Exterior Energy Use Total Approved On-Site Snowmelt 934.85 Spa° Pool° All snowmelt systems shall meet the following:
inspection of this fencing Prior to any activity. (Existing+New) v g:
If the need arises m dorm an activity the treeprotection area,please - _ "`°"'°""'°'°"""'"""""" BuildingT e -Any portions in the Right of Way must be on a separate zone.A ROW permit
perform ya tyin lilayp/ I ❑A_❑B 0F_ ❑E 0Ft I I One Family 0 Two Family and Permanent Encroachment License are required.
contact the City Forester and you will be giett specific instructions as to Occupancy Group g ❑B(A<50) 0 H ❑M ❑S R -R10 insulation shall be instated under the area to be snowmelted or R5 insulation
how to proceed to minimize impacts to the tree root zone. "'"-b ..� C ❑I_- ❑U - C 0 Townhouse shall be instated under the slab edges.(Ordinance 11 Series 2011)
The following criteria must also be met with construction: .w -Automatic controls installed for system shut off when pavement c403 2 temperature is above
UNIT DESCRIPTION AS PROPOSED 50"F and no precipitation M falling.(2015 IECC R403.9 and C403.2.4.5)
S.A construction fence must be erected along the entire dripline of �� e sos NA Automatic or manual controls installed for system shut off when outdoor temperature
all trees on site and an tree canopyfrom neighboring property. _ .„„«v. Gross Area of Building: Gross Area of Unit:
Y 9 9 P P Y ADU BUILDING DESCRIPTION is above 401F.(2015 ECG R403.9 and C403.2.3.5)
(This will serve as the tree protection zone(TPZ).This fence is to A iiy Occupant Load:NA -Inspection by testing hydrostatically at 1.5 times max system design pressure,but not
be constructed in such a manner that the area inside the dripline is E T`1eg.,. Is there an ADU? ❑Yes
'•�" •-`� 0 No less than 100psi,for 15 minutes.(2015 IMC 1208.1)
protected.AN INSPECTION OF THIS FENCE MUST BE a'k "" #Stories Above Grade 2 #Stories Below Grade 1 #Living Rooms
PERFORMED BEFORE ANY CONSTRUCTION OR DEMOLITION = eci.-........
Attached Garage Detached Garage Carport #Kitchens
(ACTIVITIES BEGIN.PLEASE ARRANGE THIS INSPECTION / �." Parking Spaces= Parking Spaces=•�•= Parking Spaces° #Full Baths
WITH IAN GRAY AT 429-2031. �"' - `� 6 Bedrooms 4 #Full Baths° Deck Area TOO ff 3/4 Baths
S.No materials may be stored in the TPZ,including but not limited _ - #1/2 Baths
to,construction backfill,construction traffic,or any other ',K,,,.„.a #3/4 Baths 3 #1/2 Baths 1 #Bedrooms
construction materials. coy 005 ee.Tree Pmvempm zone ,,,�,_,.� #Kitchensl #Wood Fireplaces° #Other Rooms(List)
➢No excavation,grading or trenching may occur within the TPZ e `#Gas Appliances TED #Gas Logs° 0
without the consent of the City of Aspen Forester or his designee. BUILDING ROOMS AND USES BY LEVEL AS PROPOSED(Include Mechanical&Storage)
i➢No parking of vehicles or equipment may occur in the TPZ. ""'"""'"
➢No dumping of any waste products may occur in the TPZ. Basement Bath 1,Bed 1,Bath 2,Bed 2,Den/Bed 3,W/D
D.Any roots cut during excavation shall be pruned with sharp
toppers/pruners back to the soil line.The roots will further be LT47.. Main Level E"try,Living,Mud,Office,Ponder,Mechanical
'protected by burlap draped over the side of the excavation
covering the exposed roots.This burlap shall be kept moist until '" 2nd Floor Breakfast.Kitchen,M Bed,M closet,M Bath
the excavation is backfilled. '"° „- Em,m„„ „„w~
n,
i➢Pruning to provide clearance for construction activities shall only � I
be done under the direction of an arborist. 3rd Floor NA
➢Site inspections shall be performed on a weekly basis,to ensure „.„,.'.�n.. "°'"'".„„,
the above listed conditions are met. ---- Additional
I➢Any unapproved improvements or activities outside of those -' ` - /. ��/►����
approved within this permit will be subject to mitigation in the form _...®�,o„_„ "'"°"" RECEIVED
of restoration. `.„.4'„� '"'°"'" "„gym Reviewed By:TF Date'3n2n9 RECEIVED
➢This permit must be posted on site during the construction atyprA Aspen cviec cnSvcvmev=iooa I nra/nB/ren q
'process. (CITY OF ASPEN,anuary2018 130 S.GALENA ST 1 ASPEN,CO 816111 02/05/2019
s,SPFim
BUILDING DEPART MENT ASPEN
BUILDING DEPARTMENT
APPENDIX F Field Plan Set Must Be Printed In Color
di
'Nee',orA4w `
TYPICAL SWUM DEPRESSURIZATION PASSIVE DON SYSTEM VENTED SPECIAL INSPECTION AND TESTING AGREEMENT
RA
PASSIVE RADON SYSTEM THROUGH SUMP
* * To permit applicants ofprject requiring special inspection and\or testing per Section 1704 of the \,,,,,,,,,.—')
, International
International Building Code(IBC)
Project Address:1112 Waters Ave Aspen,CO 81611 Permit Number: 00254.2019.arbk
' BEFORE A PERMIT CAN BE ISSUED:The owner,or the engineer or architect of record,acting as the The City of Aspen
®*\ ® \ owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing
Schedule,including the required acknowledgments.Apre-construction conference with the parties
involved may be required to review the special-inspection requirements and procedures. These plans must be kept at the
m APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the building site or inspection
�_ • �_ projects for which they provide special inspections.Special inspectors shall be approved by the building delays may occur.Construction
WING AREA LIVING AREA department prior to performing any duties.Special inspectors shall submit their qualifications and are shall conform to these plans.All
subject to personal interviews for pre-qualification.Special inspectors shall display approved
identification,as stipulated by the building official,when performing the function of special inspector. changes shall be approved by
GRAVEL—*� GRAGRADE VEL Special inspection and testing shall meet the minimum requirements of the International Building Code the building official.
BASEMENT BASEMENT Section 1704.The following conditions are also applicable:
POLVETHYLENE SUMP POLYETHYLENE
SLAB * SHEETING SLAB COVER SHEETING A. Duties and Responsibilities of the Special Inspector SEPARATE PERMITS ARE
hrlll 1. Signify presence at job site.Special inspectors should notify contractor personnel of REQUIRED FOR ELECTRICAL,
o f c uiya't?;::r F'_'Y^F ..^:`.GRAVEL:;i rail their presence and responsibilities at the job site.If required by the building official,they PLUMBING,MECHANICAL,OR
.. .. shall sign in on the appropriate form posted with the building permit. FIRE SPRINKLER WORK
SUMP PIT
2. Observe assigned work.The special inspector shall observe assigned work for
conformance with the building department approved(stamped)design drawings, SMOKE ALARMS AND
PASSIVE RADON SYSTEM USING SUBMEMBRANE DEPRESSURIZATION SYSTEM specifications,and applicable workmanship provisions of the International Building CARBON MONOXIDE
DRAIN TILE LOOP FOR CRAWL SPACE Code.Architect\engineer-reviewed shop drawings maybe used only as an aid to DETECTORS REQUIRED
• • inspection' THROUGHOUT DWELLING
\4, . For continuous special-inspection,the special inspector shall be on site at all times UNIT PER CITY OF ASPEN
observing the work requiring special inspection.Periodic inspections,if any,must have MUNICIPAL CODE 8.15
Imo 1.11
prior approval based on a separate written plan reviewed and approved by the building
411 department and the engineer or architect of record.
_ 3. Report nonconforming items.The special inspector shall bring nonconforming items to
LIVING AREA . ` the immediate attention of the contractor and note all such items in the daily report.If any item is not resolved in a timely manner or is about to b t incorporated in the work,the
- �— special inspector shall immediately notify the building department by telephone or in
GRAill
LIVING AREA person,notify the engineer or architect,and post a discrepancy notice.
GR111
BASEMENT
4. Provide timely reports.The special inspector shall complete written inspection reports
SLAB POLYETHYLENE for each inspection visit and provide the reports on a timely basis determined bythe
SHEETING building official.The special inspector or inspection agency shall famish these reports
directly to the building official,engineer or architect of record,and others as designated.
SPACE
GRrsvE� .;::':' f PERFORATED [IBC Sec.171M.1.2]These reports should be organized on a daily forma[and maybe
'� ::..... GRADE POLYETHYCRAWLLENE DRAIN TILE submitted weekly at the option of the building official.These reports should include:
GRAVEL SHEETING aDescription of daily inspections and tests made with applicable locations,
DRAIN TILE LOOP . iiiu iuuuIk•
b. Listing of nonconforming items,
c. Report on how nonconforming items were resolved or unresolved as
applicable,
d. Itemized changes authorized by the architect,engineer,and building official if
FIGURE AF1 02 not included to nonconforming items. RECEIVED
RADON-RESISTANT CONSTRUCTION DETAILS FOR FOUR FOUNDATION TYPES
818 2015 INTERNATIONAL RESIDENTIAL CODE° I 4/10/2019
INTERNATIONAL CODE COUNCIL ..,,,,,.,..a ' ,,.aa.,��'au.,''„',��r„I., ���ras ,",,,a,�..9 e ----, - .— ASPEN
BUILDING DEPARTMENT
5. Provide Final Inspection Report.The special inspector shall submit a written final
report documenting required special inspections and correction of any discrepancies
noted in the inspections prior to the final building inspection. 2. Approval of fabricator.Ap
proval shall be based upon review of the fabricator's written
B. Owner Responsibilities.The project owner,the engineer or architect or record,or an agent of the procedural and quality control manuals and periodic auditing of fabrication practices by
owner is responsible for employing special-inspection services.The special inspector agency shall an approved special inspection agency.
not be in the employ of the contractor,subcontractor or material supplier.[IBC Sec 1704.1]In
3. Completion of fabrication.Upon completion of fabrication,the approved fabricator
case of an owner\contractor,the special inspector\agency shall be employed as specified by the °r"I p p
building official. shall submit certificate of compliance to the building official stating that the work was
performed in accordance with the approved construction documents.
C. Engineer or Architect of Record Responsibilities
C. Building Department Responsibilities
1. Prepare special inspection program.The engineer or architect of record shall list the
items for which special inspection is required;and shall indicate any items for which the I. Approve special-inspection program.The building department shall approve all
IBC or the building official approves periodic inspection and the frequency of such special inspectors and special-inspection requirements.
inspections. 2. Enforce special inspection.W iid t b
2. Respond to field discrepancies.The engineer or architect of record shall respond to tor oni performaork nce of specialrequiringspecial inspectorsnspect.on Hisan\tierhe approval,uilding in
uncorrected field discrepancies in design,material,or workmanship observed by the additioninspec toshall thatm of thetor spectheial inspector,must be obtained prior to placement of concrete
covering of structural steel,or other similar materials.special inspector.
3. Review shop drawings and submit design changes.The engineer or architect of record 3. Review inspection reports.The building official should review special-inspection
shall acknowledge and review for conformance with the construction drawings those progress and final reports.
shop drawings that may detail structural information,shall submit to the building official 4. Perform final inspection.The buildin
and to the special-inspection agency written documentation of any verbally authorized approval f r a g official should perform the final inspection and
deviations from the approved construction documents,and shall submit revised project[IBC Sec.I09.3.]after the final special-inspection report has been
documents for building official approval as required. reviewed and approved.
D. Contractor Responsibilities Prject Address: 1112 Waters Ave Aspen,CO 81611 permit Number: 0024.2019.arbk
1. Notify the special inspector.The contractor is responsible for notifying the special
inspector or agency regarding individual inspections for items listed on the attached
schedule and as noted on the building department approved plans.Adequate notice shall ACKNOWLEDGMENTS
be provided so the special inspector has time to become familiar with the project. I have read and agree to comp
ly py with the conditions of this agreement.
2. Provide access to approved plans.The contractor is responsible for providing the Special Inspection Agency: nature: Printed Name:
special inspector access to approved plans. `� / t Date: �/I
CT1,./�la...9 ,-T'rt. Y__Al �•E �<�.t S->.V�G1). �.e- 312' 2'19
3. Retain special inspection records.Upon request,the contractor is also responsible for Owner. 1 ,�
retaining,at the job site,all special inspection records completed by the special inspector. Si Lure:/ Printed Name Date
E. Inspection of Fabricators Izen Investment Trust G Mark Izen
.15.19
1. Fabrication of structural assemblies and members.Where fabrication of structural Engineer/Architect: Signatu e: Printed Name:
load-bearing members and assemblies is being performed on the premises of a Zone 4 Architects LLC //// Date:
fabricator's shop,IBC Section 1704.2 shall require special inspection of the fabricated /,r/ Brendan Hamlet 1.15.19
items. Contractor:
Signature: "PAta ne:
2. Fabrication and implementation procedures.The special inspector shall verify that Kaegebein Fine Homebuilders . ".�I; Date:
the fabricator maintains detailed fabrication and quality control procedures that provide a _Brian Wells = -""`'2,— 1 15 10
basis for inspection control of the workmanship and the fabricator's ability to conform to µ w '
approved construction documents and reference standards.The special inspector shall Approved Fabricator Signature: Printed Name:
Date:
review the procedures for completeness and adequacy relative to code requirements for
fabricator's scope of work.
F. Approved Fabricator Responsibilities Inspected Fabricator: Signature:
Printed Name: Dace:
ALPINE STEEL LLC. PATRICIA KRUEGER PATRICIA
1. Fabrication exempt inspections.Special inspections are not required where work is KRI IFGER 3.25.19
done on the premise of a fabricator registered and approved to perform such work RECEIVED (circle
Signature: Prin
ted without special inspection. ned Name: Date:,CITY OF ASPEN>
4/10/2019 PITKIN COUNTY: _TF
2 — 4/23/2019 RECEIVED
ASPEN 3 4/10/2019
BUILDING DEPARTMENT
ASPEN
BUILDING DEPARTMENT