Loading...
HomeMy WebLinkAboutFile Documents.815 Ute Ave.0026.2019 (2).ARBK I 815 Ute Ave PERMIT0026.2019.ARBK Field Plan Set Must Be Printed In Color DATE:tv0�2018 MASTER PERMIT: PERMIT NUMBER:oozs.zols.AaeK ADDRESS: NUMBER: _,. COMMUNITY DEVELOPMENT DEPARTMENT • COMMUNITY DEVELOPMENT DEPARTMENTAll READ THIS OR FAIL YOUR INSPECTION! ITEMLINSP BUILDING PERMIT APPLICATION BUILDING PERMIT CONTACT SHEET Furred&Dropped Ceilings,Soffits,and Walls -structural steel welding:Field&Sh• CITY OF ASPEN ,_) . , T�CI, T ��re,q�_. 20015 IBC 803.13 PROPERTY INFORMATION NE DeivonLrowianaorougnton.com en•th boiling PERMIT NO.Name oELvoN NEMEONEa Pnan< E-man This applies to the attachment of finishes or furring to any -Epoxy anchors 0026.2019.ARBK ADoaass als Ufa Ave_ uNlTP floc. PARCEL ID If Z'371azg3Wz assemblies that are required to be either fire-rated or -' a. afv-a[u-saov -Intumescent paint LOT BLOCK 'orEsoIvis;oN u'e Trail Townhomes Name AaPe^o°"�"°n�°"'"` Phone E-mail non-combustible and is separate from the fire-rated -spray applied fire resistive materials OWNER assembly requirement. re uirement. WHITE SNOW TRAIL LLC The City of Aspen OWNER NAME Ma,.Solomon CELL EMAIL Name mats OoiOiiiOii Phone Cell Phone -Permanent micropiles STCONTACT Delvon Nemechek CELL g70-54441006(ofice) deNon®rowlendbroughton.com Man;^a Walls,Ceilings&Soffits:If furred 1 a/<inches or ADDRESS 815 UTE AVE UNIT B plansP NAME EMAIL Aeeress city State zIP Special inspection is required per2015IBC These must be kept the less,do one of the following: E-mail section 1704.Inspector verify that copy of building site or inspection PROJECT DETAILS MIL 4.Fill spaces with Class A material.` agreement for inspection program to b PARCEL ID 273718293002 delays may occur.Construction weRKis IN DETAre e,OFIL New cantilever sloe)deck on the upper level. S.Fill spaces with inorganic or non-combustible material. O Name Phone Bell Phone the job site prior to performing any 6.Fire block 8 feet in all directions. shall conform to these plans.All Mailing city State tic inspections.A copy of all Special Inspe Address changes shall be approved by PROTECT s72.soo.00 Use of Building Class of Work Fixture Counts Equipment Checklist field reports to be on the job site for vALunrloN all Walls:If set out(furred)greater than 1 a/,inches, FIRE the building official. ❑ Commerical ❑New `_T lieu,Bidets X Forces Air/Gravity Systems Aeeress inspectors'review if requested.Failure to b'RKANEA 12o El Multi-Family2_Bathtub do one Of the following: �`r 0 Addition T-wall,Suspended,or unit Heaters comply may result In denial of inspection. SPRINKLERS ❑ Single Family ❑Alteration Lavatory(Wash Soso) Gas Log Nam e oelron Name.. phone Ufv-orxs-avvo cell Phone 4.Use a Class A finish material(such as drywall). UNIT5Q FT4166 ❑ Mixed-Use ❑Repair =Shower1 Kitchen Sink(+Disposal)3.-Gas Appliancew Ma;l;ng 23q East Hopkins Ave. Aye n CO 81611 5.Use non-combustible framing. WarsozE ❑ ❑IFFR Dishwasher Heat,RnceVents Aaar<ss p city p sate zIP 6.Protect both sides with fires sprinklers. FIRE DAMPERS/RADIATION DAMPERS REQUIRED SEPARATE PERMITS ARE 17a12 ❑Tenant Finish Laundry Bar,Utility Sink-Hbsoption,Cooling,or p REQUIRED REQUIRED FOR ELECTRICAL, Will there be ❑Demolition Clothes Washer Absorption Unif A-mail delvOn@rowlandbroUghton.com Ducts and air transfer openings in fire resistive floor/ceiling or DISTURBED N. ddress XTERIOR ARFA any roof/wall ❑Change OrderFloor sink Boilers(includes vent) Ceilings&Soffits:If dropped(furred)greater roof/ceiling assemblies shall be protected with approved fro dampers PLUMBING,MECHANICAL,OR penetrations? ❑ ODU Floor Drain 2 AirHandlingUnil 55 ASe seseooros ARCHITECTS tf/v-ow4-avVO installed in accordance with their listing(IBC 717.5.2&717.5.4) FIRE SPRINKLER WORK NEW SQ FT U. El Yes =Water Heater(Pan Re 'rCooling Systems Name R phone cell Phone than 1%inches: a Gas Outlets 13-ventilation Fans Mii,r�234 East Hopkins Ave Aspen CO 81611 Framing members,hangers,and other assembly 5 7T OFROOW N. ❑No Water Treatment 1- ptlE In p ,,,,Aspen State ZIP 9 H urlLlrrwoRK -_Other -Range Hood members must be non-combustible.You may not FIRE RATED HATS REQUIRED _#of Gas System outlets ail Where floor/ceiling or roof/ceiling ZONE DISTRICT RiMF Snowmel[Sys[em Sq F[ Address use wood. In Type III and V construction only,you may use fire In are required to have a fire-resistive ratio recessed fixtures shall Name Phone cell Phone retard d wood g' o 0 � rn z Project Valuation:Cost of project as defined in valuation Affidavit. 'NOTICE:This permit becomes null andv 9• be installed such that the required fire pM0 LJ sr,n of Work Area:Total square footage of area undergoing change or reconfiguration. old if work or construction authorized 'ling D O units Ft:GrossSquare Foots a not FAR,of not commenced within 180 days,or address City State no - - r resistance will not be reduced(IBC 714.4.2) F qg, permitted unit. if construction or work is suspended or Lot Size:Total surveyed square footage of property. abandoned fora period of Lao days at . ail . lot / J Z Disturbed Exterior Area:Square footage of lot affected by permit application. N anytime after work is commenced. , Aaaress r,f 1_,...,,,,_, 2015 IBC 601 Fire Resistive Requirements for Alko 9 tr.- New Sgot:Total added square footage for additions to net livable or net leasblespace. �� ) �, Type of Construction: VA p Sq Ft of Rooms with dairy Work:Total square footage,not FAR,of all rooms with plumbing work. Re- Name Stephen Peian,el PE `J/U-`JL r-no I V - APPROVALS viewer phone Cell Phone -- Primary Structural Frame: 1 hr ZONING Rav;w;ng eeeeW sign- °are -line 298 Park Ave#301 Basalt CO 81621 (columns,beams,girders,etc) FEES ISSUANCE FEES ISSUANCE FEES ceparmem oft Approved seeress city sent aP `°'eU6®" Permit Fee PC PL 2/6/19 - all speightal©sopris.net Exterior Bearing Walls: 1 hr Plan Check 1492.97 2296.88 Parks Impact 0 Zoning aN otyt Ader<ss- Interior Bearing Walls: ' hr zoning(so)0 HPC aru-a�u-aaou Floors/Ceilings:1 hr Engineering 97.50 School Ded. 0 Name Aspen Prone canohone GA FILE NO.FC 5120 I GENERIC I 1 HOUR 50 to 54 STC Building x dH 5n2ha _ Roof: 1 hr Mailing 208 Aspen Airport Business Center Aspen CO 81611 FIRE SOUND ALL OUTDOOR LIGHTING CMP(50%) G Fire ,e woos Address Cary State no WOOD JOISTS,GYPSUM WALLBOARD,RESILIENT CHANNELS, Unless noted Otherwise for Occupancy separation or fire Toning(so%I 97.50 TDM Impact GLASS FIBER INSULATION MUST COMPLY WITH Engineering E-m,;, _ separation distance. Pad.Amenity Address THE CITY OF ASPEN LIGHTING CODE Energy Code REMP D CMP One layer+!i type X gypsum wallboard or gypsum veneer base applied at right angles to Water resilient furring channels 24"oc.with 1'Type S drywall screws 8"0.c.at ends and 12" SECTION 26.575.150 Plan Check • INSPECTIONS:The General Contractor must schedule inspections online. - -- - SMOKE ALARMS AND CMP(50%) Housing Cash in Lieu 0 Stormwater cat Intermediate furring channels.Gypsum board end joints located midway between (Hourly) Please visit www.at rho have Departments/Community-Development-Forms/to do so. continuous channels and attached to additional pieces of channel 64'long with screws CARBON MONOXIDE Zoning Sanitation I hereby certify that I have read and examined this application and know the same to be true and correct.All provisions of laws and 111 111 Parks Review Stormwater 8'o c.Resilient tuning channels applied at tight angles to 2 x 10 wood posts 16'o.e - DETECTORS REQUIRED (Hourly) Env.Health ordinances governing this type of work will be complied with whether specified herein or not.The granting of a permit does not with 6d coated nails,Isla'long.O.OBS'shank.41e"heads.two per joist.Wood joists Engineering Parks presume to give authority to violate or cancel the provisions of an other state or local law regulating construction or the performanceTHROUGHOUT DWELLING Utility Review City Use Tax y g g supporting eon interior plywood with exterior glue sub#oot and a/a"particle board.1.5 psi (Hourly) Landscape of construction.It is my responsibility to review the approved plans and any comments that are contained thereon and see that the 3t/iglass fiber insulation balls,0 7 cf,friction fit in joist cavities supported alternate UNIT PER CITY OF ASPEN County use Tax D 1 00 alternately Approx.Ceiling GIS 181.25 Efficiencystructure and/or project is built in compliance with all applicable codes. every 12-byMUNICIPAL CODE 8.15 2 ,r.x comracmr ("� e ry wire rods and resilient furring channels. Weight 2 psf �{ U Approved vow sletna signmure David Miller Dace 02082019 jiCr►EiyED Sound tested with carpet and pad anti with insulation stapled to joists. Fire Test: FM FC-181,8-31-72 ,sp>�a� Y� Lot Area Deed Restricted To Issue x RECEIVED ❑ Check if you area tested owner builder(single-family homes only).You must take a test and complete the o n ufldmg a davit. Sound Test: G8H OC-3MT,10-13.71 SO U 4aa Census Code Hof Dwellings Plans Location 'Issuance ® (CITY USE ONLY)Owner builder approved by: Date: Affid�29f�i8/2019 IC&Test G&H OC-3MT,10-13-71 ��' 05 22/2p29 CITY OF ASPENeeaaeber.o17 130 S.GALENA ST ASPEN,05 11j A CITY OF ASPENAagaa20v 130 S.GALENA ST ASPEN,C�1611 ,.��c. ASPEN BUILDING DEPAR I MbN I .•esGyu--Styrh RI It min OFPARTMFNT I _-..--._ I I PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT 5. Provide Final Inspection Report.The special inspector shall submit a written final BUILDING DESCRIPTION FORM-IRC&IBC TTgn�a. r„r E,,, ,a,ra report documenting required special inspections and correction of any discrepancies SPECIAL INSPECTION AND TESTING AGREEMENT noted in the inspections prior to the final building inspection. 4 BUILDING CODE INFORMATION • 2. Approval of fnbrlealnr,Approval shall be based upon review of the fabricator's written I]2D15 IRC 02015 IBC 020151EBC ❑Other(Please Explain) , To permit applicants of project requiring special inspection anchor testing per Section 1704 of the B.Owner Responsibilities.The project owner,the engineer or architect or record,or an agent of the ptomdurel and quality control manuals and periodic auditing of fabrication practices by • International Building Code(IBC). owner is responsible for employing special-inspection services.The special inspector\agency shall m approved special inspection agency, • Code Editions (As Adopted and Amended) (As Adopted and Amended) (As Adopted not be in the employ of the contractor,subcontractor or material supplier.[IBC Sec 1704.1]In and Amended) Project Address:815 Ute Ave Permit Number:0026.2019.ARBK case of an owner\contractor,the special inspector\agency shall be employed as specified by the 3. Completion of fabrication.Upon completion of fabrication,the approved fabd®tor building official. shall submit certificate of compliance to the building official stating that the work was Fire Sprinkler System I Existing?EO yo I Required?mO No I Type 0 NFPA 13 0 NFPA 13 R 0 NFPA 13 D BEFORE A PERMIT CAN BE ISSUED:The owner,or the engineer or architect of record,acting as the performed in accordance with the approved construction documents. owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing C.Engineer or Architect of Record Responsibilities G. Building Department Responsibilities Type Of Construction O VA❑VB❑IV 0 IIIA ❑IIIB 0 IIA❑IIB❑IA❑IB'Fire Alarms Installed O Yes❑No Schedule,including the required acknowledgments.A pre-construction conference with the parties involved may required to review the special-inspection requirements and procedures. 1. Prepare special inspection program.The engineer or architect of record shall list the I. Approve special-inspection program.The building department shall approved! Required Special Inspections❑High-Strength Bolting ❑Epoxy Anchors El Structual Steel Welding items for which special inspection is required;and shall indicate any items for Which the special inspectors and special-Inspection requirements. ❑Permanent Micropiles 0 Sprayed Fire-Resistants 0 Other APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the IBC or the building official approves periodic inspection and the frequency of such projects for which they provide special inspections.Special inspectors shall be approved by the building inspections. 2. Enforce special inspection.Work requiring special inspection and the building Energy Code Compliance 0 Prescriptive Table 0 Other department to performing duties.S l inspectors shall submit their qualifications and are inspector Mall monitor the performance of special impeders.HiaWer approval,in ❑RESCheck UA Alternativep prior per gany Special p qua addition to that ofihea Biel ins ❑COMCheck UA Alternative subject to personal interviews for pre-qualification.Special inspectors shall display approved 2. Respond to field discrepancies.The engineer or architect of record shall respond to a hector,mull be rials.rd prim to placemeniof concrete, identification,as stipulated by the building official,when performing the function of special inspector. netted field discrepancies in design,material,or workmanship observed by the covering of structure)steel,or other similar materials. Exterior Energy Use Total Approved On-Site Snowmelt"th Spa N/A Pool Nth special inspector. 3. Review inspection reports.The building official should review special-Inspection ((Existing+New) Special inspection and testing shall meet the minimum requirements of the International Building Code g ) progress and final reports. 3. Review shopdrawings submit design changes.The engineer or architect of record BuildingT e/ I ❑A_0 B 0 F_ ❑E 0 RSection 1704.The following conditions are also applicable: g g g g Type/ I ❑One Family 0TWO Family shall acknowledge and review for conformance with the construction drawings those 4. Perform final Inspection.The building official should perform the Goal inspection and Occupancy Group B ❑B(A<50) 0 H ❑M 0 S- R A.Dudes and Responsibilities of the Special Inspector shop drawings that may detail structural information,shall submit to the building official approval for aproject[IBC get.109.3,1]after the final special-inspection report has been C ❑I- ❑U C 0 Townhouse and to the special-inspection agency written documentation of any verbally authorized reviewed and approved. , 1. Signify presence at Job site.Special inspectors should notify contractor personnel of deviations from the approved construction documents,and shall submit revised UNIT DESCRIPTION AS PROPOSED their presence and responsibilities at the job site.If required by the building official,they documents for building official approval as required. 815 Ute Ave 0026.2019.ARBK shall signthe appropriate form osted with the building permit. Project Address: Permit Moebse. Gross Area of Building:11,960 SF Gross Area of Unit:416a SF s in onp g P D.Contractor Responsibilities ADU BUILDING DESCRIPTION 2. Observe assigned work.The special inspector shall observe assigned work for Occupant Load: P P gne ACKNOWLEDGMENTS Is there an ADU? 0 Yes conformance with the building department approved(stamped)design drawings, 1. Notify the special inspector.The contractor is responsible for notifying the special 0 No specifications,and applicable workmanship provisions of the International Building inspector or agency regarding individual inspections for items listed on the attached 1 have road and agree to comply with d •°°dilimisuf this agreement. #Stories Above Grade 3 #Stories Below Grade #Living Rooms Code.Architect\engineer-reviewed shop drawings may be used only as an aid to schedule and as noted on the building department approved plans.Adequate notice shall Attached Garage Detached Garage Car ort #Kitchens inspection, be provided so the special inspector has time to become familiar with the project. . Special Inspection Agency: Sign o• pled Name: Date: Parking Spaces• Parking Spaces Parking Spaces #Full Baths For continuous special-inspection,the s I ins ctor shall be on site at all times 2. Provide access to approved lens.The contractor is responsible for providing the 14//l✓t!/I i 4-c 1/Y - --- ^^(E<.[J_e irAir L/e 71r ///_... - 4 a #3/4 Baths special inspector ppr p p pr g - H Bedrooms H Full BathsDeck Area #1/2 Baths observing the work requiring special inspection.Periodic inspections,if any,must have special inspector access to approved plans. #3 4 Baths H 1 2 Baths 1 prior approval based on a separate written plan reviewed and approved by the building ,0 tier. _ Signature: Printed Name Data IQ / / #Bed rooms de rtmenI and the en architect of record 3. Retain special inspection records.Upon request,the contractor is also responsible for pals ,A I� /y/4,-,./=_/ianAsr .5/Ix O(k t #Kitchens 1 #Wood Fireplaces° pa engineer or yw _-_.q-.- _ 1. #Other Rooms(List) retaining,at the job site,all special inspection records completed by the special inspector. - ----- " #Gas Appliances 3 H Gas Logs 3. Report nonconforming items.The special inspector shall bring nonconforming items to Engineer/Architect: Signature: Printed Name: Dee: A the immediate attention of the contractor and note all such items in the daily report If E.Inspection of Fabricators fir, ,,,11 C BUILDING ROOMS AND USES BY LEVEL AS PROPOSED(Include Mechanical&Storage) any rem is not resolved in a timely manner or is about to be incorporated in the work,the 2ovuMVPd$Q,011111164--- - ----.-- PCWoe..)0M SdI .S 1511 C\ special inspector shall immediately notify the building department by telephone or in 1. Fabrication of structural assemblies and members.Where fabrication of structural Basement 1 Bedroom,Full Bath Laundry,Mechanical load-bearing bars and assemblies is bent performed on the f a 'matador: signature' riniedVamc: Dam person,notify the engineer or architect,and post a discrepancy notice g mein g p premises o .^� (�, Q fabricator's shop,IBC Section 1704.2 shall require special inspection of the fabricated C � X1.12.1.i1Hrf. R. S'ZG-( ` 4. Provide time) reports.The special inspector shall complete written inspection reports . -'- . --- -"--' ".___-_ 3 Bedrooms,3 Full Baths y on yr p p p p p stems Main Level for each inspection visit and provide the reports on a timely basis determined by the Approved Fabricate, Signature: primed Name: Date building official.The special inspector or inspection agency shall furnish these reports 2. Fabrication and implementation procedures.The special inspector shall verify that 2nd Floor Living Room,Dining/Mohan,1/2 Barn directly to the building official,engineer or architect of record,and others as designated. the fabricator maintains detailed fabrication and quality control procedures that provide a __. _ -. -_.........___ .__ __ .... [IBC Sec.1704.1.2]These reports should be organized on a daily format and maybe basis for inspection control of the workmanship and the fabricator's ability to conform to Inspected Fabricator. Slgnatu Printed Name Dec L submitted weekly at the option of the building official.These reports should include: approved construction documents and reference standards.The special inspector shall C4 Sb A'v SAAw1�Ts1dP1. . 3rd Floor a.Description of daily inspections and tests made with applicable locations, review the procedures for completeness and adequacy relative to code requirements for S1 _ �Tr1,� e�(y 5,21.t b.Listing of nonconforming items, fabricator's scope of work - -- -- --- - _--_ ----------- -- ----- c.Report on how nonconforming items were resolved or unresolved as Sol,awe: hinted Norma: Dom: Additional applicable, F.Approved Fabricator Responsibilities CITY OP ASPEN d.Itemized changes authorized b the architect,e ., ,e, JH Justin Hahn 5/22/19 RECEIVED v engineer,and building offcial if 1. Fabrication exempt inspections.Special inspections are not required where work is not included in nonconforming items p lab pecia p q .f done on the premise of a fabricator registered and approved to perform such work • 3 Reviewed By:'IN Date:5n319 02/06/201S 1 without specialInspection. x(CITY OF ASPEN,..,.. 130 S. GALENA ST I ASPEN,CO1I 2 - BUILDING DEPARTMENT • I RECEIVED 02/02./2019 ASPEN BUILDING DEPARTMENT