HomeMy WebLinkAboutFile Documents.1001 E Cooper Ave.0039.2019 (13).ARBK Field Plan Set Must Be Printed In Color .,.
DATE: MASTER PERMIT: PERMIT NUMBER:oo3s.2o1s.AR5K
COMMUNITY DEVELOPMENT DEPARTMENT 40►�D CITY OF ASPEN
BUILDING PERMIT APPLICATION t 0039.2019.ARBK
CITYOFASPEN PERMIT NO. ..
PROPERTY INFORMATION
' 1001 E.Cooper Avenue 2 273718234009 `
OWNER RICHARD LANDAU PEARLSTONE The City of Aspen
ADDRESS UNIT: PARCEL IDa
LOT BLOCK oasusoivlSloN Subdivision:VILLAGER TOWNHOUSE Unit:2 •
OWNER NAME Richard Landau Pearlstone cra970.948.1186 EMAIL riche@pearistonegroup.mm ADDRESS
1001 E COOPER UNIT 2
These plans must be kept at the
eoseceeeonT Dana Ellis CELL203-610-7633 EMAIL dana@rowlandbrOughton.com PARCEL ID 273718234009 building site or inspection
NAME
PROJECT DETAILS(READ DEFINITIONS BELOW)TNISSECTIONMUSTBE delays may occur.Construction
COMPLETED IN ITSEMIRETY shall conform to these plans.All
WORKINOO rgr Interior remodel and expansion into an interior courtyard , changes shall be approved by
RESIDENTIAL REFERENCES FROM 2015 IBC the building official.
VALUAPROIERTION 450,000 Use of Building Class of Work Fixture Counts Important Review Triggers CV/CS=crawl space ventilation sec.1203.4. 18"x 24"access required
❑ Commerical 0 New _Toilets,Bidets Major Engineering Review 1209.1
VELA
El Multi-Fami ❑Addition _Bathtub •Projects involving less than 50% EE=emergency escape required sec 1030
w liolxs 1490 Singleyy ['Alteration Lavatory(Wash Basin) hardscape area and work affecting EU=enclosed usable space under stairs shall be 1-hr construction or stair SEPARATE PERMITS ARE
ORR AREA ❑ Use shower 75%or greater of unit sgft
0 Mixed-Use ['Repair Kitchen Sink(*Disposal)•projects involving greater than enclosure rating.No access from stair enclosure.YL"gypsum permitted for REQUIRED FOR ELECTRICAL,
urvrr so Fr 1490 0 0 IFFR -Dishwasher 50%hardscape area and work stairs inside a single dwelling unit.1011.7.3. PLUMBING,MECHANICAL,OR
Lor saE 0 Tenant Finish -Laundry Bar,utility sink affecting 50%or greater of unit RV=roof and rafter ventilation re uired 1203.2
tsa En 12,000 Will there be ❑Demolition Clothes washer A=Attic Access 20"x 30"1209.2q FIRE SPRINKLER WORK
any roof/wall ❑Change Order-Floor Sink •gPojects involving 1,000+sq ft of
L TT,11r50iCE 20 BF penetrations? ❑ _Floor Drain soil disturbance area SA=smoke alarm(NFPA 72)required sec 907.2.11
l7 Yes _Water Heater(Pan Req) CO=carbon monoxide detector req.per Aspen Municipal Code 8.15
sow so Fr 271 SF ❑No _a Gas Outlets Water Efficient Landscaping SG=safety glazing required sec 2406
Water Treatment •Projects that trigger a major
ultolrvG _Water
engineering review V=mechanical ventilation required sec 1203.1&IMC 403(bath fans and SMOKE ALARMS AND
FOOTPRINT NOTICE:This permit becomes null and void If work •projects involving interior whole house ventilation)
HARWCOPE 28 SF 18pdaysuorifcontrtm[nonmwork6esuspendedol� No Change a iterations affecting50%or more CARBON MONOXIDE
AREA of exisiting gross square footage GR=guards,42"min ht,4"max opening.Guards within dwelling unit 36"min DETECTORS REQUIRED
abandoned for a period is of 1g0 nays at any time after ht sec 1015
PONE RIME workiecommencea. HR=handrails 34"-38"ht sec 1014 THROUGHOUT DWELLING
STRICT .. ,
DS=Draft stopping/fire blocking 718 UNIT PER CITY OF ASPEN
• RD=Roof drainage 1503.4 MUNICIPAL CODE 8.15
Project Valuation:Cost of project as defined in Valuation Affadavit. STC=Sound transmission class not less than 50 at dwelling separations,sec
2 Sq Ft of Building Work Area:Total square footage of interior area undergoing change or reconfiguration. 1207
Q Unit Sq Ft Gross square footage,not FAR,of permitted unit. Si=Stairway Illumination 1205.4
r Lot Stge:Total surveyed square footage of property. APPROVALS PD=protect against decay,sec 2304.12
Sq Ft of soil Disturbance:Exterior area of the lot where the ground is disturbed Reviewing Needs R rawer Due 9Per this proje s as es os asbestos on repo ,your project
Z New sq Ft:Total added square footage for additions to net livable or net leasable space. Depanment Review Sign-oft Approved REFERENCES FROM 2015 IMC
LL Building Footprint:Grade floor square footage of the permitted structure. PO x LL DE=clothes dryer exhaust,sec 504.Makeupair req'd if over 200 CFM does not require a State abatement permit.
C Hardscepe Area:Square footage of impervious lot surface. - ry q However,the following OSHA regulation must be
.1
Zone District:Underlying zone district of permitted parcel. Zoning x Sv 06/03/2019 AS=access and service space for maintenance teq'd,sec 306 strictly adhered to:Standard Title 29,Part 1910.134,
HPC MA=make up air required if hood exhausts greater than 400 CFM,sec 505.2 1910.1001,and 1926.1101 of the Code of Federal
Building x TF .1/2019 ET=exhausts terminate 3'from prop line and openings,10'from intakes, Regulations.It is recommended that you familiarize
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Fire x .r srs,^",. 501.3.1 yourself with these regulations and have a certified
Building Building Engineering I 4�=intake openings 10'from lot line&contaminant sources(vents,streets), General Abatement Contractor(GAC)conduct the removal
Review 7653.75 permit Fee 11775.00 Parks Impact 931.95 CMP x rx snnm9 1.4 of the Asbestos Containing Material(ACM)under
D=fasten and seal all ductwork per 603.9 engineering controls and that once the removal process is
Engineering zoning School Lands Water REFERENCES FROM 2015 IFGC
Review Review(50%) 1043.00 Dedication 8067.14 - completed,a visual inspection and clearance air
Stormwater DV=direct vent req'd,sec 303.3 monitoring be conducted by an independent,certified Air
Zoning CMP(50%) Sanitation x Pra snsr2ole CA=combustion air not taken from bedrooms,bathrooms or Monitorin Specialist.
Furthermore,identified ACM may
Review(50%) 1043.00 79715. DMlmpa 104.31 9
storage sec appliances
be in areas which were either not covered in the scope of
Energy Code REMP Pedestrian Env.Health p
1766.25 pays OD=outdoor appliances must be listed for outdoor use,sec 303.6 the asbestos inspection or were inaccessible or hidden
Review Payment Amenity REFERENCES FROM 2015 IECC due to their application during the construction process
CMP(50%) rez,s GIs Housing Cash in Lieu rpznaz Landscape F=new or replacement fenestration shall not exceed 0.28 U-factor,NFRC and their subsequent enclosure or covering with building
Usecity Approved
Efficiency R •„ED label required,oaps i Ordinance 2016
Parks Review e 3675.00 water rapr41\)/,t11and finish materials.These areas should be inspected
Approved L=4.1 of lamps in permanently installed lights must be high efficacy,sec when renovation or demolition activities are scheduled
Utility Review County Use 1125.00 sanitation To Issue R404.1 which may disturb the materials within,or beneath these
Issuance SE=Continuous air barrier required;all exterior joints,cracks,and holes to be barriers.
IL./ /ass Ly caulked,gasketed,sealed,table R402.4.1.1
.
I CITY OF ASPEN January 2019 130 S. GALENA ST I ASPEN,CO 816�11 REFERENCES FROM 2014 NEC
•�A EP=electric panel'happy space'30"x36"x78",not in storage,sec 110.26
SUILDING DEPARTMENT
Dwelling Separation Required-2015 IBC
ALL OUTDOOR LIGHTING -708 Fire Partitions,711 Horizontal Assemblies:
MUST COMPLY WITH Walls and floor/ceilings separating dwelling units shall have a fire-resistance
THE CITY OF ASPEN LIGHTING CODE rating of at least 1 hour.Walls shall extend from the top of the floor assembly
s below to the underside of the floor or roof slab or deck above or to the
ADDRESS:1001 East Cooper Ave,Unit 6 PERMIT NUMBER: PERMIT NUMBER: SECTION 26.575.150 fire-resistance-rated floor/ceiling assembly above.
-714:Penetrations must be protected by a through-penetration firestop
COMMUNITY DEVELOPMENT DEPARTMENT COMMUNITY DEVELOPMENT DEPARTMENTII .11; , ompen sW 81611 wmein a,a pen co ornlo s449006 system.Recessed fixtures shall not reduce the required fire resistance by use
den leap brake at,doper co1611+t aoa ape 1073 of a listed fixture,a listed firehood,or a drywall assembly meeting the required
BUILDING PERMIT CONTACT SHEET BUILDING DESCRIPTION FORM -IRC&IBC T.Cowed wan www.rowlandbroughten.com fir
¢resistance.Exhaust fans require ceiling radiation damper.
TrN trrroeAsez" rowland+broughton -1207 Sound Transmission:Separating walls and floor/ceilings shall have an
BUILDING CODE INFORMATION g STC rating of at least 50.Floor/ceilings shall have an IIC rating of at least 50.
Name Dana Ellis a/V-4Ly-O/Of uanaCU,10WianourougnuOn.Cor , arcMtenwa/urban design/'mtarior design
Na Phone E-mall ❑2015 IRC ID 2015 IBC ❑2015 IEBC 0 Other(Please Explain) LETTER of COL
Code Editions (As Adopted and Amended) (As Adopted and Amended) (As Adopted 17 May 2019
Noes Jay Dewire �� 99
ph. ill-sue-ZOOS E-mail aspenwmngLgmae.cum
and Amended) P 6
Name t<icnara Lanaau reansrone Phone cell Phone ots eats,l tee ?Ave: ?❑vas Mike Metheny,Chief Building Official SARA . J.
Fire Sprinkler System I Existing. M No I Required.l No I Type ❑NFPA 13 ❑NFPA 13 R ❑NFPA 13 D Denis Murray,Plans Examination Manager B-1 G ,*
MinPO Box 1860 cky Aspen state co ziP81612 Type Of Construction 0 VA ID VB❑IV 0 IIIA ❑IIIB 0 IIA❑116❑IA❑IB(Fire Alarms Installed ❑.Yes❑No Tony Fusero,Plans Examiner v ''o C~a
Ean richie@pearlstonegroup.cem City of Aspen \\`,1, A-v
Aeeresa _ Required Special Inspections 0 High-Strength Bolting ❑Epoxy Anchors 0 Structual Steel Welding Building Department SFD ARO�
AlisonA l Ofu-4nrasfu ❑Permanent Micropiles ❑Sprayed Fire-Resistants 0 Other NA 130 South Galena St-3'"Floor
noes ear Phone Cell Phone Aspen,Colorado 81611
ram 234 E.Hopkins Ave cm,Aspen stun co zip 81611 Energy Code Compliance El Prescriptive Table 0 Other
❑RESCheck UA Alternative ❑COMCheck UA Alternative RE: 1001 E Cooper-Egress from Master Bedroom on Upper Level Villager Townhomes#2
nanael alison.agley@rowlandbroughton.com
Exterior Energy Use Total Approved On-Site Snowmelt° Spa° Pool 0 Dear Mike,Denis and Tony:
Name Arson Agley Phone cenphonoulu.zf4.a/0D (Existing+New)
Mailing 500 E Main St As en CO 81611 Building Type/ I 0 A_0 B ❑F_ 0 E ❑Ili R? IAs discussed todaywith Denis and Ton this letter serves to memorialize egress from our
Aaare.a city p State hp _ Occupancy Group g El Family 0Two Family e 9
0 B(A<50) 0 H_ ❑M 0 S_ R alteration/remodel of Unit 2 at the Villager Townhomes permit#0009-2019-ACBK.
aaa:eleB alison.agley@rowlandbroughton.com C 0 I ❑U C ❑Townhouse
' The original design of Unit 2 included an internal double height courtyard which for the four center
me Sarah Broughton phone a 1.1-044-y000 Cell Phone UNIT DESCRIPTION AS PROPOSED units(without external sides)creates a design and code challenge.The original layout does not
Aa1lr'¢;234 E.Hopkins Avenue city Aspen SEate CO Z1p81611 Gross Area of Building:° Gross Area of Unit:1445 sq0 ADU BUILDING DESCRIPTION comply with today's codes for egress from the bedroom on the upper level.
aenese sash@rowlandbroughton.com Occupant Load: Is there an ADU? 0 Yes In light of a difficult situation we feel that the proposed layout of the upper floor is an overall
III No improvement to existing egress and citing IEBC 403.1"Alterations shall be such that the existing
Name Phone Cell Phone #Stories Above Grade 2 #Stories Below Grade° #Living Rooms- building or structure is no less conforming to the provisions of the IBC that the existing building or
Mailing Attached Garage Detached Garage Carport #Kitchens structure was prior to construction."
Aeeress city State zIP Parking Spaces Parking Spaces Parking Spaces #Full Baths _____
-mail 3 1 ° #3/4 Baths The ways we are improving egress are... �� �
acre:. #Bedrooms #Full Baths Deck Area #1/2 Baths
#3/4 Baths 2 #1/2 Baths° / • The upper level Master Bedroom 203 is open to the Great Room 201
Brett McEiva:n-KLOA a/V-UZ/-o I f4 #Bedrooms fashion with no door and a clear view to the deck door where the fire department could set a
Name Phone cell Phone P
#Kitchens 1 #Wood Fireplaces° #Other Rooms(List) ladder for rescue 05/20/2019
Aaa5 D cite state ZIP 1 1
#Gas Appliances #Gas Logs_ We are providing a permanent ladder at window 9 which is accessed through Master Closet
II bmcelvain@klaa.com ' 205 as an extra egress option ASPEN
mg.bmcelvain@klaa.com ROOMS AND USES BY LEVEL AS PROPOSED(Include Mechanical&Storage)
• • Window 8 in Master Bedroom 203 is compliant with egress dimensionsFIIaIb16tID&PfIgNT
Noon Jay Dewire-Yiking construction phonea/v-sva-,yoo cell Phone Basement used to rescue an occupant
Mailing
Aeerea. city state ZIP You may contact Alison Agley at 970.462.9370 if you have any questions regarding the variance in
E-mail aspenviking@gmail.com Main Level(z)bedrooms.(z)cams,laundry,and closet this application.
This alternate method is acceptable as it meets the
2nd Floor Kitchen,Living room,master bedroom,master bath,master closet Sincerely, intent of the 2015 IBC section 104.11 and is equivalent
INSPECTIONS:The General Contractor must schedule inspections online. in fire and life safety.
Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so.
I hereby certify that I have read and examined this application and know the same to be true and correct.At provisions of laws and A - ,a
ordinances governing this type of work will be complied with whether specified herein or not.The granting of a permit does not 3rd Floor4. _M�d_l�(7/(' _/,'/
to thorn to violate or cancel the of other state or local law regulating construction or the performance
%s(R7f�••-� oS�Ao�sa'y
presume give authority provisions O y D gu a'rig cons rut pe /
of construction.It is my responsibility to review the approved plans and any comments that are contained thereon and see that the Additional Sarah Broughton,Principal
structure and/or project is built in compliance with all applicable codes. Rowland+Broughton
sux:,Jay Dewire Date2/16/19 RECEIVED
❑ Check if you area tested owner builder(single-family homes only).You must take a test and complete the own¢RECEIVE3
(CITY USE ONLY)Owner builder approved by: Date: Affidavit n ye /70T Reviewed By: Date: r / / Page 1 of t
CITY OF ASPENAuauauet, / �� ant q
I 130 S.GALENA ST ASPEN,CO 8 p6111� (CITY OF ASPENJanuary2Dlg 130 S.GALENA ST ASPEN,CO ALc@r1J11J
Rl1ILDING DEPARTMENT BUILDING ULNAR I MEN I
I
2. Approval of fabricator.Approval shall be based u review of the fabricator's written Field Plan Set Must B e Printed I n Color .
ppprova pprova port
A. procedural and quality control manuals and periodic auditing of fabrication practices by 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written w,-
"Cv.*rs an approved spec I inspection agency procedural and quality control manuals and peas dre auditing of fabrication practices by
an approved special inspection agency.
'''`C'.`"^" SPECIAL INSPECTION AND TESTING AGREEMENT va.m 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator
shall submit certificate of compliance to the budding official stating that the work was To permit applicants of project requiring special inspection anchor testing per Section 1704 of the performed
Completion of fabrication.Upon completion of fabrication,the approved fabricator
rformed in accordance with the approved documents. shall submit certificate of compliance to the building official stating that the work was
pProved cons
International Building Code(IBC). performed in accordance with the approved construction documents.
G. Building Department Responsibilities
Project Address: 1001 E Cooper-unit 2 Permit Number:0039-2019-ARBK G. Building Department Responsibilities
j 1. Approve special-inspection program.The building department shall approve all The City of Aspen
BEFORE A PERMIT CAN BE ISSUED:The owner,or the engineer or architect of record,acting as the special inspectors and special-inspection requirements. 1. Approve special-inspection program.The building department shall approve all
owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing
Schedule,including the required acknowledgments.A pre-construction conference with the parties 2. Enforce special inspection.Work requiring special inspection and the building special inspectors and special-inspection requirements.
These plans must be kept at the
involved may be required le review the Special-inspection requirements and procedures. inspector shall monitor the performance of special inspectors.Hislier approval,in 2. Enforce special inspection.Work requiring special inspection and the building building site or inspection
addition to that of the special inspector,must be obtained prior to placement of concrete,
APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the covering afstmcmral steel,or other similar materials. inspector shall monitor the performance of special inspectors.His\Her approval,in
projects for which they provide special inspections.Special inspectors shall be approved by the building addition to that of the special inspector, ust be obtained prior to placement of concrete, delays may occur.Conitructlon
department prior to performing any duties.Special inspectors shall submit their qualifications and are 3. Review inspection reports.The building official should review special-inspection covering of structural steel,or otherrsimilar materials. shall conform to these plans.All
subject to personal interviews for pre-qualification.Special inspectors shall display approved pivgi,ss and final reports.
identification,m stipulated by the building official,when performing the function of special inspector. 3. Review inspection reports.The building official should review special-inspection changes shall e approved y
progress and final reports. the building official.
4. Perform final inspection.The building official should perform the final inspection and
Special inspection and testing shall meet the minimum requirements of the lniernational Building Code approval for a project[IBC Sec.109.3.1]after the final special-inspection report has been
final Section 1704.The following conditions are also applicable: 4. Perform inspection.The building official should perform the final inspection and
reviewed and approved. approval fora project[IBC Sec.109.3.1]after the final special-inspection report has been
A. Duties and Responsibilities of the Special Inspector reviewed and approved. SEPARATE PERMITS ARE
I. Signify presence at job site.Special inspectors should notify contractor personnel of Project Address: Permit Number: REQUIRED FOR ELECTRICAL,
their presence and responsibilities at the job site.If required by the building official,they Project Address: Permit Number: PLUMBING,MECHANICAL,OR
shall sign in on the appropriate form posted with the building permit. ACKNOWLEDGMENTS FIRE SPRINKLER WORK
2. Observe assigned work.The special inspector shall observe assigned work for ACKNOWLEDGMENTS
conformance with the building department approved(stamped)design drawings, I have read and agree to comply with a conditions of this agreement
specifications,and applicable workmanship provisions of the/nternariono/Building I have read and agree to comply with the conditions of this agreement.
Code.Architect\engineer-reviewed shop drawings may be used only as an aid to Special I lion Agency:/,, Signs 'Printed Name:
yj� ''/ Date:f�
inspection. rode", /G7/7T/f� />r/1-/// / i// r/V/g Special Inspection Agency: Signature: Printed Name: Date:
LLLLIIII i Peci P g Y: gna
For continuous special-inspection,the special inspector shall be on site at all times
observing the work requiring special inspection.Periodic inspections,if any,must have Owner Signature: Printed Name Date
prior approval based on a separate written plan reviewed and approved by the building
department and the engineer or architect of record. Owner: Signature: Printed Name Date
3. Report nonconforming Items.The special inspector shall bring nonconforming items to Engineer/Architect: Signature: Printed Name: Data:
the immediate attention of[he contractor and note all such items in the daily report.If
any item is not resolved in a timely manner or is about to be incorporated in the work,the Engineer/Architect: Signature: Printed Name: Date:
special inspector shall immediately notify the building department by telephone or in Mc
person,notify the engineer or architect,and post a discrepancy notice. KL&A Engineers&Builders 1141t it u*- Brett McElvoln 05/14/19
Contractor Signature: Printed Name: Date:
4. Provide timely reports.The special inspector shall complete written inspection reports Contractor: Signature: Printed Name: Date:
for each inspection visit and provide the reports on a timely basis determined by the - -
building official.The special inspector or inspection agency shalI furnish these reports d
directly to the building official,engineer or architect of record,and others as designated. Approved Fabricator: Signature: Printed Name: Dale:
[IBC Sec.1704.1.2]These reports should be organized on a daily format and may be Approved Fabricator: Signature: Printed Name: Date:
submitted weekly at the option of the building official.These reports should include:
a. Description of daily inspections and tests made with applicable locations,
b. Listing of nonconforming items, Inspected Fabricator: Signature: Printed Name: Date:
c. Report on how nonconforming items were resolved or unresolved as
Inspected Fabricator: Signature: Printed Name: Date:
applicable,
d. Itemized changes authorized by the architect,engineer,and building official if
not included in nonconforming items. (circle one) Signature: Printed Name: Date:
CITY OF ASPEN (circle one) Signature: Printed Name: Date:
PITKIN COUNTY: CITY OF ASPEN
1 PITKIN COUNTY:
3
. 3
2. Approval of fabricator.Approval shall be based upon review of the fabricator's written
procedural and quality control manuals and periodic auditing of fabrication practices by 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written
5. Provide Final Inspection Report.The special inspector shall submit a written final an approved special inspection agency. procedural and quality control manuals and periodic auditing of fabrication practices by
report documenting required special inspections and correction of any discrepancies an approved special inspection agency
noted in the inspectionsprior to the final buildinginspection. 3. Completion of fabrication.Upon completion offabrication,the approved fabricator
p inspec shall submit certificate of compliance to the building official stating that the work was 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator
B. Owner Responsibilities.The project owner,the engineer or architect or record,or an agent of the performed in accordance with the approved construction documents. shall submit certificate of compliance to the building official stating that the work was
owner is responsible for employing special-inspection services.The special inspector\agency shall G. Building Department Responsibiliti performed in accordance with the approved construction documents.es
nor be in the employ of the contractor,subcontractor or material supplier.[IBC Sec 1704.1]In
case of an owner\contractor,the special inspector\agency shall be employed as specified by the I. Approve special-inspection program.The building department shall approve all G. Building Department Responsibilities
building official. special inspectors and special-inspection requirements.
1. Approve special-inspection program.The building department shall approve all
C. Engineer or Architect of Record Responsibilities 2. Enforce special inspection.Work requiring special inspection and the building special inspectors and special-inspection requirements.
inspector shall monitor the performance of special inspectors.His\Her approval,in
I. Prepare special inspection program.The engineer or architect of record shall list the addition to that of the special inspector,must be obtained prior to placement of concrete, 2. Enforce special inspection.Work requiring special inspection and the building
items for which special inspection is required;and shall indicate any items for which the covering of structural steel,or other similar materials. inspector shall monitor the performance of special inspectors.His\I-ler approval,in
IBC or the building official approves periodic inspection and the frequency of such addition to that of the special inspector,must be obtained prior to placement of concrete,
inspections. 3. Review inspection reports.The building official should review special-inspection covering ofsbuctural steel,or other similar materials.
2. Respond to field discrepancies.The hitect of record shall respond to progress and final reports.
pengineer or arc 3. Review inspection reports The building official should review special-inspection
uncorrected field discrepancies in design,material,or workmanship observed by the 4. Perform final inspection.The building official should perform the final inspection and
special inspector. approval for a project[IBC Sec.109.3.1]after the final special-inspection report has been progress and final reports.
3. Review shop drawings and submit design changes.The engineer or architect of record reviewed and approved. 4. Perform final inspection.The building official should perform the final inspection and
shalI acknowledge and review for conformance with the construction drawings those approval fora project[IBC Sec.109.3.1]after the final special-inspection report has been
shop drawings that may detail structural information,shall submit to the building official Project Address: 1001 E Cooper-unit 2 Permit Number:0039-2019-ARBK reviewed and approved.
and to the special-inspection agency written documentation of any verbally authorized
deviations from the approved construction documents,and shall submit revised
documents for building official approval as required. ACKNOWLEDGMENTS Project Address: Permit Number:
D. Contractor Responsibilities I have read and agree to comply with the conditions of this agreement.
ACKNOWLEDGMENTS
1. Notify the special inspector.The contractor is responsible for notifying the special Special Inspection Agency: Signature: Printed Name: Date:
inspector or agency regarding individual inspections for items listed on the attached
schedule and as noted on the building department approved plans.Adequate notice shall I have read and agree to comply with the conditions of this agreement.
be provided so the special inspector has time to become familiar with the project.
Owner: •
PrintedN e / Date Special Inspection Agency: Signature: Printed Name: Dam:
2. Provide access to approved plans.The contractor is responsible for providing[he [� //.A,_ / //�
special inspector access to approved plans. //y/V 111//'rrrLLL
3. Retain special inspection records.Upon request,the contractor is also responsible for Engineer/Architect: Signature: Printed Name: Date: Owner: Signature: Printed Name Daze
retaining,at the job site.all special inspection records completed by the special inspector. - -
E. Inspection of Fabricators
I. Fabrication of structural assemblies and members.Where fabrication of structural
Contractor: Signamrc: Printed Name: Date: Engineer/Architect: r Signature: Printed Name: Date:
load-bearing members and assemblies is being perforated on the premises of a
fabricator's shop,IBC Section 1704.2 shall require special inspection of the fabricated
items. Approved Fabricator: Signature: Printed Name: Date:
Contractor: Signature: PrmtedName: Dam:
2. Fabrication and implementation procedures.The special inspector shall verify that `'t
the fabricator maintains detailed fabrication and quality control procedures that provide a \/\V1 h qCOtiesAirttri-i OVI ` (� D eon'(re V I3/1 q
basis for inspection control of the workmanship and the fabricator's ability to conform to Inspected Fabricator: Signature: Printed Name: Date: J
approved construction documents and reference standards.The special inspector shall Approved Fabricator. Signature: Printed Name: Dam:
review the procedures for completeness and adequacy relative to code requirements for
fabricator's scope of work.
(circle
F. Approved Fabricator Responsibilities CITY
one) Signature: Primed Name: Date:
OF ASPEN Inspected Fabricator. Signature: Printed Name: Dam:
I. Fabrication exempt inspections.Special inspections are not required where work is PITKIN COUNTY:
done on the premise of a fabricator registered and approved to perform such work
without special inspection. 3 (circle one) Signature: Printed Name: Dam:
CITY OF ASPEN
2 PITKIN COUNTY:
3