Loading...
HomeMy WebLinkAboutFile Documents.728 E Hopkins Ave.0186.2019 (4).ARBK 07/22/2019 0057.2019.ARBK 0186.2019.ARBK , , Field Plan Set Must B e Printed I n Color .,. DATE: MASTER PERMIT: PERMIT NUMBER: 728 E.HOPKINS 0186.2019.ARBK ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT °► ON COMMUNITY DEVELOPMENT DEPARTMENT �� �� BUILDING PERMIT APPLICATION '�0"f CITY OF AS • PEN ' ) CITYOFASPEN BUILDING PERMIT CONTACT SHEET PROPERTY INFORMATION arvoFasPEN - - 728 E.HOPKINS 273707361001 • Name" ofU-f ILL-Lase E-mail ryanramunoemowlarcnlrems.com PERMIT NO. 0186.2019.ARBK / unenss8 UNITS PARCEL IDS RYAN UOOTRUs Phone OWNER The Cityof Aspen TRACT HOPKINS ROAN CONDO WU-f I U-LaJO ryan(NLnunaemowlarCnlleCLS.Cb111 FIRE p LOT BLOCK ;ram... RYAN OOREMUa OWNER NAME RMJ HOPKINS LLC CELL EMAIL Name Phone E-mail RMU HOPKINS LLC Nam¢ KMJ I'1VYr.IIV LL(, Phone Cell Phone These plans must be kept at the BESTcoNTACT RYAN DOREMUS CELL 970-710-2938 EMAIL rvan@thunderbowlarchitects.mm ADDRESS.. NAME p��fe"ss2200 BUTTS RD.#220 City BOCA RATON state FL ap33431 728 E HOPKINS - SPRINKLERS building site or inspection PROJECT DETAILS(READ DEFINITIONS BELOW)TMrsscrnoN ed.4 delays mayoccur.Construction COMPLETED IN ITS ENTIRETY E-mail Y DESCRIagigF Aeeress PARCEL ID 273707361001. ./�■ WORK IN DETAII updates to exterior deck,replacement of some existing exterior doors and windows,removing and replacing upper eve REQUIRES shall conform to these plans.All fireplace Name Phone Cell Phone changes shall be approved by pROJER aeilinF the building official. vAluanoN so,000 Use of Building Class of Work Fixture Counts Important Review Triggers across city state ZIP 0 Commerical 1❑New -Toilets,Bidets Major Engineering Review gFr oP M Multi-Family ❑Addition _Bathtub •Projects involving less than 50% E-mailud,ecc REFERENCES FROM 2015 IRC aiSEA 227.19 0 Single Family ❑Alteration _Lavatory(Wash Basin) herdscape area and work affecting CV/A=crawl space ventilation required,sec.R408.1 Access required,R408.4 0 Mixed-UseShower 75%or greater of unit sqn RYAN°OREM. WU-f1U-La,SO ❑Repair -Kitchen Sink(*Disposal)•pro t t than Name phone cell Phone_ EE=emergency escape required sec R310.1 SEPARATE PERMITS ARE erensq Fr 3'690 0 ❑IFFR - projects cape area and w - EU=enclosed usablespace under stairs shall be%"G REQUIRED FOR ELECTRICAL, Dishwasher so%ting 50%or and of rig 300 S.SPRING ST ASPEN CO 81611P Gyp,sec R302.7 slZE Dja ❑Tenant Finish -Laundry ear,Utility Sink affecting 50%orgreater of unit ^�dre:s city state zIP G/D=garage/dwelling separation,sec R302.5 and R302.6 sq Fft Will there be ❑Demolition clothes warner PLUMBING,MECHANICAL,OR sq ft -ail ryas@thunderbowlarchjtects.com STC=Sound transmission class not less than 45 at dwelling separations,app any roof/wall El Change Order-Floor sink •projects involving 1,000+sgft of naaress FIRE SPRINKLER WORK DISTURBANCE 0 penetrations? 0 -Floor Drain soil disturbance area K Water Heater(Pan Req) RV=roof and rafter ventilation required,above, CI Yes - N THUNDERBOWL ARCHITECTS-Mann.smith efU-f ILL-Lana NEW SOFT 6 •No -a Gas outlets Water Efficient Landscaping ame Phone Cell phone A=attic access 22"x 30",30"headroom above,R807.1 waterrreatment •projects thattriggera major sailing 300 S.SPRING ST ASPEN CO 81611 SA=smoke alarms installed to NFPA 72 requirements,sec R314 BUILDING WA ' Other engineering review dtlress City State ZIP oorvaiNT NOTICE:This pe,mhbecomem�lland void if work - •projects involving interior CO=carbon monoxide detector per City Ordinance 41 series 2008 or authorized isnot commenced within alterations affecting 50%or more E-mail ryan@thunderbowlarchitects.com SG=safe glazing re uired,sec R308.4 SMOKE ALARMS AND HARDSCAPE 0 180 days,or if construction or work is suspended or gAddress safety g q AREA abandoned for a period of 100 days at any time after ofexisiting gross square footage GR=guardrails,36"min ht,4"max opening;req at 30"drop any point w/in 36" CARBON MONOXIDE ONE Mu we*'scommenced. horizontally,sec R312 DETECTORS REQUIRED ZONE Name Phone cell phone WFP=window fall protection-operable window<24"AFF&>72"above aee'es city state ZIP grade:use opening control device listed to ASTM F2090,sec R312.2 THROUGHOUT DWELLING Project valuation:Cost of project as defined in Valuation Affidavit. HR=handrails 34"-38"ht,sec R311.7.8 UNIT PER CITY OF ASPEN tin E-mail MUNICIPAL CODE 8.15 Sq Ft of Building Work Areal Total square footage of interior area undergoing change or reconfiguration. address SI=stairway ainstillumination,d y.sec R303.7 O Unit Sq Ft:Gross square footage,not FAR,of permitted unit. PD=protect against decay,sec R317 EH Lot Site:Total surveyed square footage of property. APPROVALS meal Kola,Engineers IncErnest Rolla, a1U-00-JLLJ Sq Ft of Soil Disturbance:Exterior area of the lot where the ground is disturbed Reviewing Needs Reviewer Data Name E En nee Phene Cell Phone REFERENCES FROM 2015 IMC New Sq Ft:Total added square footage for additions to net livable or net leasable space. Department Review_Son-Off Approved Mailing V=bathroom and balanced whole house mechanical ventilation req. 320 Main Street,Suite 203 Carbondale co 81623 SPECIAL INSPECTION REQUIRED: GLL Building Footprint:Grade floor square footage of the permitted structure. PC x LL 7/31/2019 addre:: City state 21p Ordinance 40,2016 Hardscape Area:Square footage of impervious lot surface. Zoning x ,Ra 1a14,2o19 ail ernieko of mai.COm DE=clothes dryer exhaust,sec 504.Makeup air req'd,req'd if over 200 CFM Zone District:Underlying zone district of permitted parcel. B address @9 -Structural steel welding:Field&Shop HPC AS=access and service space for maintenance sec 306 MA=make up air required if hood exhausts greater than 400 CFM,sec 505.2 -High strength bolting Building x TF lono12019 Name RuoocorsTRucnoN Phone of u-au-ally con phone a/Ub lb'Ll/U SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES ET=exhausts terminate 3'from prop line and openings,10'from intakes, -Epoxy anchors Fire Mailing 132 PARK AVE BASALT CO 81621 501.3.1 aeerass city state ZIP -Intumescent paint Building Building Engineering IT=intake openings 10'from lot line&contaminant sources(vents,streets), 25.00 Parks Impact Spray applied fire resistive materials Review Permit Fee CMP E-mail scott@ruddconstruction.com 401.4 Engineering Zoning School Lands Log. Water D=fasten and seal all ductwork per 603.9 "Permanent micropiles Review Review(5o%) Dedication REFERENCES FROM 20151FGC Stormwater INSPECTIONS:The General Contractor must schedule Inspections online. Zoning CMP(50%) DV=direct vent req'd,sec 303.3 Special inspection is required per 2015 IBC TDM Impact Sanitation Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so. P P 4 P Review(50%) I hereby certify that I have read and examined this application know the same to be true and correct.Allof laws and CA=combustion air not taken from bedrooms,bathrooms or section 1704.Inspector to verify that copyof Env.Health y ce y andprovisions p y Energy Code REMP Pedestrian 3 ordinances this f work will be complied with whether specified herein or not.The tin f apermit does not storage sec appliances governing type o p peci granting o 303agreement for inspection program to be on Review payment Amenity Parks presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance OD=outdoor appliances must be listed for outdoor use,sec 303.6 9 P P g CMP(50%) GIs Housing Cash in Lieu Landscape u ion REFERENCES FROM 2015 IECC the job site prior to performing any of construction.It is my responsibility to review the approved plans and any comments that are contained thereon and see that the City Use Efficiency F=new or replacement glazing shall not exceed 0.28 U-Value,NFRC label inspections.A copy of all Special Inspector Parks Review Tax Water rap structure and/or project is built in compliance with allapplicable codes. Approved comnnor s1 y o,yaa required,Ordinance permanently field reports to be on the'ob site for County use a vArtg Scott Duryea Dare.2ms.2 by Scot arum Date 07/10/19 L=75%of lampsinstalled lights must be high efficacy, Pj Utility Review y Sanitation To Issue R .� RECEIVE -- E J P 9 9 Y MillinIlure to Tax 0 Check if you area tested owner builder(single-family homes only).You must take a test and complete the owne JIt R404.1 Issuancepection. U//i1/L v (CITY USE ONLY)Owner builder approved by: Date: Affidavit on le SE=Continuous air barrier requited;all exterior joints,cracks,and holes to be CITY OF ASPEN,....„,2D1n 130 S.GALENA ST I ASPEN,CO 81611� (CITY OF ASPENAPgP 2D1T n���T/"'T� caulked,gasketed,sealed,table R402.4.1.1 ..e'1aM 130 S.GALENA ST I ASPEN,CO 81611 REFERENCES FROM 2014 NEC BUILDING DEPARTMENT A ••�Q' EP=electric panel'happy space'30"x36"x78",not in storage,sec 110.26 Structural steel,epoxy-set anchors:SO.1,S.6.1 BUILDING DEPARTMENT F PERMIT NUMBER:0186.2019.ARBK Sketch Sketch N.-Item No.: 01-01 • External Energy Use Approved COMMUNITY DEVELOPMENT DEPARTMENT �� Sketch Name:1-HR Rated Roof Assembly ASI Reference: ASI 1 A4kd/ ElRREMP IDCREMP Project Nome: 728 E.HOPKINS AVE. sketch NOT FOR DDNarruvnoN•wia•z A61 BUILDING DESCRIPTION FORM-IRC&IBC CITYOFASPEN Project Number: 18011.00 Date:10/04/2019 + • PERMIT#: 0186.2019.arbk DATE: 10/10/2019 BUILDING CODE INFORMATION GAE002012FIRE RESISTANCE DESIGN MANUAL 19t ` p.2015 IRC I]2015 IBC 02015 IEBC 0 Other(Please Explain) ' SNOWMELT: 0 ROOF-CEILING SYSTEMS Code Editions (As Adopted and Amended) (As Adopted and Amended) (As Adopted POOL: 0 GA FILE NO.RC 2602 J I GENERIC I 1 HOUR and Amended) 0 FIRE SPA: ARD Bas•layer w type x,�m ww$oaa GYPSUM o wood roof trusses 24' Fire Sprinkler System I Existing?END I Required?iNo I Type 0 NFPA 13 0 NFPA 13 R 0 NFPA 13D o.c.wnth VW TypeREMP SHEET: NA wallboard or gypsum veneer base applied at nahl angles to irusses with I,'Type W Of ,S drywall screws 12.o c at joints a.iniermechate irusses and 1,"Type G drywall Type Of Construction-1 VA❑VS IV 0 IIIA ❑IIIB 0 IIA❑IIB 0 IA❑IB IFire Alarms Installed 0 Yes❑No MINIMUM BOILER AFUE• NA screws 1.2.o c placed 2'back on olher side of end points Joints offsel 2,1"from layer joints Wood trusses supponing,il.wood struclural panels appled al to trusses with 8d nails Appropnale roof covering P provides•n•Sour n"a Required Special Inspections®High-Strength Bolting ®Epoxy Anchors ElStructual Steel Welding OFFSET: NA ^•'•"nLe protection t°"'"ss•°. 0 Permanent Micropiles 0 Sprayed Fire-Resistants 0 Other -_ -1 Energy Code Compliance $]Prescriptive Table 0 Other REVIEWED BY: TF 0 RESCheck UA Alternative ❑COMCheck UA Alternative SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REDS. Ceiling All snowmelt systems shall meet the following: E�pe Tea fN FD t72,2-2s72: Exterior Energy Use Total Approved On-Site Snowmelt Spa 64 existing Pool -Any portions in the Right of Way must be on a separate zone.AROW it�'T � (Existing+New) permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 Building Type/ 1 I ❑A-❑B 0 F_ 0 E "]R_ I ❑One Family 0 Two Family insulation shall be Installed under and at the slab edges.(Ordinance 11 Occupancy Group g 0 B(A<50) 0 H ❑M El 5_ R series 2011) C - - e 0 Townhouse -Automatic controls installed for system shut off when pavement ❑I- ❑U temperature is above 50°F and no precipitation is falling.(2009 IECC Sec.403.8 8 503.2 4.5) UNIT DESCRIPTION AS PROPOSED -Automatic or manual controls installed for system shut off when outdoor 9]]4 sq.ft. 419]sq.it.___ temperature is above 40°F.Ste%ilECG Sec.403.8 8 503.2.4.5) Gross Area of Building: Gross Area of Unit: ADU BUILDING DESCRIPTION -Inspection by testing hydrostatically at VA times max system design Occupant Load:N/A pressure,but not less than 100psi,for 15minutes.(2009 IMC sec. IS there an ADU? ❑Yes •No #Stories Above Grade 2 #Stories Below Grade 1 #Living Rooms Attached Garage Detached Garage Carport #Kitchens Dwelling Separation Required-2015 IBC Parking Spaces. Parking Spaces Parking Spaces #Full Baths -708 Fire Partitions,711 Horizontal Assemblies: #Bedrooms 5 #Full Baths 4 Deck Area a27.198e^ #3/4 Baths Walls and floor/ceilings separating dwelling units shall have a fire-resistance #1/2 Baths rating of at least 1 hour.Walls shall extend from the top of the floor assembly #3/4 Baths #1/2 Baths, #Bedrooms below to the underside of the floor or roof slab or deck above or to the #Kitchens 1 #Wood Fireplaces fire-resistance-rated floor/ceiling assembly above. 2 #Other Rooms(List) -714:Penetrations must be protected by a through-penetration firestop #Gas Appliances #Gas Logs system.Recessed fixtures shall not reduce the required fire resistance by use BUILDING ROOMS AND USES BY LEVEL AS PROPOSED(Include Mechanical&Storage) of a listed fixture,a listed firehood,or a drywall assembly meeting the required fire resistance.Exhaust fans require ceiling radiation damper. Basement MEDIA ROOM,LAUNDRY,MECHANICAL,BUNK ROOM,BATHROOM 2,STORAGE,BEDROOM 2,CLOSET 2,HALLWAY,BEDROOM CLOSET 1,BATHROOM 1 -1207 Sound Transmission:Separating walls and floor/ceilings shall have an STC rating of at least 50.Floor/ceilings shall have an IIC rating of at least 50. Main Level GARAGE MORO M.GUEST MASTER GUEST BATH.GUEST CLOSET.HALLWAY.ENTRY CLOSET,ENTRv,MAmcncccnevc.MASTER CLOSET,MASTHEnAeTHROOM Maintain existing 1-hr FR dwelling separation 100E CO40 2nd Floor POWDER ROOM,KITCHEN,LIVING ROOM,DINING ROOM,DECK ti? O O i 44 3rd Floor 0 RECEIVED Additional REC Scale:NOT TO SCALE Drawing Sheet/ Spec .I 300 S.SPRING ST.SUITE 201 Section: RECEIVED ASPEN,CO 81611 10/14/2019 (��''11 IIF�r��i�'�Fp�( (970)710-2938 Reviewed By: Date:07i10t19 nvoi/on O �" - "" O ASPEN I CITY OF ASPENIanuar,2018 130 S. GALENA ST I ASPEN,CO 81611TI Ltd BUILDING DEPARTMENT • ASPEN 1141147/la 9 BUILDING DEPARTMENT ZONING 5. Provide Final Inspection Report.The special ins pee for shall submit a written final Field Plan Set Must B e Printed I n Color s pee report documenting required specral inspections and correction of any discrepancies rwr C'"" ir noted in the inspections poor to the final building inspection .; SPECIAL INSPECTION AND TESTING AGREEMENT B.Owner Responsibilities.The project owner,the engineer or architect or record,or an agent of the _ To permit applicants of project requiring special inspection anchor testing per Section 1704 of the owner is responsible for employing special-inspection services.The special mspecmr\agency shall Intemational Building Code(MC). not be in the employ of the contractor,subcontractor or material supplier.[MC Sec 1704.1]In case of an owner\contractor,the special inspeetor\agency shall be employed as specified by the / Project Address: 728 EAST HOPKINS Permit Number: 0186.2019.ARBK building official. BEFORE A PERMIT CAN BE ISSUED:The owner,or the engineer or architect of record,acting as the C.Engineer or Architect of Record Responsibilities The City of Aspen owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing 1. Prepare1 inspection The engineer or architect of record shall list the Schedule,including the required acknowledgments.A pre-construction conference with the parties specie pee program. g" involved may be required to review the special-inspection requirements and procedures. items for which special inspection is required;and shall indicate any items for which the These plans must be kept at the IBC or the building official approves periodic inspection and the frequency of such building site or inspection APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the inspections. delays may occur.Construction projects for which they provide special inspections.Special inspectors shall be approved by the building department to performing duties.Special inspectors shall submit theirqualifications and are 2. Respond to field discrepancies.The engineer or architect of record shall respond to shall conform to these plans.All ep prior P g any pecia P subject to personal interviews for pre-qualification.Special inspectors shall display approved uncorrected field discrepancies in design,material,or workmanship observed by the changes shall be approved by identification,as stipulated by the building official,when performing the function of special inspector. special inspector. the building official. Special inspection and testing shall meet the minimum requirements of the International Building Code 3. Review shop drawings and submit design changes.The engineer or architect of record Section 1704.The following conditions are also applicable: shall acknowledge and review for conformance with the construction drawings those shop drawings that may detail structural information,shall submit to the building official A.Duties and Responsibilities of the Special Inspector and to the special-inspection agency written documentation of any verbally authorized SEPARATE PERMITS ARE deviations from the approved construction documents,and shall submit revised 1. Signify presence at job site.Special inspectors should notify contractor personnel of documents for building official approval as required. REQUIRED FOR ELECTRICAL, their presence and responsibilities at the job site.I£required by the building official,they PLUMBING,MECHANICAL,OR shall sign in on the appropriate form posted with the building permit. D.Contractor ResponsibilitiesFIRE SPRINKLER WORK 2. Observe assigned work The special inspector shall observe assigned work for 1. Notify the special inspector.The contractor is responsible for notifying the special conformance with the building department approved(stamped)design drawings, inspector or agency regarding individual inspections for items listed on the attached specifications,and applicable workmanship provisions of the International Building schedule and as noted on the building department approved plans.Adequate notice shall Code.Architect\engineer-reviewed shop drawings may be used only as an aid to be provided so the special inspector has time to become familiar with the project. inspection. 2. Provide access to approved plans.The contractor is responsible for providing the For continuous special-inspection,the special inspector shall be on site at all times special inspector access to approved plans. observing the work requiring special inspection.Periodic inspections,if any,must have prior approval based on a separate written plan reviewed and approved by the building 3. Retain special inspection records.Upon request,the contractor is also responsible for department and the engineer or architect of record. retaining,at the job site,all special inspection records completed by the special inspector. 3. Report nonconforming items.The special inspector shall bring nonconforming items to E.Inspection of Fabricators the immediate attention of the contractor and note all such items in the daily report.If any item is not resolved in a timely manner or is about to be incorporated in the work,the 1. Fabrication of structural assemblies and members.Where fabrication of structural special inspector shall immediately notify the building department by telephone or in bad-bearing members and assemblies is being performed on the premises of a person,notify the engineer or architect,and post a discrepancy notice. fabricator's shop,IBC Section 1704.2 shall require special inspection of the fabricated items. 4. Provide timely reports.The special inspector shall complete written inspection reports for each inspection visit and provide the reports on a timely basis determined by the 2. Fabrication and implementation procedures.The special inspector shall verify that building official.The special inspector or inspection agency shall furnish these reports the fabricator maintains detailed fabrication and quality control procedures that provide a directly to the building official,engineer or architect of record,and others as designated. basis for inspection control of the workmanship and the fabricator's ability to conform to [IBC Sec.1704.1.2]These reports should be organized on a daily format and maybe approved construction documents and reference standards.The special inspector shall submitted weekly at the option of the building official.These reports should include: review the procedures for completeness and adequacy relative to code requirements for a.Description of daily inspections and tests made with applicable locations, fabricator's scope of work. b.Listing of nonconforming items, F.Approved Fabricator Responsibilities c.Report on how nonconforming items were resolved or unresolved as applicable, 1. Fabrication exempt inspections.Special inspections are not required where work is d.Itemized changes authorized by the architect,engineer,and building official if done on the premise of a fabricator registered and approved to perform such work not included in nonconforming items. without special inspection. 1 2 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written procedural and quality control manuals and periodic auditing of fabrication practices by an approved special inspection agency. 2. Approval of fabrcator.Approval shall be baud upon review of the fabricator's wine 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written procedural and quality control manuals and periodic auditing of fabrication practices by procedural and quality control manuals and periodic auditing of fabrication practices by 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator an approved special inspection agency. an approved special inspection agency. shall submit certificate of compliance to the building official stating that the work was of fabrication. performed in accordance with the approved construction3. construction documents. 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator CompletionUpon completion of fabrication,the approved fabricator shall submit certificate of compliance to building official stating that the work was shall submit certificate of compliance to the building official stating that the work was G. Building Department Responsibilities performed in accordance with the approved construction documents. performed in accordance with the approved construction documents. 1. Approve special-inspection program.The building department shall approve all G.Building Department Responsibilities G. Building Department Responsibilities special inspectors and special-inspection requirements. I. Approve special-inspection program.The building department shall approve all I. Approve special-inspection program.The building department shall approve all 2. Enforce special inspection.Works ecial special inspectors and special inspection requirements. requiring P inspection and the building special inspectors and special-inspection requirements. inspector shall monitor the performance of special inspectors.Hisilier approval,in 2. Enforce special inspection.Work requiring special inspection and the building addition to that of the special inspector,mat be obtained prior to placement of concrete, covering of structural steel,or other similar materials. inspector shall monitor the performance of special inspectors. 5a pier approval,in 2. Enforce to special inspection.Work ncuofs special inspection and the building addition to that of the special inspector,must be obtained prior to placement of concrete, inspector shall monitor the performance of special inspectors.His\Her approval,in eying of structural steel,or other similar materials. addition to that of the special inspector,must be obtained prior to placement of concrete, 3. Review inspecNoo reports.The building official should review special-inspection cos covering of structural steel,or other similar materials. progress and final reports. 3. Review inspection reports.The building official should review special-inspection progress and final reports. 3. Review inspection reports.The building official should review special-inspection 4. Perform final inspection.The building official should perform the final inspection and progress and final reports. approval fora project[IBC Sec.109.3.1]after the final special-inspection report has been 4. Perform final inspection.The building official should perform the final inspection and reviewed and approved. approval for a project[IBC Sec.ID9.3.1)after the final special-inspection report has been 4. Perform final inspection.The building official should perform the final inspection and reviewed and approved. approval fora t IBC Sec.109.3.1 after the final s project[ ] special-inspection report has been reviewed and approved. Protect Address:728 E.Hopkins Ave. Permit Number:0186.2019ARBK 728 E.Hopkins Ave. 0186.2019.ARBK Project Address: Number: Project Address:728 E.Hopkins Ave. Permit Number:0186.2019.ARBK ACKNOWLEDGMENTS ACKNOWLEDGMENTS I have read and agree to comply with the conditions of this agreement. ACKNOWLEDGMENTS have read and a to comply with the conditions of this agreement. Special Inspection Agency: Signs Printed Name: ial[ Date: S Ag igoatine: �tad Na Date: � hare 1 he read and agree to comply with the conditions of this agreement. /�. /'//�'//0/��/ /a �•/ n) Special Inspection Agency: Signature: Printed Name: Date: Owner- Signature. Printed Name / Date Owner: Signature: rime Name Dat RM3 Hopkins LLC /7 0 Cole Rubin 9/18/2019 Owner: Signature: Printed Name Date g LOIN RM)Hopkins LLC Cole Rubin 9/18/2019 Ea ineer/Architect: Signature: Printed Name: Date: Engineer/Architect: Signature: Printed Name: Date: Ernest Kollar Engineers,Inc. Ernest Keifer Ernest Kollar 9/18/2019 Engineer/Architect: Signature: Printed Name: Date: Contractor: Signature: Printed Name: Date: Contractor. Signature: Printed Name: Date: Ernest Kollar Engineers.Inc. finest Kollar Emest Kollar 9/18/2019 Rudd Construction Je Tim Thompson 09/19/2019 Contractor. Signature: Printed Name: Date: Approved Fabricator: Signature: Printed Name: Date: Approved Fabricator: Signature: Printed Name: Date: Rudd Construction M Tim Thompson 09/19/2019 Fubii -- Si ature: Printed Name: Date: Inspected Fabricator. Signature: Printed Name: Dose: RECEIVEDlospeMed Fabricator Signature: Printed Name: Date: 'rill bvladr tJtad '2� (�- 4) LIP 4�fle to g 19 /1 Inspected Fabricator: Signature: Printed Name: Date: 10/29/2019 (circleoKIN� Y Signature: Printed Name: Date: RECEIVED (circle one) Signature: Printed Name: Date: CITY OF ASPEN CITY OF ASPEN ASPEN PITKIN COUNTY: BUILDING DEPARTMENT (circle one) Signature: Printed Name: Date: NOTE-PER DISCUSSION WITH BD-NARRATIVE-THUNDER MOUNTAIN WILL INSPECT 3 10/29/2019 CITY OF ASPEN PITKIN COUNTY: DAM DENTS MURRAY 1029/RECEIVED TIMBERWOLF WELDING AS THEY ARE NOT AN APPROVED FABRICATOR. THEN BECKY G.WILL INSPECT FIELD WELDS-TIM THOMPSON,RUDD ASPEN BUILDING DEPARTMENT 3 10/2 9/2 019 ASPEN BUILDING DEPARTMENT iTjTETNIoMAT FF109-350 T Field Plan Set Must Be Printed In Color 1 Hour Fire Rated Light Cover 1.1 T E N MAT Technical Product Specifications Report prepared for:Spec Direct FreeUser)nn11/6/2D157:45:59AM DIRECT Technical Product Specification MODEL FF109 350 Model Inside Inside Number Height Diameter - -' FF109-350 103/8" 15" 1111111 The City of Aspen f q Performance Data • These plans must be kept at the 17 For Use: LISTING INFORMATION OF Tenmat Firefly 109 Recessed Light Cover building site or inspection g i • Warnock Hersey-Intertek certified to maintain the fire delays may occur.Construction • NNE NE % 15• rating(1 hour)of fre-rated floor/ceiling assemblies. SPEC ID:29353 shall conform to these plans.All ,r' changes shall be approved by e II 5/, the building official. 1 The FF109-350 is the larger version of Model *Inside Outside Number Height Diameter the FF109-300 and suitable for lights up C US Tenmat,Incorporated to 8". SEPARATE PERMITS ARE FF109-350 10 3/8^ 17" 23 Copper Drive,Unit#3 Intertek REQUIRED FOR ELECTRICAL, Performance Data ' Both covers are made out of the same 11, Je a Newport,DE 19804 PLUMBING,MECHANICAL,OR intumescent material and exhibit 6FP6 751 FIRE SPRINKLER WORK AO52r For Use: excellent thermal and acoustical FF109-350 DOME • Warnock Hersey-Intertek certified to maintain the fire General Information rating(1 hour)of fire-rated floor/ceiling assemblies. insulating properties. The FF109-350 has an inside height of Benefits: 10 3/8"and a diameter of 15"to fit the �� 5/8' •• 60 minute protection. •most common recessed light housings. Fits most popular recessed light fixtures. CGus • Can be used in L500 floor/ceiling assemblies. Intertek • Lightweight(approx.2.5 Ibs). s • Easy Installation-can be fitted in seconds-no screws, ASI drilling or additional sealant required. Flexible material enables the cover to be fitted around This report is for the exclusive use of Intertek's Client and is provided pursuant to the agreement between Intertek and its Client. F General Information ill ^ • Intertek's responsibility and liability are limited to the terms and conditions of the agreement.Intertek assumes no liability to any party, (I/ obstacles or retro-fitted. other than to the Client in accordance with the agreement,for any loss,expense or damage occasioned by the use of this report.Only Benefits: Ventilation Holes • Enhances the acoustic protection of the ceiling. the Client is authorized to permit copying or distribution of this report and then only in its entirety.My use of the Intertek name or one of its marks for the sale or advertisement of the tested material,product or service must first be approved in writing by Intertek.The • 60 minute protection. __ • Reduces heat loss through the fixture. observations and test results in this report are relevant only to the sample tasted.This report by itself does not imply that the material, • Fits most popular recessed light fixtures. `` (� A • Significant energy cost savings. product, it service is or has ever been under an Intertek certification program. • For use with recessed Incandescent,fluorescent or LED L _ _ • Maintenance free. light fixtures. -. tr♦ • Can be used in L500 Floor/ceiling assembles. �� �, Manufactured By • Lightweight(approx.2.5 Ibs). 'I Tenmat Inc • Easy Installation-can be fitted in seconds-no screws, LPL RECEIVED 23 Copper Drive EIVE®drilling or additional sealant required. t , Report prepared for:S Direct Free User)on 11/6/2015 7:45:59 AM Newport,DE 19804 p prepm Spec ( S,OeCDIRECT ,o.ot,_ • Flexible material enables the cover to be fitted around obstacles orretro-fitted. 1� �r r....; Phone:(302)633-6600 10/21/2019 10/21/2019 • Enhances the acoustic protection of the ceiling. Fax:(302)633-6838 ASPEN ASPEN TEN/FCA 60-01/OPL LC 101 • Maintenance free. Email:info@tenmatusa.com BUILDING DEPARTMENT ii www.tenmatusa.com BUILDING DEPARTMENT TENMAT Inc. 23 Copper Drive Newport,DE 19804 T:302-633-6600 F:302-633-6838 E.Info@tenmaluse.com Tenmat,Incorporated 129353 1 Rev:Mar 29 2013 6:04PM I Uncontrolled Copy Page 1 of 5 Luminary Covers Design No.LC 101 Report prepared for Spec Direct(Free User)on 11/6/2015 7:45:59 AM SpeCDIRECT rawrreo er I® LUMINARY COVERS Report prepared for:Spec Direct(Free User)on 11/6/2015 7:45:59 AM SpecDIRECT rowreoa sr F-Hating-1 hr Report prepared for Spec Direct(Free User)on 11/6/2015 7:45:59 AM SPeCDIRECT rrerara sr 1!11® DRAWING INDEX © m The Firefly 109 is a shell constructed of a mineral fiber-matrix which has an intumescent property.The product is designed to protect ceiling openings that are made to accommodate recessed lighting fixtures in rated floor- TEN/FCA 60-01/OPL LC 101 DRAWING INDEX 0 — ceiling construction.The product is placed over the light fixture on the top side of the ceiling,and rests on the ceiling mambrane.The product is available in two sizes and is constructed with vent slots that can be used to accommodate power source cable. TEN/FCA 60-01/OPL LC 101 •110,.,_____,-- Attribute Value Criteria ASTM E119(2012) CSI Code 07 20 00 Thermal Protection Intertek Services Certification I. FLOOR CEILING ASSEMBLY: embeddcl in first layer of compound Listed or Inspected LISTED Constructed in the manner as specified over join%in gypsum wallboard. below: 2. FIXTURE PROTECTION COVER: Listing Section OTHER PRODUCTS A.Plywood subflooc Min.5/8 M.thick Constructed of a proprietary high- Report Number16683-1,16683-115827 SYPls,,o'rface'ainofplyw dimension temperature fiber matrix and having an pane grain o plywood, Spec ID 29353 perpendicular el to roars JIB)withjoints recognized abethin e diameter i aof 14 The smaller staggered,Plywood lop cover side of joist assembly with min.No.6, an overall haght of 9 in.The larger cover 1-7/8 in.long bugle-head drywall has a base di meter of 17 In.and overall screws,spaced max.16 in.OC.along height of I I-/4 M.Covers are centele red over joists. openings up b 8 in.in diameter that are cut B. Lumber Joists:Parallel eom.2 X 10,or into the gypatm ceiling for the purpose of ,n% deeper,lumber joists spaced a min.le installing a rt cased fixture.The cover may in.pc.and a max.of 24 in Of. be slit to fit over obstructions in order to allow the co See to fit flush to the gypsum C. Gypsum Wallboard:Nom.5/8 in.Type wallboard.tt hen this occurs,caution is to X gypsum wallboard is seemed to the be used to no damage the cover.The covers underside of the lumber joists JIB)with may be installed in the floor with the n.No.6,1,8 in.long bugle-head following provisions: drywall screws,spaced max.6 in.OC. . Max.1 mening within Ib sq.R.race. along perimeter and on joists in we •field.Apply vinyl o n,dry or Min.o.e.flxtme spacing of 40 in. premixed joint compound to face layers within same truss c• `.dty. of gypsum wallboard in two coals to all Min.caner-oxen er fixture spacing of exposed fastener heads and gypsum 40 in.for adjacent truss cavities. wallboard joints.A min.2 in wide RECEIVED paper,plastic,or fiberglass tape Is 30/21/2019 Revised March 5,2004 COmega Paint LaWramries,lnc. BU LDING DEPARTMENT Tenmat,Incorporated 129353 I Rev:Mar 29 2013 6:04PM I Uncontrolled Copy Page 4 of 5 RECEIVED 10/21/2019 ASPEN RECEIVED BUILDING DEPARTMENT 10/21/2019 RECEIVED ASPEN 10/21/2019 BUILDING DEPARTMENT Tenmat,Incorporated 129353 1 Rev:Mar 29 2013 6:04PM I Uncontrolled Copy Page 3 of 5 ASPEN Tenmat,Incorporated 129353 I Rev:Mar 29 2013 6:04PM I Uncontrolled Copy Page 2 of 5 BUILDING DEPARTMENT Tenmat,Incorporated 129353 1 Rev:Mar 29 2013 6:04PM I Uncontrolled CoPy Page 3 of 5 FlexDamperTM FlexDam er PC-RD05C5 Field Plan Set Must Be Printed In Color PC-RD05C5 TM 0 p Specification Submittal Data 0 Specification Submittal Data Panasonic Radiation Damper Damper for Combustible Assemblies Panasonic Radiation Dam for Non-Combustible Assemblies The City of Aspen Description: UL listed assembly"+nth Panasonic Radiation damper shall be assembled with ENERGY STAR.models: 400014 Daurtptlon: UL listed assembly with Panasonic select ENERGY STAR.rated ventilation fans WhrsparGman®Select'":FV OSt1VK2 � 1 Radat on tlamper shall be assembled with ENERGY STAR•mole.: These plans must be Kept at the faM'ghts and fans with motoNcondensahon FV0511VKL2FV0511VKS2 FV0.611VKSL2, \ f r select ENERGY STAR*rated ventilation fans, Wh.perGreee Sober:FV-0511VK2, TNi sensors Damper shall beUL and cULlisted FV-1115VHS2 FV1115VKSL2,F/-a5-11W1. 3... \J 3-1/4- faMghtsand fans wRh toN tl aton FV-0511VKL2F/0511VK52,FV-0511VKSL2, building site or inspection for wood truss assembles and meat UL 555C F/05-11VKL1 FV0511VK51 4, ' sensors Damper shall be UL and UL listed for FV-11t5VKS2 FV-1t15VKSL2,FV-05-11VK1. \ >' �� delays may occur-Construction for use in l hour Arerated floor/ceiling or roof/ /b T-arhanger rodhwreceiling installation and FV-05-11VKLt,FV-05-11VKS1, is / FV-OS-I IVKSLI FV 11 15VI(1 FV-11-15VKL1 Tb cell exceling ed National slired below.Damper Agency \ ceedUL555C for use 3h fire rated floor/ FV-05-IIVKSLI,FV-11-15V51,FV-11-15VKL1 ya shall conform to these plans.All shall exceetl Nat oriel Fire Protection Agency WlilaperCelllns•/WhlsperCelllrg•DC": B f roof/ceiling assemblies,Limper shall /�ceiling or mo WhisperCeihne/WhisperCedme DC": NFPA-soA. FV-05Vos wo11V0 w-11VOL, `� exceed FreProtectionAg NFRA- \/� changes shall be approved by FV-OBVQL6,FV-11VQ5,FV-11VQL5, `r" BOq, FV-OSVQS,FV-OBVQS,FV-OBVGLS,FV-08VQL6, Features: FV-11VQL6,FV-15VQ5,FV-15VQL5, FV-11V05,FV-11VQL5,F/-11VQL6,FV-15V05, the building official. •UL 555C listed for use in l hour fire-rated FV-15VQL6,FV-Ott tOO1,FV-1115VQ1, Peatunss: FV-15V0L5,FV-15VQL6,FV-0511VQ1, wood twos floor/ceiling and roof/ceiling FV-0511 VOLt,FV-1115V0L1 PC-RDO5C5 •UL 555C listed for use in a 1,2 or 3 hour fire FV-1 t 15V01,FV-0511 VQL1,FV-1115VQL1 \TI/ designs' WhlsperSense°AM.perSense Dt: rated 5oor/ceiling and roof/ceiling designs.' Wh.perSense'/YthisperSense°DC': •165 degree Fahrenheit fusible link. FV08V0C5,FV08VQCL5,FV-00V0CL6, •.5 degree Fahrenheit fusible link. FV-OBV0C5,FV-OBVQCL5,FV-O8VQCLO, PC-RDO5C5 SEPARATE PERMITS ARE •High-temperature,non-asbestos,reinforced F/-1fVQC5,FV-1fVQCL5,FV-11VOCL6, •Hgh-temperetnre,non-asbestos,reinforced FV-11VQC5,FV-t1v0CL5,FV-t1VQCL6.FV- REQUIRED FOR ELECTRICAL, fiber thermal fabric. FV-0511VQC1,FV-0511VQCL1 0511VQ01.FV-0511V0CL1 fiber thermal fabric. •Galvanized steel frame. PLUMBING,MECHANICAL,OR WlilsperFlN/WhlsperRN E2":F/-05VF2, •Galvanized steel frame. Wh.peiflN/Whl•PerFN°Et:F/-05VF2, •Damper sleeve allows for fan/motor access for FV-05VFL4,FV-05VFM2,FV-08-11cF5, „lows FV-050FL4,FV-050FM2,FV-08-11VF5, FIRE SPRINKLER WORK ongoing maintenance or framing/drywall/paint •Qamper sleeve nonce fir eming/or access fir FV-OB-I IVFLS,FV-OS-IIVFMS,FV-OBVF2, ongoing maintenance or framing/tlryvalVpaiM FV-OB-I IVFLS,FV-08-11VFMS,FV-OBVF2, installation staging. FV-08VFL4,FV-08VFM2,FV-11 VF2,FV-11 VFL4 installation staging. FV-OBVFL4,FV-OBVFM2,FV-11VF2,FV-11VFL4 O •Drywall support installation after drywall Whiepereaiee°/WhisperrMiee•DC, WhisperValue•AYhiaperValue•DC": to make tan/damper assembly meet UL FV-0510VS1,FV-0810VSS1,FV-0510VSC1, O FV-0510VS1,FV-0010VSS1,FV-0510VSC1, Combustible Assemblies. FV-0510VSL1,FV-0810VSSL1,FV-0510VSCL1, FV-0510VSL1,FV-0B10VSSL1,FV-0510VSCL1, FV-05VS1,FV-05VS3,FV-OBVS3,FV-08VSL3, FV-05VS1,F/-05V53,FV-OBVS3,F/-08VSL3, FV-10VS1,FV-10VS3,FV-10VSL3,FV-10VS3E, 1.z or a hour Non-combustible Assemblies. FV-10V51,FV-10VS3,FV-10VSL3,FV-10VS3E, �mrae for ,°I L'a°° W ootl FV-t005LOE Fv-totSLOE Truss Assembly 3/8 L502.o'ssLsre.L581,t5e3.L585.Nwa.e5sz 3/8" aPsu Oreosa,. I r 3-9/1 Y 3 1 ll 1 (IIt RI @ ww 3-9/16" 3-1/4., t IIII o. o _ / / i- Forcompletelnstallot:on instructions visit us.panasonle.com/ventrans ree,e0ansue.rm e.x.vmwss�asn�m».sire _ 11-7/3" Model Quantity Comments project: For complete Installation Instructions visit us.panasoniacom/veMfans Location: Model Quantity Comments Project: Architect: Location: Engineer: Architect: Contractor: Engineer: Submitted by: Contractor: Date: Submitted by: Date: RECEIVEDSee following page for Non-Combustible O Panaa•nl0E Assembly application. RECEIVED a Solutions N•e America Eco Products Divsion Riverfront Plaza 10/21�ZD19 0 Panasonic Eoo Solutions No America Too arc lion 10/21/2019 sae'Rug us.parnason�,wMveMians ASPEN Newark,NJ 07102 BUILDING DEPARTMENT Panasonic us u.:masonic:con venaane ASPEN V1errees_ecrpoece_pomasl BUILDING DEPARTMENT Panasonic DOWCO UEPESUaBLf PRODUCTS SINCE Ipee e„aaaa_Ppaoo s .tomes>i Static Curtain Fire Damper- MODEL 150A Features-U.L.Baled for 1-1/2 hour fire damper.for use u1 a 2 hour fire partition • Meets NFPA 90A&UL555 T T E N MAT V TEN MAT STANDARD CONSTRUCTIONIMINIIIPI FF109-350 Technical Product Specifications FRAME a 4.7l8'deep.22 gauge galvanized steel IQ STWI.S N UL FIRE PROTECTION SOLUTIONS 1 Hour Fire Rated Light Cover BLADES C �' 1 (U, 1 •tea •® Model Inside Inside 3.3le"wide.22 gauge galvanized steel ✓‘ �J ��• T Technical Product Specification MODEL FF109 300 Number Height Diameter UNDERSIZED IXeered size unless specified otherwise ltl 03225.07514Di FF109-300 7 3/8" 13" FUSIBLE LINK ' 165'Standard(others evailabtel 15- Performance Data SPRING 14.25' Stainless Steel-301 Negator type :7/8 For Use: Vertical-Optional Horizontal-Standard 13' • UL Classified to maintain the fire rating(1 hour)for the MINIMUM SUE following fire-rated floor/ceiling assemblies: x l 6 Horizontal) UL L500 series MAXIMUM SUM SINGLENGLE SECTION SIZE 11 • - - Vertical-60'w x liOT (11:11.0 Horizontal-MULTIPLE x SEC I\ r L MAXIMUM MULTIPLE SECTION SIZE \ • Vertical-120'w x 80'h(40'x 40'Single Section) Horizontal-97"w x 42-h(36-x 42'Single SectNxi) Model Inside Outside The FF109-350 is the larger version of Number Height Diameter the FF109-300 and suitable for lights up e" FOR FIRE RESISTANCE OPTIONAL CONSTRUCTION CLASSIFIED w to 8". FF109-350 103/8" 17" see UL FIRE RESISTANCE SPRING-Available in vertical mount \\`I' Both covers are made out of the same FF109-300 DOME FRAME-Available in Seamless Steel Performance Data General Information BLADE-Available in Stainless Steel intumescent material and exhibit FUSIBLE LINK-Electrically triggered link IETL) I For Use: excellent thermal and acoustical Benefits: SLEEVE&DUCT CONNECTION-10 ga to 20 ga galvanized 4 7/8" 60 minute protection. steel to 30'm length.-transitions available in,round,oval, • Warnock Hersey-Intertek certified to maintain the fire �� 5/8' • p rectangular.orcustom.Factory can install access door,retaining Rollformed Steel rating(1 hour)of fire-rated floor/ceiling assemblies. i insulating properties. • Fits most popular IC rated fixtures. angles flan Irons or security bars. I �1rge connec y ��1� Frame 22 ga. The FF109-350 has an inside height of •• Can be used in L500 floor/ceiling assemblies. 10 3/8"and a diameter of 15"to fit the •• Lightweight(approx.1.5 ins). �I1 Interlocking Steel Blades 22 ga C us most common recessed light housings. •• Easy Installation-can be fitted in seconds-no screws, drilling or additional sealant required. a Fexible Link Intertek • Flexible material enables cover to be fitted around 1 m (replaceable) re t a O • obstacles or retro-fitted. 1� L E standard 165' rirv005 } Enhances the acoustic protection of the ceiling. Blade Ventilation Holes LOB Stainless Steel • Reduces heat loss through the fixture. \O Ns,: Closure Spnng General Information y • Significant energy cost savings. l Benefits: ---_• `: ■ • Maintenance free. J- 518 • Fits most to popular Manufactured • Fits most popular recessed light fixtures. • ` By Horizontal Section Vertical Section • For use with recessed incandescent,fluorescent or LED - light fixtures. L. Li Tenmat Inc RECEIVED °^� unooi c•• Can be used in L500 floor/ceiling assemblies. - 23 Copper Drive • Lightweight(approx.2.5 lbs). Newport,DE 19804 � .FUR Phone:(302)633-6600 10/21/2019cT ��sasaaa • Easy Installation-can be fitted in seconds-no screws, - I�QW VQ drilling or additional sealant required. Fax:(302)633-6838 ASPEN ITEM Grr W DESCRIPTION DEPENDABLE PRODUCTS SINCE 1955 • Email:info@tenmatusa.com • Flexible material enables the cover to be fitted around I BUILDING DEPARTMENT obstacles en etro-fitted. hl www.tenmatusa.com SAFE-AIR/DOWCO • Enhances the acoustic protection of the ceiling. Engtne vi ng and Gcnera/llinoies • Maintenance free. I s55 South 54'"Avenue,Cicero,Illinois 60804 - ril Phone 708-652-9100 FAX 70Xfi52-9158 I III TENMAT Inc. 23 Copper Drive Newport,DE 19804 T:302-633-6600 F.302-633-6838 E:info@tenmatusa.com ,.,..,u_s,...aaL i AOA