Loading...
HomeMy WebLinkAboutFile Documents.728 E Hopkins Ave.0004-2020-BCHO 0004.2020-BCHO Customise Page I Notable View I Help(orlhis Page Field Plan Set Must Be Printed In Color •k.,. moor Feed Contacts Ll I Submissions;;] Milestones I Reviewsl3l InSDedional9] Fees OI I PaymeolsUI I BondsIDe o�s1S'CI Conditions l0l I Openacliub'es191 I A�Hula I Informational Notes'al Notes&Attachments lgl Pro ep dies;]]I Affordable Housing Credits[D Com aiits'01 I Related Penis l9] Work Items Nester PemlhlDl PermitHritoly J CITY OF ASPEN 3 PERMIT NO.0004-2020-BCHO The City of Aspen Permit Detail Edit Clop¢ Permit Form,1PrintApplication Letter ViewGISMap,Send Email Create Permit Fee Update BBprojectID l✓ OWNER RMJ HOPKINS LLC These plans must be kept at the building site or inspection Number D0042020 BCHO Record Type Change OrderiChangei ADDRESS 728 EAST HOPKINS delays may occur.Construction Address Owner Lauren U1Che1[Chang shall conform to these plans.All i changes shall be approved by Street Name E HOPKINS AVE Status PermVReview PARCEL ID273707361001 the building official. Original Number 20.0215 Reason for Cancel onCompl.Review Fail SEPARATE PERMITS ARE Type Change Order Aspen Internal? REQUIRED FOR ELECTRICAL, PLUMBING,MECHANICAL,OR Applicant RYAN DOREMUS Required Bond Amount FIRE SPRINKLER WORK Account THUNDERBOWI.ARCHITECTS Total Available Bond Amount Valid Business License on Account Bluebeam Project Id 495601198 External Energy Use Approved Project HPC.ZON EH-UTIL Review ❑ RREMP ❑ CREMP Land Use Planning Application Eng Review PERMIT DATE:_1/28/20_ Master BuildinPermit 0051.2019.ARBK Parks-Prim-San Review SNOWMELT:0004-2020-BCHO 0 SNOWMELT: 235.1 Imported Conditional Inspections aooL: SPA: Required Submissions Conditional Final Inap REMP SHEET: Documents Resubmitted MINIMUM BOILER AFUE: OFFSET: Conditional Flat Fee Formula REVIEWED BY: Condibonal Tiered Fee Formula MIR. SNOWMED4NTEM AND EQUIPMENT MANDATORY REQ'S. All snowmelt systems shall meet the following: Conditional Tiered SqFt Fee Formula -Any portions in the Right of Way must be on a separate one A ROW permit and Permanent Encroachment License am required. -R10 Insulation shall be Installed under the area to be snow melted or RS insulation shall be instated under and at the slab edges.(Ordinance 11 Series 2011) Action Items -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling.(2009 IECC Sec.403.8 8 503.2.4.5) Hold All Reviews Create Fees -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F.(2009 IECC Sec.403.8 8 503.2.4.5) -Inspection by testing hydrostatically at 1%times max system design Hold Reason Create Fees 2 J pressure,but not less than 100psi,for 15minutes.(20091MC Sec.8 Price Book 2020 Discoe nt All Fees(MI Fee Discount Reason SEE NOTES#1 PLANS v Related Charts FIRE Rolatailtritivn Related Inspections SPRINKLERS 16 Cbud The rapot tined noresults REQUIRED 1 FON 12 1 tNaooSMOKE ALARMS AND Up 6• CARBON MONOXIDE u S DETECTORS16- THROUGHOUT DWELL NG UNIT PER CITY OF ASPEN 6- MUNICIPAL CODE 8.15 lC a 3 0• oa3-m5o. Ptmla.Numk+ Queue Scoring Queue Designation Current Days in City Hands 0 Queue Score 0 Total Days in City Hands 0 Last Date Received from Applicant Total Days in Applicant's Hands V Dates New Application Date 1282020 CloseiCO Issuance Date Applicaton Complete Date 112812020 Last Activity Date Application Accepted Date 12812020 Expiration Date LjED p M 0 T[ 1 Issue Date Due Date o d11k2197/10Tho TCO Issuance Dale Override Expiration Date ZONING