Loading...
HomeMy WebLinkAboutFile Documents.837 W Smuggler St.0240.2018 (3).ARBK Field Plan Set Must Be Printed In Color t DATE: MASTER PERMIT: PERMIT NUMBER:0240.2018.ARBK ` '" COMMUNITY DEVELOPMENT DEPARTMENT _ illi ADDRESS:837 W SMUGGLER PERMIT NUMBER: a >:. BUILDING PERMIT APPLICATION Tar Cm'orAsrx COMMUNITY DEVELOPMENT DEPARTMENT * CITY OF ASPEN PROPERTY INFORMATION BUILDING PERMIT CONTACT SHEET 1„E GTv OE AEaw- PERMIT NO.e 0240.2018.ARBK ADDRESS 837 W Smuggler union PARCEL!.273512428001 • The City of Aspen son 1 BLOCK OR"susolvlsloN Ranger Station Subdivision rvame Martin Mate phone970.274-6011 E-mail matatlesign@mac.com OWNER GSS SMUGGLER LLC OWNER NAME GSS Properties LLC CELL EMAIL do Martin Mata Below - These plans must be kept at the Name Simon Bentley Phone970-309-9151 E-mwicdbsimon@eomcast.net BEST CONTACT Martin Mata CELL 970-274-6011 EMAIL matadesign@mac.com ADDRESS 837 W SMUGGLER ST building site or inspection NAME • Name GSS Properties Phone 970-309-9151 cell Phone 970-309-9151 - delays may occur.Construction PROJECT DETAILS • A"eaa:p•a.boX 66 c;tyCarbondale stare CO Zp81623 PARCEL ID 273512428001 shall conform to these plans.All ogscRlPTlory of ,"._�..__ warms.DETAIL New single family home ---._-- - changes shall e approve y addal::cdbsimon@comcast.net the building official. Paa'CT 2 137,500 Use of Building Class of Work Fixture Counts Equipment Checklist Name Martin Mata Pnone970-274-6011 __Cell Phone970-274-6011 vALURnox ❑ Commerical Toilets,Bidets arSipp Fr oP 6,623 s.f. ❑ Multi-Family ®New -Forced Air/Grevi(vsmems Ileg iiaFA ID Addition Bathtub Wall,Suspended,or Unit Heaters a8dreesP0 Box 189 aryCarbondale stare CO zIP81623 El Single Family ID Alteration Lavatory(Wash Basin) -Gas Log E-mailSEPARATE PERMITS ARE UNIT so FT NA ❑ Mixed-Use ❑Repair =Shower ,_-Gas Appliancew Address matatlesign@ma0.COm P 1KachenSink(+Disposal)- REQUIRED FOR ELECTRICAL, LOT SNE 0 ❑IFFR Dishwasher -Appliance vents (sore 6,623 s.f. ❑Tenant Finish -LaundrynaGU5litysink An g,Coormg,or PLUMBING,MECHANICAL,OR Will there be ❑Demolition Name Martin Mata @Info Above Phone cell Phone �aomeswasner Absorption FIRE SPRINKLER WORK DISTURBED s.f. TAU EIITERIOR AREA 6,623any roof/wall ❑Change Order Floorsink _▪ Air Handling(includes ddress City State ZIP penetrations? ❑ -FloorDmin Air Handling SPECIAL INSPECTION REQUIREI NEW sOF,4498 s.f. -Water Outlets Req)▪ Cooling systems E-mail ®Yes p Gas outlets Aaaress 55ppfror Rooms 17 No -WaterTreatment -ventilation Fans -Structural steel welding:Field& WRH UTILITY WORK 600 _Water Range Hood Name GRW Architecture LLC Phone970-618-4346 cell Phone 970-618-4346Shop R of Gas System Outlets EI oxstrength anchors bolting ZONE DISTRICT R6 -Snowmel(System Sq PR /dfe;4264 Carnwath Rd coy Tallahassee state FL ZP32303 -Epoxy y Project Valuation:Cost of project as defined in Valuation Affadavit. NOTICE:This permit becomes null and , pd iLsgrwarch@gmail-eom -Intumescent paint Z -Spray applied fire resistive materials Sq Ft of Work Area:Total square footage of area undergoing change or reconfiguration. void if work or construction authorized O is not commenced within 180 days,or H Units :Total uveyedsquare fotage ofprOpermitted unit if construction or work lssuspended or Name High Country Engineering phone970-945-8676 cell Pnone970-945-8676 -Permanent micrapiles ZLot Slze:Total surveyed square footage of property. abandoned for a period of 180 days at Disturbed Exterior Area:Square footage of lot affected by permit application. y e after work is commenced. 'ling E New Sq Ft:Total added square footage for additions to net livable or net leasble space. arfrlress 1517 Blake Ave gryGlenwood Springs stateCO ,p81601 peciel inspection is required per 2015 IBC ci Sri Ft of Rooms with Utility Work:Total square footage,not FAR,clan rooms with plumbing work., an time Re- E- II ction 1704E Inspector to verify that copy of viewer iewer Ad"Sees rneal@hceng.com SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES atZat Rx 1.1, SV AoVrro ea greement for inspection program to be on Permit Fee e job site prior to performing any Pc X SV 09/25 a Kaup Engineering,Inc Pnone970-945A613 Cell Pnone970.945.9613 spections.A copy of all Special Inspector Plan Check 25,081.87 38,587.50 Parks Impact 17053.87 Zoning X JRB 6/28/19 Mai°nil Aaaress1129 Grand Avenue ciryGlenwood Springs srereCO zIP81601 sill reports to be on the job site for Zoning(5o%) HPC Engineering 13,736.43 7,036.94 school Ded. 30972.63 p-^'ag dale@kau en ineerin com inspectors'review if requested.Failure to Building x BM 6/27/19 ddress P 9 9- zoning(SO%) 7,036.94 CMP(50%) 3,543.31 tom impact 1908.78 Fire X BM 6/27/19 comply may result in denial of inspection. Engineering X Id 6/4/19 Name Crawford Design Build abww970.963.3833 cell Phone 970-309-9151 Energy code 5,788.12 REMP Ped.Amenity CMP X AR 6/25/19 ^g REFERENCES FROM 2015 IRC 'TAU 1101 Village Rd Unit LL2B QtyCarbondale smote CO DP CV/A=crawl space ventilation required,sec.R408.1 Access required,R408.4 Plan Check c Water X sw 7/8/19 it EE=emergency escape required sec R310.1 CMP(50%) 3,543.31 Plan Housing Cash in Lieu 280699.9E stormwater X AR 3/11/19 n�rees crawforddesignbuild@comcast.net or cdbsimon@comcest.net EU=enclosed usable space under stairs shall be%"Gy p,yp,sec R302.7 Zoning sanitation X PM 11/6/18 G/D=garage/dwelling n separation,sec R302.5 and R302.6 Parks Review 198.69 stormwater 9 9 9 P (Hourly) Env.Health INSPECTIONS:The General Contractor must schedule inspections online. STC=Sound transmission class not less than 45 at dwelling separations,app Engineering Please visit wwwaspenpitkin-com/Departments/Community-Development-Forms/to do so- utility Review 600.00 g g City use Tax 21,393.75 Parks X Dr 6/18/19 I hereby certify that I have read and examined this application and know the same to be true and correct.All provisions of laws and K (Hourly) Landscape RV=roof and rafter ventilation required,R806.1 County Use Tax X RM ordinances governing this type of work will be complied with whether specified herein or not.The granting of a permit does not GIs 500.00 5,343.75 Efficiency A=attic access 22"x 30",30"headroom above,meets, presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance Approved ���E of construction.It is my responsibility to review the approved plans and any comments that are contained thereon and see that the SA=smoke alarms installed to NFPA 72 requirements,sec R314 To Issue � CO=carbon monoxide detector per City Ordinance 41 series 2008 Lot Area Deed Restrictedt+' structure and/or project is built in compliance with all applicable codes. SG=safety glazing required,sec R308.4 Issuance Contractor Census Code #of Dwellings Plans Location r(�19(rT/ �i,1 Signature Date® GR=guardrails,36"min ht,4"max opening;req at 30"drop any point w/in 36" (CITY OF ASPEN e, 130 5.GALENA ST I ASPEN,CV is? '11A( ❑ Check if you are atested owner builder(single-family homes only)You must take atest and complete the own RECEIVED horizontally,sec R312 N. cember zov (CITY USE ONLY)Owner builder approved by: Date: Affidavit on file 1 WFP=window fall protection-operable window<24"AFF&>72"above RtN 9 grade:use opening control device listed to ASTM F2090,sec R312.2 BUILDING DEPARTMENT (CITY OF ASPEN..... 130 S. GALENA ST I ASPEN,C8� 1 HR=handrails 34"-38"ht,sec R311.7.8 A:JI'LN SI=stairway illumination,sec R303.7 BUILDING DEPARTMENT PD=protect against decay,sec R317 REFERENCES FROM 20151MC r V=bathroom and balanced whole house mechanical ventilation req. PERMIT NUMBER: Ordinance 40,2016 DE=clothes dryer exhaust,sec 504.Makeup air req'd if over 200 CFM COMMUNITY DEVELOPMENT DEPARTMENT • AS=access and service space for maintenance req'd,sec 306 MA=make up air required if hood exhausts greater than 400 CFM,sec 505.2 BUILDING DESCRIPTION FORM IRC&IBC ET=exhausts terminate 3'from prop line and openings,10'from intakes, THE Cm of ASPEN 501.3.1 1T=intake openings 10'from lot line&contaminant sources(vents,streets), BUILDING CODE INFORMATION 837 W Smuggler Lot 1 401.4 112015 IRC ❑2015 IBC ❑2015 IEBC ❑Other(Please Explain) D=fasten and seal all ductwork per 603.9 Code Editions (As Adopted and Amended) (As Adopted and Amended) (As Adopted REFERENCES FROM 2015 IFGC and Amended) DV=direct vent req'd,sec 303.3 CA=combustion air not taken from bedrooms,bathrooms or Fire Sprinkler System I Existing?DZ I Required?it,I Type ❑NFPA 13 ❑NFPA 13 R ❑NFPA 13 D storage sec 303.3 OD=outdoor appliances Type Of Construction❑VA 0 VB■IV 0 IIIA ID BIB 0 IIA❑IIB❑IA IDIB'Fire Alarms Installed •Yes❑No REFERENCESmust beli F for FROM outdooruse,sec 303.6 2015 1ECC F=new or replacement glazing shall not exceed 0.28 U-Value,NFRC label Required Special Inspections ill High-Strength Bolting MI Epoxy Anchors II Structual Steel Welding required,Ordinance 40,2016 ❑Permanent Micropiles 0 Sprayed Fire-Resistants ❑Other L=75%of lamps in permanently installed lights must be high efficacy,sec R404.1 Energy Code Compliance ❑Prescriptive Table ❑Other SE=Continuous air barrier required;all exterior joints,cracks,and holes to be IN RESCheck UA Alternative ❑COMCheck UA Alternative caulked,gasketed,sealed,table R402.4.1.1 External EnergyUse A roveREFERENCES FROM 20 Exterior Energy Use Total Approved On-Site Snowmelt 0 Spa 0 Pool 0 pP EP=electric panel'happy space'30"x36"x78", sec 110.26 (Existing+New) g yP/ I ❑A_❑B ❑F_ ❑E 0 R_ 0 RREMP ❑ CREMP Buildin T eI SMOKE ALARMS AND Occupancy Group g 0 One Family 0Two Family 0 B(A<50) 0 H C _ ❑M El 5_ C 0 Townhouse CARBON MONOXIDE 131_ ❑U PERMIT#: 0240.2018.ARBK DATE: 6/-1111 27/19 DETECTORSPERCIT REQF UIREDA SP UNIT DESCRIPTION AS PROPOSED SNOWMELT: 0 sf TU NHROUGHOUT IT Y DOE LING EN Gross Area of Building:4498 sf Gross Area of Unit: POOL: 0 sf MUNICIPAL CODE 8.15 ADU BUILDING DESCRIPTION Occupant Load: 0 sf Is there an ADU? ❑Yes M No REMP SHEET: #Stories Above Grade 2 #Stories Below Grade 1 #Living Rooms Attached Garage Detached Garage Carport #Kitchens MINIMUM BOILER AFUE: Parking Spaces 2 Parking Spaces 2 Parking Spaces 0 #Full Baths OFFSET: #Bedrooms 4 #Full Baths 5 Deck Area 392 #3/4 Baths REVIEWED BY: Bonnie Muhigirwa #3/4 Baths 0 #1/2 Baths 1 #Bedrooms #Kitchens 1 #Wood Fireplaces 0 SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REEFS. #Other Rooms(List) All Snowmelt systems shall meet the following: #Gas Appliances 2 #Gas Logs 0 -Any portions in the Right of Way must be on a separate cone.A ROW ed. BUILDING ROOMS AND USES BY LEVEL AS PROPOSED(Include Mechanical&Storage) ' -010aanld tion shall be intoned underLicenseharea to rbesnow g) -R10 insulation shall installed under the area to be snow melted nc or Basement GAME ROOM,STORAGE,MECH,B +F 3/4 Bath insulation shall be installed under and at the slab edges.(Ordinance11 Series eon) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling.(20091ECC I I Main Leve 5 5i , , , 90C.403.8&503.2.4.5) ALL OUTDOOR LIGHTING 3 bedrooms,2 full baths,1 3/4 bath,Mud/Laundry room,2 car garage -Automatic or manual controls installed for system shut off when outdoor MUST COMPLY WITH temperature is above 40°F.(20091ECC Sec.403.8&503.2 4.5) 2nd Floor , -Inspection by testing hydrostatically at 1%times max system design THE CITY OF ASPEN LIGHTING CODE Living room,dining room,kitchen,pantry,1 bedroom,1 3/4 bath,1 1/2 bath pressure,but not less than loopsi,for tsminutes.(zoos IMC sec. SECTION 26.575.150 1208.1) 3rd Floor Additional riEVED 220019 p II- -- RFC.FI {rap( cORPLINICE 41 Bonnie Muhigirwa 6/27/19 bonniem QI�IfL2f7��ER 9 'J Reviewed By: Date: Q 1 s� I CITY OF ASPENIennaeeaoos 130 S.GALENA ST I ASPEN,CU9�i21611�( ZONING Ali kN BUILDING DEPARTMENT 5. Provide Final Inspection Report.The special inspector shall submit a written final report documenting required special inspections and correction of any discrepancies noted in the inspections prior to the final building inspection. 2. 1m,nn,1 xl f•urr,tur 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written SPECIAL INSPECTION AND TESTING AGREEMENT procedural and quality control manuals and periodic auditing of fabrication practices by B. Owner Responsibilities.The project owner,the engineer or architect or record,or an agent of the - an approved special inspection agency. To permit applicants of project requiring special inspection and\or testing per Section 1704 of the owner is responsible for employing special-inspection services.The special inspector\agency shall International Building Code(IBC). not be in the employ of the contractor,subcontractor or material supplier.[IBC Sec 1704.1]In 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator case of an owner\contractor,the special inspector\agency shall be employed as specified by the f anwl.rins of14132224 wa shall submit certificate of compliance to the building official stating that the work was Project Address:837 W SMUGGLER Permit Number: 0240.2018.ARBK building official. •' - performed in accordance with the approved construction documents. BEFORE A PERMIT CAN BE ISSUED:The owner,or the engineer or architect of record,acting as the C. Engineer or Architect of Record Responsibilities I t, baudm P•r nu•m Rceeuo nn a Ire G. Building Department Responsibilities owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing hiL. Schedule,including the required acknowledgments.A pre-construction conference with the parties 1. Prepare special inspection program.The engineer or architect of record shall list the 1 t1, I. Approve special-inspection special-inspection program.The building department shall approve all involved may be required to review the special-inspection re uirements and dines. items for which special inspection is required;and shall indicate anyitems for which the 1 V�„s•�Ia�1i1 Ia�to non wog... special inspectors and special-inspection requirements. Y9 Proce pecia p squirei n,I"n"•.r.f.rv..,.,1.1- .... IBC or the building official approves periodic inspection and the frequency of such 2. Enforces 1 Inspection.Work re I APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the inspections. 2. I nfur ee y,•dd myn,n»n.,t special geeing specie inspection and the building projects for which they provide special inspections.Special inspectors shall be approved by the building • :. .- inspector shall monitor the performance of special inspectors.Hsu\Her approval,in department prior to performing any duties.Special inspectors shall submit their qualifications and are 2. Respond to field discrepancies.The engineer or architect of record shall respond to - addition to that of the special inspector,must be obtained prior to placement of concrete, - - subject to personal interviews for pre-qualification.Special inspectors shall display approved uncorrected field discrepancies in design,material,or workmanship observed by the covering of structural steel,or other similar materials. identification,as stipulated by the building official,when performing the function of special inspector. special inspector. 1. Rr. o In.prruon r•pnrt.. 1, , ., 3. Review inspection reports.The building official should review special-inspection rr ,. progress and final reports. Special inspection and testing shall meet the minimum requirements of the International Building Code 3. Review shop drawings and submit design changes.The engineer or architect of record Section 1704.The following conditions are also applicable: shall acknowledge and review for conformance with the construction drawings those 4. Perform Meal m.pr.00•. I r.'.., . .. . 4. Perform final inspection.The building official should perform the final inspection and shop drawings that may detail structural information,shall submit to the building official ''p1"'�^,mi 1"•'"� �f1 approval project[ ]a special-inspection report has been s P g Y g o oval for [IBC Sec.109.3.1 after Me final A. Duties and Responsibilities of the Special Inspector and to the special-inspection agency written documentation of any verbally authorized "' PI""'i1 reviewed and approved. deviations from the approved construction documents,and shall submit revised 1. Signify presence at job site.Special inspectors should notify contractor personnel of documents for building official approval as required. Project Adore..:__ r„m„v"mlor, their presence and responsibilities at the job site.If required by the building official,they - Project Address: Permit Number. shall sign in on the appropriate form posted with the building permit. D. Contractor Responsibilities t,1 ..I.tl i 1n.\II t , 2. Observe assigned work The special inspector shall observe assigned work for 1. Notify the special inspector.The contractor is responsible for notifying the special ACKNOWLEDGMENTS conformance with the building department approved(stamped)design drawings, inspector or agency regarding individual inspections for items listed on the attached specifications,and applicable workmanship provisions of the International Building schedule and as noted on the building department approved plans.Adequate notice shall '7 spar al Inspe u,,,n Ageas ,/ c,gnam,. • 1' .,, I have read and agree to comply with the conditions of this agreement. Code.Architect\engineer-reviewed shop drawings may be used only as an aid to be provided so the special inspector has time to become familiar with the project. ,/--�`( '�(/ /�L___n// lam, // /) inspection. v"✓'cle (�+C],L�++�'• -7, K,,1 f•,�4 ei.t f c i/[. ' Special Inspection Agency: Sign sue Printed Name: Date: 2. Provide access to approved plane.The contractor is responsible for providing the s'� i For continuous special-inspection,the special inspector shall be on site at all times special inspector access to approved plans. ironer 7�r _.---- ti'�i. n;. --� 1, .1!c C f r/a observing the work requiring special inspection.Periodic inspections,if any,must have prior approval based on a separate written plan reviewed and approved by the building 3. Retain special inspection records.Upon request,the contractor is also responsible for - Own Si / Printed Name ,s Date department and the engineer or architect of record. retaining,at the job site,all special inspection records completed by the special inspector. I neinm tvhne.l S:nn.mre rn,,..,c,�„r (/,1-� / ,'/��g/'G��n�p�'-``�'/��J, G-- ' / , t k p �•� 3. Report nonconforming items.The special inspector shall bring nonconforming items to E. Inspection of Fabricators / the immediate attention of the contractor and note all such items in the daily report.If Engineer/ S. Printed Name: Date: any item is not resolved in a timely roamer or is about to be incorporated in the work,the 1. Fabrication of structural assemblies and members.Where fabrication of structural t wet.. Slgnamre tha,lal',caw 1/c.A.-3/ ,-(� lq special inspector shall immediately notify the building department by telephone or in load-bearing members and assemblies is being performed on the premises of a f lW{ r/C't] '-'�^--t"^�\ 1 person,notify the engineer or architect,and post a discrepancy notice. fabricator's shop,IBC Section 1704.2 shall require special inspection of the fabricated -- - --- - C PIS�^/ Signature: Printed Name: Date: items. vireo..)I abrt.,nr S,gtulure Pnnl..!\,m. �//7 i / A 4. Provide timely reports.The special inspector shall complete written inspection reports - >_/' C./k f/1.p A // PLOW C.-./' AM1.�/a7/ID 7.2'(aS for each inspection visit and provide the reports on a timely basis determined by the 2. Fabrication and implementation procedures.The special inspector shall verify that _ __ i�Z��'�l7 building official.The special inspector or inspection agency shall furnish these reports the fabricator maintains detailed fabrication and quality control procedures that provide a Approved Fabricator: Signature: Printed Name: Date: directly to the building official,engineer or architect of record,and others as designated. basis for inspection control of the workmanship and the fabricator's ability to conform to Iny"c,N I altrt.u.n ',prawn, IY,n,.\,,:„. ,,-„ [IBC Sec.1704.1.2]These reports should be organized on a daily format and may be approved construction documents and reference standards.The special inspector shall submitted weekly at the option of the building official.These reports should include: review the procedures for completeness and adequacy relative to code requirements for ---- -- a. Description of daily inspections and tests made with applicable locations, fabricator's scope of work. .tick oriel S,gnarurc I'on:,to\,^„. I,.r Inspected Fabricator: Signature: Printed Name: Date: b. Listing of nonconforming items, XI n'OF'1SP6\ c. Report on how nonconforming items were resolved or unresolved as F. Approved Fabricator Responsibilities Pll kl\CM\11 • applicable, d. Itemized changes authorized by the architect,engineer,and building offs 1. Fabrication exempt inspections.Special inspections are not required where work is (circle sure) Signature: Printed Name: Date: not included in nonconforming items. RECEIVED done on the premise of a fabricator registered and approved to perform such work RECEIVE I I. CITY OF ASPEN RECEIVED without special inspection. RECEIVED ,EIVED PITKIN COUNTY: _ 1 06/25/2019 2 06/25/2019 06/25/2019 3 06/25/2019 ASPEN ASPEN ASPEN BUILDING DEPARTMENT BUILDING DEPARTMENT BUILDING DEPARTMENT ASPEN BUILDING DEPARTMENT 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written procedural and quality control manuals and periodic auditing of fabrication practices by an approved special inspection agency. 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator shall submit certificate of compliance to the building official stating that the work was performed in accordance with the approved construction documents. G. Building Department Responsibilities 1. Approve speclallnapectiun program.The building department shall approve all special inspectors and special-inspection requirements. 2. Enforce special inspection,Work requiring special inspection and the building inspector shall monitor the performance of special inspectors.His\Ha approval,in addition to that of the special inspector,must be obtained prior to placement of concrete, covering of structural steel,or other similar materials. 3. Review inspection reports.The building official should review special-inspection progress and final reports. 4. Perform final inspection.The building official should perform the final inspection and approval for a project[IBC Sec.109.3.1]after the final special-inspection report has been reviewed and approved. Project Address: Penult Number: • ACKNOWLEDGMENTS I have read and agree to comply with the conditions of this agreement. Special Inspection Agency: Signature: Printed Name: Date: r • Owner. Signature: Printed Name Date Eagliuonr/Architect: Signature: Printed Name: Date: • Connector: Signature: Printed Name: Date: Approved Fabricator: Signature: Printed Name: Dote: Imported Fabricator: Signs Printed Name: Dam: 3-1)Tron, Atl0 etzw%rw.X 6(VII//S? (circle one) Signature: Printed Name: Dam:CITY OF ASPEN PrrKIN COUNTY: -RECEIVED 3 06/25/2019 • ASPEN BUILDING DEPARTMENT REScheck Software Version 4.6.5 D t Compliance Certificate Grg55Area Cavity Cont. Assembly or R-Value R-Value U-Factor UA Perimeter Ceiling 4:Cathedral Ceiling 32 56.0 0.0 0.019 1 Comment:Lot 1-Bath 3,164-56 Project Smuggler Residences Lot 1 Ceding 5:Cathedral Ceiling 10 56.0 0.0 0.019 0 Comment:Lot 1-Master Brm,16A-56 Energy Code: 2015 IECC Ceiling 6:Cathedral Ceiling 50 56.0 0.0 0.019 1 Location: Aspen,Colorado Comment:Lot 1-M.Bath,164-56 Construction Type: Single-family Ceiling 7:Cathedral Ceiling 57 56.0 0.0 0.019 1 Comment:Lot 1-Laund,16A-56 Project Type: New Construction Ceiling 8:Cathedral Ceiling 313 49.0 0.0 0.022 7 Conditioned Floor Area:4,007 ft2 Comment:Lot 1-Garage,164-56 Glazing Area 17% Ceiling 8a:Cathedral Ceiling 325 56.0 0.0 0.019 6 Climate Zone: 7 (9922 HDD) Comment:Lot 1-Garage,16A-56 Permit Date: Ceiling 9:Cathedral Ceiling 374 56.0 0.0 0.019 7 Permit Number: Comment:Lot 1-Living/Stairs,164-56 Ceiling 10:Cathedral Ceiling 319 56.0 0.0 0.019 6 Construction Site: Owner/Agent: Designer/COmractor: Comment:Lot 1-Dining,16A-56 TBD Smuggler St. Brad Crawford Mark Burggraaf Ceiling 11:Cathedral Ceiling 143 56.0 0.0 0.019 3 Aspen,CO 81611 Crawfod Design Build Burggraaf Associates Inc. Comment:Lot 1-Kitchen,16A-56 1001 Village Road 1404 Hawk Parkway Ceiling 12:Cathedral Ceding 35 56.0 0.0 0.019 1 Unit LL2b Suite 218 Comment:Lot 1-Pwdr,16A-56 Carbondale,CO 81623 Montrose,CO 81401 Ceiling 13:Cathedral Ceiling 281 56.0 0.0 0.019 5 (970)963-3833 (970)240-5990 Comment:Lot 1-Bedroom 4,16A-56 m.burggraaf@bai-eng.biz Ceiling 14:Cathedral Ceiling 64 56.0 0.0 0.019 1 Comment:Lot 1-Bath 4,16A-56 Basement Wall 1:Solid Concrete or Masonry 55 11.0 10.0 0.034 2 Compliance:Passes using UA trade-off Wall height:10.0' Compliance:12.5%Batter Than Cade Maximum UA:583 your UA:510 Depth Insulationbel depth-grade:0 ' o,reeads now close to comqunce the novae Is based on coaetratlean rules. Comment:depth:The' IItto`ots Nm amyl.an estimate index use or cost relative to a minimumcone none Lo[1-ThdCConcrete e,75B11-Om-10 Basement Wall 2:Solid Concet or Masonry 235 11.0 10.0 0.034 8 Wall height:10.0' Envelope Assemblies Depth below grade:10.0' Insulation depth:10.0' Gross Area Comment:Lot 1-Theatre/Game,15811-0m-10 Assembly or RV Rty Cvont. aluc U-Factor UA Basement Wall 2a:Solid Concrete or Masonry 65 11.0 0.0 0.052 3 Perimeter Wall height:10.0' Floor 1:All-Wood joist/Truss:Over Unconditioned Space 138 38.0 0.0 0.026 4 Depth belowpth 1 0' P Comment: enton tlott1 The Comment:Lot 1-Hall/Stair,20R-38 Comment:Lot 1-Theatre/Game.151311-Om-30 Floor 2:All-Wood Joist/Truss:Over Unconditioned Space 216 38.0 0.0 0.026 6 Window 001:Wood Frame:Double Pane with Low-E 15 0.280 4 Comment Lot 1-Bedroom 2,20R-38 Floor 3:All-Wood joist/Truss:Over Unconditioned Space 45 38.0 0.0 0,026 1 Basement Wall a:Solid Concrete or Masonry 145 11.0 10.0 0.034 5 Comment:Lot 1-Bath 2,20R-38 Wall height 10.0' Depth below grade:10.0' Floor 4:All-Wood joist/fruss:Over Unconditioned Space 169 38.0 0.0 0.026 4 Insulation depth:10.0' Comment:Lot 1-Bedroom 3,20R-38 Comment:Lot 1-Theatre/Game,151311-0m-10 Floor 5:All-Wood joist/Truss:Over Unconditioned Space 41 38.0 0.0 0.026 1 Wall 1:Solid Concrete or Masonry:interior Insulation 188 11.0 0.0 0.092 17 Comment:Lot 1-Bath 3,20R-38 Comment:Lot 1-Theatre/Game,15B11-Om-4 Floor 6:All-Wood Jolst/rruss:Over Unconditioned Space 30 38.0 0.0 0.026 1 Basement Wall 4:Solid Concrete or Masonry 70 11.0 10.0 0.034 2 Comment:Lot 1-M.Bath,20R-38 Wall height:10.0' Floor 7:Slab-On-Grade:Unheated 78 15.0 0.655 51 Depth below grade:30.0' Insulation depth:4.0' Insulation depth:10.0' Comment:Lot 1-Garage,22C-l0pm Comment:Lot 1-Theatre/Game.15811-0m-10 Ceiling 1:Cathedral Ceiling 10 56.0 0,0 0.019 0 Basement Wall 5:Solid Concrete or Masonry 17 11.0 10.0 0.034 1 Comment:Lot 1-Hall/Stair,164-56 Wall height:10.0' Ceiling 2:Cathedral Ceiling 21 56.0 0.0 0.019 0 Depth below grade:10.0' Comment:Lot 1-Bath 2, depth:10.0'2,16A-56 Comment:Lot 1-Storage,151311-0m-10 Ceiling 3:Cathedral Ceiling 149 56.0 0.0 0.019 3 Comment:Lot 1-Bedroom 3,164-56 REC F IVED Project Title:Smuggler Residences Lot 1 Report date: 05/24/19RECEIVED Data filename:Z:\Workfiles\2018\8058\8058 REScheck 05-24-19.rck 054428 j 19 Project Title:Smuggler Residences Lot 1 Report date: 0524/19 Data filename:Z:\Workfiles\2018\BOSS\8058 REScheck 05-24-19.rck os Q/2019 ASPEN BUILDING DEPARTMENT ASPEN BUILDING DEPARTMENT Gross Area Cavity Cont. Assembly o R-Value R-Value U-Factoi UA Perimeter Basement Wall 6:Solid Concrete or Masonry 100 11.0 10.0 0.034 3 Gross Area Ca4ross Area Wall height:10.0' Assembly or 1v Cont.coot. u-Factor UA Assembl or Cavity Cont. u-Factor UA Depth below grade:10.0' Perimeter R-Value R-Value y Perimeter R-Value R-Value Insulation depth:10.0' Comment:Lot 1-Storage,151311-0m-10 Wall 11,Wood Frame,16"o.c. 103 21.0 3.0 0.098 5 Gross Area Cavil Con, ow 205:Wood Frame:Double Pane with Low-E 4 0,280 1 Comment:Lot 1-Bedroom 3,12F-Osm Assembly Basement Wall 7:Solid Concrete or Masonry 45 11.0 10.0 0.034 2 y or y R-Vae R-Va lulue u-Factor ow nment:Lot 1-Bedroom 4,CustomGlassl Wall height:10.0' Window 120:Wood Frame:Double Pane with Low-E 4 0.280 1 Perimeter 41:Wood Frame,16"o.c. 154 21.0 3.0 0.048 5 Depth below grade:10.0' Comment:Lot 1-Bedroom 3,CustomGlassl Wall 27:Wood Frame,16`o.c. 113 21.0 3.0 0.048 5 nment Lot 1-Bedroom 4,12F-Osm Insulation depth:10.0' Window 121:Wood Frame:Double Pane with Low-E 4 0.280 1 Comment:Lot 1-Garage,12F-Osm ow 201:Wood Frame:Double Pane with Low-E 10 0.280 3 Comment:Lot 1-Storage.151331-0m-OS Comment:Lot 1-Bedroom 3,CustomGlassl Window 114:Wood Frame:Double Pane with Low-E 6 0.280 2 nment:Lot 1-Bedroom 4,CustomGlassl Basement Wall 8:Solid Concrete or Masonry 87 11.0 10.0 0.034 3 Wall 12:Wood Frame,16"o.c. 49 21.0 3.0 0.048 2 Comment:Lot 1-Garage,CustomGlassl low 202:Wood Frame:Double Pane with Low-E 15 0.280 4 Wall height:10.0' Comment:Lot 1-Bath 3,12F-0sm Wall 28:Wood Frame,16`o.c. 39 21.0 3.0 0.048 2 nment:Lot 1-Bedroom 4,CustomGlassl Depth below grade.10.0' Window 119:Wood Frame:Double Pane with Low-E 6 0.280 2 Comment:Lot 1-Garage,12F-Osm low 203:Wood Frame:Double Pane with Low-E 10 0.280 3 Insulation depth:10.0' Comment:Lot 1-Bath 3,CustomGlassl Comment:Lot 1-Bath 4,15871-0m-10 Wall 29:Wood Frame,16`o.c. 116 21.0 3.0 0.048 6 nment:Lot 1-Bedroom 4,CustomGlassl Wall 2:Solid Concrete or Masonry:lntorior Insulation 92 11.0 0.0 0.092 8 Wall 13:Wood Frame,16"o.c. 16 21.0 3.0 0.048 1 Comment:Lot 1-Garage,12F-0sm low 301:Wood rame:Double Pane with Low-E 12 0.280 3 Comment:Lot 1-HVAC,15811-0m-4 Comment:Lot 1-Bath 3,12F-0Sm Wall 30:Wood Frame,16`o.c. 39 21.0 3.0 0.048 2 omen[:Lot 1-Bedroom 4,CustomGlassl Basement Wall 9:Solid Concrete or Masonry 90 11.0 10.0 0.034 3 Wall 14:Wood Frame,16"o.c. 45 21.0 3.0 0.048 0 Comment:Lot 1-a 16"Stairs,12F-0sm 42:Wood Frame,16"o.c. 44 21.0 3.0 0.048 2 Comment:Lot 1•Master Brm,12F-0sm Wall height:10.0' Wall 31:Wood Frame,16`o.c. 70 21.0 3.0 0.048 2 nment:Lot 1-Bedroom 4,12F-0sm Depth below grade:10.0' Window 113:Wood Frame:Double Pane with Low-E 15 0.280 4 Comment:Lot 1-Uving/Stairs,12F-0sm 43:Wood Frame,16"o.c. 64 21.0 3.0 0.048 3 Insulation depth:10.0' Comment Lot 1-Master Brm,CustomGlassl Pt Window 214:Wood Frame:Double Pane with Low-E 32 0.280 9 omen[:Lot 1-Bath 4,12F-0sm Comment:Lot 1-HVAC,15811-0m-10 Door 102e:Wood Frame:Double Pane with Low-E 24 0.280 7 Comment:Lot 1-Living/Stairs,CustomGlassl low 216:Wood Frame:Double Pane with Low-E 6 0.280 2 Basement Wall 10:Solid Concrete or Masonry 35 11.0 10.0 0.034 1 Comment:Lot 1-Master Brm,CustomGlassl Wall 32:Woad Frame,16'o.<. 29 21.0 3.0 0.048 1 men[:Lot 1-Bath 4,CustomGlassl Wall height:10.0' Wall 15:Wood Frame,16"o.c. 21 21.0 3.0 0.048 1 Comment:Lot 1-Living/Stairs,12F-0sm 44:Wood Frame,16"o.c. •3 21.0 3.0 0.048 4 IInepth nsulatlion depth:10.0'10.0'ow grade: Comment:Lot 1-Master Brm,12F-0sm Wall 33:Wood Frame,16"o.c. 163 21.0 3.0 0.048 6 nment:Lot 1-Bath 4,12F-0sm ``o��Nwt1\tilt Comment:Lot 1-HVAC,15B11-Om-30 Wall 16:Wood Frame,16`o.c. 40 21.0 3.0 0.048 2 Comment:Lot 1-Living/Stairs,12F-0sm 4,.pD0// III10,tans specifications,and other Comment:Lot 1-Master Brm,12F-0sm liance Statement:The proposer)building design described here Is co r. -• c p Wall 3:Wood Frame,16"o.c. 61 21.0 3.0 0.048 2 Window 212:Wood Frame:Double Pane with Low-E 15 0.280 4 1 7; Comment Lot 1-Hall/Stair,12F-0sm Wall 17:Wood Frame,16"o.c. 21 21.0 3.0 0.048 1 Comment:Lot 1-Living/Stairs,CustomGlassl atlons submitted with the permit application.The or requirements building y-a:I•3\•'I"' t :v he 20. CC requirements In Comment:Lot 1-Master Brm,12F-0sm [deck Version 4.6.5 and to comply with the mandatory requirements I�',-• !'• ecklist. Window 103:Wood Frame:Double Pane with Low-E 12 0.280 3 Window 213:Wood Frame:Double Pane with Low-E 15 0.280 4 i i Comment:Lot 1-Hal/Stair,CustomGlassl Wall 18:Wood Frame,16 o.c. 45 21.0 3.0 0.048 1 Comment:Lot 1-Living/Stairs,a Pane Low-E Burggraaf,P.E. IR ••"' ' SI L"/l'/ Comment:Lot 1-Master Brm,12F-0sm Window 310:Wood Frame:Double Pane with Low-E 9 0.280 3 -Title Signature Y / r, i-� DateWindow 112:Wood / 15 0.280 4 Comment Lot 1-Hall/Stair, -Osm Comment:Lot 1-Master WCall 5::Wood Frame,omment: 1 d o.c. 28 12F-OsmF 28 21.0 3.0 0.048 1 Wall 19:Wood 1 Frame,Ma 16"ter Brm Frame:Double CustomGlassl Low-E 47 21,0 3.0 0.048 2 CoWall 34:Wood Lot 1a e,Living/Stairs,12F-Osm 1a551 121 21.0 3.0 0.048 2 gna ///III1j1 t O\a�'�' t e 'st1 `_ Window 305:Wood Frame:Double Pane with Low-E 24 0.280 7 p ttq\V n.1.� Wall 6:Wood Frame.16"o.c. 146 21.0 3.0 0.048 5 Wall 20:Wood Frame,16"o.c. 113 21.0 3.0 0.048 4 Comment:Lot 1-Living/Stairs,CustomGlassl Comment:Lot 1-Bedroom 2,12F-Osm Comment:Lot 1-M.Bath.12F-Osm Window 306:Wood Frame-Doable Pane with Low-E 24 0.280 7 Window 104:Wood Frame:Double Pane with Low-E 10 0.280 3 Window 110:Wood Frame:Double Pane with Low-E 13 0.280 4 Comment:Lot 1-Living/Stairs,CustomGlassl Comment:Lot 1-Bedroom 2,CustomGlassl Comment:Lot 1-M,Bath,CustomGlassl Window 307:Wood Frame:Double Pane with Low-E 24 0.280 7 Window 105:Wood Frame:Double Pane with Low-E 15 0.280 4 Window 111:Wood Frame:Double Pane with Low-E 13 0.280 4 Comment:Lot 1-Living/Stairs,CustomGlassl Comment:Lot 1-Bedroom 2,CustomGlassl Comment:Lot 1-M.Bath,CustomGlassl Window 106:Wood Frame:Double Pane with Low-E 10 0.280 3 Wall 35:Wood frame,16`on. 184 21.0 3.0 0.048 1 Comment:Lot 1-Bedroom 2,CustomGlassl Wall 21:Wood Frame,16"o.c. 37 21.0 3.0 0.048 2 Comment:Lot 1-Dining.12F-0sm Comment:Lot 1•M.Bath,12F-0sm Door 201e:Wood Frame:Double Pane with Low-E 170 0.280 48 Wall 7:Wood Frame.16'o.c. 107 21.0 3.0 0.048 5 Wall 22:Wood Frame,16'.o.c. 16 21.0 3.0 0.048 0 Comment:Lot 1-Dining,CustomGlassl Comment:Lot 1-Bedroom 2,12F-0sm Comment:Lot 1-Laund,12F•05m Window 107:Wood Frame:Double Pane with Low-E 4 0.280 1 Wall 36:Wood Frame,16"o.c. 163 21.0 3.0 0.048 6 117:Wood Frame:Double Pane with Low-E 14 0.280 4 Comment:Lot 1-Dining,12F-0sm Comment:Lot 1-Bedroom 2,CustomGlassl Comment:Lot 1-Laund,CustomGlassl Window 207:Wood Frame:Double Pane with Low-it 15 0.280 4 Window 108:Wood Frame:Double Pane with Low-E 4 0.280 1 Wall 23:Wood Frame,16`o.c. 103 21.0 3.0 0.048 5 Comment:Lot 1-Dining,CustomGlassl Comment:Lot 1-Bedroom 2,CustomGlassl Comment:Lot 1-Laund,12F-0sm Window 208:Wood Frame:Double Pane with Low-E 15 0.280 4 Wall 8:Wood Frame.16"o.c. 37 21.0 3.0 0.048 2 Wall 24:Wood Frame,16"o.c. 47 21.0 3.0 0.048 2 Comment:Lot 1-Dining.CustomGlassl Comment:Lot 1-Bath 2,12F-Osm Comment:Lot 1•Laund,12F-0sm Wall 9:Wood Frame.16"o.c. 49 21.0 3.0 0.048 2 Window 303:Wood Double Pane with Low-E 9 0.280 3 Comment:Lot 1-Bath 2,12F-0sm Wall 25:Wood Frame,16`o.c. 284 21.0 3.0 0.048 12 Comment:Lot 1-Dining,CustomGlaul Comment:Lot 1-Garage.12F-0sm Wall 37:Wood Frame,16`o.c. 130 21.0 3.0 0.048 5 Window 109:Wood Frame:Double Pane with Low-E 6 0.280 2 Window 115:Wood Frame:Double Pane with Low-E 6 0.280 2 Comment:Lot 1-Kitchen,12F-0sm Comment:Lot 1-Bath 2.CustomGlassl Comment:Lot 1-Garage,CustomGlassl Wall 10:Wood Frame,16`o.c. 121 21.0 3.0 0.048 4 Door Window 206:Wood Frame:Double Pane with Low-E 18 0.280 5 Comment:Lot 1-Bedroom 3,12F-0sm lose:Solid 24 0.300 7 CComment:Lot 1-Kitchen,CustomGlassl Comment:Lot r-Gar16e,11D Wall 38:Wood Frame,16"o.c. 69 21.0 3.0 0.048 3 Window 101:Wood Frame:Double Pane with Low-E 15 0.280 4 Wall 26:Wood Frame,16'o.<. 213 21.0 3.0 0.048 3 Comment:Lot 1-Pwdr,12F-0sm Comment:Lot I-Bedroom 3,CustomGlassl 15 REOEIVED Comment Lot 1-Garage,12F-osm Wall 39:Wood Frame,16`o.c. 49 21.0 3.0 0.048 2 Door 303e:Solid 72 0.125 9 Comment:Lot 1-Pwdr,12F-0sm Project Title:Smuggler Residences Lot 1 Report date: 05/24/19 Comment.Lot 1-Garage,11D Window 215:Wood Frame:Double Pane with Low-E 4 0.280 1 Data filename:Z:\Workfiles\2016\8058\8058 REScheck OS-24-19.rck D5 S tt(z®19 Door me Solid 72 Comment:Lot i-Pwdr.CustomGlassl F Comment:Lot 1-Garage,11D R�' EI�IED Wall 40:Wood Frame,16`o.c. 138 21.0 3.0 0.048 6 RECEIVED 12F-0sm ASPEN Project Title:Smuggler Residences Lot 1 Report date: 05/24/19 Comment:Lot 1-Bedroom 4. ct Title:Smuggler Residences Lot 1 Report date: 05/24/19 BUILDING DEPARTMENT Data filename:Z:SWorkfiles\2018\80513\8058 REScheck 05-24-19.rck 0 54412 S 9t2E0 19 Window 204:Wood Frame:Double Pane with Low-E Comment:Lot l-Bedroom a.CustomGlassl 4 RErEI V`� filename:Z:\Workfiles\2018\8058\8058 REScheck OS-24-19.rck 0t3i4 ED 28 d 2(0 19 ASPEN Project Title:Smuggler Residences Lot 1 Report date: 05/24/19 ASPEN BUILDING DEPARTMENT Data filename,Z:\Workfiles\2018\B05B\8058REScheck05-24-19.rck 05428p(2019 BUILDING DEPARTMENT ASPEN BUILDING DEPARTMENT