Loading...
HomeMy WebLinkAboutFile Documents.211 Cottonwood Ln.0062.2019 (71).ARBK DATE: MASTER PERMIT: PERMIT NUMBER:(062.2o19ARe8 Field Plan Set Must Be Printed In Color •7 COMMUNITY DEVELOPMENT DEPARTMENTAl ADDRESS: PERMIT NUMBER: w. 4 BUILDING PERMIT APPLICATION COMMUNITY DEVELOPMENT DEPARTMENT CITY OF ASPEN PROPERTY INFORMATION BUILDING PERMIT CONTACT SHEET nlacm or Asry - ADDRESS 211 Cottonwood Lane ueaa211 PARCEL ID*273707490211 ` e Sam Barney Phone t`J/U)3uu-Ii530 Fm,llsamoamey(dcomcast.nec PERMIT NO.o062.2o19.ARBK • rvsm Loy 211 BLOCK N/A OR SUBDIVISION Smuggler Park owNER NAME Barney,Desiree&Samuel CELL(970)309-1838 EMAIL sambarneyGcomcast.net Name Sam Barney men.IC/U)3UC-1030 E-mall samoamemicomcast.net OWNER DESIREE AND SAMUEL BARNEY The City of Aspen BEBTCONTAC1 Sam rn Barney CELL(970)309-1836 EMAIL sambeey(�comcast.net Name Jamey,ueslt ee Os Jamuel phone tuft))3Uy) -103 one t`U/0 Cell Ph U)`'U -1030 NAME �+ These plans must be kept at the PROJECT DETAILS ad°e.211 Cottonwood Lane ch,,Aspen shoot CO ZIP 81611 ADDRESS 211 COTTONWOOD LN building site or inspection OE9CRIPRON DF -mail sambarney@comcast.net PARCEL ID 273707490211 delays may occur.Construction WORK IN DETAIL Demolish/remove existing structure,build new structure. Aaaress shall conform to these plans.All Name Sam Barney Phone cell Pho ne ty/u)3Uy-I u3o PR01ECr $39g 200 Use of Building Class of Work Fixture Counts Equipment Checklist Magmg changes shall be approved by vALunnoN 211 Cottonwood Lane Aspen CO 81611 sQ FroF ❑ Commerical ONew �Toilets,Bidets _ForcedAir/Graviw5yrtems Aaaress city State zlv the building official. L%IAREA 1996 ❑ Multi-Family ❑Addition s LavBathatory t Wall,Suspended,or unit Heaters E-mail sambarney@comcast.net O Single Family ❑Alteration —L t Y(Wash Basin) —_Gas Log Aaaress 1996 0 Mixed-Use t Shower UNRgq FT ❑Re air -I Kitchen sink(tDisposa)—Gas Appliancew y/U 3Uy-7D30 RIME 0 0 IFFR I Dishwasher _Appliance Vents Name Sam Barney Phone can Phone) ) SEPARATE PERMITS ARE ROFTj 2e67 ❑Tenant Finish Laundry Bar,Utility Sink_Heat,Refrig,Cooling,or M ring DISTURBED Will there be O Demolition -clothes washer Absorption unit rigen&211 Cottonwood Lane 0,,,Aspen State CO ur 81611 REQUIRED FOR ELECTRICAL, EXTERIOR AREA All peneoof/wall 0 Change Order'—Floor nk _Boilersiadling(Includes vent) PLUMBING,MECHANICAL,OR penetrations? 0 T Drain'Wate Air Handling Unit Aenafelusambarney@comcast.net NEW SOFT 933 El Yes --Water Heater(Pan Req)—Cooling Systems FIRE SPRINKLER WORK a Gas Outlets TVenNlalion Fans S5pp Fi OF ROOMS 0 No Water Treatment Name Ripple Design Studio Phone t/IU)LLl-3L3L Cell Phone wRH UTINTy WORK Range Hood clue- .0_aofGasSystemOutlets Mailing 1219 Harrison Avenue Leadville CO 80641 ZONE DISTRICT R-3 y_snewmelt System Sq Ft Tam City glace ZIP naeaelss paul@rippledesignstudio.us Ln Project Valuation:Cost of project as defined in Valuation Affadavit. 'NOTCE:This permit becomes null and 9 l Z Sq Ft of Work Area:Total square footage of area undergoing change or reconfiguration. void if work or construction authorized m Mountain Cross En tC1 U)y40-n0AC Cell Phone O Is not commenced captain 180 days,or Name Engineering Phone ▪ Unit Sq Ft:Gross Squa eFootage,not FAR,of permitted unit. if construction or work is suspended or LotSize:Total surveyed square footage of property. abandoned for a period of ISO days at Mathng8261/2 Grand Avenue Glenwood Springs CO 81601 ? Disturbed Exterior Area:Square footage of lot affected by permit application. anytime after work is commenced. tlaress City State ZIP pLL New Sq Ft:Total added square footage for additions to net livable or net leasble space. p-mail Chris@mountaincross-eng.com Sq Ft of Rooms with Utility Work:Total square footage,not FAR,of all rooms with plumbing work. Bo- ddress APPROVALS atiri,ing Needs viewer Date Ripple oesi SIAAio t/T y)LLl-3L.5L SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES _Deaaament Review off Approved Nameppe gn Phone ten Phone Permit Fee PC X LL 3/27/2019 MBaJe.1219 Harrison Avenue ca,,Leadville slate CO m80641 Plan Check 6993.35 10759.00 Parks Impact 2498.83 zoning X J. WU.— HPc na"laee paul@rippledesignstudio.us Engineering 5056.59 inning/501/I 1989.43 School Ded. 8199.12 — Building X BM 55119 CMP IBO%) Fire x en wilt Name Owner Builder-Sam Barney phone tall Phene ty/U)auu--1030 Zoning(so%) 1989.43 1373.35 TDM ImpaR 279.69 Engineering x JD S.W. Mating 211 Cottonwood Lane As en CO 81611 Energy Code 1613.85 REMP Ltd.Amenity 0 CMP x AR �giplg Aaaress City p State ZIP Water x SW Creaa19 aregssambamey@comcast.net CMP(50%) 1373.35 PlanHourl Chey)ck 6tOrmWater ar Housing Cash In Ueu 0 x ahn9 Parks Review 77.01 Zoning Stormwater Sanitation x ma oaaat9 INSPECTIONS:The General Contractor must schedule inspections online. (Hourly) Env.Health Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so. Engineering Parks X Dr 5/30(19 I hereby certify that I have read and examined this application and know the same to be true and correct.All provisions of laws and Utility Review 2695.35 city Use Tax 3141.60 ordinances governing this type of work will be complied with whether specified herein or not.The granting of a permit does not (Hourly) Landscape County use Tax presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance GI5 500.00 998.00 Efficiency of construction.It is my responsibility to review the approved plans and any comments that are contained thereon and see that the Approved Rti.` 1}�F.Ik structure and/or project is built in compliance with all applicable codes. Lot Area Deed Restricted To Issue a C14p' co,aanor ppC{/.i��s�`�I Issuance SignatCe (single-family g Y y) ndce p ,RWluiw'@mIa,TiEn Census Code #of Dwellings Plans Location ❑ Check if you are a tested owner builder sin le-famil homes only).You must take a test and complete the own ICITY OF ASPENDecember2017 130 S.GALENA ST I ASPEN,CO/ 1611] (CITY USE ONLY)Owner builder approved by: Date: Affidavit Donf e 2D C AGIYN I CITY OF ASPENAuau =017 130 S.GALENA ST I ASPEN,CO 816111 BUILDING DEPARTMENT ASPEN ' BUILDING DEPARTMENT OyC&\ s- y�o' Submit ermitC orto: Colorado Department of Public Health and Environment t DEMOLITION NOTIFICATION APPLICATION FORM Permit Coordinator Colorado of Public 0062.2019.ARBK • Health rid E ;�_," APPLICATION FEE MUST ACCOMPANY THIS FORM APCD-EE1 Environment Air Pollution Control Division-Indoor Environment Program-Asbestos/IAO Air Unit PERMIT NUMBER: a s" 49p0 Cherry Creek Mae Cherry Creek Drive South,APCD-IE-B1 INCOMPLETE APPLICATIONS WILL BE RETURNED south Denver,Colorado 80246-1530 COMMUNITY DEVELOPMENT DEPARTMENT Colorado Department (Notice will be mailed to the demolition contractor unless specked otherwise) Denver,co aoz4a-lsso Phone: 303-692-3100-Fax: 303-782-0278MI of Publiclleallh Phone:sosaez-smo and Environment Fee:$50+$5 per 1000ft7 of area to be demolished=$ 60l . n �9782-ee7S E-mail: asbestos@state.co.us BUILDING DESCRIPTION FORM—IRC&IBC nernnrA (see Instruction#1 on reverse side) DEMOLITION APPROVAL NOTICE BUILDING CODE INFORMATION Company Nome: Building Nome: r 2015 IRC Homeowner-Sam Barney 211 Cottonwood Ln ❑ ❑201518C ❑2015 IEBC ❑Other(Please Explain) street: square/comge offootpdnt orrmly or portion of fealty to be demolished iThis approval notice is granted subject to Colorado Air Quality Control Commission Regulation Code Editions (As Adopted and Amended) (As Adopted and Amended) (As Adopted 211 Cottonwood Lit 1063sf ✓ • and Amended) '§ city: sieve: we code: maw No.8,Part B,adopted December 21,2007,and effective January 30,2008 and the Colorado Air Telephone# Aspen Pait# CO 81611 w ay 211 Cottonwood Ln `zip cone. I,1 Pollution Prevention and Control Act C.R.S.(25-7-101 and 25-7-501 et seq). This notice signifies Fire Sprinkler System I Existing?R:I Required?lit I Type 0 NFPA 13 0 NFPA 13 R 0 NFPA 13 D A (970)309-1836 ( ) N/A a Aspen 'firkin �7 81611 that the structure was inspected for asbestos,luminous exit signs(containing radioactive material), Type Of Construction❑VA O VB❑IV❑IIIA 0 IIIB❑IIA❑IIB❑IA 0 IB(Fire Alarms Installed 0 Yes❑p No e Project Manager Oat Phone* ,., Proposed Sled oafs / Propoaea Comp'1 n •Date ' and Ozone-Depleting Refrigerants and the demolition contractor has properly notified the _o Sam, _,,,_�7,309-1836__ -_- '0 4)29/2019 May 13,2019 Required Special Inspections 0 High-Strength Bolting ❑Epoxy Anchors l Structual Steel Welding ipe5108e tfe—gi tedA b99tosecidbghepaanmhsinlemaaen - E Method/Means Colorado Department ofPublic Health and Environment pursuant to Regulation No.8,Part B. o about any remaining asbestos-containing mated..h the faantyro be ❑Permanent Micropiles 0 Sprayed Fire-Resistants 0 Other E demolished. o N ®Wrecking 0 nooeo�0 implosion 0 Moving 0 Other.specify: o si.nure:,, I Print Nome: As a contractor,you may be subject to other demolition licenses and permits,depending on the Energy Code Compliance 0 Prescriptive Table 0 Other ��a�.lI/ Samuel T Barney t omit ReoeMng aercmngps requirements of the county and municipality in which the work is being performed. The Colorado B RESCheck UA Alternative ❑COMCheck UA Alternative Fellow CO ty Solid Waste Center / 'Burning rewires additional authorization-Memo con(303)6924100 and ask to speak to the Open owning Pem,K coordinator Department of Public Health and Enviromnent,Air Pollution Control Division,strongly suggests Exterior Energy Use Total Approved On-Site Snowmelt 0 Spa O Pool 0 Deseret Abelmment om eaor(DAC) owners None: that you check with county and municipal authorities in order to determine any other local (Existing+New) N A Desiree&Samuel Barney building/permitting requirements that must be Inet. E i 3 MFRSAsbes .molt# Total Quantity mgqsabestesRemoved m v street. Building Type/ I 0 A 0 B ❑F_ ❑E 0 R_ I ❑p One Family ❑Two Family o Fll�/} N/k v c 211 Cottonwood Ln I Occupancy Group B ❑B(A<50) ❑H_ OM ❑S_ R z5 Date RemonalO Irod Tiophono# �B 3 car state: Zip Code: II Please note that certain asbestos-containing materials(ACM)may remain in the structure , C C ❑Townhouse u !ff ( ) N/� - m Aspen co 81611 ❑I_ ❑U Type(s)of Asbestos-Containing Removed: Contacts Nam. Telephone - - during demolition. Therefore,any demolition debris left behind after the completion of post- . - N/A . Sam Barney (970)309-1836 demolition site cleanup may constitute a"reason to know of asbestos-contaminated soil"at UNIT DESCRIPTION AS PROPOSED With my signature below,I certify that I possess current AHERA accreditation and state of Colorado certification as the site,subject to the requirements of Section 5.5 of the Solid Waste Regulations(6 CCR Gross Area of Building:1996 Gross Area of Unit:1996 `o art Asbestos Building Inspector.I also certify that I have thoroughly inspected the facility to be demolished,as listed 1007-2,Part . ADU BUILDING DESCRIPTION 1 In the Demolition Site block above,sampled all suspect materials,had all samples analyzed for the presence of ) Occupant Load:2 Is there an ADU? ❑Yes 5. asbestos bye NVLAP-accredited laboratory,and have determined that no Regulated ACM exists anywhere in the ❑p No S c facility."I also certify that I have informed the owner/operator of the facility or the demolition contractor that any r THE ORIGINAL APPROVAL NOTICE MUST BE POSTED ON SITE AT ALL TIMES. w o asbestos-containing material allowed to stay in the facility must remain non-friable during demolition. Specify type(s) #Stories Above Grade 1 #Stories Below Grade 1 #Living Rooms o a of ACM remaining,below:(check appropriate box(es)): 1 Immediately notify 1/ee Asbeslos/IAQ Unit of project modifications by fax(number above)or e-mail Attached Garage Detached Garage Carport #Kitchens `o 5 (address above)and the appropriate county health department by fox.Project modifications include Parking Spaces Parking Spaces Parking Spaces _ #Full Baths n r ❑Vinyl asbestos floor tile(VAT)❑VAT mastic H( asphalt impregnated roofing El Asphaltic pipe coatings ) changes in the scope of work or the scheduled work dates,etc. #Bedrooms 1 #Full Baths 1 Deck Area 293 #3/4 Baths v U nsoray-applied tar coatings Caulking❑Glazing Other,specify:,'.'A-',r ,,x'' g #1/2 Baths d signature:In Blue ink) Panted Nano: P I Thus demolition approval notice is valid beginning 4/29/2019. #3/4 Baths #1/2 Baths 1 #Bedrooms8. f ?" J/m/ jz.t.4- i The actual scheduled work dates are from 4/29/2019 through 5/13/2019. #Kitchens 1 #Wood Fireplaces 1 #Other Rooms(List) oats 6rfmat repeamn co cud# expirotw Data Telephone* Cell Penns# 7zo I Approval issued on:11/7/2018 #Gas Appliances 0 #Gas Logs0 /nt ty$// /343 re oy/22_t, ( ) (97r>)eeg L/�'o Record number:143126 Fee Paid:$60.00 BUILDING ROOMS AND USES BY LEVEL AS PROPOSED(Include Mechanical&Storage) I vefify that all refrigerants from air conditioning/refrigeration 09 efrigeration appliances have been properly recovered In accordance with AOCC Regulation No. Notice Number:18P17432D • 15(for information on CFC requirements can 692-3100).I further verity that all luminous exit signs(containing radioactive material)have beenCheck number:3022 0,815, disposed of in accordance with 6 CCR 1007-1 subpart 3.6.4.3(for Information on luminous exit sign requirements call 303-692-3320). Basement Personal workspace,storage,mechanical. For the location specified below: v C cHtCK THE APPROPRIATE SOX: • Asbestos Building Inspector: 5 211 Cottonwood Lu Bathroom.m 1,o ® awing Owner I❑ convector I❑ Omer I Dam: October 31,2018 Jim Baker Main Level ALL OUTDOOR LIGHTING O nit m:,, iT ('q I Print Sama: Cerificatmn Ne: 13437 Kitchen,living room,laundry room,one 1/2 bath,one bedroom,one full bath MUST COMPLY WITH �(`ij.`(/ 1� �P��--�i/l`Tl Samuel T Barney kk 211 Cottonwood Ln. 2nd Floor N/A THE CITY OF ASPEN LIGHTING CODE ails Box is FOR CDPHE USE ONLY:. - :' Aspen SECTION 26.575.150 • Postmark or Hand DeliveryDate: I I ( Approved a: - Pitldn County Inspection Date: 10/18/2018 0 P y Lv4 ICode: LJ Initial-310❑transfer-380 Ty �� 3rd Floor N/A Form of Payment bib.a 3002 6o Po/r)I itp/��, n Retold e1L/3/ ,Date Issued: I This notice has been issued to: 0 0 �0 l�J a Regulated asbestos-containing materials means(a)friable asbestos-containing material,(b)Category I non(riabte ACM that has4„1 I Sam Barney Additional N/A J" Uu Celegoty I noldrlable ACM that will be or has been subjected to sanding,gdnd�n,cam,or abrading or(d)Category II nonhlable A I D j 211 Cottonwood Ln. RECEIVED `I a +-' probability of becoming or has become crumbled,pulverized,or reduced to powder by me forces expected to act on the material In th aF_ �� I Y I•� 2�11 demolition or renovation operations regulated by this regulation. Note:Asbestos-containing sheet vinyl and linoleum must be properly I Aspen,CO 81611 Issued S I/L ebetedhemoved prior to demolition. - . �t„- F / �J 03� 7/�� 9 12019 Reviewed By: Bonnie Muhigirwa Date: 5l9/19 emm.,..nit ASPI ND � N CITY OF ASPENIanaavaoso r BUILDINGDEPARTMENT BUILDING DEPARTMENT 130 S.GALENA ST ASPEN,C�'$1 1 ZONING RID SING EFPARTMFNT City of Aspen and Pitkin County • AFFIDAVIT 1 County of Pitkn} State of Colorado) }s.s. • The undersigned, Samuel T Barney after first being sworn upon(his/her)oath,states and agrees as follows: 1. I am of legal age and am currently suffering no infirmities,which might affect my statement and agreement herein. . 2. I am the legal owner or owner's representative of the certain parcel of real estate,known as(street address) 211 Cottonwood Lane Lot 211,Smuggler Park Aspen,Colorado,which property is located within the boundaries of the Smuggler Mountain Superfund Site(Site)as designated by the United States Environmental Protection Agency(EPA). 3..I have proposed to do certain excavation work upon the referenced property, which work I acknowledge is subject to Institutional Controls in the Site,as the excavated soils contain more than 1,000 parts per million(ppm)of total lead.I understand and agree that such excavated material shall be handled in conformance with the Record of Decision and Institutional Controls for the Site. 4. I will direct my contractors or any persons working for me during this excavation and insure that all excavated materials containing total lead equal . to or in excess of 1,000 ppm are transported to an approved repository site, where they will be subject to inventory and be deposited in accordance with repository regulation.It is currently estimated that this project will require the excavation of 385 cubic yard/tons of materials,all of which materials actually excavated shall be accounted for in accordance with current regulations.At the conclusion of my project,I understand that I shall be required to confirm the proper accounting and handling of all such excavated materials before the Building Official will issue my final certificate of occupancy. 5. I understand that falsification of this affidavit may subject me to civil and criminal penalties under local,State and Federal law,including response . costs and penalties under the Comprehensive Environmental Response, Compensation,and Liability Act(CERCLA). Owner or Owner's Representative: Y y (r^ "- • Subscribed and sworn t efore me this 3/Sf day of /1 j 20J Notary Public: -3. (6rr1&.- ' LYNNE S CORDOVA NOTARY PUBLIC STATE OF COLORADO NOTARY ID a 19964010801 MY COMMISSION EXPIRES 06-24.2020 le r_e „ 5. Provide Final Inspection Report.The special inspector shall submit a written final 2. Approval of fabricator Approval shall be based upon review of the fabricator's written SPECIAL INSPECTION AND TESTING AGREEMENT report documenting required special inspections and correction of any discrepancies procedural and quality control manuals and periodic auditing of fabrication practices by noted in the inspections prior to the final building inspection. an approved special inspection agency. To permit applicants ofproject requiring special inspection anchor testing per Section 1704 of the International Building Code(BC). B.Owner Responsibilities.The project owner,the engineer or architect or record,or an agent of the 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator owner is responsible for employing special-inspection services.The special inspector\agency shall shall submit certificate of compliance to the building official stating that the work was Project Address: Permit Number: not be in the employ of the contractor,subcontractor or material supplier.[IBC Sec 1704.1]In performed in accordance with the approved construction documents. case of an owner\contractor,the special inspector\agency shall be employed as specified by the BEFORE A PERMIT CAN BE ISSUED:The owner,or the engineer or architect of record,acting as the building official. owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing G. Budding Department Responsibilities Schedule,including the required acknowledgments.A pre-construction conference with the parties C.Engineer or Architect of Record Responsibilities involved maybe required to review the special-inspection requirements and procedures. 1. Approve special-inspection program.The building department shall approve all 1. Prepare special inspection program.The engineer or architect of record shall list the special inspectors and special-inspection requirements. APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the items for which special inspection is required;and shall indicate any items for which the projects for which they provide special inspections.Special inspectors shall be approved by the building BC or the buildingofficial a periodic inspection and the frequency of such 2. Enforce special inspection.Work requiring special inspection and the building o approves perio p equency inspector shall monitor theperformance of s al ins inspectors.His\Her department prior to performing any duties.Special inspectors shall submit their qualifications and are inspections. p special p approval,in subject to personal interviews for pre-qualification.Special inspectors shall display approved addition to that of the special inspector,must be obtained prior to placement of concrete, identification,as stipulated by the building official,when performing the function of special inspector. 2. Respond to field discrepancies.The engineer or architect of record shall respond to covering of structural steel,or other similar materials. uncor rected field discrepancies in design,material,or workmanship observed by the Special inspection and testing shall meet the minimum requirements of the International Building Code l ins ector. 3. Review inspection reports.The building official should review special-inspection Section 1704.The following conditions are also applicable: specra p progress and final reports. 3. Review shop drawings and submit design changes.The engineer or architect of record 4. Perform final inspection.The building official should the final ins d A.Duties and Responsibilities of the Special Inspector shall acknowledge and review for conformance with the construction drawings thosePec n• g perform inspection an shop drawings that may detail structural information,shall submit to the building official approval for a project[IBC Sec.109.3.1]after the final special-inspection report has been 1. Signify presence at job site.Special inspectors should notify contractor personnel of and to the special-inspection agency written documentation of any verbally authorized reviewed and approved. their presence and responsibilities at the job site.If required by the building official,they deviations from the approved construction documents,and shall submit revised shall sign in on the appropriate form posted with the building permit. documents for building official approval as required. Project Address: Permit Number:'211 Cottonwood Lane Aspen,CO 81611 0062.2019.ARBK 2. Observe assigned work.The special inspector shall observe assigned work for D.Contractor Responsibilities conformance with the building department approved(stamped)design drawings, specifications,and applicable workmanship provisions of the International Building 1. Notify the special inspector.The contractor is responsible for notifying the special ACKNOWLEDGMENTS Code.Architect\engineer-reviewed shop drawings may be used only as an aid to inspector or agency regarding individual inspections for items listed on the attached inspection. schedule and as noted on the building department approved plans.Adequate notice shall I have read and agree to comply with the conditions of this agreement be provided so the special inspector has time to become familiar with the project. For continuous special-inspection,the special inspector shall be on site at all times Special Inspection Agency: Signature: Printed Name: Date: observing the work requiring special inspection.Periodic inspections,if any,must have 2. Provide access to approved plans.The contractor is responsible for providing the -( f 4 /�/I / 1,.� `y, )b prior approval based on a separate written plan reviewed and approved by the building special inspector access to approved plans. VJ4f+Vitt I'�j TI l I pi I fii'd A W. f'b1 09IA�I^-j L r Yowl wl 12-/7 /g department and the engineer or architect of record. J 3. Retain special inspection records.Upon request,the contractor is also responsible for Owner. Signature: A Printed Name Dote 3. Report nonconforming items.The special inspector shall bring nonconforming items to retaining,at the job site,all special inspection records completed by the special inspector. Desiree 4&Samuel T gamey �ap,{N6t¢G%�2LL¢ey Samuel T Barney December 3,2018 the immediate attention of the contractor and note all such items in the daily report.If /j any item is not resolved in a timely manner or is about to be incorporated in the work,the E.Inspection of Fabricators special inspector shall immediately notify the building department by telephone or in Engineer/Architect: Signature: Printed Name: Date: person,notify the engineer or architect,and post a discrepancy notice. 1. Fabrication of structural assemblies and members.Where fabrication of structural 12/19/18 load-bearing members and assemblies is being performed on the premises of a RIPPLE DESIGN STUDIO Paul Irwin PE 4. Provide timely reports.The special inspector shall complete written inspection reports fabricator's shop,IBC Section 1704.2 shall require special inspection of the fabricated for each inspection visit and provide the reports on a timely basis determined by the items. Contractor: Signature: Printed Name: Date: building official.The special inspector or inspection agency shall furnish these reports Samuel T BarneyS /!3 Samuel T Barney December 3,2018 directly to the building official,engineer or architect of record,and others as designated. 2. Fabrication and implementation procedures.The special inspector shall verify that �Y [IBC Sec.1704.1.2]These reports should be organized on a daily format and maybe the fabricator maintains detailed fabrication and quality conaol procedures that provide a submitted weekly at the option of the building official.These reports should include: basis for inspection control of the workmanship and the fabricator's ability to conform to Approved Fabricator Signature: / �� Printed Name: Date: a.Description of daily inspections and tests made with applicable locations, approved construction documents and reference standards.The special inspector shall Bradford Holland !32adz e,GG j4JYBG�¢.. / Bradford Holland 12-19-18 b.Listing of nonconforming items, review the procedures for completeness and adequacy relative to code requirements for (/ c.Report on how nonconforming items were resolved or unresolved as fabricator's scope of work. Myers&Company applicable, inspected Fabricator: Signature: Printed Name: Date: d.Itemized changes authorized by the architect,engineer,and building official if F.Approved Fabricator Responsibilities Bradford Holland , s," !1/�� s 12-19-18 not included in nonconforming items. U�vtza�C2eG Y rB�C¢zt� Bradford Holland 1. Fabrication exempt inspections.Special inspections are not required where work is ((// done on the premise of a fabricator registered and approved to perform such work (divisional_ Signature: Printed Name: Date: 1 without special inspection. ajTY OF ASPF,)) PITON COUNTY: 2 RECEIVED 3 03/27/2019 ASPEN • BUILDING DEPARTMENT