HomeMy WebLinkAboutFile Documents.837 W Smuggler St.0240.2018 (9).ARBK PV WORKSHEET
CITY OF ASPEN VERSION 111 UPDATED MARL I28 2017
PROJECT ADDRESS: 1320 Mountain View Dr.
Parcel ID#: Permit Number: 0023.2019.ARBK
Collector Solar
Aspect,Degress Collector Tilt, Orientation
from True South Degrees From Adjustment DC side capacity Inverter capacity kW for kW Mitigation
Horizontal Factor (kW) (kW) credit Credit
Collector Group 1 10 10 93.10% 14.4 12 12 11.17 kW
Collector Group 2 87.00% 0 0.00 kW
Collector Group 3 87.00% 0 0.00 kW
Collector Group 4 87.00% 0 0.00 kW
Collector Group 5 87.00% 0 0.00 kW
Collector Group 6 87.00% 0 0.00 kW
Collector Group 7 87.00% 0 0.00 kW
Collector Group 8 87.00% 0 0.00 kW
Collector Group 9 87.00% 0 0.00 kW
Collector Group 10 87.00% 0 0.00 kW
Collector Group 11 87.00% 0 0.00 kW
Collector Group 12 87.00% 0 0.00 kW
Collector Group 13 87.00% 0 0.00 kW
Collector Group 14 87.00% 0 0.00 kW
Collector Group 15 87.00% 0 0.00 kW
Collector Group 16 87.00% 0 0.00 kW
Collector Group 17 87.00% 0 0.00 kW
Collector Group 18 87.00% 0 0.00 kW
Collector Group 19 87.00% 0 0.00 kW
Collector Group 20 87.00% 0 0.00 kW
Total: 11.17 kW
$Mitigation Credit: $ 76,699.36
Instructions:
1) Determine how many collector groups you have.Groups are used to differentiate between collectors
(panels)with different tilts,aspects,sizing,or inverters. If all your collectors are installed similarily,you
might have just one group.
2) Enter the aspect and tilt for each group.The solar orientation adjustment factor is automatically
calculated.
3) DC side capacity is the total labled panel output kW in a group.
4) Inverter capacity is the recommended input power in kW of your inverter(s).
5)You will be given credit for the lesser of the labeled panel output or the inverter.
6)The kW for credit is multiplied by the solar orientation adjustment factor to get kW mitigation credit.
7)The kW mitigation credit is totalled and multiplied by$6865.32/kW to get the$Mitigation Credit
8)The mitigation credit will be automatically entered into your RREMP or CREMP form.If your project has both RREMP and
CREMP,it will automatically divide the credits up,with priority given to mitigating the CREMP fee.
PREPARED BY: Date:
Print Name: Bonnie Muhigirwa
Signature:
Phone&EMail:
REVIEWED: Bonnie Muhigirwa Date: 7/11/2019