HomeMy WebLinkAboutFile Documents.993 Moore Dr.0322.2017.ARBK 993Moore_BuildingComments_1
PlanSet.Architecture.993MooreDrive.2017.12.pdf(3)
Page:A-123-MAIN LEVEL FLOOR PLAN -NORTH
File Name: PlanSet.Architecture.993MooreDrive.2017.12.pdf Provide specifications for a pool
Author: bonniem and spa cover listed as ASTM
Subject: PlanCheck F1346 or revise to show an
VColor: •
-
enclosure barrier per 2015
ISPSC 305.
� no
1, . , See attached:
—' T---' "'—` PoolCover.993Moore.2018.04
Q.,1', a I i`- Refer to final page for compliance listings
v v Page:A-503-TYPICAL WALL ASSEMBLIES R10 continuous+ R10 spray 4';'"T .w�„®`�,�� •";----•";---- File Name: PlanSet.Architecture.993MooreDrive.2017.12.pdf P y
"'��
-; Author: bonniem cavity insulation is shown at
� ,i 1 ` Subject: PlanCheck detail W2. Minimum basement
wall value per Table R402.1.2 is
p , _.. '� * Color. ■
V R15 continuous or R19 cavity or
L' : a- a combination of R10 continuous
' . a-: .a.�. s- and R13 cavity.
-w' � Proww® omorE s v..W.•,. nP�w� Revised, refer to sheet A-503.
Page:A-601 -DOOR SCHEDULE Maximum is U-value .28 per
File Name: PlanSet.Architecture.993MooreDrive.2017.12.pdf Ordinance 40, lue Correct at
Author: bonniem Exterior Door&Window Notes VrE:::VROell[ o Ell Subject: PlanCheck
#;
Color: • on A601-603.
U
V W
o Revised, refer to sheets A601-603.
U o
re
PlanSet.Mechanical.993MooreDrive.2017.12.pdf(1)
T Page: M.0.001 -MECHANICAL LEGEND&SPEC'S
_ File Name: PlanSet.Mechanical.993MooreDrive.2017.12.pdf Balanced mechanical ventilation
,::7,
v.__......_..___ 1 with simultaneous outdoor
m q _..._ ____: == Author: bonniem
=-= airflow and exhaust airflow within
Subject: PlanCheck o
Color • 20/o of each other is required
V -_ -Y-- ---- 1 — This house is equipped with(4)Energy Recovery Ventilators(ERVs) per Ordinance 40, 2016.
that provide a combined airflow of 775 cfm.The Sequence of Provide additional clarification on
a� Operations on Sheet M.7.001 describes how the ERVs will operate how this requirement is to be
---_ __,._..®...,,...a for 20 minutes of every hour,or more if initiated manually.The met.
_____n__ Energy Recovery Ventilator Schedule on sheet M.7.002 specifies the
:. 7_-_.- ERVs and lists the airflow.The placement of the units and ducting/
air distribution can be seen on sheets M.2.001 &M.2.002.
PlanSet.Structure.993MooreDrive.2017.12.pdf(1)
Page: S-600-POOL PLAN AND DETAILS
_— File Name: PlanSet.Structure.993MooreDrive.2017.12.pdf Provide additional detail on the
proposed pool structure. Clarify
Author: bonniem how vertical and lateral support
Subject: PlanCheck
ji.
is to be provided to resist
settlement on the slope.
r
°
Refer to attached letter submitted by KL&A(Structural Engineer)and attached pool
.- ign drawings from Colorado Pool Designs.Pool retaining wall design needs RECEIVED
to be stamped by a licensed
engineer or architect. 06/01/2018
ASPEN
BUILDING DEPARTMENT
Special Inspection Signature Sheet 12-22-17.pdf(1)
w~M Page: 1 A fabricator will need to be
= n;asp °,WN Author: bonniem File Name: Special Inspection Signature Sheet 12-22-17.pdf
� identified and sign the form prior
A.roM Ha* S�uioe: bond Nem:
Subject: PlanCheck to permit issuance
FArriumer _gm Color: ■
Name:
CRY Or ASPEN
tmm A fabricator will need to be identified and
sign the fonn prior to permit Issuance
All special inspection
agreement signatures must
be receive prior to permit
issuance.
RECEIVED
06/01/2018
ASPEN
BUILDING DEPARTMENT