Loading...
HomeMy WebLinkAboutFile Documents.993 Moore Dr.0322.2017.ARBK 993Moore_BuildingComments_1 PlanSet.Architecture.993MooreDrive.2017.12.pdf(3) Page:A-123-MAIN LEVEL FLOOR PLAN -NORTH File Name: PlanSet.Architecture.993MooreDrive.2017.12.pdf Provide specifications for a pool Author: bonniem and spa cover listed as ASTM Subject: PlanCheck F1346 or revise to show an VColor: • - enclosure barrier per 2015 ISPSC 305. � no 1, . , See attached: —' T---' "'—` PoolCover.993Moore.2018.04 Q.,1', a I i`- Refer to final page for compliance listings v v Page:A-503-TYPICAL WALL ASSEMBLIES R10 continuous+ R10 spray 4';'"T .w�„®`�,�� •";----•";---- File Name: PlanSet.Architecture.993MooreDrive.2017.12.pdf P y "'�� -; Author: bonniem cavity insulation is shown at � ,i 1 ` Subject: PlanCheck detail W2. Minimum basement wall value per Table R402.1.2 is p , _.. '� * Color. ■ V R15 continuous or R19 cavity or L' : a- a combination of R10 continuous ' . a-: .a.�. s- and R13 cavity. -w' � Proww® omorE s v..W.•,. nP�w� Revised, refer to sheet A-503. Page:A-601 -DOOR SCHEDULE Maximum is U-value .28 per File Name: PlanSet.Architecture.993MooreDrive.2017.12.pdf Ordinance 40, lue Correct at Author: bonniem Exterior Door&Window Notes VrE:::VROell[ o Ell Subject: PlanCheck #; Color: • on A601-603. U V W o Revised, refer to sheets A601-603. U o re PlanSet.Mechanical.993MooreDrive.2017.12.pdf(1) T Page: M.0.001 -MECHANICAL LEGEND&SPEC'S _ File Name: PlanSet.Mechanical.993MooreDrive.2017.12.pdf Balanced mechanical ventilation ,::7, v.__......_..___ 1 with simultaneous outdoor m q _..._ ____: == Author: bonniem =-= airflow and exhaust airflow within Subject: PlanCheck o Color • 20/o of each other is required V -_ -Y-- ---- 1 — This house is equipped with(4)Energy Recovery Ventilators(ERVs) per Ordinance 40, 2016. that provide a combined airflow of 775 cfm.The Sequence of Provide additional clarification on a� Operations on Sheet M.7.001 describes how the ERVs will operate how this requirement is to be ---_ __,._..®...,,...a for 20 minutes of every hour,or more if initiated manually.The met. _____n__ Energy Recovery Ventilator Schedule on sheet M.7.002 specifies the :. 7_-_.- ERVs and lists the airflow.The placement of the units and ducting/ air distribution can be seen on sheets M.2.001 &M.2.002. PlanSet.Structure.993MooreDrive.2017.12.pdf(1) Page: S-600-POOL PLAN AND DETAILS _— File Name: PlanSet.Structure.993MooreDrive.2017.12.pdf Provide additional detail on the proposed pool structure. Clarify Author: bonniem how vertical and lateral support Subject: PlanCheck ji. is to be provided to resist settlement on the slope. r ° Refer to attached letter submitted by KL&A(Structural Engineer)and attached pool .- ign drawings from Colorado Pool Designs.Pool retaining wall design needs RECEIVED to be stamped by a licensed engineer or architect. 06/01/2018 ASPEN BUILDING DEPARTMENT Special Inspection Signature Sheet 12-22-17.pdf(1) w~M Page: 1 A fabricator will need to be = n;asp °,WN Author: bonniem File Name: Special Inspection Signature Sheet 12-22-17.pdf � identified and sign the form prior A.roM Ha* S�uioe: bond Nem: Subject: PlanCheck to permit issuance FArriumer _gm Color: ■ Name: CRY Or ASPEN tmm A fabricator will need to be identified and sign the fonn prior to permit Issuance All special inspection agreement signatures must be receive prior to permit issuance. RECEIVED 06/01/2018 ASPEN BUILDING DEPARTMENT