Loading...
HomeMy WebLinkAboutFile Documents.1419 Crystal Lake Rd.0044-2020-BCHO (2) Engineering Markup Summary Round 1 7-30-2020 Updated Civil Plans.1419 Crystal Lake Rd.2019.11.pdf(2) `" �° ; Page: C6 GRADING AND DRAINAGE How is drainage from the north ®_ p \ . Author: mikeh east portion patio conveyed to ®!/ \ Date: 7/30/2020 3:36:44 PM the BMP?Appears to sheet flow it -` Q File Name: Updated Civil Plans.1419 Crystal Lake 4"1 U Rd.2019.11.pdf into green space. Detention is t 01l required for all impervious areas. - 1kt ".oF awEE�9 ,,� A swale has been extended to a new inlet proposed to the south of ila s,Eo ,�pp f 4, � the patio(INLET-C4.1). / _it I Page: C6 GRADING AND DRAINAGE ;o° 4 How is drainage from the Author: mikeh southern portion of the patio -i Date: 7/30/2020 3:36:28 PM E°<;„ i E conveyed �� File Name: Updated Civil Plans.1419 Crystal Lake to the BMP?Appears 1001, to sheet flow into green space. Rd.2019.11.pdf Detention is required for all ,�• The french drain has been extended to capture this portion of impervious areas. Ea impervious area from the patio. RECEIVED 08/31/2020 ASPEN BUILDING DEPARTMENT