`" �° ; Page: C6 GRADING AND DRAINAGE
How is drainage from the north
®_ p \ . Author: mikeh east portion patio conveyed to
®!/ \ Date: 7/30/2020 3:36:44 PM the BMP?Appears to sheet flow
it -` Q File Name: Updated Civil Plans.1419 Crystal Lake
4"1 U Rd.2019.11.pdf into green space. Detention is
t 01l required for all impervious areas.
- 1kt ".oF awEE�9 ,,� A swale has been extended to a new inlet proposed to the south of
ila s,Eo
,�pp f 4,
� the patio(INLET-C4.1).
/ _it
I
Page: C6 GRADING AND DRAINAGE
;o° 4 How is drainage from the
Author: mikeh southern portion of the patio
-i Date: 7/30/2020 3:36:28 PM
E°<;„ i E conveyed
�� File Name: Updated Civil Plans.1419 Crystal Lake to the BMP?Appears
1001,
to sheet flow into green space.
Rd.2019.11.pdf
Detention is required for all
,�• The french drain has been extended to capture this portion of
impervious areas.
Ea
impervious area from the patio.