HomeMy WebLinkAboutFile Documents.1411 Crystal Lake Rd.0062.2018 (13).ARBK DATE: 03-02-18 MASTER PERMIT: PERMIT NUMBER:
0062 . 2018 .arbk 1
•
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT APPLICATION THECITYOFASPEN
PROPERTY INFORMATION
ADDRESS 1411 Crystal Lake Road, Aspen UNIT# PARCEL ID# 2737-181-00-018
Lor N/A BLOCK N/A T OR SUBDIVISION RAT Section 8, Township 10 South, Range 84 W of the 6th P.M.
OWNER NAME Valley Group LLC CELL 615-594-7443 EMAIL psmallwood@smallwoodnickle.com
BEST CONTACT Luis Menendez CELL 970-948-8347 EMAIL LAM@MenendezArchitects.com
NAME
PROJECT DETAILS
OF
WORK IN DESCRIPTION D TAIL New single-family dwelling, with attached garage, to replace existingsingle-family dwelling.
Y 9, 9 9 p 9 Y
PROJECT Use of Building Class of Work Fixture Counts Equipment Checklist
VALUATION $6,640,234
❑ Commerical 6 Toilets,Bidets
SQ FT OF ® New 0 Forced Air/Gravity Systems
o ❑ Multi-Family1 Bathtub
W RKAREA 9,164 (gross area) 0Addition 0 Wall,Suspended,or Unit Heaters
® Y 0Alteration Family Single7 Lavatory(Wash Basin)
g1 Gas Log
El5 Shower
UNITSQFT Mixed-Use ❑ Repair 2 Gas Appliancew
F 1 Kitchen Sink(+Disposal)
LOT SIZE 0 El IF R 1 Dishwasher 1 Appliance Vents
(SQ FT) 40,813 ❑ Tenant Finish 1 Laundry Bar,Utility Sink 4 Heat,Refrig,Cooling,or
DISTURBED Will there be ® Demolition 1 Clothes Washer Absorption Unit
EXTERIOR AREA 24,200 any roof/wall ❑ Change Order 0 FloorSink 2 Boilers(includes vent)
penetrations? ❑ 6 Floor Drain 4 Air Handling Unit
NEW SQ FT ® Yes 0 Water Heater(Pan Req) 0 Cooling Systems
Q4 #Gas Outlets 0 Ventilation Fans
WITH UTIUOT10f WORK 1,574 ❑ No 1 Water Treatment 1 Range Hood
0 Other 4 #of Gas System Outlets
ZONE DISTRICT R-15 1 Snowmelt System Sq Ft 974
J
N Project Valuation:Cost of project as defined in Valuation Affadavit. NOTICE: This permit becomes null and
Z Sq Ft of Work Area:Total square footage of area undergoing change or reconfiguration. void if work or construction authorized
Unit Sq Ft:Gross Square Footage,not FAR,of permitted unit. is not commenced within 180 days,or
~ Lot Size:Total surveyed square footage of property. if construction or work is suspended or
Y q g p p Y abandoned for a period of 180 days at
Disturbed Exterior Area:Square footage of lot affected by permit application. any time after work is commenced.
u_ New Sq Ft:Total added square footage for additions to net livable or net leasble space.
p Sq Ft of Rooms with Utility Work:Total square footage,not FAR,of all rooms with plumbing work. Re-
FOR CITY USE ONLY APPROVALS viewer
Reviewing Needs Sign- Date
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Department Review Off Approved
PC x jb 3/29/ 8
Plan Check 56924 . 89 Permit Fee 87576 . 76 Parks Impact x JPO 3/22/19
Zoning
Engineering 32608 . 67 Zoning(50%) 9736 . 75
School Ded. HPC
Building x NT 3/12/19
Zoning(so%) 9736 . 75 CMP(50%) 4902 . 74 TDMlmpact Fire xx NT 2/21/19
Engineering X MH 3/12/19
Energy Code 13136 . 51 REMP Ped.Amenity CMP x TK 3/15/19
4902 . 74 Plan Check Water x SW 3/22/19
CMP(50%) Housing Cash in Lieu Stormwater x Al' 3/6/19
(Hourly)
Parks Review 1224 . 39 Zoning Stormwater Sanitation x PM 5/7/18
(Hourly) Env. Health
Utility Review 1574 Engineering City Use Tax 68672 . 46 Parks x Dr 3/20/19
(Hourly) Landscape
GIS 500 County Use Tax 16600 . 59 Efficiency x RM 3/14/19
Approved I DAM 4/, 1 „
Lot Area Deed Restricted
To Issue . i,
" �_' �11 B_ 1
434 Census Code # of Dwellings Plans Location Issuance
( CITY OF ASPEN 130 S. GALENA ST I ASPEN, C 1j
December
ADDRESS: 1411 Crystal Lake Road PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
146-1
BUILDING PERMIT CONTACT SHEET TUECnYOFASPES
FOR PLAN REVIEW QUESTIONS
Name Luis Menendez Phone 970-544-4851 E-mail LAM@MenendezArchitects.com
FOR INSPECTION QUESTIONS
Name Jim Iglehart Phone 970-379-5990 E-mail Jim@lqlehart.com
OWNER
Name Valley Group LLC Phone Cell Phone 615-594-7443
Ar�dress 3001 Hillsboro Road
city Brentwood State TN ZIP 37027
E-mail psmallwood@smallwoodnickle.com
AddOWNER'S AUTHORIZED AGENT
Name Jim Iglehart Phone 970-925-5990 Cell Phone 970-379-5990
Mailing
617 W. Main Street State CO ZIP
Aspen
City81611
Address Jim@Iglehart.com
APPLICATION BEST CONTACT
Name Luis Menendez Phone 970-544-4851 Cell Phone 970-948-8347
Address 715 W. Main Street, Suite 104
City Aspen State CO ZIP 81611
E-mail LAM@MenendezArchitects.com
Address
ARCHITECT OR DESIGNER OF RECORD
Name Luis Menendez- Menendez Architects P.C. Phone 970-544-4851 Cell Phone 970-948-8347
argess 715 W. Main Street, Suite 104 C; Aspen City P State CO ZIP 81611
Address LAM@MenendezArchitects.com
CIVIL ENGINEER OF RECORD
Name Josh Rice -Woody Creek Engineering Phone 970-429-8297 Cell Phone 970-309-7130
Adds lregs 557 N. Mill Street, Suite 201 City Aspen State CO ZIP 81611
aaess Josh@WoodyCreekEngineering.com
STRUCTUAL ENGINEER OF RECORD
Name Hein Brutsaert-Silver Town Structures Phone 970-300-1003 Cell Phone
ram 307 Aspen Airport Business Center, Suite N City Aspen State CO ZIP 81611
Address Hein@Brutsaertenqineerinq.com
GENERAL CONTRACTOR
Name Iglehart Construction Phone 970-925-5990 cell Phone 970-379-5990
address 617 W. Main Street City Aspen State CO zip 81611
Address Jim@Iglehart.com
INSPECTIONS: The General Contractor must schedule inspections online.
Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so.
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my responsibility to review the approved plans and any comments that are contained thereon and see that the
structure and/or project is built in compliance with all applicable codes.
Contractor Digitally signed by Jim Iglehart
Signature Jim Iglehart DN: Iglehart,o=Iglehart Construction,ou,emaikjimotigfillgtecom,c U5
Dare a016.JSrS.7.33.0/-07'0J
❑ Check if you are a tested owner builder(single-family homes only).You must take a test and complete the owner i it gM W r')
(CITY USE ONLY)Owner builder approved by: Date: Affidavit on file
I CITY OF ASPENAugust2ol7 130 S. GALENA ST I ASPEN, CO3g .t11 f 8
C,�Crr04C7v1'
1411 Crystal Lake Road
ADDRESS: Y PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
SCOPE OF WORK CHECKLIST THE GrYorAsrEN
LAND USE QUESTIONS
If you check any of the boxes below, please consult with the Planner of the Day(planneroftheday@gmail.com) before submitting your
permit application.
Does your permit involve any of the following?
• Part of an approved COA Land Use Review ❑ Work involves Landmark Parcel or Historic District
❑ Work affects net leasable, net livable, or ❑ Located in 100-year flood plain or within 100' of high
non-unit space water mark
❑ Work involves lot splitting or combining a lot ❑ Work involves changes in occupancy to structure
❑ Work involves exterior of structure Changes to elevator or stair configuration
ElChanging the number of residential units Changes to the use of existing structure or space
• Changes to number or location of
onsite parking
ADDITIONAL SCOPE OF WORK QUESTIONS
Does your permit involve any of the following?
• Exterior lighting added or changed ❑ Work involves exterior wall penetrations
❑ Work involves roof penetrations ❑ Work involves digging or excavation
Work adds, removes, or changes ❑ Work involves restaurant or food service
plumbing fixtures
❑ Disturbs 1,000 sq ft or more of soil within ❑ Affects parking spaces/meters, loading zones, or alleys
12 months
❑ Work occurs in public right of way ❑ Adding structures or systems over utility lines
❑ Work affects trees or occurs within the ❑ Work within City Mall boundaries
dripline of a tree
•
RECEIVE!
( CITY OF ASPEN
_August130 S. GALENA ST I ASPEN, Cdigf e1�1'f
,a
BUILDING DEPARTMENT
PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DESCRIPTION FORM - IRC & IBC THE On or ATE\
BUILDING CODE INFORMATION
I$I 2015 IRC ❑ 2015 IBC 0 2015 IEBC 0 Other (Please Explain)
Code Editions (As Adopted and Amended) (As Adopted and Amended) (As Adopted
and Amended)
Fire Sprinkler System I Existing? ENo I Required? ❑®Neon I Type 0 NFPA 13 ❑ NFPA 13 R l NFPA 13 D
Type Of Construction ❑ VA ® VB❑ IV 0 IIIA ❑ IIIB ❑ IIA ❑ IIB 0 IA 0 IB Fire Alarms Installed ❑ Yes® No
Required Special Inspections El High-Strength Bolting fl Epoxy Anchors IZI Structual Steel Welding
0 Permanent Micropiles 0 Sprayed Fire-Resistants 0 Other
Energy Code Compliance ® Prescriptive Table 0 Other
❑ RESCheck UA Alternative ❑ COMCheck UA Alternative
Exterior Energy Use Total Approved On-Site Snowmelt 866 SF Spa 64 SF Pool none
(Existing + New) (package unit)
Building Type/ I ❑ A ❑ B ❑ F_ ❑ E ❑ R_ I ® One Family ❑ Two Family
Occupancy Group g ❑ B (A<50) ❑ H_ ❑M ❑ S_ R
C ❑ I ❑ U C ❑ Townhouse
UNIT DESCRIPTION AS PROPOSED
Gross Area of Building: 9,164 SF Gross Area of Unit: N.A. ADU BUILDING DESCRIPTION
Occupant Load: 46
Is there an ADU? 0 Yes
® No
# Stories Above Grade 2 # Stories Below Grade 1 # Living Rooms
Attached Garage Detached Garage Carport # Kitchens
Parking Spaces 2 Parking Spaces 0 Parking Spaces 0 # Full Baths
# Bedrooms 4 # Full Baths 1 Deck Area # 3/4 Baths
# 3/4 Baths 4 # 1/2 Baths 1 # Bed Baths
# Bedrooms
# Kitchens 1 #Wood Fireplaces 0 #Other Rooms (List)
# Gas Appliances 1 # Gas Logs 0
BUILDING ROOMS AND USES BY LEVEL AS PROPOSED (Include Mechanical & Storage)
Basement Bedroom #4 Closet#4 Bath #4, Mechanical Room, Play Room, Owner's Storage, Utility Room, Hallway,
Stair, Elevator
Main Level Living Rm, Dining Rm, Kitchen, Office, Mudroom, Laundry, Powder Rm, Garage, Storage, Master Bedrm,
Master Bath & Closet, Hallway 2, Stair, Bedroom #2, Bath & Closet#2, Bedroom #3, Bath & Closet#3, Elev.
2nd Floor Storage, Elevator
3rd Floor
Additional
RECEPED
Reviewed By: NT Date: 2/21/19
( CITY OF ASPEN January 2018 130 S. GALENA ST I ASPEN, COS/gf6i°11)E
BUILDING DEPARTMENT
ADDRESS: 1411 Crystal Lake Road PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
HOMEOWNER ASSOCIATION COMPLIANCE FORM T„1 0I1 01_A±,,,,
All applications for a building permit within the City of Aspen are required to include a certification of compliance
with applicable covenants and homeowner association policies. The certification must be signed by the property
owner or attorney representing the property owner. The following certification shall accompany the application
for a permit.
ADDRESS 1411 Crystal Lake Road UNIT# PARCEL ID# 2737-181-00-018
I, the property owner, certify as follows: (pick one)
eThis property is not subject to a homeowners association or other form of private covenant.
❑ This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit do not require approval by the homeowners association or covenant
beneficiary.
❑ This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit have been approved by the homeowners association or covenant beneficiary.
I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning, or effect
of private covenants or homeowner association rules or bylaws. I understand that this document is a public
document.
Owner Signature 7474. J,Y, oocil - 1 , CAeiw Date 3 ' ) • ) 4�
1 ;az„�-
Owner Printed Name Patti Smallwood
OR
Owner's Attorney Signature Date
Owner's Attorney Printed Name
REC�EIV
CITY OF ASPEN
—January130 S. GALENA ST I ASPEN, COlgfgfilA8
;-ctW L IB;
BUILDING DEPARTMENT
ADDRESS: 1411 Crystal Lake Road PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
ASBESTOS VERIFICATION AND CHECKLIST THE CITY orASII\
ASBESTOS INFORMATION
Asbestos is a known human carcinogen and is an airborne hazard.Once airborne,asbestos fibers can stay suspended in the air for days,
weeks,or even months before settling out of the air.The fibers can easily become airborne again from a minor disturbance like turning
on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos
hazards that could expose people to asbestos in the future, long after the renovation activity occurred.The airborne asbestos fiber
concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home.
The 1989"ban"on asbestos-containing materials is commonly misunderstood. In fact, in 1991 the U.S. Fifth Circuit Court of appeals
vacated much of the so-called "Asbestos Ban and Phaseout Rule"and remanded it to the EPA.Thus, much of the original 1989 EPA ban
on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos-containing product categories was
set aside and DID NOT TAKE EFFECT.Therefore,ALL demolition, remodel or renovation projects must determine if disturbed material
above the trigger levels contains asbestos.
ASBESTOS CHECKLIST
eles❑No
Residential: Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel—examples are drywall,
linoleum, ceiling tiles, roofing materials, etc.?
❑Yes❑ No
Commercial: Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel—examples are drywall,
linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.?
If the answer is YES to any of the above,you will need an asbestos test before you can receive a building and/
or demolition permit. You will also need to provide plans indicating areas to be demolished and determine if a
CO state demolition license is required. A state certified asbestos inspector must do this test and the test report
must be submitted with the building permit application. If the building has asbestos, a state certified asbestos
abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building
Department stating that all the asbestos has been removed and that the air is clean.This letter must be received
BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state.
co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof
of current state certification.)
If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the
Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE:
A copy of this demolition permit app must be submitted with the initial building permit application. When the
CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our
permit.
I hereby certify that the above information is true and complete.
Owner Valley Group LLC Phone # 615-594-7443
Applicant (print name) Jim Iglehart Phone# 970-379-5990
Digitally signed by Jim Igiehart
DN:cn,llm Iglehart,o=lglefvrt Construction,
Applicant Signature Jim Ig a art ou ernalF-ylm@ylebartcwnc-4Js Date 03-02-2018
to t..ze1aez z)1733.4e 07e0 r CEP/E
Please calf the City of Aspen Environmental Health Department at 920-5039 at any time if you h xiu
about asbestos, interpreting your test results, or other matters.
CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO3 i.96/fY1- 3
A3f-
Liv
BUILDING DEPARTMENT
ADDRESS: 1411 Crystal Lake Road PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
VALUATION AFFADAVIT
THE CITY OF ASPEN
AFFIDAVIT POLICY
All applications for a building permit within the City of Aspen are required to include a certification of
compliance with building permit valuation requirements. The certification must be signed by the property
owner or authorized representative. The following certification shall accompany the application for a permit.
I,the property owner or authorized agent, understand and certify as follows:
City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and
International Building Code (IBC)with certain amendments. These codes define building valuation as follows:
R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a
permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems,
including materials and labor.
109.3 Building permit valuations.The applicant for a permit shall provide an estimated permit value at time
of application. Permit valuations shall include total value of work, including materials and labor, for which the
permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in
the opinion of the building official,the valuation is underestimated on the application,the permit shall be
denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final
building permit valuation shall be set by the building official.
City policy indicates that permit valuation includes materials and labor for the structure and mechanical,
electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as
audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction
such as equipment rental and contractor fees. Finish materials such as paint,floor coverings, tile, cabinets and
counter tops are included in the permit valuation total.
Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development
mitigation fees, trash removal, and cleaning are not included.
I certify that the permit valuation entered on the permit application for this property complies with the above
valuation requirements. I understand that this document is a public document.
Owner Signature: Date:
Owner Printed Name:
or, J i m Digitally signed by Jim Iglehart
DN:cn=Jim Iglehart,o=lglehart
Construction,ou,
Authorized Agent Signature: If e h a rt _ nem,ffi.1=,jom, mesha,rt,.coms3tate: 03-02-18
Authorized Agent Printed Name: Jim Iglehart
RECEIVE D
( CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO3giti?f J B
ASPEN
BUILDING DEPARTMENT
Iglehart Construction Estimate
617WMainSt 1
Aspen, CO 81611 Iglehart
construction
(970) 925.5990
Item/Cost Code Description Amount
1185 1411 Crystal Lake
1 General Requirements
10125.000 Project Manager 122,938.00
10150.000 Superintendent 245,295.21
10152.001 Field Office Supplies 1,500.00
10156.000 General Liability Insurance 42,000.00
10200.002 Plan Reproductions 3,000.00
10200.004 Temporary Utilities 10,000.00
10200.005 Temporary Office 15,184.00
10200.006 Temporary Heat&Tenting 13,832.00
10200.007 Winter Protection 5,000.00
10200.008 Telephone&Internet 2,000.00
10200.009 General Labor 40,000.00
10200.010 Trash Removal 8,000.00
10200.012 Jobsite Signs 500.00
10200.013 Drinking Water 800.00
10200.018 Temp Lighting 2,300.00
10200.020 Environmental Testing 2,500.00
10200.021 Freight 1,000.00
10201.000 Contractor Fee 603,701.00
10203.000 Contractors Contingency 40,000.00
10210.000 Traffic Control 2,500.00
10500.001 Rental Equipment 10,000.00
10525.000 Storage Facility 5,184.00
10527.000 Portable Toilet 5,400.00
10550.000 Safety Compliance 3,300.00
10600.000 Contract Closeout 8,000.00
10700.000 Construction Clean 8,000.00
Division Total: 1,201,934.21
2 Site Requirements
20220.000 Surveying 6,132.00
20225.000 Waterline installation 29,045.88
20231.001 Demolition 110,000.00
20231.009 Crane 10,000.00
20231.012 Winterization/Snowremoval 10,000.00
20231.019 Temporary Fencing 8,000.00
20232.000 Mud Control 1,023.00
RECEIVED
3/29/2018
ASPEN
BUILDING DEPARTMENT
Proposal 02/27/18
Continued...
Item/Cost Code Description Amount
20234.001 Sound Mitigation 20,000.00
20235.000 Excavation 140,000.00
20236.000 Backfill 52,438.81
20239.000 Shoring 35,000.00
20250.000 Utilities 45,156.87
20262.000 Drywell 10,069.00
21020.000 Driveway Surfacing Roadbase 29,757.00
21100.000 Site Drainage 15,050.00
21200.000 Landscaping 68,642.00
Division Total: 590,314.56
3 Concrete
30331.000 Foundation 155,782.00
30350.000 Concrete-Entry&Walks 13,394.00
30352.000 Concrete-Garage 2,750.00
30353.000 Concrete-Slab Prep 6,148.00
30354.000 Concrete Decks and Patios 12,469.25
30356.000 Concrete Topping 41,262.00
Division Total: 231,805.25
4 Masonry
40000.000 Masonry 60,500.00
40100.000 Fireplace Masonry 45,000.00
Division Total: 105,500.00
5 Metals
50510.000 Structural Steel 200,000.00
50520.000 Handrails and Railings Steel 59,800.00
50551.000 Misc. Metals 57,766.53
Division Total: 317,566.53
6 Wood and Plastics
60112.001 Cabinetry 309,828.57
60500.000 Interior Trim Materials 87,500.00
60510.000 Interior Trim Labor 170,968.85
60600.000 Wood Framing-Materials 155,000.00
60611.000 Wood Framing Labor 190,000.00
Division Total: 913,297.42
7 Thermal/Moisture Protection
70400.000 Flashing 21,300.00
70600.000 Insulation 44,098.00
70711.000 Foundation Waterproof& Insul 15,787.00
70722.000 Roof and Deck Insulation 55,000.00
70723.000 Roofing 352,179.61
70740.000 Chimney Cap Metal 9,420.00
Report 6-1-11-52 RECEIVED
jamespi Page 2 3/29/2018
ASPEN
BUILDING DEPARTMENT
Proposal 02/27/18
Continued...
Item/Cost Code Description Amount
Division Total: 497,784.61
8 Doors and Windows
80310.000 Windows&Exterior Doors 320,585.38
80600.000 Door Hardware 21,254.43
80800.000 Interior Doors 64,354.77
80837.000 Garage Doors 17,160.24
80852.000 Windows Installation 60,793.60
80853.000 Specialty Glass 91,986.62
Division Total: 576,135.04
9 Finishes
90300.000 Drywall&Integral Plaster 192,653.57
90400.000 Stucco 56,070.00
90600.000 Painting 62,430.00
90711.000 Slab Material& Install 113,042.00
90715.000 Sealants/Caulking 16,538.00
90800.000 Wood Flooring 63,425.11
90900.000 Carpet 13,050.00
Division Total: 517,208.68
10 Specialites
100200.000 Mirrors 1,565.99
100250.000 Tub&Shower Enclosures 12,832.00
100300.000 Fireplace Appliances 15,000.00
Division Total: 29,397.99
11 Equipment
110100.000 Appliances 87,480.11
Division Total: 87,480.11
13 Special Construction
130200.000 Spas 62,598.10
Division Total: 62,598.10
15 Mechanical
150100.000 Plumbing 208,430.41
150150.000 Plumbing Fixtures 189,678.00
150200.000 Fire Protection 60,000.00
150302.000 Radient Floor Heat 216,959.50
150350.000 Snowmelt 12,000.00
150400.000 HVAC 275,530.00
Division Total: 962,597.91
16 Electrical
160101.000 Electrical 435,937.84
160500.000 Security& Fire Alarm 7,615.82
Report 6-1-11-52 RECEIVED
jamespi Page 3 3/29/2018
ASPEN
BUILDING DEPARTMENT
Proposal 02/27/18
Continued...
Item/Cost Code Description Amount
160601.001 Audio Visual System 65,000.00
160675.000 Motorized Shades 38,060.00
Division Total: 546,613.66
Grand Total: 6,640,234.07
Report 6-1-11-52 RECEIVED
jamespi Page 4 of 4 3/29/2018
ASPEN
BUILDING DEPARTMENT
PERMIT NUMBER: ADDRESS: 1411 Crystal Lake Road
COMMUNITY DEVELOPMENT DEPARTMENT 40 1
ZONING COMPLIANCE VERIFICATION POLICY
THE Crn of ASPEN
4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/
elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items
unique to the project.
5-The report shall include a written description or drawing notes of the benchmarks or control points used to
establish property boundaries, setbacks, building location, building height,and grades for each measurement.
6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in
the approved building permit set.
7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who
conducted the field measurements certifying that the field measurements areaccurately represented.
Review and Acceptance of Report: The Zoning Officer shall review the report(s) and either confirm the project
conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets
the zoning limitations for the property or shall determine which elements of the project are not in compliance.
The Zoning Officer may request additional information to verify zoning compliance, which may include but is not
limited to additional survey work or a site visit.
All drawings of the survey report must correlate with representations in the approved building permit set for
acceptance. Modifications to field conditions or amendments to the building permit may be required.
A determination of non-compliance shall result in the issuance of a correction notice and possible work
stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the
construction process to minimize disruption to the construction schedule.
Acknowledgment:
I (contractor name) Jim Iglehart understand this policy. I agree that this project will
comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of
the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this
project complies with all applicable zoning limitations.
Digitally signed by Jim Iglehart
Im Iglehart DN:cn Jim Iglehart,o=Iglehart Construction,Signature: ou,email=iim@,iilehartcom,r—u5
Date 2018.022317:42:58-07'00'
Date: 03-02-2018
RECEIVE
f CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO isibi2f f 8
BUILDING DEPARTMENT
ADDRESS: 1411 Crystal Lake Road PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
4011
ZONING COMPLIANCE VERIFICATION POLICY THE CITY OF A ,
Applicability: All development projects must comply with the City's zoning regulations, including height and
location, and are subject to periodic inspection during construction and a final inspection prior to project
completion.When required by the City's Zoning Officer, certain development projects within the City of Aspen
shall verify height and/or location compliance through submission of a survey report.
Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one
foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance
through this method.
In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/
duplex development or other projects where compliance may be in question. Independent of this policy, all
projects must comply with all applicable zoning limitations.
The Zoning Officer will inform the applicant during building permit review if verification will be required.
However, circumstances may require zoning compliance verification of a project which is already underway.
Timing: Height verification should be accomplished at a point of construction when enough roof structure is in
place to accurately measure the structure yet early enough in the process to still make changes if the structure
is too tall. Location verification should be accomplished at a point of construction when the final exterior of the
structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer
with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to
perform their own verification during construction to ensure the building is progressing to plan, including the
height and location of foundation forms prior to concrete pours.
Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a
structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set.The
City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural
or finished grade should be used.
The report shall include the following information:
1-A brief cover letter with the building permit number, name of the project, name of the owner and general
contractor, with a written description of the measurement methods including date(s) of measurement.
2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope
(if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all
exterior veneer or other exterior treatments), and the location and dimension of each observed measurement.
3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum
permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior
sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles,
or other veneer treatments orornamentation), and the location and dimension of each observedwas
Additional roof plans showing location of measurements may be necessary. V
( CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO3gi` 1ft8
BUILDING DEPARTMENT
(Note:Applications will NOT be processed until the application fee is paid.)
THE CITY or ASPEN FOR PARKS USE ONLY
Date Received: Permit#2017:
Parks Department
585 Cemete Lane Date Responded: Building Permit#:
ry (If applicable)
Aspen,CO 81611 Fees Paid: Y/N Amount$ Credit/Cash/Cheek# Init:
Parks Office: 970.920.5120
Fax: 970.920.5128
TREE REMOVAL / DRIP LINE EXCAVATION PERMIT
Please submit the following information to the Parks Department, together with your check payable to the City ofAspen.
Please check the appropriate options below:
0 $77—Non construction related 0 Tree Removal Permit
C* $206—Construction related 0 Drip Line Excavation
1. Site address- 1411 Crystal Lake Road
2. Outline/Sketch/Drawing of property to include: (Please attach TWO copies)
a. Property address.
b. Property boundaries.
c. Locations of buildings on the property.
d. Location,diameter, and species of trees on property and designate with arrows or circles which trees are to be removed.
3. List trees to be removed, species and diameter at 4.5' above grade. City Forester will define tree values utilizing the
following equation: Max value—.$42 x 3.14 x(D/2)2,D=Diameter of tree in inches at 4.5'above grade.
4. Reason for Removal:
New Construction
5. Mitigation Plan {relocation of trees or replacement as referenced in Aspen Municipal Code Sec. 1320(e)}
Please ADD to the Property Drawing: (TWO copies needed)
a. Location of replacement/relocation trees.
b. Size and species of trees to be replaced.
c. Professional cost estimate ofplanting (nursery stock,delivery,and installation).
6. Estimated Start Date ofProject: Issuance of Building Permit
7. Person(s)responsible for project(applicant):
a) Primary Contact Name: Jim Iglehart Phone: 970-379-5990
Email Address: jim@iglehart.com
b) Name of Architect or Construction Representative(please print): Jim Iglehart
Company Name(please print): Iglehart Construction Phone: 970-379-599C ,ax:
} Digitally sig b♦y�Ji�m Iglehart Signature of Representative: J i m I g'e h a r l DN:cnJim acc,o=Iglehart Construction,ou,
email=jim@iglehart.com,c=US
Date 2018.02.2813:45:06-07'00'
c) Property Owner Name(please print): Phone:
Address: Fax/Email address:
Signature of Owner: Date: RE C E IVE r
3/29/2018
MUST BE POSTED ON PROPERTY DURING REMOVAL ASPEN
BUILDING DEPARTMENT