Loading...
HomeMy WebLinkAboutFile Documents.1411 Crystal Lake Rd.0062.2018 (22).ARBK Cit of As en Water Efficient Landsca in: Ordinance City of Aspen Parks& Recreation Dept. Pre-Submission Packet Completeness Review 585 Cemetery Lane THE CmcrAsrs% Information & Documentation Checklist Aspen,CO 81611 (970)920-5120 Effective June 22, 2017, City of Aspen Water Efficient Landscaping Standards, Ordinance #16, Series 2017, shall apply to the following projects that use City of Aspen potable water: Landscaping, grading, installing or disturbing hardscapes, additions to structures, etc. that meet the requirements of a Major Engineering Review (a disturbance area greater than 1,000 square feet) and 25% of the entire site OR All interior alterations with a work area that affects 50% or greater of the existing gross square footage Links to the Water Efficient Landscaping Standards, the Water Budget Analysis & Calculation Sheet and the Water Ordinance Fact Sheet can be found at: www.citvofaspen.com/water. For assistance in compiling required documentation package, including water budget calculations, please contact Molly Somes at the City of Aspen Parks Department at 970.920.5582 or at efficientlandscape(cs,citvofaspen.com. WATER SUPPLY INFORMATION If water is to be provided by City of Aspen, Applicant must answer the following questions. 1. Is the property already receiving City of Aspen water service? 4Yes ❑ No 2. Is there a well or wells on the property? ❑ Yes ,el No 3. Are there other water sources/supplies on the property? ❑ Yes ❑No If yes,name other water sources/supplies: 4. Will raw water be used for irrigation on this property? If yes, provide your proof of a raw water agreement, an account number, and/or proof of right. 5. Are there existing city water taps to be disconnected? ❑ Yes ❑ No REQUIRED INFORMATION AND DOCUMENT CHECKLIST PROJECT INFORMATION Date: 44 - t Z . 213 iS Project Address: 14I I 0R1S-r-AL, — A4 l 0 ) Co (8)(40) Project Type(e.g.New Construction, Redevelopment, Remodel, Addition): 1,..1Etz � 11.t1G-1`To1/1/4-.) Total Property Sq. Ft.: 4$, ti 12 *Disturbance Area Sq. Ft.: ,e g 90 s. p *Disturbance Area is defined as the external area of the building site where the ground is disturbed,which includes,but is not limited to: soil grading,landscaping, removing impervious area,adding impervious area,replacing impervious area,layback areas,and stock pile areas. RECEIVED Last Updated: 9/6/2017 g7t3Y2018 ASPEN BUILDING DEPARTMENT Water Efficient Landscaping Ordinance Information & Documentation Checklist Total Landscape Area Sq. Ft.: // 0 S,r, Total Irrigated Area Sq. Ft.: 7 I ZS S. l � t . Project Applicant Name: Project Applicant Phone#: Irrigation System Installer Name: 1‘)4"41 S � Irrigation System Installer Phone#: G w'l _ g 3}o.$z4 Landscape Installer Name: �10,4� trk'd00L. Landscape Installer Phone .. _3}q� 8,21 (a AUTHORIZED OWNER INFORMATION Owner Name: Mailing Address—Street: Mailing Address—City. State, Zip: City Water Account Number: Phone: Email: SUMISSION PACKET CHECKLIST (Due at time of building permit application if landscape compliance is required) REQUIREMENTS: COMMENTS: SUBMITTAL COMPLIANCE: Site Plan Identify Disturbance Area ❑ Yes ❑ No Landscape Design Plan with Soil Required Components Listed in CI Yes CI No Information Landscaping Standards Irrigation Design Plan Required Components Listed in ❑ Yes ❑ No g g Landscaping Standards Water Budget Analysis& Calc. Sheet Provided by City Staff and Online ❑ Yes ❑ No Pools & Water Features(ponds, Is there a pool,spa or water feature? IX Yes ❑ No fountains. etc.) Are pool and spa covers installed? 14 Yes ❑ No Do features use a recirculating water system and/or recycled water if available? NI Yes ❑ No APPLICANT ACKNOWLEDGEMENT I/we agree to comply with the requirements of the City of Aspen Water Efficient Landscaping Standards and submit a complete Landscape and Irrigation Documentation Package. Applicant Signature Date Print Name Contact Phone# FOR INTERNAL USE ONLY: CHECKLIST ACCEPTED & REVIEW BY: DATE: CHECKLIST WARRANTS LANDSCAPING ORDINANCE COMPLIANCE: ❑ Yes ❑No RECEI ED Last Reviewed: 9/6/2017 PI 3 NO O 18 ASPEN BUILDING DEPARTMENT