HomeMy WebLinkAboutFile Documents.1411 Crystal Lake Rd.0062.2018 (23).ARBK Engineering Comments 5-7-2018 20180318_1411 Crystal Lake Report.pdf(4) rt and the accompanying plans for the drainage improvements of"141 l 0 Page Label: 2 tercel of land situated in Section 18 Township 10 South,Rage 84 West Author: mikeh Drainage report must be e for the owners thereof in accordance with the provisions of the City ofA Plan and approved variances and exceptions listed herein.I understands Date: 5/1/2018 9:57:42 AM stamped and signed. the City of Aspen does not and will not assume liability for drainage foci File Name: 20180318_1411 Crystal Lake Report.pdf rainage report must be stamped and Corrected. signed. License No. oess Page Label: 16 The total flow in the north pipe is Author: mikeh greater than the capacity.All Date: 5/1/2018 10:04:14 AM i. mm File Name: 20180318_1411 Crystal Lake Report.pdf pipes must have a maximum of 80/0 full capacity. Please adjust Corrected. The north pipe is now an 8-in. design to ensure no pipes areIIIIMI The invert in is equal to the invert out of greater than 80%full. the outlet pipe. Page Label: 16 Author: mikeh Please provide drywell volume Date: 5/1/2018 10:01:14 AM calculations as well as drain time File Name: 20180318_1411 Crystal Lake Report.pdf calculations.fffpppnnueeennnIIInnn���www ,°°°*°°,.,n,�.n.Tre ova Reesepmv:lreellvelumecaM Provided. 2 Pipe Calculations lie:arei�eme eemuleu 3.2.1 North Pipe ftxl.ro Page Label: 16 flows from pr...basins PB:1.0,PE1:1.1, tPa^°°(se'x1.. Author° mikeh No calculations are provided for °°`a; the capacity of the overflow pipe. ° to Date: 5/1/2018 10:10:49 AM °"y.'peek""°n",',athe""""'"°°" Please include to ensure system pipe'~ .rain '°slope .•.capacity File Name: 20180318_1411 Crystal Lake Report.pdf QIN(Cx) Iwapnearepa aaakrns doesn't backflow. wp...eneosystem pesn'tba Provided. peon �Inclutle b ensure system doesn't backflow. 0.121 0.066 0.073 0.103 0.060 0.027 0.027 0.6 Valley Group Drawings 03-21-18.pdf(21) Page Label: 1411 Crystal Lake_20180316_Permit_Plans Author: mikeh No excavation stabilization plan Date: 5/1/2018 10:13:20 AM is included in the plan set. File Name: Valley Group Drawings 03-21-18.pdf Please include an excavation No excavation stabilization plan is plan. Judea in the plan set.Please ����laaa an axeavacinn plan. These were provided by the contractor. NOTES: Refer to the originally submitted 1. ALL MATERIALS,WORKMANSOIP,AND CO ISMPPERCOIF.I:CEAMTEINOTNSS STALL OMRTECT ION RT CEYD OA; Construction Management Plan. CODE,COA TECONICAL MANUALS,AND APPLIC 4i STATE AND FEDERAL REGULATIONS.WDERE T RECEIVED 11/27/2018 ASPEN BUILDING DEPARTMENT Page Label: C300 / Grading is proposed outside of I Author: mikeh iii s l Date: 5/1/2018 9:21:56 AM property limits. Please obtain 14 ,l File Name: Valley Group Drawings 03-21-18.pdf approval from neighboring 11,E\ property or contain proposed i' it \ The plan was revised to limit the grading grading to the property. \\ \\\\\\`�\ ',I ` to the property. l VA\VA\A�\V v \ v -N. Page Label: C300 �� v �� —�%Via` Author: mikeh It is not clear which lines are the \ TOS setback and floodplain. Date: 5/1/2018 9:19:54 AM �.a ,'sarv� Please adjust plans to clearly ���� ,y File Name: Valley Group Drawings 03 21 18.pdf \ depict these delineations. N - The plan was revised to better a'le°° \` demonstrate the two lines. r the TOS setback and \ floodplain.Please adlust \ \ plans tocleartydepict \ these tlelineations. - \ \ Page Label: C300 \i\ Author: mikeh It is unclear which line is ditch \\ setback. Please clearly depict \ \ , Date: 5/1/2018 9:14:07 AM v NA Fileditch center line and 10'offsets Name: Valley Group Drawings 03-21-18.pdf vv\\\�a on plans. °°�°°re°° °°° °�°°°° The plan was revised to better ' \ demonstrate the lines. \ \ ,y \\\\\_ 1, Page Label: C300 Please include top and bottom of Author: mikeh �° x �`, Date: 5/1/2018 9:16:18 AM wall elevations and provide File Name: Valley Group Drawings 03-21-18.pdf detail. \ \ \ Please include top and bottom of wall \ deta elevationsil and provide We have added top and bottom of wall. We have added a wall detail. / Page Label: C300 More grading detail is required in Author: mikeh Date: 5/1/2018 9:09:26 AM this area to ensure no runoff File Name: Valley Group Drawings 03-21-18.pdf leaves property from impervious „� area. We have added spot elevations. N \ fir RECEIVED 11/27/2018 ASPEN BUILDING DEPARTMENT -- Page Label: C300 Spot elevations over lap and are Author: mikeh '� Date: 5/1/2018 9:11:22 AM difficult to read in most areas. Please adjust spot elevations so I lK File Name: Valley Group Drawings 03-21-18.pdf that elevation and location of spots are easily readable. Ix,HI; v The plan has been cleaned up for ,,1_,ap,,�y; ,'; ` readability. Page Label: C300 .t' °' Author: mikeh Patio drops a foot in this area. a3., I w- .yz, Date: 5/1/2018 9:18:05 AM Patio grading must be modified File Name: Valley Group Drawings 03-21-18.pdf to ensure no encroachment I beyond top of slope occurs. Pa p drops a foot in thisarea.Patio�g Spot elevations have been added. st be motlifled to ensure no encroachment beyond top of slope occurs. I Page Label: C300 Author: mikeh A 20'ditch easement will be Date: 5/1/2018 9:14:00 AM required to be recorded. Please ^z°'ditaheaaemantwillbaregNlredtnbe submit an easement exhibit as \ �rded Pleasesubmltaneasemente''` File Name: Valley Group Drawings 03-21-18.pdf as well as easement language for review. \\\\ well as easement language for review. ,\\\\\ We have prepared an exhibit demonstrating the 20-ft 1/4\ \�\gt easement (10-ft) from flowline. We would recommend that \\ the easement be recorded along with the as-built survey to reduce the number of recorded documents. ® Author: mikeh °� Page Label: C301 � Runoff must be discharged in a � �� Date: 5/1/2018 9:43:57 AM historical manner. Please \\\`\\\ File Name: Valley Group Drawings 03-21-18.pdf include a spreading mechanism at outflow. ` - A level spreader is provided. ,p°e�a iaone'nIslmea�Nfuaa a eye�� ow. to pmq lets) Inlet Type a,etb.PVC g lw, \ Page Label: C301 1S.83'of 8'PVC @d.5O°h This contour doesn't make W7rtst Author: mikeh INv og, ° Date: 5/1/2018 10:09:39 AM sense. Please adjust contour to \a a PV File Name: Valley Group Drawings 03-21-18.pdf match grading. vv 'gas mg This contour doesn't make se Please adjust contour to match grading ,' We've added high point ���� ���� notation and have disconnected the two 84 \ o JOINT. contours. RECEIVED 11/27/2018 ASPEN BUILDING DEPARTMENT a9''o4".VC®288. Page Label: C301 Author: mikeh Please include inverts, size, rim %���N� �i Date: 5/1/2018 9:47:22 AM elevation, and floor elevation of • N File Name: Valley Group Drawings 03-21-18.pdf drywell. .plee�sis=le°em We've added the requested levation,and Floor I vation of drywell. I\ notation. 1) I 091 \. \ i ll1 i�v 1 Page Label: C401 Author: mikeh Please include utility crossings in Date: 5/1/2018 10:28:31 AM profile to ensure no conflicts File Name: Valley Group Drawings 03-21-18.pdf exist. 18"inches of separation if Plaase lnclede ufllty crosslags In required at crossings. profile to ensure no conFlicts exist. L ,e"mchesof4 radonRreGN We've added separation atroaaladistances on C600. ring,1118..Poc c-2i50 0 e 1\ ate -q Page Label: C500 7 Author: mikeh Detail doesn't appear to include as2 =:> Date: 5/1/2018 9:24:34 AM the bottom of drywell/gravel. • _,3 _-� I File Name: Valley Group Drawings 03-21-18.pdf Please adjust detail to include entire drywell design. ° 9 We've added a gravel base. Page Label: C500 Pipe will have standing water in Author: mikeh ?�±' it. Design should incorporate no ;yam; Date: 5/1/2018 9:55:46 AM ...A standing water. .v File Name: Valley Group Drawings 03-21-18.pdf ow The invert in values now match MEM "' °" the invert out values to avoid • standing water. Page Label: C500 -- -a Please label hatching. Author: mikeh Date: 5/1/2018 9:53:36 AM File Name: Valley Group Drawings 03-21-18.pdf Please label hatching. Labeled. RECEIVED 11/27/2018 ASPEN BUILDING DEPARTMENT Page Label: C600 / It appears pump station is within Author: mikeh Date: 5/1/2018 9:30:17 AM 10'setback of ditch. No File Name: Valley Group Drawings 03-21-18.pdf structures are allowed within setback. Please adjust design. :a�on�k or a�mn.Nos �m e�are`a owaa wimm'''''.P se'' e—II 1 The pump station has been relocated. \\\ \ Page Label: C600 Please remove all existing 7\ ' , Author: mikeh ' ` Date: 5/1/2018 9:30:07 AM utilities that plan to be removed Te \\ \ from plan or call out removal. m nit File Name: Valley Group Drawings 03-21-18.pdf A 14 ` \\ ,zikt&kii.„, y; Corrected. '4ils:ktl 4" \ \ Page Label: C600 Author: mikeh Is electric service utilizing old Date: 5/1/2018 9:27:21 AM service line? Please clarify File Name: Valley Group Drawings 03-21-18.pdf electrical design and verify f — m. \/ capacity as tie in location. ° —"-^P1°'-- I 11/16/18 email text from Chris Bilby, Holy Cross: Josh, ,6�1 My apologies for the delayed response.As both of the homes fed from this transformer see to be very seasonal load r, I j I am good with the capacity of the current transformer and we will watch the load through our AMI network. e, Page Label: C600 Author: mikeh Water service line depiction Date: 5/1/2018 9:26:14 AM must extend to water main. ` File Name: Valley Group Drawings 03-21-18.pdf Please depict entirety of water Water service line depiction must // service and water main tie in extend to water main.Please depict \ entirety°[water service and water Corrected. location on plans. main tie In location on plans. i_ :/.m /- ; - , Page Label: L 3.0 1::6, , Hatching notes an approved i , Author: mikeh r/� k',/f/� of I Date: 5/1/2018 9:38:31 AM seed mix. Plans must propose a SEDBBC/AREA 1: �/ / Ja♦ native seed mix. �o ,` .f �, � r�� �� � File Name: Valley Group Drawings 03-21-18.pdf 1/ cM1 'notes an 1 tlse/ mu PmPPsaa " atlm=1 ' Seed mix is specified on Sheet L3.0 of the Landscape Plans. to - ; ;� , , , t` . BPA LOCATION`,./ / �. / 7 OR iiiS��rIMIL///AR WOOD-TBD A . � I SI f RECEIVED 11/27/2018 ASPEN BUILDING DEPARTMENT