Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.150 Roaring Fork Dr.0117.2019.ARBK
SCHEDULE OF VALUES Morris 150 Roaring Fork Drive Aspen, CO 81611 The Schedule of Values be provided using the 16 Division approach and format. The 16 Divisions: Division 1 General Requirements Division 2 Excavation = $8,000 Division 3 Concrete= $7,000 Division 4 Masonry= N/A Division 5 Metals= N/A Division 6 Framing=$2,000 Division 7 Dry Wall = $6,000 Division 8 Doors and Windows= N/A Division 9 Finishes=$2,800 Division 10 Specialties= N/A Division 11 Equipment= N/A Division 12 Furnishings = = N/A Division 13 Special Construction Division14 Plumbing$5,800 Division 15 Mechanical =$6,200 Division 16 Electrical =$5,000 Total Valuation $42,000 RECEIVED 05/03/2019 ASPEN BUILDING DEPARTMENT