Loading...
HomeMy WebLinkAboutMaster Permit.1419 Crystal Lake Rd.0009.2017 (3).ARBK 11/30/24, 10:50 AM 0009.2017.ARBK Salesforce-Enterprise Edition • Close Window salesforce • Print This Page • Expand All i Collapse All 0009.2017.ARBK Number 0009.2017.ARBK Record Type Building-Imported Address 1419 CRYSTAL LAKE RD Owner Fernando Cruz Original Number 0009.2017.ARBK Status Closed-Final Type Building Reason for Cancel or Comp!. Review Fail Applicant JOHN CHROMY Aspen Internal? No Account CLEARWATER CONSTRUCTION MANAGEMENT Required Bond Amount Project Total Available Bond Amount Land Use Planning Application Is This Associated w/a Building Permit? Permit Contractor CLEARWATER CONSTRUCTION MANAGEMENT Master Building Permit Valid Business License on Bluebeam Project Id 537-412-791 Account Imported ,/ HPC-ZON-EH-UTIL Review Required Submissions HPC-ZON-EH-UTIL Review-2 Documents Resubmitted Eng Review Eng-CMP Rev,Eng-Dev Rev,Eng-ES Rev,Util Rev,Eng-Wtr Rev, Approved Covid-19 Plan ,/ Parks-Prkng-San Review Parks Rev,Parks Fee,Water-LSE Rev,San Rev, Conditional Inspections Parks Insp, Conditional Final Insp Eng-Dev Final,Eng-ES Final,Eng-Wtr Final,Util Final,Parks Final,Water-LSE Final,San Final, Action Items Hold All Reviews Create Fees 1 Hold Reason Create Fees 2 1 Utility Review Type Minor Price Book EDEN Conditional Flat Fee Formula Applicant is a Nonprofit? No Conditional Tiered Fee Formula Eligible for Small Lodge No Program? Conditional Tiered SqFt Fee MAR, Discount All Fees(%) Formula Fee Discount Reason CO/LOC? CO Status if Applicable Issued Queue Score Queue Designation Milestone Current Days in Applicant Hand Queue Score 0 Milestone Current Days in City Hands Last Date Received from Milestone-Total Days in Applicant Applicant Hand Milestone-Total Days in City Hands Dates New Application Date 2/15/2017 TCO Issuance Date Application Complete Date 2/15/2017 Close/CO Issuance Date 11/2/2020 Application Accepted Date 2/15/2017 Expiration Date 12/24/2023 Issue Date 11/28/2017 Override Expiration Date Last Activity Date 6/27/2023 Basic Information Description Applicant: Census Code 101-Single Family Residences Ryan Doremus Thunderbowl Architects Contractor: John Blatz Clearwater Construction Management INTERIOR AND EXTERIOR REMODEL EXISTING SFR https://cityofaspen.my.salesforce.com/a033s00000kZroYAAS/p 1/15 11/30/24, 10:50 AM 0009.2017.ARBK—Salesforce-Enterprise Edition INCLUDING SITE IMPROVEMENTS AND ADDITIONAL SNOWMELT/SPA I/GARRETT/->JOHN//BLUEBEAM 537-412-791 Use of Building Single Family Interior Remodel Only Use Class Residential Class of Work Alteration Permit Comments Job Location Address 1419 CRYSTAL LAKE RD,ASPEN:273718132017 Lot 14-E Site Address Display on Map Legal Description Historic Property? No Eden Address 1419 CRYSTAL LAKE RD Historic District? No HPC-Planning-Zoning Details Zone District R-15 HOA/Covenant HOA/Covenant Approval Acquired Is There an ADU? No HPC Certificate of No Appropriateness? ADU Sq Ft Work Involves a Land Use No Approval? Deed Restricted? No Located in a PD? Yes #of Dwellings Adds/Changes Floor Area? Yes Category of Zoning Fee Residential Occupancy or Use Change? No Zoning Work Level Major Zoning Fee Work Affects Exterior of Yes Building? Building Project Details Valuation $3,469,989.00 Lot Size Sq.Ft. 44,866 Reason for Valuation Change Soil Disturbance Sq Ft 16,500 Unit Sq.Ft. 9,295 Affected Area Sq Ft 16,500 Building Footprint Sq Ft Existing Hardscape Footprint Sq 0 Ft Sq Ft of Building Work Area 9,295 Existing Hardscape%of Lot 0% Building Fire Area Sq Ft 9,284 Con Mit Sq Ft Total 25,795 Utility Review Sq.Ft. 4,207 Utility Review Sq Ft Total 16,500 %of Interior being Altered 100% New Sq.Ft. 0 Scope of Work Details Work Changes Building No Work Affects Tree/Drip Line? Yes Footprint? Work Changes Yes Located Within City Mall No Fenestration/Thrml Envelop? Boundaries? Requires Asbestos Test? Yes Adjacent to City Open Space? No Photovoltaic Installation No Impacts City Trails/Parks? No Work Adds/Removes/Changes Yes Work Subject to Water Efficient No Plumbing Fixt? L.O.? Restaurant/Food Service No Involves Impact on Sewer? Yes Involved? Change of Restaurant No Prevents Access to Sewer Main? No Ownership? Affects Parking/Alleys/Loading? No Sewer Easements Affected? No Building Description Code Editions 2009 IRC Required Special Inspections Other Code Editions Energy Code Compliance Building Type(IRC) Total Snowmelt Sq Ft Construction Type VB Total Spa Sq Ft Occupancy Load Total Pool Sq Ft Fire Sprinkler Existing? Amount of Onsite Renewable Generation? Fire Sprinkler Required? Yes CO Description Fire Sprinkler Type Basement 2 bedrooms,1 full bath,2 3/4 baths,gym,media,game room,laundry and mechanical Fire Alarms Installed? 1st Floor Kitchen,dining room,living room,garage,1/2 bath #Wood Fireplaces 2nd Floor 3 bedrooms 1 full bath,2 3/4 baths,office https://cityofaspen.my.salesforce.com/a033s00000kZroYAAS/p 2/15 11/30/24, 10:50 AM 0009.2017.ARBK-Salesforce-Enterprise Edition #Gas Log Fireplaces 3rd Floor #Gas Appliances Additional Open Text Field For Comments Financials Total Fees $14,261.50 Total Payments $14,261.50 Fees Due at Current Status Total Balance $0.00 System Information Number 0009.2017.ARBK Community Visibility Created By Ruth Kinney,7/27/2019 Contact'Gs 0036A00000iMgg6QAC,0036A00000sdaguQAA,0036A00000saF43QAE,0036A00000cuulWQAQ,0036A00000sdaguQAA 1:49 PM IsTestData? Last Modified By Fernando Cruz,11/30/2024 10:50 AM VIP Form Tool VIP VIP [{"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvPUAS"}, Submitted Template ("parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvNUAS"}, Status ("parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"","categoryld":"a2E6A000000iWidUAE"}, ("parentCategoryld":nulrisSu bm it":n ulrisCurrent":n u II,"categoryStatusLabels":nu I I,"categoryStatus":"","categoryld":"a2E6A000000UwvVUAS"), ("parentCategoryld":null,"isSu bm it":n ulrisCurrent":n u Il,"categoryStatusLabels":nu I I,"categoryStatus":"","categoryld":"a2E6A000000UwvKUAS"), ("parentCategoryld":null,"isSu bm it":n ulrisCurrenn n u Il,"categoryStatusLabels":nu I I,"categoryStatus":"","categoryld":"a2E6A000000UwvXUAS"), ("parentCategoryld":"a2E6A000000Uwva UAC","isSu bm it":n ulrisCurrent":n u I I,"categoryStatusLabels":nu I I,"categoryStatus":"","categoryld":"a2E6A000000UxFOUAO"), ("parentCategoryld":null,"isSu bm it":n ulrisCurrenn n u Il,"categoryStatusLabels":nu I I,"categoryStatus":"","categoryld":"a2E6A000000UwvZUAS"}, ("parentCategoryld":null,"isSubmit":true,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"","categoryld":"a2E6A000000Ux1 dUAC"}] VIP VIP Permit Application Foreign Form Language Template Action Items View/Print Permit Link Attachment View GIS Map View Milestone Gantt Chart Activity History Email:Certificate of Occupancy for 1419 Crystal Lake Road Type Billable Assigned To Lisa Guida Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 11/2/2020 Days in Applicant's Hands To:jchromy@ccmaspen.com CC: BCC: Attachment:1419 Crystal Lake Road-0009.2017.ARBK-CO.pdf,1-County Use Tax Final Return Template(PDF).pdf,1-City Final Return Use Tax.pdf, 1419 Crystal Lake Road-0009.2017.ARBK-FRR Transmittal to Contractor.pdf,1419 Crystal Lake Road-0009.2017.ARBK-FRR Transmittal to Owner.pdf Subject:Certificate of Occupancy for 1419 Crystal Lake Road Comments Body: Good Afternoon, Please find attached the certificate of occupancy for 1419 Crystal Lake Road.Also attached are the city use tax documents. Warmest Regards, Lisa Guida Email:Utility Connection Permit Final Type Billable Assigned To Steve Wilson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 9/25/2020 Days in Applicant's Hands Comments To:jchromy@ccmaspen.com CC: BCC: Attachment:UCP Water Final 20200925.docx Subject:Utility Connection Permit Final Body: Hello JOHN CHROMY, https://cityofaspen.my.salesforce.com/a033s00000kZroYAAS/p 3/15 11/30/24, 10:50 AM 0009.2017.ARBK-Salesforce-Enterprise Edition Attached is your review Utility Connection Permit for the completed project at 1419 CRYSTAL LAKE RD associated with permit#:0009.2017.ARBK. After review,please print and have signed by owner and notarized.Once signed and notarized,please return with payment,if applicable,to the Finance Department window located on the first floor of City Hall at 130 S.Galena St. NOTE:As City Hall is currently closed,please reach out to the Utility Billing office via email at utilbill@cityofaspen.com or call 920-5030 to arrange drop off of documents and payment. Please reach out with any questions or concerns. Thank you, Steve Wilson Email:COVID-19 Safety Plan Approval Type Billable Assigned To Steve Feder Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/26/2020 Days in Applicant's Hands To:jblatz@ccmaspen.com CC: BCC: Attachment:APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN_20200426.pdf Subject:COVID-19 Safety Plan Approval Comments Body: Dear JOHN BLATZ, Thank you for submitting a COVID-19 Site Safety Plan for 0009.2017.ARBK at 1419 CRYSTAL LAKE RD.City staff has reviewed and approved the safety plan.Attached is the COVID-19 Approval Notice to re-commence construction.Please hang this Approval Notice on site so it is clearly visible for inspectors and law enforcement.Please adhere to all aspects of the plans to keep all employees and the community safe.Failure to adhere to the plan, as well as County requirements,will result in a site shut down.We thank you for your efforts to keep the community safe,and please let us know if you have any further questions. Email:Important!Your City of Aspen permit has been moved to new permitting system Type Billable Assigned To Garrett Larimer Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 12/3/2019 Days in Applicant's Hands To:jblatz@ccmaspen.com CC: BCC: Attachment:--none-- Subject:Important!Your City of Aspen permit has been moved to new permitting system Body: Dear JOHN BLATZ, As you may know,the City of Aspen has been transitioning to a new online-based permitting system,Salesforce.Thank you for your patience during this transition,which is now complete.Your permit is now operational in Salesforce.Your project located at 1419 CRYSTAL LAKE RD,ASPEN: 273718132017 will retain its original permit number,0009.2017.ARBK and you will use this number to find your permit in Salesforce.If you have not already done so,you must register in Salesforce before you are able to access your permit information,upload new documents,request inspections,or otherwise track the status of your permit.Instructions on how to register and navigate the new permitting system can be found at this link: Comments https://www.cityofaspen.com/1211/Salesforce-Applicant-Portal-Support TO REQUEST AN INSPECTION: You are no longer able to request an inspection via the old system.Instructions on how to request an inspection in Salesforce can be found at this link: https://www.cityofaspen.com/Docu mentCenterNiew/4254/Request-an-Inspection?bid ld= If you have additional questions that are not addressed at the above links,you may reach out directly to City staff for assistance at sfsupport@cityofaspen.com. Sincerely, John Barker City of Aspen Permit Inspection Type Inspection Billable Assigned To Steve Feder Number of Hours 1.00 Total Cost $325.00 Fee Generated Date https://cityofaspen.my.salesforce.com/a033s00000kZroYAAS/p 4/15 11/30/24, 10:50 AM 0009.2017.ARBK-Salesforce-Enterprise Edition Start Date Completed Date 10/19/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To Steve Feder Number of Hours 0.25 Total Cost $81.25 Fee Generated Date Start Date Completed Date 3/11/2020 Days in Applicant's Hands Comments Permit Inspection Type Building Billable Assigned To Steve Feder Number of Hours 0.50 Total Cost $162.50 Fee Generated Date Start Date Completed Date 3/10/2020 Days in Applicant's Hands Comments Conditions 0000253 Type Other Other Type Utility Development Review Fees Due Status Closed Date Resolved Last Modified Date 3/6/2023 Contacts JOHN CHROMY Account CLEARWATER CONSTRUCTION MANAGEMENT Type Representative Active Contractor License Count 1.00 Number 0026565 JOHN BLATZ Account CLEARWATER CONSTRUCTION MANAGEMENT Type Applicant Active Contractor License Count 1.00 Number 0022394 RYAN DOREMUS Account THUNDERBOWL ARCHITECTS Type Architect Active Contractor License Count 0.00 Number 0024046 GREGORY WESLEY Account CLEARWATER CONSTRUCTION MANAGEMENT Type Representative Active Contractor License Count 1.00 Number 0024345 JOHN BLATZ Account CLEARWATER CONSTRUCTION MANAGEMENT Type Contractor Active Contractor License Count 1.00 Number 0024346 Fees 0043958 Type Utilities Development Review Fee Total $9,261.50 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At https://cityofaspen.my.salesforce.com/a033s00000kZroYAAS/p 5/15 11/30/24, 10:50 AM 0009.2017.ARBK-Salesforce-Enterprise Edition Show in Cart is Paid in Full ✓ Fee Paid Date/Time 0053070 Type Temporary Certificate of Occupancy Total $5,000.00 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Issued Show in Cart ✓ Paid in Full V. Fee Paid Date/Time Files 1419 Crystal Lake Road-0009.2017.ARBK-CO 1-County Use Tax Final Return Template(PDF) Last Modified 11/2/2020 4:33 PM Last Modified 11/2/2020 4:30 PM Created By Lisa Guida Created By Lisa Guida 1-City Final Return_Use Tax 1419 Crystal Lake Road-0009.2017.ARBK-FRR Transmittal to Contractor Last Modified 11/2/2020 4:30 PM Last Modified 11/2/2020 4:29 PM Created By Lisa Guida Created By Lisa Guido City_Use_Tax__FRR_Notice_to_Contractor_20201102.docx 1419 Crystal Lake Road-0009.2017.ARBK-FRR Transmittal to Owner Last Modified 11/2/2020 4:23 PM Last Modified 11/2/2020 4:23 PM Created By Lisa Guido Created By Lisa Guida C ity_U se_Tax_-_F RR_Tra nsm itta I_to_Owner_20201102.d ocx U C P_Water_Final 20200925.docx Last Modified 11/2/2020 4:15 PM Last Modified 9/25/2020 1:54 PM Created By Lisa Guida Created By Steve Wilson IBC TCO Letter 20200924.docx UCP Water Final 20200908.docx Last Modified 9/24/2020 7:53 AM Last Modified 9/8/2020 3:23 PM Created By Renee Espinoza Created By Steve Wilson APPROVAL_NOTICE_COVID-19_SITE_SAFETY_PLAN_20200426.pdf permit inspection report_0009.2017.arbk Last Modified 4/26/2020 12:58 PM Last Modified 12/2/2019 5:40 PM Created By Steve Feder Created By Garrett Larimer permit fee estimate_0009.2017.arbk Last Modified 12/2/2019 5:40 PM Created By Garrett Larimer Inspections I N S-0005039-19 Status Partial/Non-Complete Type Building Subtype Foundation Requested Date Scheduled Start Date 11/15/2019 Completed Date 11/15/2019 Owner Last Name Feder Permit Inspection Round Closed TRUE I N S-0005040-19 Status Partial/Non-Complete Type Building Subtype Foundation Requested Date Scheduled Start Date 11/18/2019 Completed Date 11/18/2019 Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE I N S-0007724-19 Status Pass/Accepted Type Parks Subtype Requested Date 9/24/2020 10:00 AM Scheduled Start Date Completed Date 9/24/2020 Owner Last Name Radeck Permit Inspection Round Final Inspection https://cityofaspen.my.salesforce.com/a033s00000kZroYAAS/p 6/15 11/30/24, 10:50 AM O0O9.2O17.ARBK-Salesforce-Enterprise Edition Closed TRUE I N S-0007729-19 Status Partial/Non-Complete Type Concrete Subtype Footings Requested Date 3/9/2020 10:00 AM Scheduled Start Date 3/9/2020 Completed Date 3/9/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE IN S-0007731-19 Status Pass/Accepted Type Concrete Subtype Pads Requested Date 1/17/2020 8:44 AM Scheduled Start Date 1/21/2020 Completed Date 1/21/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE I N S-0007736-19 Status Closed-Not Needed Type Building Subtype Special Insp. Requested Date 2/11/2020 10:30 AM Scheduled Start Date 2/11/2020 Completed Date 2/11/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE I N S-0007739-19 Status Failed/Rejected Type APECC Subtype Snowmelt Requested Date 1/17/2020 8:50 AM Scheduled Start Date 1/21/2020 Completed Date 1/21/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE I N S-0007742-19 Status Partial/Non-Complete Type Concrete Subtype Walls Requested Date 3/11/2020 10:30 AM Scheduled Start Date 3/11/2020 Completed Date 3/11/2020 Owner Last Name Feder Permit Inspection Round Initial Inspection Closed TRUE IN S-0007751-19 Status Pass/Accepted Type Fire Subtype Requested Date Scheduled Start Date Completed Date 8/25/2020 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0001265-20 Status Failed/Rejected Type APECC Subtype Snowmelt Requested Date 2/13/2020 10:00 AM Scheduled Start Date 2/13/2020 Completed Date 2/13/2020 https://cityofaspen.my.salesforce.com/a033sOOOOOkZroYAAS/p 7/15 11/30/24, 10:50 AM 0009.2017.ARBK-Salesforce-Enterprise Edition Owner Last Name Feder Permit Inspection Round Re-Inspection Closed TRUE I N S-0006499-20 Status Pass/Accepted Type Covid-19 Plan Review Subtype Requested Date 4/25/2020 7:13 AM Scheduled Start Date 4/26/2020 Completed Date 4/26/2020 Owner Last Name Feder Permit Inspection Round Final Inspection Closed TRUE INS-0011837-20 Status Pass/Accepted Type Engineering Dev Subtype Requested Date Scheduled Start Date Completed Date 9/29/2020 Owner Last Name Roedel-On Maternity Leave-please chatter @Kyla Smits Permit Inspection Round Final Inspection Closed TRUE INS-0011838-20 Status Pass/Accepted Type Engineering Erosion&Sediment Subtype Requested Date 10/1/2020 11:49 AM Scheduled Start Date Completed Date 10/2/2020 Owner Last Name Reed Permit Inspection Round Final Inspection Closed TRUE INS-0011839-20 Status Pass/Accepted Type Engineering Water Subtype Requested Date 8/25/2020 10:39 AM Scheduled Start Date Completed Date 10/2/2020 Owner Last Name Wilson Permit Inspection Round Final Inspection Closed TRUE INS-0012152-20 Status Pass/Accepted Type Sanitation Subtype Requested Date Scheduled Start Date Completed Date 8/28/2020 Owner Last Name Permit Inspection Round Final Inspection Closed TRUE INS-0013971-20 Status Pass/Accepted Type Building Subtype Final Building Requested Date 10/19/2020 12:00 AM Scheduled Start Date 10/19/2020 Completed Date 10/19/2020 Owner Last Name Feder Permit Inspection Round Final Inspection Closed TRUE I N S-0014038-20 Status Pass/Accepted Type Zoning Subtype Requested Date 10/8/2020 8:30 AM https://cityofaspen.my.salesforce.com/a033s00000kZroYAAS/p 8/15 11/30/24, 10:50 AM O0O9.2O17.ARBK-Salesforce-Enterprise Edition Scheduled Start Date 10/8/2020 Completed Date 10/8/2020 Owner Last Name Pomeroy Permit Inspection Round Final Inspection Closed TRUE MEP Permit Inspections INS-0007757-19 Type Electric Subtype Final Electrical Status Partial/Non-Complete Permit 0007.2018.AELE Due Date Priority 2 Normal Owner Alias TParr Closed TRUE I N S-0007759-19 Type Fire Subtype Status Pass/Accepted Permit 0069.2019.afsr Due Date Priority 2 Normal Owner Alias jlage Closed TRUE I N S-0007763-19 Type Plumbing Subtype Plumbing Gas Tag Status Pass/Accepted Permit 0085.2019.ASPL Due Date Priority 2 Normal Owner Alias stevef Closed TRUE IN S-0007781-19 Type Electric Subtype Final Electrical Status Pass/Accepted Permit 0117.2019.AELE Due Date Priority 2 Normal Owner Alias TParr Closed TRUE I N S-0007787-19 Type Plumbing Subtype Final Plumbing Status Pass/Accepted Permit 0123.2018.ASPL Due Date Priority 2 Normal Owner Alias stevef Closed TRUE I N S-0007800-19 Type Mechanical Subtype Final Mechanical Status Pass/Accepted Permit 0206.2018.AMEC Due Date Priority 2 Normal Owner Alias stevef Closed TRUE INS-0007943-19 Type Mechanical Subtype Rough Mechanical Status Failed/Rejected Permit 0289.2018.AMEC Due Date Priority 2 Normal Owner Alias MMill Closed TRUE https://cityofaspen.my.salesforce.com/a033sOOOOOkZroYAAS/p 9/15 11/30/24, 10:50 AM O0O9.2O17.ARBK-Salesforce-Enterprise Edition I N S-0007945-19 Type Mechanical Subtype Final Mechanical Status Pass/Accepted Permit 0289.2018.AMEC Due Date Priority 2 Normal Owner Alias stevef Closed TRUE INS-0003110-20 Type Mechanical Subtype Rough Mechanical Status Accepted as Noted Permit 0043-2020-MECH Due Date Priority 2 Normal Owner Alias stevef Closed TRUE INS-0003112-20 Type Mechanical Subtype Final Mechanical Status Pass/Accepted Permit 0043-2020-MECH Due Date Priority 2 Normal Owner Alias TParr Closed TRUE INS-0011012-20 Type Electric Subtype Final Electrical Status Requested Permit 0007.2018.AELE Due Date Priority 2 Normal Owner Alias MEPs-Inspection Closed FALSE INS-0011886-20 Type Mechanical Subtype Final Mechanical Status Pass/Accepted Permit 0167-2020-MECH Due Date Priority 2 Normal Owner Alias TParr Closed TRUE I N S-0013564-20 Type Engineering Dev Subtype Status Pass/Accepted Permit Due Date Priority 2 Normal Owner Alias HGugl Closed TRUE I N S-0006462-24 Type Electric Subtype Special Electrical Status Requested Permit 0231.2018.AELE Due Date Priority 2 Normal Owner Alias MEPs-Inspection Closed FALSE Milestones Review Round 1-0009.2017.ARBK Status Approved Due Date Created Date 12/2/2019 Payments https://cityofaspen.my.salesforce.com/a033sOOOOOkZroYAAS/p 10/15 11/30/24, 10:50 AM 0009.2017.ARBK-Salesforce-Enterprise Edition PY-006891 Related To 0009.2017.ARBK Amount $5,000.00 Created Date 9/11/2020 Payment Source R-0006611 Receipt-Amount Remaining R-0006611:$0 PY-006219 Related To 0009.2017.ARBK Amount $9,261.50 Created Date 6/22/2020 Payment Source R-0005904 Receipt-Amount Remaining R-0005904:$0 Permit History 11/30/2024 10:50 AM User Fernando Cruz Action Changed Owner from Lisa Guida to Fernando Cruz. 6/27/2023 5:49 AM User Renee Espinoza Action Changed Expiration Date from 4/17/2021 to 12/24/2023. Related Permits 0267.2018.ARBK Type Building Address 1419 CRYSTAL LAKE RD Work Type New Status Load-Closed Applicant JOHN BLATZ Issue Date 5/22/2019 Last Activity Date 0113.2018.ARBK Type Building Address 1419 CRYSTAL LAKE RD Work Type New Status Load-Closed Applicant JOHN BLATZ Issue Date 10/29/2019 Last Activity Date 0007.2018.AELE Type Electrical Address 1419 CRYSTAL LAKE RD Work Type New Status Issued Applicant MIKE HAMAN Issue Date 1/24/2018 Last Activity Date 11/29/2024 0117.2019.AELE Type Electrical Address 1419 CRYSTAL LAKE RD Work Type New Status Closed-Final Applicant STEVEN FERRARESE Issue Date 7/15/2019 Last Activity Date 8/13/2020 0231.2018.AELE Type Electrical Address 1419 CRYSTAL LAKE RD Work Type New Status Issued Applicant MIKE HAMAN Issue Date 10/29/2018 Last Activity Date 11/29/2024 0069.2019.afsr Type Fire Address 1419 CRYSTAL LAKE RD Work Type New Status Closed-Final Applicant STEVEN FERRARESE Issue Date 7/8/2019 https://cityofaspen.my.salesforce.com/a033s00000kZroYAAS/p 11/15 11/30/24, 10:50 AM 0009.2017.ARBK-Salesforce-Enterprise Edition Last Activity Date 8/13/2020 0206.2018.AMEC Type Mechanical Address 1419 CRYSTAL LAKE RD Work Type New Status Closed-Final Applicant ISAC SALIDO Issue Date 9/27/2018 Last Activity Date 8/27/2020 0289.2018.AMEC Type Mechanical Address 1419 CRYSTAL LAKE RD Work Type New Status Closed-Final Applicant CHARLES HOGE Issue Date 1/25/2019 Last Activity Date 9/16/2020 0123.2018.ASPL Type Plumbing Address 1419 CRYSTAL LAKE RD Work Type New Status Closed-Final Applicant CHARLES HOGE Issue Date 7/3/2018 Last Activity Date 8/21/2020 0094.2019.ASPL Type Plumbing Address 1419 CRYSTAL LAKE RD Work Type New Status Expired Applicant CHARLES HOGE Issue Date 7/29/2019 Last Activity Date 12/2/2019 0085.2019.ASPL Type Plumbing Address 1419 CRYSTAL LAKE RD Work Type New Status Expired Applicant CHARLES HOGE Issue Date 12/2/2019 Last Activity Date 2/27/2020 0043-2020-MECH Type Mechanical Address 1419 CRYSTAL LAKE RD Work Type New Status Closed-Final Applicant LINDSEY LATHAM Issue Date 2/14/2020 Last Activity Date 9/4/2020 0044-2020-BCHO Type Change Order Address 1419 CRYSTAL LAKE RD Work Type New Status Closed-Final Applicant RYAN DOREMUS Issue Date 9/3/2020 Last Activity Date 0167-2020-MECH Type Mechanical Address 1419 CRYSTAL LAKE RD Work Type New Status Closed-Final Applicant JEREMY STRAIN Issue Date 8/24/2020 Last Activity Date 9/4/2020 Reviews REV-009663 https://cityofaspen.my.salesforce.com/a033s00000kZroYAAS/p 12/15 11/30/24, 10:50 AM 0009.2017.ARBK-Salesforce-Enterprise Edition Milestone Review Round 1-0009.2017.ARBK Status Approved Type Parks Due Date Completed Date 12/2/2019 5:41 PM Owner Alias DRade On Hold Created Date 12/2/2019 REV-009665 Milestone Review Round 1-0009.2017.ARBK Status Approved Type Sanitation Due Date Completed Date 12/2/2019 5:42 PM Owner Alias PMohr On Hold Created Date 12/2/2019 REV-009666 Milestone Review Round 1-0009.2017.ARBK Status Approved Type Engineering Water Due Date Completed Date 12/2/2019 5:42 PM Owner Alias SWilson On Hold Created Date 12/2/2019 REV-009667 Milestone Review Round 1-0009.2017.ARBK Status Approved Type Engineering CMP Due Date Completed Date 12/2/2019 5:43 PM Owner Alias Engineering CMP-Review On Hold Created Date 12/2/2019 REV-009668 Milestone Review Round 1-0009.2017.ARBK Status Approved Type Engineering Dev Due Date Completed Date 12/2/2019 5:44 PM Owner Alias MHory On Hold Created Date 12/2/2019 REV-009669 Milestone Review Round 1-0009.2017.ARBK Status Approved Type Engineering Erosion&Sediment Due Date Completed Date 12/2/2019 5:45 PM Owner Alias AReed On Hold Created Date 12/2/2019 REV-009670 Milestone Review Round 1-0009.2017.ARBK Status Approved Type Fire Due Date Completed Date 12/2/2019 5:45 PM Owner Alias JHahn On Hold Created Date 12/2/2019 REV-009671 Milestone Review Round 1-0009.2017.ARBK Status Approved Type Zoning Due Date Completed Date 12/2/2019 5:46 PM https://cityofaspen.my.salesforce.com/a033s00000kZroYAAS/p 13/15 11/30/24, 10:50 AM 0009.2017.ARBK-Salesforce-Enterprise Edition Owner Alias JPome On Hold Created Date 12/2/2019 REV-009672 Milestone Review Round 1-0009.2017.ARBK Status Approved Type Building Due Date Completed Date 12/2/2019 5:46 PM Owner Alias JHahn On Hold Created Date 12/2/2019 Submissions COVID-19 Plan Actions Submission Date 4/24/2020 9:50 AM Status Pending Required Description covid-19 safety plan.pdf Actions Upload Submission Date Status Required Description Addendum 3 Landscape Plan.1419 Crystal Lake.2020.06.pdf Actions Upload Submission Date Status Required Description Addendum 3 Structural Plan.1419 Crystal Lake.2020.06.pdf Actions Upload Submission Date Status Required Description Addendum 3 Civil 2.1419 Crystal Lake.2020.06.pdf Actions Upload Submission Date Status Required Description Addendum 3 Landscape Plan.1419 Crystal Lake.2020.06.pdf Actions Upload Submission Date Status Required Description Addendum 3 Structural Plan.1419 Crystal Lake.2020.06.pdf Actions Upload Submission Date Status Required Description Addendum 3 Civil 2.1419 Crystal Lake.2020.06.pdf Actions Upload Submission Date Status Required Description Addendum 3 Landscape Plan.1419 Crystal Lake.2020.06.pdf Actions Upload Submission Date Status https://cityofaspen.my.salesforce.com/a033s00000kZroYAAS/p 14/15 11/30/24, 10:50 AM 0009.2017.ARBK-Salesforce-Enterprise Edition Required Description Addendum 3 Landscape Plan.1419 Crystal Lake.2020.06.pdf Actions Upload Submission Date Status Required Description Addendum 3 Structural Plan.1419 Crystal Lake.2020.06.pdf Actions Upload Submission Date Status Required Description Addendum 3 Civil 2.1419 Crystal Lake.2020.06.pdf Actions Upload Submission Date Status Required Description Addendum 3 Landscape Plan.1419 Crystal Lake.2020.06.pdf Actions Upload Submission Date Status Required Description Addendum 3 Structural Plan.1419 Crystal Lake.2020.06.pdf Actions Upload Submission Date Status Required Description Addendum 3 Civil 2.1419 Crystal Lake.2020.06.pdf Actions Upload Submission Date Status Required Description Copyright©2000-2024 salesforce.com,inc.All rights reserved. https://cityofaspen.my.salesforce.com/a033s00000kZroYAAS/p 15/15