Loading...
HomeMy WebLinkAboutFile Documents.1419 Crystal Lake Rd.0009.2017 (37).ARBK Markup Summary 1419 Crystal Lake Drawings.pdf(27) I L o Subject: PlanCheck . / Page: [1]A-103X v These numbers should match MIMM — , File Name: 1419 Crystal Lake Drawings.pdf 0 0 0 0 0 I This has been corrected on the sheets. E,Pa PPER�E BBo OF LE Subject: PlanCheck SFeI should be 1450 Page: [1]A-103X ✓ Total should be 1450 SF File Name: 1419 Crystal Lake Drawings.pdf This has been corrected on the sheets. ER LEVE —1430 SQFT EXIST e UPPEF VW 3/I6•=1 0' • Y Subject: PlanCheck / Will these water features be ' Page: [4] Cl D-Crystal ake-LandscapeSheetset-L1.03 \t 4;-=: File Name: 1419 Crystal Lake Drawings.pdf heated'? If so they will be / �u� These water features are not heated treated as a pool/spa for REMP. . ' • What is the depth of the water 1 [ I, r�'� r U% and drained in the winter. The features? I 1110k - L features will be approximately 6" deep. lls il• j iii'>i E:f ar -.---I Subject: PlanCheck Page: 18 V What are you showing here? ona File Name: 1419 Crystal Lake Drawings.pdf Please clarify. ,� ��� This door has been changed to a two What are you showi 104 here? Please clarify. C'A direction "barn" door as shown on -.is lower level plans. /2' BUILT IN ID- Z- -Z.- Subject: PlanCheck t/ Req'd to be a solid door or have eegamceeeeStl --I_--� �,. Page: 19 Itloorohe«oin File Name: 1419 Crystal Lake Drawings.pdf 20 min fire rating IRC 302.5.1, frerong':;°.5.1, I LM1etluletloor— L— —J show on door schedule ee o 'EV ,■ a Door type updated in dwg, as well as added to door schedule. �6' Door to follow IRC 302.5.1 Subject: PlanCheck EIL e ' ! Page: 19 !/ Fill out a COA fireplace N;12 11 �dtn1� r�1:9 File Name: 1419 Crystal Lake Drawings.pdf registration form for all existing and new fireplaces m I MI = dinillaillI These will be sealed gas appliances, J iir —T -Forim-- cutsheets and manufacturer information have been provided. 1111 1 1 1 i 1 Subject: PlanCheck Page: 19 v Label all windows on the floor Label all windows on plans to correspond with the the floor plans to File Name: 1419 Crystal Lake Drawings.pdf correspond with the labeling on the window schedule labelingthewindow scheduleduleAll windows have been labeled on the schedule plans to correspond to the window ,,_»,,. schedule. l li ,, Subject: PlanCheck III o Page: 19 What is this? Please clarify. File Name: 1419 Crystal Lake Drawings.pdf "' --__ u� zo.z,/m,• This will be a bifold door system from III ' $.o��-0. ' NanaWall, La Cantina, Pacific 9, � Millworks, or similar manufacturer. The door will meet exterior door - requirements per IRC Climate zone 7. Subject: PlanCheck Pa e: 19 Include all new interior doors on Include all new Interior g the door schedule doors the door File Name: 1419 Crystal Lake Drawings.pdf hetlule -- __ i IIIMINI_ All interior doors have been added to the Door Schedule. See sheet A-602 Comm mil(' 4'33/4' I,83/4' g Subject: PlanCheck Page: 21 Two solar proposals were File Name: 1419 C sta Lake Drawings.pdf included in the submission. Two solar proposals were included in the ry submission. Please select one and Please select one and include it include it on the roof plan if you intend to The new form has been filled out. At on the roof plan if you intend to use REMP it to mitigateworksheetyou REMP fees submitted withis it.an The this time the snowmelt between use it to mitigate REMP fees old form,please fill out our new REMPwo with it. The REMP worksheet tabrksheet includintocorrespoadwiththeselectedsoth PV tlar existing and new will zero out with you submitted is an old form, proposal. regards to area. The shown exterior please fill out our new REMP (D. spa will be offset with REMP fee at this worksheet including the PV time. No Solar PV will be used to worksheet tab to correspond with the selected solar proposal. offset. Subject: PlanCheck as A) Page: 24 Show the gas meter location on File Name: 1419 C stal Lake Drawings.pdf your proposed elevations. Gas Meter has been shown on Show the gas meter location on your proposed elevations. elevations and noted. Existing location to remain. n, OPER LEVEl Subject: PlanCheck 2�fl e^e 0 0 ' Page: 25 Showing a window here on the �� File Name: 1419 Crysta Lake Drawings.pdf floor plans .7a1,=— �, L Bathroom window has been added to MII ■ — elevations as well as window schedule. li) Subject: PlanCheck °fl°Z°°°,.. Page: 25 v Safety glazing req'd, shown as s afery glazing req'd, / �E�°�V such on the schedule but not File Name: 1419 Crystal Lake Drawings.pdf here, please revise. Pad5e�V1$e✓ Window has been noted as 'Tempered' on the elevations. 01 �6 25 77 a a a a a a a �\ N 1 Subject: PlanCheck �. — Pnewage: 25 Door 112D is shown here on the —� I 1�--- 'y�_ floor plan. -�_-- < File Name: 1419 Crystal Lake Drawings.pdf __ ',amm mul�'•uinWI= Door 112D has been updated on the ��� : �t:am.T .� ____ elevations. Dore on Ike flam plan. Subject: PlanCheck k/ Page: 25 Safety glazing req'd per 308.4 File Name: 1419 Crystal Lake Drawings.pdf (2) <]. \ 0 Tempered window has been noted on the elevations. 1 - ae Ne�n�e \ �e 9o9A�x�na k A m---=- k sl Subject: PlanCheck Page: 29 This does not meet prescriptive •...e. File Name: 1419 Crystal Lake Drawings.pdf req's if I am reading your insulation schedule correctly. ...ee.�. °°- ' The intent is that the R-49 is met with Either provide insulation values e._ rm both continuous insulation above deck on the detail or provide more detail on the schedule. As I read as well as cavity spray foam insulation. it your flat roof rigid insulation e The insulation schedule indicates two give you 24.2 average R value In °:=uE,vinsulation. different categories for this ilati with a 4"average thickness. order to have the req'd R 49 for We have adjusted the detail to indicate the ceiling you would need to 4" of rigid insulation above deck at the have the full 4"of rigid insulation which is not what this detail minimum point. / shows. --- v __ Subject: PlanCheck Page: 32 y Safety glazing req'd IRC 308.4 Safety glazing req'd (shown on elevation but not IRC 308.4 elevation (shown on File Name: 1419 Crystal Lake Drawings.pdf here) Tempered window has been noted on , LEI / the window schedule. Subject: PlanCheck Page: 32 VVV Interior doors should also be File Name: 1419 Crystal Lake Drawings.pdf included in your door schedule, make sure to note any safety Interior doors should also be included Interior doors have been added to glazing or fire rating. in note any or schedule,lazinmake sure to door schedule. See sheet A-602 note any safety glazing or fire rating. 111 7 6. 1 Subject: PlanCheck I Safety glazing req'd per 308.4 Safely glazing req'd Page: 32 Per 308.4 File Name: 1419 Crystal Lake Drawings.pdf Tempered window has been noted on the window schedule. Subject: PlanCheck ®"-- Page: 32 Identify emergency egress e'a^'yarearga^°y File Name: 1419 Crystal Lake Drawings.pdf windows as such gress wintlows as such I� All emergency door and window egress locations have been updated ..._ � on the elevations and schedules. Subject: PlanCheck Page: 32 Safety glazing req'd IRC 308.4 . l 1 File Name: 1419 Crystal Lake Drawings.pdf (shown on elevation but not Safety glazing req'd here) IRC 308.4(shown on elevation but not here) Tempered window has been noted on the window schedule. 21 _1-! f,°s~. m a.E°,°,M. 2] "E° 0.FIXED S ject: PlanCheck age: 32 Safety glazing req'd IRC 308.4 Sefetygleziugregd (shown on elevation but not IRC 308.4(shown on "'��' "'� " elevation but not here) Mechanical ventilation is required throughout the home per COA 8.16.020(k). Show the locations of the ventilation equipment/supply and return air throughout the home in your plans to demonstrate compliance with this. Operable windows do not help meet this requirement. --- ------ --- -- --- ------ --- -- --- --- -- --- -- --- --- -- --- -- --- --- -- --- ------ --- -i 1 a t m Subject: PlanCheck ��, Page:40 No ventilation information is LT�: File Name: 1419 Crystal Lake Drawings.pdf shown in either the mechanical L__�__—__' 1 -© ; w, plans or RCP, compliant iOn page 3 of the Mechanical Design Assist file the ventilation system ventilation must be No ventilation information is shown in either the mechanic Nans e entireRhome t20091MC403�on must tlemonstrabhor equipment is laid out.Each bathroom exhaust fan will exceed the 50 cfm demonstrated hor the entire intermittent flow requirement,the garage fan will be sized at 100 home(2009 IMC 403). cfm/vehicle,and the kitchen make-up air system will be automatic and balanced.The remaining house will have operable windows in all bedrooms L as well as(2)Energy Recovery Ventilators(ERVs);these are sized according to ASHRAE 62.2 for a minimum size of 280 cfm,which exceeds the IMC requirement of 90 cfm. u.jec : ' an - e D Page:40 A minimum of 50/D of all lamps — — — — 1 I File Name: 1419 Cry al ake Drawings.pdf installed in permanent light - fixtures must be high efficacy A minimum of 80°/<of all lamps installetl in permanent RCP's have included IECC 404.1 note, (2009 IECC 404.1), note this on light fixtures must be high encacy(2009 IECC 404.1), your plans. notethisonyourplans. referencing at least 50% of all lamps ® _' must be high efficacy. OI r m - F ��=� Subject: PlanCheck 1� - RCP directs you to reference�I Page:42 lighting plans for specific c File Name: 1419 Crystal Lake Drawings.pdf j� ;_ fixtures, location, etc.-no Ir�= c) LEGEND RCP's have included IECC 402.5, lighting plan was submitted. ' in o ' showing all recessed cans are sealed Please provide more detail A ® -: regarding new lighting to be m and IC rated. A cut sheet and graphicEir.fatiFEEEFEil'; go installed. Any recessed lighting .omo..a - °••°°� © .. has been supplied as well. in the thermal envelope must be ___nr ® ®. sealed and IC rated (IECC 402.5), if recessed lighting is proposed in the upper level provide a cutsheet demonstrating compliance. Subject: PlanCheck This total should be 8168 SF Page: 89 y File Name: 1419 Crystal Lake Drawings.pdf LT EL-6718SQFT This has been updated. AELT 8148 SQFT Ig 685I should be Subject: PlanCheck Page: 91 1/ Note the temperature and RYSTAIµEom°"° File Name: 1419 Crystal Lake Drawings.pdf moisture controls req's per IECC Page 2 of the Mechanical Design Assist file 403.8 on your snowmelt plan. f¢� , has the Snowmelt sequence of operations. This +��►� «,o 9 44. ' sequence calls for outdoor temperature % -� sensors and slab snow/ice sensors which in „" ' / conjunction with a Tekmar controller will operate the snowmelt system in compliance of Energy Code Compliance.pdf(2) IECC 403.8. Subject: PlanCheck Page: 2 Provide a cutsheet on the boiler File Name: Energy Code Compliance.pdf that corresponds with this and the efficiency noted on the r. The Manual J design conditions do not reference any REMP worksheet. boiler efficiency, they show the results of the heat loss and gain modelling. The snowmelt boilers referenced in the REMP worksheet are existing and the cutsheet is attached. The pool boiler efficiency is based off a Raypak R206-406 pool heater which is 82% efficient, but is subject to change by the pool contractor. • Subject: PlanCheck ,. - ....._ ._....,^. This REMP worksheet does not 611 Page: 3 611 appear to match what is shown This REMP worksheet EBD File Name: Energy Code mpliance.pdf in the plans, please remove. does not appear to This has been updated. match what is shown in the plans, please y, por remove. Zip Code: REMP 1419 Crystal Lake-2017-0208.pdf(2) Subject: PlanCheck Page: 1 Two other REMP worksheets File Name: REMP 1419 Crystal Lake-2017-0208.pdf were submitted with this permit set(one in the"energy code $sIFCC FEW/JEWELL ootbeFREMP ksheetsyr MITIGATION PROGRAM '"e"nmNedwRAn This has been updated. compliance"and another titled set(one in the"ZyrE code compliance'and anotM1er ttlletl 'REMP docs'�,they botM1 appear to be incorrect Please fill out' "REMP dots"),they both appear '' the new 201]REMP wohaheet indutling the PV worksM1eet tab °`P�asP°^'w'hUesela etlsPlar °Pose'. to be incorrect. Please fill out the new 2017 REMP worksheet �.. a.. including the PV worksheet tab _ mm to correspond with the selected solar proposal. Email: matthew@ Subject: PlanCheck Per the plans this should be Page: 1 V 8313 SF Ph,Per the plans this File Name: REMP 1419 Crystal Lake-2017-0208.pdf should be 8313 SF This has been updated. RESIDEN AL RENEWABLE ENEI T,tal e S. Ft Existing to o Snowmelt 8333 c Snowmelt 0 Pool 0 Spa 127