HomeMy WebLinkAboutFile Documents.1419 Crystal Lake Rd.0009.2017 (38).ARBK round 2
0009.2017.ARBK BuildingCommentsl.pdf(1)
Subject: PlanCheck
v
Mechanical ventilation is
Page: 5
Author:justinh required throughout the home
� °'�PoM "°d ,: o ,,. MwM File Name: 0009.2017.ARBK BuildingCommentsl.pdf per COA 8.16.020(k). Show the
locations of the ventilation
1` "'-"""" r Per our discussion, this equipment/supply and return air
I
.-.,., .°n throughout the home in your
. ................ ,,x w�, ..,_....,. information has been addressed plans to demonstrate
""� °� g• adequately in the narrative. compliance with this. Operable
W.rpnewindows do not help meet this
requirement.
Rd1 Revised Plans.pdf(7)
Subject: PlanCheck
Page:A-103.1 -Proposed REMP � This should be changed to 948
This should be to be consistant with what is
changed Author:justinh
your7or proposed File Name: Rd1 Revised Plans.pdf shown on the plan and your new
your °rov°:ea
snowmelt'°�'s proposed snowmelt totals.
I O C
This sheet and change has been
included.
VEL-949 SQFT PROPC
f\ IIPPFR
mew,_ •....; Subject: PlanCheck
mi- m�:' Page:A-201
This new operable window is
a„rss� � directly above your gas meter,
�— d - . Author:justinh
.` which is in violation of Source
�� .,� _ ,��. File Name: Rd1 Revised Plans.pdf
1 O 1 � ��i� Gas policy. See the attached
! �
__ We have moved this meter outline of Source Gas'
� 1 --- — approximately 8' to the south and requirements. Please revise to
°"., �$e.��.•m.,•Me -n a dimensions the regulator distance show compliance.
off windows.
0 Subject: PlanCheck
Page:A-601 This window is required to be
safety glazed (it was not on the
^ Author:justinh
"' c File Name: Rd1 Revised Plans.pdf schedule previously).
- ato^
J Qco This change has been made on
\ , -
J o M the schedule and elevations.
Q o�
Subject: PlanCheck
Page: HVAC1 `/ Remove the Not For
7
° Author:justinh v Construction note from all plans.
File Name: Rd1 Revised Plans.pdf
20NINIO PI
gatim HVA` This change has been made on
lammimmin
the plans.
w 'ii [_ Subject: PlanCheck
V
You are identifying the spa as
RE Page: L.1.03
Author:justinh 127 SF on your REMP
r=11111RE File Name: Rd1 Revised Plans.pdf worksheet and sheet L2.0.
°''aya Via, SP Revise for consistency.
SP" - FIRMEF
This change has been made on
165F
LOWER LEVEL ( the appropriate sheets.
TERRACE
TILED LANDSCAPE
STEPS:RE:4IL5.01
_ STAINLESS STEEL SPA WI 1
Subject: PlanCheck
Page: L.5.03 Provide a cutsheet on the
Author:justinh outdoor fire pit that shows it is
e�`" °' File Name: Rd1 Revised Plans.pdf intended for outdoor use, IFGC
303.6.
-, / We are no longer doing a fixed
outdoor fire pit. This has been
°r Ili■
.,_—.� changed on this sheet.
:::. _ mil.
Subject: PlanCheck V
Page: L.5.03 Provide a cutsheet on the spa
Author:justinh cover that shows it meets the
FlA. "'- requirements of ASTM F-1346.
File Name: Rd1 Revised Plans.pdf
3Eo —v.,-
1
"-'°—=°—=sa:v s "°— °—"— We have provided a cut sheet for
tA this.
OW1