HomeMy WebLinkAboutFile Documents.1419 Crystal Lake Rd.0009.2017 (40).ARBK 0009.2017.ARBK_Zoning_2
Rd1 Revised Plans.pdf(75)
$oo, poM �nrr—ter Page: [1]A-201 PROPOSED ELEVATIONS
— Checkmark: Unchecked 9'-1 3/8"
T _ Author:jimp
File Name: Rd1 Revised Plans.pdf
r.,9
roPoo.�
--"r V
-
10, I I v Page: [2]A-202 PROPOSED ELEVATIONS
TII_, Checkmark: Unchecked
n Author:jimp
___ File Name: Rd1 Revised Plans.pdf
Page: [2]A-202 PROPOSED ELEVATIONS
IT o o Checkmark: 20'-3 7/16"
T O . Checkmark: Unchecked� „M„•, Author:jimp
�_ _ ,•.,,« File Name: Rd1 Revised Plans.pdf
I --1—��.1
Page: [2]A-202 PROPOSED ELEVATIONS
Checkmark: Unchecked 9'-1 13/32"
Author:jimp
File Name: Rd1 Revised Plans.pdf
1
Page: [2]A-202 PROPOSED ELEVATIONS
Checkmark: Unchecked 20.3981 sf
Author:jimp
20 File Name: Rd1 Revised Plans.pdf
Page: 1
Checkmark: Unchecked Zoning will require at least a zoning site
Author:jimp plan showing setbacks.
Zoning will require at
least a zoning site plan File Name: Rd1 Revised Plans.pdf
showing setbacks. Please see sheet A001 - Proposed Site Plan
for property setback information
Page:A-103-D
® Checkmark: Unchecked If a wall is being removed here, than it
your eNval on¢end
Author:jimp should show up in your elevations and
.m1 " File Name: Rd1 Revised Plans.pdf your demo calcs drawings. Currently it
• . does not. Please reconcile.
1 This is an existing window that is being removed. RECEIVED
No wall area at this location is to be removed.
We have updated this plan to more accurately show 09/29/2017
that only the window is being removed.
ASPEN
BUILDING DEPARTMENT
Page: A-104
I Checkmark: Unchecked 23'-8 1/16"
Author:jimp
File Name: Rd1 Revised Plans.pdf
Page:A-104-D
Checkmark: Unchecked This demo plan for the roof does not quite
This demo plan for the roof does not match up with your elevations. The
quite match up with your elevations. Author:jimp
The elevations show the ends of elevations show the ends of many rafter
many rafter tails being cut off,but File Name: Rd1 Revised Plans.pdf
that does not show up here or In tails being cut off, but that does not show
your demo talcs.Please clarify,and
revise your drawings to be We have revised our drawings to be consistent. up here or in your demo calcs. Please
consistent.
We are only reducing the dimension of roofs where clarify, and revise your drawings to be
it is shown as demo on the demo plans. consistent.
-------------------------- -------
Page: A-104-X
t Checkmark: Unchecked 23' 8 1/16"
Author:jimp
File Name: Rd1 Revised Plans.pdf
Page: C6 This wall can be no taller than 42" (3'-6")
`
Checkmark: Unchecked
�. a 9
_ Author:jimp and will be checked at CO.
r ,® File Name: Rd1 Revised Plans.pdf
��
- Ok
Page: HVAC 3
Checkmark: Unchecked Where is all of the new HAVAC
Where is all of the new Author:jimp equipment being located?
HAVAC equipment p All of the exterior equipment will be located on the
being located? File Name: Rd1 Revised Plans.pdf
roof. This includes condensing units and air handlers
that will all be under 6' including pad. This equipment
will be screened as necessary. Spec sheets of this
equipment has been included.
l�,�,-+� i•i c� Page: Z-001
Checkmark: Unchecked to
Author:jimp
File Name: Rd1 Revised Plans.pdf
T L V I Page: Z-001
Checkmark: Unchecked
Author:jimp
File Name: Rd1 Revised Plans.pdf
RECEIVED
09/29/2017
ASPEN
BUILDING DEPARTMENT
Page:Z-001
Checkmark: Unchecked
Author:jimp
• File Name: Rd1 Revised Plans.pdf
V I' / s Page:Z-001
Checkmark: Unchecked 274.1
Author:jimp
274. 1 File Name: Rd1 Revised Plans.pdf
Page: Z-001
Checkmark: Unchecked As per Sheet Z-004,the existing and
Author:jimp proposed basement FA is not the same
File Name: Rd1 Revised Plans.pdf We have updated Z-001 to match the
calculations on Z-004 - which shows that
the lower level existing and proposed FAR
numbers are not the same.
PM- Page:Z-001
Checkmark: Unchecked 25,618.85
_ Author:jimp
—
3 25,618.85 File Name: Rd1 Revised Plans.pdf
AlIMMMMOI
3,480.00 Page:Z-001
Checkmark: Unchecked —
10715.1 Author:jimp
File Name: Rd1 Revised Plans.pdf
119,694.93
Page:Z-001
Checkmark: Unchecked 19,567.85
Author:jimp
3 19,567.85 File Name: Rd1 Revised Plans.pdf
Page:Z-001
= 4781.69 sq Checkmark: Unchecked
4,774.1
Author:jimp
s 4,774.1 File Name: Rd1 Revised Plans.pdf
RECEIVED
09/29/2017
ASPEN
BUILDING DEPARTMENT
T
Page: Z-001
Checkmark: Unchecked —
Author:jimp
781.6^, sM ft File Name: Rd1 Revised Plans.pdf
Jf, Page: Same note as before!! You only revert to
_== Checkmark: Unchecked
Author: imp25% if the steep slopes reduce your FA
File Name: Rd1 Revised Plans.pdf by more than 25% not if the sq.ft. of
your steep slope reduction is more than
7- t,.,,_J We have updated this information on Z-001 accordingly 25%. Therefore your steep slope
- and provided two cells showing the 2 different ways reduction should be 3,725.15+7,698.6=
6 to calculate this information. 11,423.75.
. r.i tea., . Page: Z-001
Checkmark: Unchecked —
Author:jimp
+ ft ; File Name: Rd1 Revised Plans.pdf
I
Page:Z-002 If the log holding up the log is removed,
Checkmark: Unchecked
. ili then the log's structural support has been
•
Author:jimp demolished and therefore it has been
File Name: Rd1 Revised Plans.pdf
.� demolished.
�a As discussed and clarified via email if a log holding
°m` up a log is removed then the upper log will only be counted as demolished if that log is also
1-7/ removed. In this instance we are not removing the upper log and this can be seen on sheet S2.4.
Page:Z-002
Checkmark: Unchecked If the log holding up the log is removed,
If the log holding up then the log's structural support has been
the logthe log's
Author:jimp demolished and therefore it has been
structural
tur lsup File Name: Rd1 Revised Plans.pdf
structural support has
been demolished and demolished.
therefore it
demolishedhas been As discussed -and clarified via email - if a log holding
up a log is removed then the upper log will only be counted as demolished if that log is also
removed. In this instance we are not removing the upper log and this can be seen on sheet S2.4.
m I Page: Z-002
Checkmark: Unchecked If the log holding up the log is removed,
] then the log's structural support has been
,` File Name: Rd1 Revised Plans.pdf demolished and therefore it has been
� ,, demolished.
%" n As discussed -and clarified via email - if a log holding
m°fed ,a
a . up a log is removed then the upper log will only be counted as demolished if that log is also
removed. In this instance we are not removing the upper log and this can be seen on sheet S2.4.
I%AI N N fj I L, Page:Z-002
., i
Checkmark: Unchecked
' If the log holding up the log is removed,
7 [
"11 Author:jimp demolished and therefore it has been
.0 �i .f File Name: Rd1 Revised Plans.pdf demolished.
,0 ,„,,
'°"""re''l therefore II has been
As discussed -and clarified via email - if a log holding then the logs structural support has been
•
up a log is removed then the upper log will only be counted as demolished if that log is also
removed. In this instance we are not removing the upper log and this can be seen on sheet S2.4.
RECEIVED
09/29/2017
ASPEN
BUILDING DEPARTMENT
Page:Z-002
Checkmark: Unchecked
Author:jimp
, — File Name: Rd1 Revised Plans.pdf
'/ /,I Page:Z-002
Checkmark: Unchecked
Author:jimp
File Name: Rd1 Revised Plans.pdf
j
1 =-� i Page: Z-002
1� A I Checkmark: Unchecked New Header being installed per S2.4
;,� Author:jimp This area is currently being counted as demo.
1.°° _�= —' D File Name: Rd1 Revised Plans.pdf
ILIA i I!I:
7"" Page:Z-002 1111111111111111.111111.111111111111111111111111V-7
Checkmark: Unchecked 1�� ■■■■■■■■■■■i61�bi
Author:jimp 1■■■■■■■■■■■■■■1
/� File Name: Rd1 Revised Plans.pdf
j1//1, 4i�i� �i1•i1•i1•i �������■■■■l �
. moirmilificuiliellivireitr
Checkmark: Unchecked Looking at your elevations, there is no
8
Author:jimp fenestration here.
File Name: Rd1 Revised Plans.pdf This area is shown as existing wall area to remain.
elevations,[here is no
fenestration here.
%% 13
,,,,,^ I " IN H I Ln Page: Z-002 If the log holding up the log is removed,
Checkmark: Unchecked
� Author:jimp then the log's structural support has been
/// NM demolished and therefore it has been
File Name: Rd1 Revised Plans.pdf demolished.
the lop.s removed As discussed -and clarified via email - if a log holding
Fi,ed "° up a log is removed then the upper log will only be counted as demolished if that log is also
removed. In this instance we are not removing the upper log and this can be seen on sheet S2.4.
Page:Z-002 71111111111
Checkmark: Unchecked s'lu ■Author:jimp �n � mi ���� mm �'
so File Name: Rd1 Revised Plans.pdfII■■■■■■■■■■■■■■I
WM PPPII PPPII PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM PPM PM mommer
RECEIVED
09/29/2017
ASPEN
BUILDING DEPARTMENT
Page:Z-002
Checkmark: Unchecked
Author:jimp
File Name: Rd1 Revised Plans.pdf
16
7 y�A Page:Z-002
Checkmark: Unchecked
Author:jimp
File Name: Rd1 Revised Plans.pdf
Page: Z-002
NE A Checkmark: Unchecked New Header being installed per S2.4
Author:jimp The proposed new header is shown as
New Hcadg El 1' File Name: Rd1 Revised Plans.pdf demo on sheet Z002. Some of this header
installed pe overlaps the existing door opening -so only
part of the surface area of this new header
i / counts towards demo.
pal Page:Z-002 If the log holding up the log is removed,
Checkmark: Unchecked
Author:jimp then the log's structural support has been
File Name: Rd1 Revised Plans.pdf demolished and therefore it has been
demolished.
l'; /
as ,6 As discussed -and clarified via email - if a log holding
i up a log is removed then the upper log will only be counted as demolished if that log is also
removed. In this instance we are not removing the upper log and this can be seen on sheet S2.4.
3 1 4 5 Page:Z-002
Checkmark: Unchecked See A 103 D at grid line 3.5. Plus S2.4
Author:jimp specifically says that this column will be
Sae A-t03-0 atgnd line 3.5. File Name: Rd1 Revised Plans.pdf replaced.
Plus 52.4 specifically says that
111 iii 5014 Ib VJIJ li
j i In this instance we are not removing the upper column and have adjusted structural
A, drawing S2.4 accordingly.
Page: Z-002
Checkmark: Unchecked There is no exception for a built in
Author:jimp parapet wall, and the Code treats this as
File Name: Rd1 Revised Plans.pdf part of the exterior wall.
� II We have revised our structural solution for this existing parapet wall at the
garage and plan on keeping all garage walls unless noted otherwise. Please
see an updated detail within the structural set.
Page:Z-002 There is no exception for a built in
Checkmark: Unchecked
M.N., TM Author:jimp parapet wall, and the Code treats this as
File Name: Rd1 Revised Plans.pdf part of the exterior wall.
al
We have revised our structural solution for this existing parapet wall at the
garage and plan on keeping all garage walls unless noted otherwise. Please
see an updated detail within the structural set.
RECEIVED
09/29/2017
ASPEN
BUILDING DEPARTMENT
A Page:Z-002
Checkmark: Unchecked New Header being installed per S2.4
b"
�� Author:jimp The proposed new header is located above
Newoead;being %i/% File Name: Rd1 Revised Plans.pdf
installed.=S24 .,___-Y��,� the existing wall, and in line with the roof.
The roof is being shown as demolished,
III therefore the new header does not require
additional demo in elevation.
'NG LOWFR I EVFL Page:Z-002
Checkmark: Unchecked There is no exception for a built in
5CpQ Author:jimp parapet wall, and the Code treats this as
There is no exception fora part of the exterior wall.
bailtin parepet wall,and the File Name: Rd1 Revised Plans.pdf
/ Code treats this as part of the
IG/ . ° We have revised our structural solution for this existing parapet wall at the
re., " ���' garage and plan on keeping all garage walls unless noted otherwise. Please
see an updated detail within the structural set.
Page: Z-002
Naeneaderbeng Checkmark: Unchecked New Header being installed per S2.4
amalma rAr sza
Author:jimp Header is now shown as demoed.
?'""`" ` File Name: Rd1 Revised Plans.pdf
Page:Z-002
�% Checkmark: Unchecked becauseThis l is being demolished
)the ere ntire wall is moving forward.
1 v=11 A Author:jimp
l Ii File Name: Rd1 Revised Plans.pdf We have added this entire wall to the demo calcs and shown
II `'PPA/ accordingly on Z002
d
=ff.„ / Page: Z-002 ��■■■■
Checkmark: Unchecked
Author:jimp
,— File Name: Rd1 Revised Plans.pdf
zz �
Page: Z-002
Checkmark: Unchecked
�� �� Author:jimp
File Name: Rd1 Revised Plans.pdf
Page:Z-002 If the log holding up the log is removed,
^-) Checkmark: Unchecked
Hi �3 j Fr Author:jimp then the log's structural support has been
File Name: Rd1 Revised Plans.pdf demolished and therefore it has been
e demolished.
w?° ad ' As discussed - and clarified via email - if a log holding
been d end
=m� d °" up a log is removed then the upper log will only be counted as demolished if that log is also
removed. In this instance we are not removing the upper log and this can be seen on sheet S2.4.
RECEIVED
09/29/2017
ASPEN
BUILDING DEPARTMENT
Page:Z-002
19 Checkmark: Unchecked
Author:jimp
File Name: Rd1 Revised Plans.pdf
I 18 ,p
I
Page:Z-002
14 Checkmark: Unchecked
Author:jimp
IA
File Name: Rd1 Revised Plans.pdf
19
Page:Z-002
Checkmark: Unchecked
Author:jimp
File Name: Rd1 Revised Plans.pdf
Page:Z-003
Checkmark: Unchecked See note#9 about removing all exiting
structural log beams and columns
i Author:jimpJ Milli/ File Name: Rd1 Revised Plans.pdf
We are removingan existingcolumn in this area as shown on sheet S2.4. We are also cuttingthe
/ ,;, �
I.,° :. .,, existing glulam beam at this location to receive the new column. The existing column's plan view
N n area has been accounted for in this section of roof 14 shown by the small rectangle that corresponds
to this area.
° I °o Page:Z-003 Demolition for new duct and pipe
„„r222 \N Checkmark: Unchecked
y Author:jimp openings?
Thri (�, \ .., File Name: Rd1 Revised Plans.pdf
mm,i All new ducts and pipe openings will take place in roof areas that will be demoed.
N Page: Z-003
Checkmark: Unchecked Demolition for new duct and pipe
,, Author:jimp
„9„ openings?
File Name: Rd1 Revised Plans.pdf
All new ducts and pipe openings will take place in roof areas that will be demoed.
4••3 _•__• Page:Z-003
72.29 c.",t Checkmark: Unchecked
.00 ..,,Vpp.•• Author:jimp
: ),/. File Name: Rd1 Revised Plans.pdf
, iv❖.❖.❖��❖.,��.❖�,�i❖.❖.•J
RECEIVED
09/29/2017
ASPEN
BUILDING DEPARTMENT
Page:Z-003
_ Checkmark: Unchecked 23.-8
Author:jimp
. . 23,8•_.__.____.__. File Name: Rd1 Revised Plans.pdf
'15 sq ft
22/ I 23
42.29 sq ft 32.0
Page:Z-003
J_ I1 Checkmark: Unchecked See note#9 about removing all exiting
Author:jimp structural log beams and columns
File Name: Rd1 Revised Plans.pdf
We are not removing any structural roof log beam and columns within this area. This can be
shown on S2.4.
v(iLzi -v - Page: Z-003
a Check your elevations. It appears that all
� Checkmark: Unchecked of your eaves are being cut down. Please
u{ Autho� mimp add that work to your demo total
1 = File File Name: Rd1 Revised Plans.pdf
We have revised our drawings to be consistent.
N_ - - We are only reducing the dimension of roofs where
it is shown as demo on the demo plans.
pp0 �0,2 Page:Z-003
00•.O•.�.F..5 Checkmark: Unchecked
•iiiOi%p • ••
•••••••••��•� • Author:jimp
/•0000�..fl.;e4r File Name: Rd1 Revised Plans.pdf
0.00❖.-.r-..-O.
I
Page:Z-004
Checkmark: Unchecked As you can see on sheet A-201,the
��.�a.° °°°`�aw Author:jimp bottom of the first story floor structure is
e-� File Name: Rd1 Revised Plans.pdf above the new finished grade. Therefore,
at least a portion of this wall will be
- ' ` _ ' We have updated the main level wall calcs to match exposed.
the sections and elevations. Per our discussion we
will be taking the grade line shown in elevation adjacent to the building
r i Page:Z-004
Checkmark: Unchecked
Author:jimp
-1 File Name: Rd1 Revised Plans.pdf
Page:Z-004
V Checkmark: Unchecked Both tables seem to be missing a column
f1Er Author:jimp for exposed wall.
File Name: Rd1 Revised Plans.pdf
°-99=1- We have re-imported these charts to include that column
_1,
f
RECEIVED
09/29/2017
ASPEN
BUILDING DEPARTMENT
.. i Page:Z-004
Checkmark: Unchecked This does not appear to be the right
-' amount of exposed wall. Please see
the
,,,,..=�.n.,o,
Author:jimp
rynixeWe „ow,.,aa -- - Sheet A-202. I have preformed an area
r File Name: Rd1 Revised Plans.pdf measurement based on the height of the
mea„remen.ese,on the o,e, ien b We have updated the lower level wall calcs to match space shown in the sections. The
the sections and elevations. resultant area is closer to 20sq.ft rather
than 8.
Page:Z-005
1 Checkmark: Unchecked 2'-8 19/32"
TA Author:jimp
) File Name: Rd1 Revised Plans.pdf
1
Page:Z-005
„ Checkmark: Unchecked 18' 11 7/32"
Author:jimp
—i 18'-11 7/32"—► File Name: Rd1 Revised Plans.pdf
,
7
183.73 sq ft
-Irl
J
Page:Z-005
Checkmark: Unchecked Add the calculation for the garage FA
Add the calculation for the garage FA Author:jimp
File Name: Rd1 Revised Plans.pdf
This is shown on Z001 but we have also included it on Z005
Page:Z-005 According to both the Civil and
J o Checkmark: Unchecked Landscaping drawings,the stairs down to
According to both the Civil and Author:jimp
Landscaping drawings,the stairs File Name: Rd1 Revised Plans.pdf the path are being restored. Please add
down to the path are being restored.
lease add them to your proposed
J dPleck total.
a a These stairs will only be stones set in earth them to your proposed deck total.
4 and will therefore not be structured and therefore would
not count towards FAR
IMaink.r.I Deck N.e-Tctdtsf,1 it.a<r,, Page: Z-005
Checkmark: Unchecked Add the calculation for the garage FA
Add the calculation for the garage
FA Author:jimp
File Name: Rd1 Revised Plans.pdf
This is shown on Z001 but we have also included it on Z005
1 L Page:Z-005
Checkmark: Unchecked 18' 7 5/16"
4,,����� Author:jimp
L1875/16 —�I File Name: Rd1 Revised Plans.pdf
8
246.20 sq ft
t, i1
RECEIVED
09/29/2017
ASPEN
BUILDING DEPARTMENT
Page:Z-005
Checkmark: Unchecked Based on the measurements of the buried
Author:jimp wall, this exposed area should be smaller.
File Name: Rd1 Revised Plans.pdf Please fix and adjust the amount of
= counting FA.
We have adjusted the amount of counting FA.
Page:Z-005 2'-9 27/32"
5 Checkmark: Unchecked
CN
Author:jimp
N File Name: Rd1 Revised Plans.pdf
rn o-
N
Page: Z-006
For this area to be exempt from deck
Checkmark: Unchecked
�� oME totals,we will require this detail to show
e Author:jimp
File Na up in both the floor plan and structural
!_ t:-------- • File Name: Rd1 Revised Plans.pdf drawings as well as the elevations.
iab:�a
IIIel L Wq We have updated our floor plans, elevations, and structural drawings to show this planter.
Page:Z-006
Checkmark: Unchecked Please add a chart here showing total
Please add a chart here showing Existing FA
total Existing FA Author:jimp
File Name: Rd1 Revised Plans.pdf
We have included a section from the summary sheet on this page.
Page:Z-006
Checkmark: Unchecked Please add a chart here showing total
Please add a chart here showing proposed FA
total proposed FA Author:jimp
File Name: Rd1 Revised Plans.pdf
We have included a section from the summary sheet on this page.
RECEIVED
09/29/2017
ASPEN
BUILDING DEPARTMENT