HomeMy WebLinkAboutFile Documents.150 Roaring Fork Dr.0010-2019-BCHO (2) 0010-2019-BCHO_Zoning_1
150 RFD PH II SPECIFICATION PACKAGE + SCHEDULE 2 Lighting.pdf(1)
- Page: 18
�^ Checkmark: Unchecked Please provide a picture showing this®� fixture"lit up",to verify that it meets the
n.,�X_
Author:jimp
File Name: 150 RFD PH II SPECIFICATION PACKAGE+ standard for Fully Shielded.
„ p- SCHEDULE 2 Lighting.pdf
150 Roaring Fork Drive Architectural Set Phase Il.pdf(44)
Page: 1
Because of the volume of comments, the
Because of the volume of Checkmark: Unchecked
comments,the Zoning officer Author:jimp Zoning officer will require a pre-submittal
will require a pre-submittal 1 p meeting with the applicants
meeting with the applicants File Name: 150 Roaring Fork Drive Architectural Set Phase
representative before representative before re-submittal.
re-submittal. I I.pdf
r �., Page: 3 Based on the site visit on 1/15/20,the
Checkmark: Unchecked
= : = Author:jimp walls in the existing basement were taller
' ' ' ' - File Name: 150 Roaring Fork Drive Architectural Set Phase than a crawl space, but much lower than
O• - �- t_� +_ Il.pdf
the 8' being shown. Please provide
' exterior wall drawings that represent
-AMMO original existing conditions.
• @._.I Page:4
Checkmark: Unchecked From the floor plans, it appears that this
-0 e area is currently accessed from a floor
P Author:jimp hatch. Therefore, per 26.575.020.D.3,
- File Name: 150 Roaring Fork Drive Architectural Set Phase
ry Il.pdf Attics, since the area is accessed from a
floor hatch the entire area is currently
6 6 6 b 6
L...>^ Q 9 a..,a , 9 9 exempt.
I
Page: 5
Checkmark: Unchecked Add the Juliet balcony square footage to
Author:jimp your deck total unless there is no decking
Q Q ° ° at all and it is completely open to below.
l _; l o File Name: 150 Roaring Fork Drive Architectural Set Phase
Il.pdf
r
Page: 5
Checkmark: Unchecked This is just one wall. Please make it one
~I wall, rather than 5,for your Subgrade wall
Author:jimp
14 -- File Name: 150 Roaring Fork Drive Architectural Set Phase drawings above
-,15, -i ..„ Il.pdf
Page: 5
Checkmark: Unchecked Please check your layers in your
® e m ®® V m a program. I would like to see everything
®_ _ __- — t Author:jimp within the wall shaded as FA, unless it is
- File Name: 150 Roaring Fork Drive Architectural Set Phase
1 - exempt. Right now it is hard to tell what
1
c - II.pdf
1
a 1 counts and what doesn't.
o® Page: 6
' Checkmark: Unchecked alye se e ethe these are to au
t your
®
y
drawn, I cannot tell what is being counted
Author:jimp
ii File Name: 150 Roaring Fork Drive Architectural Set Phase
Il.pdf and what you consider exempt.
/p A - - Page: 6
Per 26.575.020.D.3,Attic Space, if any
�s�' �: _ Checkmark: Unchecked
'//,- 0.,: o- portion of this attic space is accessible,
Author:jimp then the entire area counts towards your
File Name: 150 Roaring Fork Drive Architectural Set Phase
-----;= r =7 6� ll.pdf regardless of the height.
FA totals
,
6 6 9 a'F�.'� '`
Level FAR 7 1E-.7.
1 I I
w— Page: 6
�, o Per section 26.575.020.D.6, Patios, as
Checkmark: Unchecked
r Author:jimp well as the definition of Patio in the LUC,
File Name: 150 Roaring Fork Drive Architectural Set Phase the area under this overhang may need to
� EIE be added to the 15/o deck allowance.
a k£ Il.pdf Please show why this does not meet
�+b xb 6 those standards.
Page: 7
ili4 _>_>____>____>______:__- Based on all of your other drawings,
Checkmark: Uncheckedapip
�;;;_______________________ including the structurals, it looks like part
�,,s,,,,_____________ _____' Author:jimp
of the roof above the stairwell is being
File Name: 150 Roaring Fork Drive Architectural Set Phase
II pdf demolished. Please amend your
0 0 o b I drawings.
Page: 7 Where are the skylights? They should be
mi Checkmark: Unchecked included as existing fenestrations.
Author:jimp
1 I File Name: 150 Roaring Fork Drive Architectural Set Phase
rim
Il.pdf
§- — -
Page: 9
neaaen
Checkmark: Unchecked Header?
Author:jimp
File Name: 150 Roaring Fork Drive Architectural Set Phase
Il.pdf
ins 2k '
Page: 9
Checkmark: Unchecked Your demo drawings show this whole wall
Author:jimp as being demolished. Please update your
File Name: 150 Roaring Fork Drive Architectural Set Phase drawing
II.pdf
Page: 9
A All of this area is being demolished
All of this area Checkmark: Unchecked
being demolished
Author:jimp
File Name: 150 Roaring Fork Drive Architectural Set Phase
Il.pdf
2 sgft
Page: 9
Checkmark: Unchecked I will review your demo calculations once
you have submitted all existing and
°neea�a ew,n 9a"n e` Author:jimp
File Name: 150 Roaring Fork Drive Architectural Set Phase proposed elevations. However,there are
ei";reaoeaaailwiil„°tlaby a few things I have noticed already that
tle,aM1�M1a II.pdf
'sling M1eatler being dem°Ils"etl.
Ipwsa"yxamiag"eingrem°"ed — will need to be corrected. If any window
y°".aem°arewmge.same r°�
is being expanded, it will probably require
a new header. Show the existing header
being demolished, plus any framing being
removed in your demo drawings. Same
for the header above newly cut in
windows.
Page: 9
=W:= The lower portion of these walls are
Checkmark: Unchecked D Author:jimp surrounding a"crawl area" under the
o �
1=" File Name: 150 Roaring Fork Drive Architectural Set Phase garage that is open to the elements. That
='--� N Il.pdf should not be included in the demolition
drawings. Please remove these sections
01 111 1 Q a j ® ■ of wall from the drawings and revise your
calculations.
Page: 9 Your structurals show the entire wall as
— Checkmark: Unchecked Author:jimp being demolished including posts and
File Name: 150 Roaring Fork Drive Architectural Set Phase headers. Please update.
Il.pdf
Page: 9
Checkmark: Unchecked Your demo drawings show this whole wall
"°°° Author:jimp as being demolished. Please update your
File Name: 150 Roaring Fork Drive Architectural Set Phase drawing
/� � Il.pdf
44
Page: 9
All of this area is Checkmark: Unchecked All of this area is being demolished
being demolished
Author:jimp
File Name: 150 Roaring Fork Drive Architectural Set Phase
T,7 Il.pdf
118,k
sgft
Page: 9 Header?
Header! Checkmark: Unchecked
4sq fl Author:jimp
File Name: 150 Roaring Fork Drive Architectural Set Phase
»sgft Il.pdf
Wei! O�
- Page: 9
o
Checkmark: Unchecked Headers.
Author:jimp
File Name: 150 Roaring Fork Drive Architectural Set Phase
Il.pdf
Page: 9
Checkmark: Unchecked Headers?
Author:jimp
File Name: 150 Roaring Fork Drive Architectural Set Phase
firzfiffeiga
.,,..„ II.pdf
Page: 9 Headers?
Checkmark: Unchecked
Author:jimp
File Name: 150 Roaring Fork Drive Architectural Set Phase
II.pdf
Page: 9
Checkmark: Unchecked Headers and post?
Author:jimp
= File Name: 150 Roaring Fork Drive Architectural Set Phase
..... .C ", and POSr, I lI.pdf
Page: 9 I doubt the door itself goes from edge to
"M" Checkmark: Unchecked edge of the wall. The door hole is
"A ` Author:jimp fenestration, but the framing and wall
-- = File Name: 150 Roaring Fork Drive Architectural Set Phase
uw z around the door is wall that is being Il.pdf demolished.
Z-007
Page: 9
Checkmark: Unchecked Do these walls include the portion of the
Author:jimp chimney above the existing roof line?
File Name: 150 Roaring Fork Drive Architectural Set Phase
I Il.pdf
Page: 9
Checkmark: Unchecked Your demo drawings show this whole wall
".„e Author:jimp as being demolished. Please update your
File Name: 150 Roaring Fork Drive Architectural Set Phase drawing
Il.pdf
Page: 11
Checkmark: Unchecked Based on the roof drawing on this page,
1 the amount of demo should be larger.
Author:jimp
File Name: 150 Roaring Fork Drive Architectural Set Phase
Il.pdf
Page: 11 This new roof element does not match the
Checkmark: Unchecked
Author:jimp width shown on the elevations. Please
1 ® reconcile.
File Name: 150 Roaring Fork Drive Architectural Set Phase
pr ILpdf
Page: 11
F Checkmark: Unchecked 4' 3/8"
{ Author:jimp
File Name: 150 Roaring Fork Drive Architectural Set Phase
ILpdf
Page: 11
Checkmark: Unchecked Top of chimney?
® 9 o Author:jimp
— File Name: 150 Roaring Fork Drive Architectural Set Phase
ILpdf
Page: 11
Checkmark: Unchecked 14' 11 9/16"
;;; Author:jimp
FFFi ==T
,��a,F,,,;,,==T File Name: 150 Roaring Fork Drive Architectural Set Phase
;pc �� P I. df
yee
ttF�
ism
'III
-=T
Page: 11 Based on your structural drawings,this
Checkmark: Unchecked
_ '_.__l._J._. ._._. Author:jimp area should be narrower.
a
_ , File Name: 150 Roaring Fork Drive Architectural Set Phase
Il.pdf
Page: 11
Checkmark: Unchecked Please compare these demolition
Author:jimp drawings with your structural drawings.
Mm File Name: 150 Roaring Fork Drive Architectural Set Phase Demolition includes any structural
ILpdf elements needed for the integrity of the
_ exterior. Therefore, if any structural
�r -•--•. =.00s elements have been demolished that hold
up the roof,then that structural element
(beams and posts)must be shown as
demolished on your roof plan.
Page: 16
g In order for this roof to be exempt from
Checkmark: Unchecked
.il _-_-_
Author:jimp height,
.� ���t�„ � File Name: 150 Roaring Fork Drive Architectural Set Phase
tJ .»» Il.pdf
it
Est , !PI,
Page: 17
Checkmark: Unchecked In order to finish reviewing this permit we
Author:jimp will require:
:,0� a , File Name: 150 Roaring Fork Drive Architectural Set Phase All Proposed elevations, including east
eu 9
II.pdf and west,
All existing elevations, Including n, s, e&
w
All elevations must have existing and
proposed grades shown and labeled.
Page: 18
Checkmark: Unchecked Please see 26.575.020.F, Measuring
""""' Author:jimp Building Heights,for how to measure
File Name: 150 Roaring Fork Drive Architectural Set Phase "roofs with multiple pitches within one
vertical plane. Please show how these
Im_ .. ..=. II.pdf two roofs combined meet that height
.1111111 methodology.
who Illllilllllll tlIIll:PiIIIINIINw, .�
Y Y Y Page: 18 14' 11 3/4"
i i I „ Checkmark: Unchecked
--_ Author:jimp
File Name: 150 Roaring Fork Drive Architectural Set Phase
Il.pdf
_ .aa.=.,�.,.w Page: 18
_.._ Checkmark: Unchecked It appears as if the existing roof is
° ° A�° Author:jimp non-compliant for height. Per
File Name: 150 Roaring Fork Drive Architectural Set Phase 26.312.030, Non conforming Structures,
E11 1111 d- II.pdf as well as 26.575.020.B, Limitations,
non-conformities may not be expanded.
gingrilla ill
— Page: 22
Checkmark: Unchecked This is a structural beam and post that is
Author:jimp carrying all the way up to the roof.
File Name: 150 Roaring Fork Drive Architectural Set Phase Therefore, it will need to be shown in the
r --- II.pdf demolition drawings.
S,E°, RDIMENSIONS len Page: 22
Checkmark: Unchecked Please provide details on what portion of
�� this non-conforming deck is being
1 Author:jimp
File Name: 150 Roaring Fork Drive Architectural Set Phase demolished. If structure is being
74:1 .° o-_ - r- '' , II.pdf demolished and you plan on rebuilding it,
-- p you will need to show how that constitutes
,.� "maintenance".
g
Page: 23
Your structural drawings show the beam
Checkmark: Unchecked
_ Author:jimp holding up the deck is being"lowered". In
g e File Name: 150 Roaring Fork Drive Architectural Set Phase order to maintain this non conforming
MEMs r-.__ Il.pdf deck please show how the lowering of the
-- rimm I
- beam constitutes maintenance.
Page: 27
Checkmark: Unchecked Please provide details on what"normal
?-Po CRE Author:jimp Maintenance"encompasses for both the
a m..
"°.ww ,°°° °°° p °°° � File Name: 150 Roaring Fork Drive Architectural Set Phase decks and the railings.
4 w;=i_._._.____. =_ I I.pdf
Page: 28
--- -- Because this deck is in the setback, it
® Checkmark: Unchecked
• Author:jimp may not have any permanent structure on
l�� � File Name: 150 Roaring Fork Drive Architectural Set Phaseit. Please show that this entire"kitchen"
-pit`""r is movable,and confirm that there is no
;d Il.pdf." 1 " hard piped gas or water.