Loading...
HomeMy WebLinkAboutFile Documents.124 W Hallam St.0025.2017 (46).ARBK Markup Summary 7-28-2017 LANDSCAPE DRAWINGS_REVISION 1.2019.06.29.pdf(2) deco4i Page: 1 rock Author: amyg end of fen a File Name: LANDSCAPE DRAWINGS_REVISION 1.2019.06.29.pdf pl new small sculptural Page: 1 deciduous tree ' Author: amyg Please revise to eliminate this File Name: LANDSCAPE DRAWINGS_REVISION planting bed, as represented in 1.2019.06.29.pdf architectural site plan. Please revise to eliminate this planting bed, PLANTING BED HAS BEEN as represented in architectural site plan. e ELIMINATED.SEE PLAN LS-10.0 PERMIT REVISIONS 1-ARCHITECTURAL.2017.06.29.pdf(18) DOOR SCHEDULE Page: 5 After inspection of historic Author: amyg File Name: PERMIT REVISIONS framing,there is no door at 102. 1-ARCHITECTURAL.2017.06.29.pdf Please delete from design. aaere ro gas°amas,ae,e,"°doa.a„ou.eaee DOOR 102 HAS BEEN REMOVED FROM PLAN,ELEVATION,AND DOOR SCHEDULE aDaMw — e.,p Page: 5 ""N p • - • Author: amyg Examine historic framing at 101 e°""" 19/' File Name: PERMIT REVISIONS and determine if both a code DOOR SCHEDULE 1-ARCHITECTURAL.2017.06.29.pdf compliant entry door and samae hsanaamaa M,ma"a aae"m°erceanamae transom will fit in the rough opening. Revise design for review and approval by HPC staff. FRAMING REVEALS THERE IS SUFFICIENT DIMENSIONS FOR DOOR AND TRANSOM RECEIVED 09/14/2017 ASPEN BUILDING DEPARTMENT Page: 6 ae®®®==®=®®e® Author: amyg Window 1: Exposed framing has ------------- File Name: PERMIT REVISIONS revealed the historic rough 1-ARCHITECTURAL.2017.06.29.pdf opening. Please adjust design. M1 o r Pm.4pgy4Y`m, W ;•..,rw y.,,,,,,,,F_ Window 2: Please review :a..._..__.,_•.._ exposed framing and adjust design if appropriate.This is labeled as an existing window in schedule, but it is new. Window 3: Match historic window 6 PER THE WALK-THROUGH WITH OAC Window 7: Please review (OWNER,ARCHITECT,CONTRACTOR)AND HPC, exposed framing and adjust FRAMING INFORMATION WAS REVIEWED AND REVISED. design if appropriate. Window 8: Please review SEE UPDATED WINDOWS SCHEDULE AND LIST BELOW: exposed framing and adjust design if appropriate. Window 11: Match historic WINDOW 1 OPERABLE DOUBLE HUNG IF POSSIBLE window 9 Window 12: Confirm historic WINDOW 2 NO CHANGES rough opening in field and adjust WINDOW 3 WILL MATCH#6 design Window 18: Exposed framing WINDOW 7 TO BECOME MORE NARROW PER WINDOW 8 shows there was no window in WINDOW 8 TO SET WINDW 7 WIDTH this location. Please delete. Window 19/20: Please review WINDOW 11 MATCH WINDOW 9 exposed framing and adjust WINDOW 12 DIMENSIONS HAVE BEEN REVISED design if appropriate. Window 21/22: This is labeled as WINDOW 18 REMOVED an existing window in schedule, WINDOWS 19/20 R.O. REVISED but it is new. Window 27/28: Exposed framing WINDOWS 21/22 LABELED AS NEW/GRABILL reveals one double hung WINDOWS 27/28 CHNAGED TO SINGLE DOUBLE HUNG centered in the gable end. Historic sill (and maybe header) WINDOW 29 TO BE INCLUDED IN PROJECT are in place. Confirm historic WINDOW 30 SIZE(HEIGHT)INCREASED.SEE ELEVATIONS rough opening in field and adjust design. Window 29: Please review exposed framing and adjust design if appropriate. Window 30: Review condition in field. Exposed framing reveals this was a pair of double hung windows. The historic jamb was sliced in half horizontally to reduce the glazing. Please confirm historic rough opening and restore to original design. Page: 10 Author: amyg Appears to be original siding. All File Name: PERMIT REVISIONS original siding is to be retained if 1-ARCHITECTURAL.2017.06.29.pdf feasible. Study on site with HPC Appears to be original siding.All original staff after exterior demolition siding is to be retained if feasible. Study on site with HPC staff after exterior work. Use this area of siding as demolition work. Use this area of siding / for new siding. as model for new siding. model ` 9 SIDNG THAT APEARS TO BE ORIGINAL AT WEST/NORTH FACADES WILL BE RETAINED IF POSSIBL F cm/Fri SIDING WILL BE USED AS MODEL FOR NE RECEIVED 09/14/2017 ASPEN BUILDING DEPARTMENT Page: 10 Author: amyg File Name: PERMIT REVISIONS 1-ARCHITECTURAL.2017.06.29.pdf r= Page: 10 Appears to be original siding. All �_ _ Author: amyg p , - �s original siding is to be retained if H� r File Name: PERMIT REVISIONS 'I 'Vi‘d kT,, 1-ARCHITECTURAL.2017.06.29.pdf feasible. Study on site with HPC Appears to be original siding.All original siding is '—1 staff after exterior demolition to ffafterexeriorde'm'o;„on°worrk.Usetnsaea work. Use this area of sidingas SIDNG THAT APEARS TO BE ORIGINAL AT WEST/NORTH model for new siding. --of siding as model for new siding. \>\�i I, 41li> t �� FACADES WILL BE RETAINED IF POSSIBLE.SAVED .- 1 - 1 \ SIDING WILL BE USED AS MODEL FOR NEW/ADDED SIDING will i� I L----R, 1 '- t�r3� Page: 10 C� Author: amyg P\V�u�F -i File Name: PERMIT REVISIONS L---__IL_ 1-ARCHITECTURAL.2017.06.29.pdf I W' _N ,1 v I --JL JL- \\\ Ir-- TTnn + I I L 111 ir Page: 11 Author: amyg Change stone steps to wood File Name: PERMIT REVISIONS steps. EE 1-ARCHITECTURAL.2017.06.29.pdf Change stone steps to SEE A-100.00 wood steps. STONE STEPS CHANGED TO WOOD \\ I \\ // Page: 11 Change note to"Pin lights to be Author: amyg approved by HPC prior to File Name: PERMIT REVISIONS Change note to"Pin 7-7/ 1-ARCHITECTURAL.2017.06.29.pdf installation." lights to be approved by HPC prior to PIN LIGHTS NOT APPROVED BY HPC installation." NEW LIGHT FIXTURES SELECTED RECEIVED 09/14/2017 ASPEN BUILDING DEPARTMENT Page: 11 Author: amyg Change note to"Stone paving I� (, must be approved by HPC prior File Name: PERMIT REVISIONS Change note to"Stone 1-ARCHITECTURAL.2017.06.29.pdf to installation." paving must be approved by HPC prior SEE A-100.00 - to installation." NOTE HAS BEEN ADJUSTED otti /// Page: 19 P Author: amyg Study any remaining original StudyremainingE File Name: PERMIT REVISIONS porch rafters to determine any 1-ARCHITECTURAL.2017.06.29. df historic pitch and revise if original porch rafters to vi p appropriate. determine historic pitch T( and revise if KORU HAS STUDIED appropriate. ORIGINAL PORCH RAFTERS P a W uthor:: amyg:A Update angle of PV panels Auth File Name: PERMIT REVISIONS based on energy consultant Update angle of PV 1-ARCHITECTURAL.2017.06.29.pdf feedback. panels based on energy consultant feedback. SEE EXTERIOR ELEVATIONS: PV PANEL ANGLES ADJUSTED Page: 19 Author: amyg Remove window 18 and revise File Name: PERMIT REVISIONS window 31. Remove window 1 ARCHITECTURAL.2017.06.29.pdf SEE EXTERIOR ELEVATIONS: 18 and revise REMOVED&REVISED window 31. Page: 19 Author: amyg Remove note and door 102. File Name: PERMIT REVISIONS DOOR HAS BEEN REMOVED 1-ARC H ITECTU RAL.2017.06.29.pdf Remove note and door 102. RECEIVED 09/14/2017 ASPEN BUILDING DEPARTMENT 6AR-,i0 LE,CO81623 Page: 20 TEL:970.927.5174 Author: amyg Remove note. Revise design CIVIL ENGINEER File Name: PERMIT REVISIONS based on framing evidence. ^ �FORK 1-ARCHITECTURAL.2017.06.29.pdf Remove note. Revise design CO81623 HAS BEEN CHANGED TO SINGLE based on framing evidence. DOUBLE-HUNG WINDOW. MEP ENGINEER SEE A-301.00 POWERHOUSE E 520 E.COOPER AVE,SW ASPEN,CO 81611 TEL:970.315.2035(Brand, 970.240.5990(Mark) ASPEN. Page: 21 i HPC TO Author: amyg Change to wood entry steps. ;IATE File Name: PERMIT REVISIONS 1-ARCHITECTURAL.2017.06.29.pdf SEE A-100.00 Change to wood entry STONE STEPS CHANGED TO WOOD steps. FRONT P RCH IPC Page: 35 Author: amyg Add note"Provide shingle File Name: PERMIT REVISIONS sample for review and approval 1-ARCHITECTURAL.2017.06.29.pdf by HPC staff" Add note"Provide shingle sample for review and approval by HPC staff." NOTE ADDED-SAMPLE TO BE PROVIDED (CUT, NOT SHAKE SHINGLE) Page:48 Author: amyg This conflicts with roof plan File Name: PERMIT REVISIONS shown on A 113. Please revise 1-ARCHITECTURAL.2017.06.29.pdf design or clarify location of this This conflicts with roof plan shown roof vent. on A-113. Please revise design or clarify location of this roof vent. DETAIL SECTION A-730.00 HAS BEEN REVISED;CHIMNEY DOES NOT VENT DIRECTLY ABOVE FIRLEPLACE AS PREVIOUSLY SHOWN RECEIVED 09/14/2017 ASPEN BUILDING DEPARTMENT