HomeMy WebLinkAboutFile Documents.124 W Hallam St.0025.2017 (46).ARBK Markup Summary 7-28-2017
LANDSCAPE DRAWINGS_REVISION 1.2019.06.29.pdf(2)
deco4i Page: 1
rock Author: amyg
end of fen a File Name: LANDSCAPE DRAWINGS_REVISION
1.2019.06.29.pdf
pl
new small sculptural Page: 1
deciduous tree ' Author: amyg Please revise to eliminate this
File Name: LANDSCAPE DRAWINGS_REVISION planting bed, as represented in
1.2019.06.29.pdf architectural site plan.
Please revise to eliminate this planting bed, PLANTING BED HAS BEEN
as represented in architectural site plan. e
ELIMINATED.SEE PLAN LS-10.0
PERMIT REVISIONS 1-ARCHITECTURAL.2017.06.29.pdf(18)
DOOR SCHEDULE Page: 5
After inspection of historic
Author: amyg
File Name: PERMIT REVISIONS framing,there is no door at 102.
1-ARCHITECTURAL.2017.06.29.pdf Please delete from design.
aaere ro gas°amas,ae,e,"°doa.a„ou.eaee DOOR 102 HAS BEEN REMOVED
FROM PLAN,ELEVATION,AND
DOOR SCHEDULE
aDaMw — e.,p Page: 5
""N p • - • Author: amyg Examine historic framing at 101
e°""" 19/' File Name: PERMIT REVISIONS and determine if both a code
DOOR SCHEDULE 1-ARCHITECTURAL.2017.06.29.pdf compliant entry door and
samae hsanaamaa M,ma"a aae"m°erceanamae transom will fit in the rough
opening. Revise design for
review and approval by HPC
staff.
FRAMING REVEALS THERE IS
SUFFICIENT DIMENSIONS FOR
DOOR AND TRANSOM
RECEIVED
09/14/2017
ASPEN
BUILDING DEPARTMENT
Page: 6
ae®®®==®=®®e® Author: amyg Window 1: Exposed framing has
------------- File Name: PERMIT REVISIONS revealed the historic rough
1-ARCHITECTURAL.2017.06.29.pdf opening. Please adjust design.
M1 o r Pm.4pgy4Y`m, W ;•..,rw y.,,,,,,,,F_
Window 2: Please review
:a..._..__.,_•.._ exposed framing and adjust
design if appropriate.This is
labeled as an existing window in
schedule, but it is new.
Window 3: Match historic
window 6
PER THE WALK-THROUGH WITH OAC Window 7: Please review
(OWNER,ARCHITECT,CONTRACTOR)AND HPC, exposed framing and adjust
FRAMING INFORMATION WAS REVIEWED AND REVISED. design if appropriate.
Window 8: Please review
SEE UPDATED WINDOWS SCHEDULE AND LIST BELOW: exposed framing and adjust
design if appropriate.
Window 11: Match historic
WINDOW 1 OPERABLE DOUBLE HUNG IF POSSIBLE window 9
Window 12: Confirm historic
WINDOW 2 NO CHANGES rough opening in field and adjust
WINDOW 3 WILL MATCH#6 design
Window 18: Exposed framing
WINDOW 7 TO BECOME MORE NARROW PER WINDOW 8 shows there was no window in
WINDOW 8 TO SET WINDW 7 WIDTH this location. Please delete.
Window 19/20: Please review
WINDOW 11 MATCH WINDOW 9 exposed framing and adjust
WINDOW 12 DIMENSIONS HAVE BEEN REVISED design if appropriate.
Window 21/22: This is labeled as
WINDOW 18 REMOVED an existing window in schedule,
WINDOWS 19/20 R.O. REVISED but it is new.
Window 27/28: Exposed framing
WINDOWS 21/22 LABELED AS NEW/GRABILL reveals one double hung
WINDOWS 27/28 CHNAGED TO SINGLE DOUBLE HUNG centered in the gable end.
Historic sill (and maybe header)
WINDOW 29 TO BE INCLUDED IN PROJECT are in place. Confirm historic
WINDOW 30 SIZE(HEIGHT)INCREASED.SEE ELEVATIONS rough opening in field and adjust
design.
Window 29: Please review
exposed framing and adjust
design if appropriate.
Window 30: Review condition in
field. Exposed framing reveals
this was a pair of double hung
windows. The historic jamb was
sliced in half horizontally to
reduce the glazing. Please
confirm historic rough opening
and restore to original design.
Page: 10
Author: amyg Appears to be original siding. All
File Name: PERMIT REVISIONS original siding is to be retained if
1-ARCHITECTURAL.2017.06.29.pdf feasible. Study on site with HPC
Appears to be original siding.All original staff after exterior demolition
siding is to be retained if feasible. Study
on site with HPC staff after exterior work. Use this area of siding as
demolition work. Use this area of siding / for new siding.
as model for new siding. model
` 9 SIDNG THAT APEARS TO BE ORIGINAL AT WEST/NORTH
FACADES WILL BE RETAINED IF POSSIBL F cm/Fri
SIDING WILL BE USED AS MODEL FOR NE RECEIVED
09/14/2017
ASPEN
BUILDING DEPARTMENT
Page: 10
Author: amyg
File Name: PERMIT REVISIONS
1-ARCHITECTURAL.2017.06.29.pdf
r=
Page: 10 Appears to be original siding. All
�_ _ Author: amyg
p , - �s original siding is to be retained if
H� r File Name: PERMIT REVISIONS
'I 'Vi‘d kT,, 1-ARCHITECTURAL.2017.06.29.pdf feasible. Study on site with HPC
Appears to be original siding.All original siding is '—1 staff after exterior demolition
to ffafterexeriorde'm'o;„on°worrk.Usetnsaea work. Use this area of sidingas
SIDNG THAT APEARS TO BE ORIGINAL AT WEST/NORTH model for new siding.
--of siding as model for new siding.
\>\�i I, 41li> t �� FACADES WILL BE RETAINED IF POSSIBLE.SAVED
.- 1 - 1 \ SIDING WILL BE USED AS MODEL FOR NEW/ADDED SIDING
will i� I L----R,
1 '- t�r3� Page: 10
C� Author: amyg
P\V�u�F -i File Name: PERMIT REVISIONS
L---__IL_ 1-ARCHITECTURAL.2017.06.29.pdf
I W'
_N ,1
v
I --JL JL- \\\
Ir-- TTnn
+ I I
L 111 ir
Page: 11
Author: amyg Change stone steps to wood
File Name: PERMIT REVISIONS steps.
EE 1-ARCHITECTURAL.2017.06.29.pdf
Change stone steps to SEE A-100.00
wood steps.
STONE STEPS CHANGED TO WOOD
\\
I \\
// Page: 11 Change note to"Pin lights to be
Author: amyg approved by HPC prior to
File Name: PERMIT REVISIONS
Change note to"Pin 7-7/ 1-ARCHITECTURAL.2017.06.29.pdf installation."
lights to be approved by HPC prior to PIN LIGHTS NOT APPROVED BY HPC
installation." NEW LIGHT FIXTURES SELECTED
RECEIVED
09/14/2017
ASPEN
BUILDING DEPARTMENT
Page: 11
Author: amyg Change note to"Stone paving
I� (, must be approved by HPC prior
File Name: PERMIT REVISIONS
Change note to"Stone 1-ARCHITECTURAL.2017.06.29.pdf to installation."
paving must be
approved by HPC prior SEE A-100.00
- to installation." NOTE HAS BEEN ADJUSTED
otti
///
Page: 19
P Author: amyg Study any remaining original
StudyremainingE File Name: PERMIT REVISIONS porch rafters to determine
any
1-ARCHITECTURAL.2017.06.29. df historic pitch and revise if
original porch rafters to vi p appropriate.
determine historic pitch T(
and revise if KORU HAS STUDIED
appropriate.
ORIGINAL PORCH RAFTERS
P
a W uthor:: amyg:A Update angle of PV panels
Auth
File Name: PERMIT REVISIONS based on energy consultant
Update angle of PV 1-ARCHITECTURAL.2017.06.29.pdf feedback.
panels based on energy
consultant feedback. SEE EXTERIOR ELEVATIONS:
PV PANEL ANGLES ADJUSTED
Page: 19
Author: amyg Remove window 18 and revise
File Name: PERMIT REVISIONS window 31.
Remove window 1 ARCHITECTURAL.2017.06.29.pdf SEE EXTERIOR ELEVATIONS:
18 and revise REMOVED&REVISED
window 31.
Page: 19
Author: amyg Remove note and door 102.
File Name: PERMIT REVISIONS DOOR HAS BEEN REMOVED
1-ARC H ITECTU RAL.2017.06.29.pdf
Remove note and
door 102.
RECEIVED
09/14/2017
ASPEN
BUILDING DEPARTMENT
6AR-,i0 LE,CO81623 Page: 20
TEL:970.927.5174 Author: amyg Remove note. Revise design
CIVIL ENGINEER File Name: PERMIT REVISIONS based on framing evidence.
^ �FORK 1-ARCHITECTURAL.2017.06.29.pdf
Remove note. Revise design CO81623 HAS BEEN CHANGED TO SINGLE
based on framing evidence.
DOUBLE-HUNG WINDOW.
MEP ENGINEER
SEE A-301.00
POWERHOUSE E
520 E.COOPER AVE,SW
ASPEN,CO 81611
TEL:970.315.2035(Brand,
970.240.5990(Mark)
ASPEN. Page: 21
i HPC TO Author: amyg Change to wood entry steps.
;IATE File Name: PERMIT REVISIONS
1-ARCHITECTURAL.2017.06.29.pdf SEE A-100.00
Change to wood entry STONE STEPS CHANGED TO WOOD
steps.
FRONT P RCH
IPC
Page: 35
Author: amyg Add note"Provide shingle
File Name: PERMIT REVISIONS sample for review and approval
1-ARCHITECTURAL.2017.06.29.pdf by HPC staff"
Add note"Provide shingle sample for
review and approval by HPC staff." NOTE ADDED-SAMPLE TO BE PROVIDED
(CUT, NOT SHAKE SHINGLE)
Page:48
Author: amyg This conflicts with roof plan
File Name: PERMIT REVISIONS shown on A 113. Please revise
1-ARCHITECTURAL.2017.06.29.pdf design or clarify location of this
This conflicts with roof plan shown roof vent.
on A-113. Please revise design or
clarify location of this roof vent. DETAIL SECTION A-730.00 HAS BEEN
REVISED;CHIMNEY DOES NOT VENT
DIRECTLY ABOVE FIRLEPLACE AS
PREVIOUSLY SHOWN
RECEIVED
09/14/2017
ASPEN