HomeMy WebLinkAboutFile Documents.124 W Hallam St.0025.2017 (47).ARBK Markup Summary 6-7-2017 HPC
A. PERMIT DRAWINGS-ARCHITECTURAL.2017.03.08.pdf(11)
Page: 6
HPC'.Please atltl a Hare intlicating that you will
Author: amyg HPC: Please add a note
provide shop drawings for doors 102 and 103,plus File Name: A. PERMIT indicating that you will provide
transoms,for review and approval by HPC staff prior
to oNenng.The transoms must match the DRAWINGS-ARCHITECTU RAL.2017.03.08.pdf shop drawings for doors 102 and
dimensions of the rails and stiles found on the historic
windows that remain in the house. 103, plus transoms,for review
and approval by HPC staff prior
SEE NOTE#13 ON DOOR SCHEDULE G-105.00 ADDRESSING to ordering. The transoms must
match the dimensions of the rails
SHOP DRAWINGS TO BE APPROVED FOR TRANSOM WINDOWS and stiles found on the historic
windows that remain in the
house.
Page: 7
Author: amyg
File Name: A. PERMIT
DRAWINGS-ARCH ITECTURAL.2017.03.08.pdf
Page: 7 HPC: Windows 4, 5, 6, 9 and 12
HPC'wmd°wa4.5,6.9and,2are°riginalandmastne Author: amyg
used as the model for new windows m the historic house File Name• A. PERMIT are original and must be used as
numbered 1.2,3.10,11,18,19,20.21,22,23,24,25.26,2E.29.36 antl 3,.Hew wintlewa,antlein lM1e M1iacM1e DRAWINGS-ARCHITECTURAL2017.03.08.pdf the model for new windows in
House M1ave been permittetl to be larger,motlern units antl tlo
Hat naaammoaal ma hiar°rie wmaow:.Please amana ma the historic house numbered 1,
w;naow arheaale ro eonaeuv iaendry historic winaowa m I»
ainetiva.newwintlowa Pleaseaddan°te�oindi°sterner 2, 3, 10, 11, 18, 19, 20, 21, 22,
napecn°n arms niamri°rmmmg maa°°°ar berore me
window order is placed tc confim cunent assumptions.
Please add a note stating that shop drawings wi"need to be 23, 24, 25,26, 27, 28, 29, 30
wed and approved by HPC staff before ordering.Please
reviewed
natthe°°a°nt°addtl°pblevaneglaae inniet SEE NOTES 8,9, 10,AND 13 ON WINDOW SCHEDULE G-106.00
Ind..tattheoptitoadeioublepasent,issinhireview. and 31. New windows 7 and 8
Please mmeata haw rod will reavana m me bwltlmg
tla aodwmiz Comment regaNmg saferyglanng ar harone in the historic house have been
ADDRESSING HISTORIC AND REPLACEMENT WINDOWS PER
permitted to be larger, modern
HPC COMMENTS.SEE COMMENT FOR WINDOW 12 REGARDING units and do not need to model
SAFETY GLAZING. the historic windows. Please
amend the window schedule to
correctly identify historic
windows to be retained vs. new
windows. Please add a note to
indicate that an inspection of the
historic framing must occur
before the window order is
placed to confirm current
assumptions. Please add a note
stating that shop drawings will
need to be reviewed and
approved by HPC staff before
ordering. Please indicate that
the option to add double pane
glass in historic windows,where
original glass is not present, is
under review. Please indicate
how you will respond to the
building department comment
regarding safety glazing at
historic window 12.
City of Aspen
Received
06/23/17
Building Department
Page: 7
HPC: Please provide a detail
HPC:Please provide a detail showing how drywall
Author: amyg
will be installed behind Window 31 so that the File Name:A. PERMIT showing how drywall will be
bevatorona shaft is enclosed,but the window appears toe installed behind Window 31 so
DRAWINGS-ARCH ITECTURAL.2017.03.08.pdf
that the elevator shaft is
WINDOWS WILL BE INSTALLED OUTBOARD OF enclosed, but the window
appears to be functional.
FRAMED/WATERPROOFED/INSULATED WALL AND SET AND SEALED
IN TYPICAL FASHION WITH PAINTED GYP OR PAINTED METAL BEHIND WINDOW
to alPage: 20
° Author: amyg HPC: Please provide more
HPC:Please Drovitle more tleWlletl plans antl elevMions •re:PN File Name: A. PERMIT detailed plans and elevations re:
weelarorreNawaatlapprovalbyHPcaurtaoamoairorpdor�b DRAWINGS-ARCHITECTURAL.2017.03.08.pdf PV panels for review and
resubmiaing this permit ror Rouna 2 review.
approval by HPC staff and
SEE ELEVATIONS,SECTIONS,AND ROOF PLAN A113.00 FOR monitor prior to resubmitting this
PV PANEL INFORMATION.CURRENTLY SPEC'D:(1)40"WIDE X permit for Round 2 review.
'N 65"TALL PANELS AT 40 DEGREES ANGLE
Page: 20 HPC: Please add a note
Author: amyg
File Name: A. PERMIT indicating that the front porch
HPC: Please add note indicating DRAWINGS-ARCH ITECTURAL.2017.03.08. df deck will be stained wood, 3-4"
— that the front porch deck will be p wide planks.
stained wood,3-4"wide planks.
NOTE HAS BEEN ADDED ON SHEET A111.00 FOR STAINED
3'-4"WOOD PLANKS AT PORCH
--1—- f—
Page: 24 HPC: Please add a note
Author: amyg
43'-7Y." RI File Name: A. PERMIT indicating that any exterior vents
HPC: Please add a note indicating that on the walls and roof of the
any exterior vents on the walls and roof DRAWINGS-ARCHITECTU RAL.2017.03.08.pdf
of the Victorian that are not shown on Victorian that are not shown on
tnese plans will be submitted for review SEE MECHANICAL PLANS.SEE NOTES ON A111.00 AND 112.00 these plans will be submitted for
and approval by HPC staff prior to any
installation. review and approval by HPC
CHIMNEYS WILL BE LOCATED ON ROOFS ONLY. staff prior to any installation.
n n
X Page: 24
Author: amyg HPC: Please revisit the front
HPC:Please revisit the front porch File Name: A. PERMIT porch so that the east face of the
so that the east face of the roof pitch DRAWINGS-ARCHITECTU RAL.2017.03.08.pdf roof pitch is either fishscale
is not the roofing leshingles.
shingles a thep shingles or siding, not the
not the roofing shingles. Also,the
XTERIORZLEVATIONEPEAST roofing shingles. Also,the
norttieast corner of me porcn ana FRONT PORCH HAS BEEN REVISED TO FULFILL THE LISTED overhanglooks toodeep. At the
e southwest corner of the porch
Oere should be a%column applied REQUIREMENTS.SEE EXTERIOR ELEVATION SHEETS A300-02 northeast corner of the porch
ifti the house,not a full column. and the southwest corner of the
is FOR FURTHER INFORMATION. porch there should be a '/2
column applied to the house, not
a full column.
City of Aspen
Received
06/23/17
Building Department
Page: 34
Author: amyg HPC: Please revise the
HPC: Please revise the File Name:A. PERMIT information about the roof on the
information about the roof onhistoric house to be clear that
the historic house to be clear DRAWINGS-ARCHITECTU RAL.2017.03.08.pdf
that original framing, original framing, sheathing,
sheathing,fascia,soffit NOTE ON ROOF PLAN SHEET A113.00 fascia, soffit material and trim
material and trim will be
retained,unless approved for will be retained, unless approved
removal by HPC staff. for removal by HPC staff.
Page: 38
Author: amyg HPC: Please revise this detail to
HPC:Please evise this detail to indicate that,in
File Name: A. PERMIT indicate that, in addition to
addition to ret fining all historic studs,you will also retain retaining all historic studs,you
historic sheathng and siding.Anew detail/note will be DRAWINGS-ARCHITECTURAL.2017.03.08.pdf
needed to add ess how waterproofing will be will also retain historic sheathing
ornplished hile retaining historic exterior materials
Qoclbe extentt eyeoat)inpleoe,andaplanforwhat and siding. A new detail/note
you will do wh re historic exterior material is all missing
and needaro erecreated. will be needed to address how
:WING WOOD SONG
,ISTING BUILDING PAPER FRONT PORCH HAS BEEN REVISED TO FULFILL THE LISTED waterproofing will be
accomplished while retaining
'°"G'�xlNw.S SISTER.
REQUIREMENTS.SEE EXTERIOR ELEVATION SHEETS A300-02 historic exterior materials(to the
ALL SHEATHING,9s.n.
FOR FURTHER INFORMATION. extent they exist)in place, and a
plan for what you will do where
historic exterior material is all
missing and needs to be
recreated.
7a r=u. Page: 38
- Ao. ... Author: amyg HPC: Please ensure that the
File Name: A. PERMIT representations made in the
ziiianiFEEE5===== DRAWINGS-ARCHITECTU RAL.2017.03.08.pdf architectural drawings regarding
preservation of the historic
STRUCTURAL DRAWINGS DO NOT REPRESENT MEASURES TO building envelope and exterior
BE TAKEN TO PRESERVE HISTORIC BLDG ENVELOP AESTHETICS.materials are consistent with the
structural drawings.
NEW STRUCTURE TO ACCOMMODATE EXISTING VICTORIAN HOME
AND NEW ARCHITECTURAL ELEMENTS(I.E.STN CLADDING
AND ACCOMPANYING MORTAR AND INSULATION AND WD SIDING
G. ELECTRICAL DRAWINGS.2017.03.08.pdf(1)
Page: [8]T-2.1 Main Level Security, Surveillance&Access
Control Plan HPC: Remove exterior mounted
Author: amyg security cameras from plan
�^ m�'�'sm"�=`°�°'°�°m°== — File Name: G. ELECTRICAL DRAWINGS.2017.03.08.pdf unless HPC staff appaoval is granted by
Similarly, backlit entry key
pads/intercoms have not been
approved.
EXTERIOR MOUNTED CAMERA HAS BEEN REMOVED.SEE SHEET T-2.1
H. LANDSCAPE DRAWINGS.2017.03.08.pdf(3)
Page: 1 HPC: Basalt stone front
Author: amyg
HPC:Basalt stone front walkway has not been File Name: H. LANDSCAPE DRAWINGS.2017.03.08.pdf walkway has not been approved
approved yet by staff and monitor.Please add a
note indicating that it will not be installed without yet by staff and monitor. Please
approval.Please add a note that the steps at the
front porch will be either red sandstone,grey add a note indicating that it will
concrete or wood,after being reviewed and
approved by HPC staff and monitor. not be installed without approval.
DESIGN TEAM IS AWAITING HPC APPROVAL FOR BASALT STONE Please add a note that the steps
FRONT WALKWAY.SEE NOTE ON A111.00 at the front porch will be either
red sandstone, grey concrete or
wood, after being reviewed and
FRONT STEPS WILL BE WOOD TO MATCH PORCH approved by HPC staff and
monitor.
(OVER SNOW-MELTED CONCRETE) City of Aspen
Received
06/23/17
Building Department
Page: 1 HPC: Please revise the planting
HPC: Please revise the planting bed Author: amyg
in front of the historic building so that File Name: H. LANDSCAPE DRAWINGS.2017.03.08.pdf bed in front of the historic
it is not continuous. Grass, building so that it is not
groundcover,or a narrow rock border
should meet the base of the building continuous. Grass,
for some meaningful length,to groundcover, or a narrow rock
expose the historic foundatiwi mail sculptur border should meet the base of
view. deciduous tre
the building for some meaningful
PLANTER REMOVED WEST OF FRONT STEPS.SEE NOTE A111.00 length,to expose the historic
AND LANDSCAPE DRAWINGS foundation to view.
Page: 6
Author: amyg HPC: Pin lights in front walk
HPC:Pin lights in front walk steppers have not yet been steppers have not yet been
approved by HPC staff and monitor.Please add a note File Name: H. LANDSCAPE DRAWINGS.2017.03.08.pdf
"'aongtbntUey ""ntbelnatalledw""° approved by HPC staff and
monitor. Please add a note
indicating that they will not be
installed without approval.
DESIGN TEAM IS AWAITING HPC APPROVAL FOR PIN LIGHTS SEE
FRONT WALKWAY NOTE ON A111.00
City of Aspen
Received
06/23/17
Building Department