HomeMy WebLinkAboutFile Documents.124 W Hallam St.0025.2017 (48).ARBK 0025-2017-ARBK_BuildingComments_2 124 W Hallam
170627 308 N. First St- Permit Resubmit.pdf(2)
Page: 1 Please submit the ompleted
File Name: 170627 308 N. First St- Permit Resubmit.pdf
Subject: PlanCheck special inspectio' agreement
form. It does n• appear to be in
Author: nickt your latest re-•onse.
Please submit the completed special Color: •
inspection agreement form.It does not
appear to be in your latest response.
SIGNED S' CIAL INSPECTION
LETTE- CLUCED IN RESPONSE
SPECIAL INSPECTIOI
Page: 1
•
File Name: 170627 308 N. First St- Permit Resubmit.p• Provide stamped desi•
Subject: PlanCheck drawings of the permane
Author: nickt micropiles. Minimum factor o
Provide stamped design drawings of safety is 2.Your response says
the permanent micropiles.Minimum Color: •
factor of safety is 2.Your response it will be provided by others.
says it will be provided by others.
Please provide it. Please provide it.
FORTHCOMING
INSPECTIONS AND TESTING C1i55
MECHANICAL DRAWINGS_REVISION1.2017.06.29.pdf(1)
Page: 3
Tic File Name: MECHANICAL The dryer vents appear to
o- DRAWINGS_REVISION1.2017.06.29.pdf terminate less than 3'fr.
window 15 which is o•-rable.
ay cos ""���,- Author: nickt Subject: PlanCheck
Move the vents to ► at least 3'
'
MENU,1 Color: ■� �-.. away.2009 IMC :e 1.
�
�me, DRYER VENT: HAVE BEEN RELOCATED.
NEARBY NDOW IS FIXED.SEE
3I rr armill.' I
ME u NICAL SHEET M-3
PERMIT REVISIONS 1-ARCHITECTURAL.2017.06.29.pdf(11)
Page: 1 Asbestos abateme clearance
File Name: PERMIT REVISIONS
1-ARCHITECTURAL.2017.06.29.pdf letter will be requi d prior to
Subject: PlanCheck sign off.
Asbestos abatement clearance letter will be Author: nickt
required prior to sign off. Color: •
ASBESTOS BATEMENT AND
STATE MO PERMIT INCLUDED
Page: 1 Revise gross floo area plans on
File Name: PERMIT REVISIONS Z-106 to measu areas to the
1-ARC H ITECTU RAL.2017.06.29.pdf
Subject: PlanCheck INSIDE of ext for walls but still
Author: nickt include the erior usuable
a�,ae,,,a,e,�, a„aa�aaau a covered ar as.Also, get it out of
Color: •
the Z s ets and put it on an A
shee
SEE REVISE[
PLANS.SHEE RECEIVED
A-001.00
09/14/2017
ASPEN
BUILDING DEPARTMENT
m - ., ¢.a.ID Page: 6
s•'°"�""`- ilZ.n:n:°= ' File Name: PERMIT REVISIONS Note which specific windows
u' ` `"'' ''< need window f rotection and
o� 1-ARCHITECTURAL.2017.06.29.pdf
�•,.,,�k= •=. _''�•i ,amu°, Subject: PlanCheck provide a spec on roduct
"° Author: nickt complying with AST 2090.
_•••,- _Ww.=• %�N F- �,_.,,Po_ , ,g Color: ■
NOTED ON FLOOR PLANS AS WELL AS IN DOW SCHEDULE.
-°-A OPERABLE WINDOWS PERFORMING AS EGRE WINDOWS TO BE FITTED ITH
E.aiipm SAFEGARD CASEMENT WINDOW OPENING CONTR EVICE-SPEC INL ED
I ., o —� i Page: 14
,� I �.'"" ; File Name: PERMIT REVISIONS Door 209 appears to have a
step. Provide landing heights •n
o r .; L 1-ARCHITECTURAL.2017.06.29.pdf either side. Door may not mg
® I Subject: PlanCheck
�� 6 r /, e' Author: nickt over a step(2009 IRC R 1.3.1)
`ii�j.....■._ o �r • Color: •■
r.ial: SEE SHEET A-700.00 'sR LANDING
L� �/' -_-_-_-_-_ -_- HEIGHTS. DOOR %sES NOT SWING
ii ititoII ; it
® ' R, ° I OVER STEP
i 1 1 Page: 14
° File Name: PERMIT REVISIONS Provide the finish floor elev on
=r= of the 2nd floor decks. ply
1 ARCHITECTURAL.2017.06.29.pdf
HIE
��' with 2009 IRC R31
® lip
%. _ "` Subject: PlanCheck
r, Author: nickt FLOOR ELEVA S HAVE BEEN
Color: ■ ADDED T LOOR PLAN SHEETS
Cfs Mill ®- -_ ---_-_-.
IuuuuuuI /'_
�7 w g ----------
, wwn r Page: 15
� -}----- The provided microinve r cut
tl i File Name: PERMIT REVISIONS
I Jr. sheets do not note w ' h type
1-ARCHITECTURAL.2017.06.29.pdf
®'==x I you have selected. rovide the
VIN� h � � �° =c� Subject: PlanCheck
I! C+ O� -- capacity of the i erters. If it is
� � J� Author: nickt
Color: ■ less than the parity of the
panels,th sser wattage will
0 1 SEE ATTACHED MICROINVERTER CUTSHEET be use r calculating REMP
flfl11I
credit eise REMP worksheet
ttillIMM �P'ACI�� ��= WITH SELECTION/SPEC. INFO. IN'ENERGY
�WEA? ■1: = as cessary.
DOCUMENTS'FOLDER
+ i '_N ° I: Page: 15 Provide primary and s condary
° 'i i ....• - - • • • • ,i,•.,, File Name: PERMIT REVISIONS
=nu=1 `Ii I 1-ARCHITECTURAL.2017.06.29.pdf roof drains to the lin roof.
r
i
i Subject: PlanCheck
Author: nickt
O- o :a�i Color: • LINKING ELEMENT ROOF TO H E PRIMARY ROOF DRAIN
I
AND SECONDARY DRAINAG WILL BE HANDLED BY
! ®s
i, _ 4 - FLOWING OVER METAL P RAPET(OUTBOARD OF ALL
=°`°R°=E.a<-1-1 )- FACADE MATERIALS, MAX HEIGHT.SEE SHEET A-504.00
FOR MORE INFO TION
RECEIVE()
09/14/2017
ASPEN
BUILDING DEPARTMENT
Page: 15
-7--1 - v Provide sheets A63 and A640.
li `��i ��;���„�•••�• File Name: PERMIT REVISIONS
l 1-ARCHITECTURAL.2017.06.29.pdf
h� SHEETS HAVE B N INCLUDED
-- ori, Subject: PlanCheck
e o Author: nickt
1II .1 Color: ■
i i
H_4i
i Page: 15
i',' File Name: PERMIT REVISIONS Provide primary and second
" i i roof drains to the roof deck nd
11.1W111 1-Subject: ECTURAL.2017.06.29.pdf
., PlanCheck bottom landing of the roof eck
ji. ..r stairs.
- Author: nickt
Is, ,' 07 i i Color: ■
• = . . ROOF DECK HAS BEEN REVISED TO INCLUDED PRIMARY-SECONDARY ROOF D WHERE NOTED.
O ,.,.,,a,u Isc 2: SECONDARY STAIR DRAIN TO BE SIZED TO ACCOMMODATE ROOF DECK
-II �� * Page' 28 Provide the R val f
IFile Name: PERMIT REVISIONS
1-ARCHITECTURAL.2017.06.29.pdf insulatio the window ell a
II _ Subject: PlanCheck make it atch the REScheck.
.0 __ Author: niclkt
ii ii RESche HAS BEEN REVISED.ALS
sw. Color: ■
� __ __ SEE RE SED SHEET A-500.00 FOR
LI `'sal _..__
MORE WA ASSEMBLY INFO.
Page:47
t t = File Name: PERMIT REVISIONS Stair riser openings ust be
�9f�I[1°���.a��o��� 1-ARCHITECTURAL.2017.06.29.pdf:. LESS than 4"
,`����„� ��"������ ' Subject: PlanCheck SEE REVISED OTE ON SHEET A-720.00,
,.;: Author: nickt
sa,,,,aa,o,an,n9a + _ Color: ■ DETAIL 6
must be LESS than 4• N/77M``//(`]]//I?.
rii
RECEIVED
09/14/2017
ASPEN
BUILDING DEPARTMENT