Loading...
HomeMy WebLinkAboutSub Permit.315 Midland Ave.0164.2019.ARBK 11/30/24, 10:20 AM 0034-2021-BCHO-Salesforce-Enterprise Edition • Close Window salesforce • Print This Page • Expand All I Collapse All 0034-2021-BC HO Number 0034-2021-BCHO Record Type Change Order Address 315 MIDLAND AVE Owner Sydney Fallon Original Number 21-0896 Status Expired Type Change Order Reason for Cancel or Compl. Review Fail Applicant NICOLE CATTANEO Aspen Internal? No Account DIVISION 6.4 LLC Required Bond Amount Project Total Available Bond Amount Land Use Planning Application Bluebeam Project Id 823-813-494 Master Building Permit 0164.2019.ARBK HPC-ZON-EH-UTIL Review Permit Contractor DIVISION 6.4 LLC HPC-ZON-EH-UTIL Review-2 Valid Business License on Eng Review Account Imported Parks-Prkng-San Review Required Submissions Conditional Inspections Documents Resubmitted Conditional Final Insp Approved Covid-19 Plan Action Items Hold All Reviews Create Fees ,/ Hold Reason Create Fees 2 ,/ Conditional Flat Fee Formula Price Book 2021 Conditional Tiered Fee Formula Applicant is a Nonprofit? No Conditional Tiered SqFt Fee MIR, Discount All Fees(%) Formula Fee Discount Reason Queue Score Project Designation Milestone Current Days in 0 Applicant Hand Queue Designation Milestone Current Days in City 0 Hands Queue Score 0 Milestone-Total Days in 0 Applicant Hand Last Date Received from Milestone-Total Days in City 22 Applicant Hands Dates New Application Date 4/15/2021 TCO Issuance Date Application Complete Date 6/22/2021 Close/CO Issuance Date Application Accepted Date 6/22/2021 Last Activity Date 7/26/2021 Issue Date 7/26/2021 Expiration Date Days to Issue 34 Due Date Override Expiration Date Basic Information Description Change order from original plan-change existing window Census Code **Change Order to a door. Use of Building Single Family Use Class Residential Class of Work Alteration Permit Comments Job Location Address 315 MIDLAND AVE,ASPEN:273718100044 Lot 6 Site Address Display on Map Legal Description Subdivision:RIVERSIDE ADDITION Block:2 Lot:6AND:- Lot:7 ALL OF LOTS 6 7&8 EXCEPTING THE SLY 32 FT https://cityofaspen.my.salesforce.com/a034o00000FOMxeAAH/p 1/9 11/30/24, 10:20 AM 0034-2021-BCHO—Salesforce-Enterprise Edition OF SAID LOTS BLK 2 RIVERSIDE ADDN THE ELY 40 FT OF LOTS 3 4&5 OF SAID BLK 2 RIVERSIDE ADDN& ALL OF LOT 2 OF SAID BLK 2 RIVERSIDE ADDN EXCEPT TRACT BY M/B BK 284 PG 838 BK 165 PG 850 BK 468 PG 123 BK 477 PG 790&8,&S 32'OF 3,4,5. SEE M&B Historic Property? No Eden Address Historic District? No HPC-Planning-Zoning Details Zone District R-6 HOA/Covenant Property Not Subject to HOA or Covenant Is There an ADU? No HPC Certificate of No Appropriateness? ADU Sq Ft Work Involves a Land Use No Approval? Deed Restricted? No Located in a PD? No #of Dwellings 1 Adds/Changes Floor Area? No Category of Zoning Fee Residential Occupancy or Use Change? No Zoning Work Level Minor Zoning Fee Work Affects Exterior of Yes Building? Building Project Details Valuation $94,000.00 Lot Size Sq.Ft. 10,150 Reason for Valuation Change total project valuation for change order and master Soil Disturbance Sq Ft 0 Unit Sq.Ft. 4,658 Affected Area Sq Ft 0 Building Footprint Sq Ft Existing Hardscape Footprint Sq 0 Ft Sq Ft of Building Work Area 20 Existing Hardscape%of Lot 0% Building Fire Area Sq Ft Con Mit Sq Ft Total 20 Utility Review Sq.Ft. 0 Utility Review Sq Ft Total 0 %of Interior being Altered 0% New Sq.Ft. 0 Scope of Work Details Work Changes Building No Work Affects Tree/Drip Line? No Footprint? Work Changes Yes Located Within City Mall No Fenestration/Thrml Envelop? Boundaries? Requires Asbestos Test? No Adjacent to City Open Space? No Photovoltaic Installation No Impacts City Trails/Parks? No Work Adds/Removes/Changes No Work Subject to Water Efficient No Plumbing Fixt? L.O.? Restaurant/Food Service No Involves Impact on Sewer? No Involved? Change of Restaurant No Prevents Access to Sewer Main? No Ownership? Affects Parking/Alleys/Loading? No Sewer Easements Affected? No Utility Water Details Already on City Water? Class of Service Customer Utility Account Number Water Service Area Water Service Agreement Is There Well or Wells on the Required? Property? Common Building Name Abandon Existing Well Abandon Existing Tap Acre-feet of Water Currently by Well Date of Existing Tap Acre-feet of Water Rights to be Conveyed Existing Tap Modifications? Existing ECU Count New Tap? If Residential App,Estimated New ECUs Date of New Tap Final ECU Count Does Project Involve Outdoor Size of Existing Domestic Water Irrigation? Line Irrigated Area Sq Ft Number of Meters Proposed Identify ALL Sources of Water Size of Existing Fire Suppression Line Is There a Pool,Spa or Water Size of Proposed Domestic Feature? Water Line https://cityofaspen.my.salesforce.com/a034o00000FOMxeAAH/p 2/9 11/30/24, 10:20 AM 0034-2021-BCHO—Salesforce-Enterprise Edition Summary of Prior Water Fees Size of Proposed Fire Paid Suppression Line Building Description Code Editions Required Special Inspections Other Code Editions Energy Code Compliance Building Type(IRC) Total Snowmelt Sq Ft Construction Type Total Spa Sq Ft Fire Sprinkler Existing? Total Pool Sq Ft Fire Sprinkler Required? Amount of Onsite Renewable Generation? Fire Sprinkler Type CO Description Fire Alarms Installed? Basement #Wood Fireplaces 1st Floor #Gas Log Fireplaces 2nd Floor #Gas Appliances 3rd Floor Open Text Field For Comments Additional Financials Total Fees $512.50 Total Payments $512.50 Total Balance $0.00 System Information Number 0034-2021-BCHO Community Visibility Created By NICOLE CATTAEO,4/14/2021 7:30 AM Contact IDs 0033s00000zOxP5AAK Last Modified By Aspen Avocette,9/28/2024 1:35 AM VIP Form Tool VIP 4/15/2021 VIP Permit Application Submitted 4:43 PM Form Template VIP VIP [{"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvPUAS"), Foreign Template ("parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvNUAS"), Language Status {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000iWidUAE"}, {"parentCategoryld":null,"isSubm it":nu I I,"isCu rrent":n u l I,"categoryStatusLabels":n u l I,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvV UAS"}, {"parentCategoryld":null,"isSubm it":nu I I,"isCu rrent":n u l I,"categoryStatusLabels":n u l I,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvKUAS"}, {"parentCategoryld":null,"isSubm it":nu I I,"isCu Trent":n u l I,"categoryStatusLabels":n u l I,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvXUAS"}, ("parentCategoryld":null,"isSubm it":nu I I,"isCu Trent":n u l I,"categoryStatusLabels":n u l I,"categoryStatus":"Completed","categoryld":"a2E6A000000Uwva UAC"), ("parentCategoryld":null,"isSubm it":nu I I,"isCu Trent":n u l I,"categoryStatusLabels":n u l I,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvZUAS"), ("parentCategoryld":null,"isSubmit":true,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000Ux1 dUAC")] Action Items View/Print Permit Link Attachment Activity History Email:Building Permit 0034-2021-BCHO-315 MIDLAND AVE,ASPEN:273718100044-Issued Type Billable Assigned To Renee Espinoza Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 7/26/2021 Days in Applicant's Hands Comments To:division6.411c@hotmail.com CC: BCC: Attachment:--none-- Subject:Building Permit 0034-2021-BCHO-315 MIDLAND AVE,ASPEN:273718100044-Issued Body: Dear NICOLE CATTANEO, Please find attached your issued building permit for 0034-2021-BCHO for 315 MIDLAND AVE,ASPEN:273718100044,City Use Tax exemption letter and COVID-19 site safety plan approval notice(if applicable). Below is a link to your plans.Please print these 24x36 in color and keep them on site at all times.As a reminder,Dropbox links expire,so please download the plans as soon as you get this email. https://www.d ropbox.com/sh/0m 16m5c31t1 wsti/AAD4F39OxN PrP77Ga86U751Za?d I=0 PLEASE NOTE THAT ALL REFERRAL AGENCIES MUST APPROVE THEIR FINAL INSPECTIONS PRIOR TO THE FINAL BUILDING INSPECTION. https://cityofaspen.my.salesforce.com/a034o00000FOMxeAAH/p 3/9 11/30/24, 10:20 AM 0034-2021-BCHO—Salesforce-Enterprise Edition Please allow 7 working days prior to requesting your final building inspection for this process.All inspections are scheduled through the Salesforce applicant portal.Scheduling information can be found on our website:https://www.cityofaspen.com/DocumentCenter/View/6436/How-to-request-an- inspection?bidld= Referral Agency Sign Off Requirements for Your Permit ENGINEERING* ENVIRONMENTAL HEALTH FIRE DISTRICT HISTORIC PRESERVATION LANDSCAPE EFFICIENCY PARKS SANITATION WATER ZONING *Please provide these items to Engineering two weeks prior to requesting their final building inspection: As builts Maintenance plan&agreements Storm Water video(if applicable) Thank you, City of Aspen Email:Permit Fees Due Type Billable Assigned To Renee Espinoza Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 7/23/2021 Days in Applicant's Hands To:division6.411c@hotmail.com CC: BCC: Attachment:--none-- Subject:Permit Fees Due Body: If you have not already paid the fees due on your permit 0034-2021-BCHO,at 315 MIDLAND AVE,ASPEN:273718100044,please log into the Aspen Permitting Portal to pay them.If you pay online,be aware that credit card or e-check transaction fees will apply. If you would like to pay by check,you can mail payments to the following locations: •Building and related permits:Community Development,130 S Galena St.,3rd Floor •Parking Reservation permits:Parking Department,130 S Galena St,1st Floor •Pitkin County Water Permit:Utility Billing.,130 S Galena,1st Floor Comments •ROW and encroachments:201 N Mill St.,Suite 203 •Tree permits:Parks Dept.,585 Cemetery Lane Aspen •Utility Connection Permits:Utility Billing.,130 S Galena,1st Floor •Electric Community Investment Fee:Utility Billing.,130 S Galena,1st Floor Current Amount Due:$512.50 Instructions to see detail of fees due: -Log in to the Portal here:https://cityofaspen.force.com/applicantportal and click on Permits menu -Open the permit by clicking on the permit number link -Click on the Related tab(next to Details tab)and scroll down to Fees section -If all fees are not visible,click the"View All"link -To filter fees,click on the black funnel icon at the top right.(Example:to only see the fees due at permit submission,select"Complete Pending Submittal Fees"under Permit Fees Due At section and then click Apply button.) Thank you! City of Aspen Email:City of Aspen-Application Status:Completeness Review Failed Type Billable Assigned To Emmy Garrigus Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/20/2021 Days in Applicant's Hands Comments To:division6.411c@hotmail.com CC: BCC: Attachment:--none-- Subject:City of Aspen-Application Status:Completeness Review Failed Body: Dear NICOLE CATTANEO, Your Permit Application#21-0896 for 315 MIDLAND AVE,ASPEN:273718100044 is in the"Completeness Review Failed"Status because of the https://cityofaspen.my.salesforce.com/a034o00000FOMxeAAH/p 4/9 11/30/24, 10:20 AM 0034-2021-BCHO—Salesforce-Enterprise Edition following: Nicole, I have reviewed your application for completeness.The following items need to be addressed prior to deeming your application as complete: •Please note that the permit that you listed as the master permit is the former change order.The master permit number is 0164.2019.ARBK.Please note that this master permit has expired due to inactivity and lack of inspections.Please contact our Chief Building Official,Stephen Kanipe,for an extension on your project.His contact is stephen.kanipe@cityofaspen.com. •Provide an updated HOA form •Provide a narrative of all of the changes that are occurring under this change order. •Your description only mentions fenestration changes however your plans also indicate the addition of a dormer.Plans and description of work need to be consistent. •If you are adding a dormer,please ensure that all structural information is updated for your change order. •Updated RDS approval will need to be obtained for the fenestration changes.Please contact garrett.larimer@cityofaspen.com for these approvals. These documents need to be submitted with your permit application documents. •I cannot open the.heic file that you uploaded.All documents need to be uploaded in PDF format utilizing the file naming standards linked below. Once you have these documents together,please attach them to your submission in Salesforce and notify me when you have done so,and I will re- review your application for completeness. Please note that we do not receive a notification when you re-upload,so it is imperative that you notify us. For information on how to upload documents to your application after submission,please refer to this link: https://www.cityofas pen.com/DocumentCenter/View/4253/U pload-Documents-After-Submission?bid ld= For information on our file naming standards that are required for permit submission,please refer to this link: https://www.cityofas pen.com/DocumentCenter/View/275/Electronic-File-Preparation-Standards-for-City-of-Aspen Please contact Lauren Litchet with any questions at lauren.litchet@services.cityofaspen.com. Thank you, City of Aspen Lauren Litchet Permit Coordinator Community Development 130 S Galena St 3rd Floor Aspen,CO 81611 p 970.429.2020 Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contain in the email are based on current zoning and/or applicable building code regulations,which is subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email:City of Aspen-Application Status:Completeness Review Failed Type Billable Assigned To Emmy Garrigus Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/20/2021 Days in Applicant's Hands Comments To:division6.411c@hotmail.com CC: BCC: Attachment:--none-- Subject:City of Aspen-Application Status:Completeness Review Failed Body: Dear NICOLE CATTANEO, Your Permit Application#21-0896 for 315 MIDLAND AVE,ASPEN:273718100044 is in the"Completeness Review Failed"Status because of the following: Nicole, I have reviewed your application for completeness.The following items need to be addressed prior to deeming your application as complete: •Please note that the permit that you listed as the master permit is the former change order.The master permit number is 0164.2019.ARBK.Please note that this master permit has expired due to inactivity and lack of inspections.Please contact our Chief Building Official,Stephen Kanipe,for an extension on your project.His contact is stephen.kanipe@cityofaspen.com. •Provide an updated HOA form •Provide a narrative of all of the changes that are occurring under this change order. •Your description only mentions fenestration changes however your plans also indicate the addition of a dormer.Plans and description of work need to be consistent. •If you are adding a dormer,please ensure that all structural information is updated for your change order. •Updated RDS approval will need to be obtained for the fenestration changes.Please contact garrett.larimer@cityofaspen.com for these approvals. These documents need to be submitted with your permit application documents. •I cannot open the.heic file that you uploaded.All documents need to be uploaded in PDF format utilizing the file naming standards linked below. Once you have these documents together,please attach them to your submission in Salesforce and notify me when you have done so,and I will re- review your application for completeness. Please note that we do not receive a notification when you re-upload,so it is imperative that you notify us. https://cityofaspen.my.salesforce.com/a034o00000FOMxeAAH/p 5/9 11/30/24, 10:20 AM 0034-2021-BCHO—Salesforce-Enterprise Edition For information on how to upload documents to your application after submission,please refer to this link: https://www.cityofas pen.com/DocumentCenter/View/4253/U pload-Documents-After-Submission?bid ld= For information on our file naming standards that are required for permit submission,please refer to this link: https://www.cityofas pen.com/DocumentCenter/View/275/Electronic-File-Preparation-Standards-for-City-of-Aspen Please contact Lauren Litchet with any questions at lauren.litchet@services.cityofaspen.com. Thank you, City of Aspen Lauren Litchet Permit Coordinator Community Development 130 S Galena St 3rd Floor Aspen,CO 81611 p 970.429.2020 Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contain in the email are based on current zoning and/or applicable building code regulations,which is subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Email:Your Building Permit Application Has Been Received...Here's What to Expect Type Billable Assigned To Emmy Garrigus Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 4/16/2021 Days in Applicant's Hands Comments To:division6.411c@hotmail.com CC: BCC: Attachment:--none-- Subject:Your Building Permit Application Has Been Received...Here's What to Expect Body: Dear NICOLE CATTANEO: I have received your permit application.I will be your Permit Coordinator.The City of Aspen permit process works as follows: Completeness Review:I will be reviewing your permit application for completeness in the next 5 business days.I will follow up with you directly if I need any additional information. Submittal Fees:Once your permit is deemed complete,I will provide you with a list of all permit submittal fees that are due.Your permit will not be placed into our review queue until payment of all submittal fees is received. Permit Review:Your permit will be placed in our review queue on the date that the submittal fee payment is received.Each review agency triggered for the review will either approve the permit or issue comments that you are required to address prior to their approval.You can see the status of all reviews by going into your permit on the portal,clicking on'Related,'and scrolling down to'Reviews.' Comment Response:Once you have addressed all agency comments,both in writing and on your plans,you will resubmit all documents via the portal. Just go into your permit,scroll down to the bottom of the page,and use the'Add more'button.You must notify me when you have uploaded your files for me to know that you have resubmitted.You can use the portal's Chatter feature(see below). Issuance:Once all agencies have approved your permit,you will be notified that it is time to pay your permit issuance fees.Once you do so,your approved plans and permit documents will be sent to you electronically. Additional Important Information: Only after I perform a completeness review and submittal fees are paid will your permit be accepted into our system as a formal submission.At that time,it will be put into the permit work queue. I may need to meet with you—either in person,over the phone,or via a virtual meeting—before I can finish my completeness review to ensure that I have a full understanding of your project's scope. If you need to contact me about your permit,I encourage you to use the Chatter feature on your permit on the applicant portal.When you use Chatter,I get an email,but it also gets attached to the permit record in the back office.So,anyone looking at the permit can see the conversations.This will be very helpful if someone else needs to get involved with your permit.To use Chatter: Open your permit on the portal. In the'Share an update...'box,type @,then start typing my name.My name will appear.Just click on it then add your message. Please let me know if you have any questions. Regards, Lauren Litchet City of Aspen Community Development Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from https://cityofaspen.my.salesforce.com/a034o00000FOMxeAAH/p 6/9 11/30/24, 10:20 AM 0034-2021-BCHO—Salesforce-Enterprise Edition disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contain in the email are based on current zoning,and/or applicable building code regulations which is subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Lauren Litchet Permit Coordinator Community Development 130 S Galena St 3rd Floor Aspen,CO 81611 p 970.429.2020 Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law.If you are not the intended recipient,please reply to the sender that you have received the message in error and then delete it.Further,the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen.If applicable,the information and opinions contain in the email are based on current zoning and/or applicable building code regulations,which is subject to change in the future,and upon factual representations that may or may not be accurate.The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. Permit Review Type Building Billable V. Assigned To Tony Fusaro Number of Hours 1.50 Total Cost $487.50 Fee Generated Date 7/23/2021 Start Date Completed Date 7/22/2021 Days in Applicant's Hands Comments Contacts NICOLE CATTANEO Account DIVISION 6.4 LLC Type Applicant Active Contractor License Count 0.00 Number 0035475 Account DIVISION 6.4 LLC Type Contractor Active Contractor License Count 0.00 Number 0035476 Fees 0060700 Type Change Order Fee Total $25.00 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time 0061790 Type Building Hourly Review Fee Total $487.50 Waived/Refunded Amt Discount$ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart ✓ Paid in Full ✓ Fee Paid Date/Time Files Permit Application 2021-04-15 22:43:21.pdf Last Modified 4/15/2021 4:43 PM Created By NICOLE CATTAEO Inspections INS-0005306-21 Status Pending Type Building&Referral Inspection Status https://cityofaspen.my.salesforce.com/a034o00000FOMxeAAH/p 7/9 11/30/24, 10:20 AM 0034-2021-BCHO—Salesforce-Enterprise Edition Subtype Requested Date Scheduled Start Date Completed Date Owner Last Name Permit Inspection Round Final Inspection Closed FALSE Milestones Review Round 1-0034-2021-BCHO Status Approved Due Date Created Date 6/22/2021 Payments PY-009772 Related To 0034-2021-BCHO Amount $512.50 Created Date 7/23/2021 Payment Source R-0009333 Receipt-Amount Remaining R-0009333:$0 Reviews REV-019437 Milestone Review Round 1-0034-2021-BCHO Status Approved Type Zoning Due Date Completed Date 7/12/2021 2:24 PM Owner Alias jbarn On Hold Created Date 6/22/2021 REV-019438 Milestone Review Round 1-0034-2021-BCHO Status Approved Type Building Due Date Completed Date 7/21/2021 3:40 PM Owner Alias TFusa On Hold Created Date 6/22/2021 Submissions 315 Midland Window to Door change drawing.pdf Actions Submission Date 4/14/2021 10:20 AM Status Required Description CA5CE DA4-4BAF-4E99-8 F B4-0 D03 D849874F.hei c Actions Submission Date 4/14/2021 10:20 AM Status Required Description 315 Midland Pella Door specs.pdf Actions Submission Date 4/15/2021 4:42 PM Status Required Description Architectural Plans Corrected for Change order.315 Midland.2021.05.pdf Actions Submission Date 5/28/2021 6:35 PM Status Required Description Current HOA Cert.315 Midland Ave.2021.05.pdf Actions Submission Date 5/28/2021 6:35 PM https://cityofaspen.my.salesforce.com/a034o00000FOMxeAAH/p 8/9 11/30/24, 10:20 AM 0034-2021-BCHO-Salesforce-Enterprise Edition Status Required Description Pella replacement door specs.315 Midland.2021.05.pdf Actions Submission Date 5/28/2021 6:35 PM Status Required Description Picture of Replacement door.315 Midland 2021.05.pdf Actions Submission Date 5/28/2021 6:35 PM Status Required Description 20.315 Midland.RDS Exemption 315 Midland.20210616.pdf Actions Submission Date 6/16/2021 12:57 PM Status Required Description Copyright©2000-2024 salesforce.com,inc.All rights reserved. https://cityofaspen.my.salesforce.com/a034o00000FOMxeAAH/p 9/9