Loading...
HomeMy WebLinkAboutFile Documents.183 Red Mountain Rd.0038.2018 (6).ARBK Markup Summary Civil Set.183 Red Mtn Rd.2018.01.pdf(1) ~a°- Page: [1] C1-COVER BP C1.0 / �' i Author:jackd This utility plan is inconsistent ,,_ File Name: Civil Set.183 Red Mtn Rd.2018.01.pdf with the plan on the next page. ir--_,i,,,„ , ; , Rectify. '4,0:* / i fJj 2i: = Sheet rectified. /a- 1 :..., Soils Report.183 Red Mtn Road.2018.01.pdf(1) Page: 2 Author:jackd The geotech recommends not File Name: Soils Report.183 Red Mtn Road.2018.01.pdf building below groundwater e + level. Provide proof you are is „�y g �o�aaaieuor complying with this leakagetl expensive and there recommends . recommendation or provide a �o, are geotech approval of proposed ap S EE'Th 1,FE- designto Teveal tile mime end extent of vonanons In the subwrface condldons �s,a g;tl wre�P,=,.o e=M Cthena The initial letter from the Geo-tech on 7-3-17 made that statement. In the later document, 8-10-17; after the site was explored. Under the section preliminary planning, it specifies the design criteria for the portion of the basement below water level. It includes items demonstrated in the design drawings including micro-pile tie downs, a mat slab and dewatering. I have removed the earlier letter from this submission as the later dated letter supersedes it. We believe we have demonstrated full compliance with recommendations of the Geotechinical engineer. RECEIVED 02/13/2019 ASPEN BUILDING DEPARTMENT