Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.183 Red Mountain Rd.0038.2018 (8).ARBK
0038-2018-ARBK_BuildingCommentsl Architecture Set.183 Red Mtn Rd.2018.01.pdf(38) Subject: PlanCheck 1 Page Label: 7.1 FLOOR ASSEMBLIES& DETAILS Indicate in your sections and Author:justinh details how you will accomplish File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf the air sealing requirements of 2015 IECC table R402.4.1.1. �mema.�aim9,anire,a°.N°�wnd,°mow°ams a.ma°aaa =o�eroam.a�°m�n°�rao.a°aor Indicate the continuity of the air iaina��ven° ei�sren°rwe s«tl::reie,n:°:e ew�° General air sealing details provided on sheet 3. where (not vapor barrier)and where it is located throughout FiNisi Details of sealing are also provided throughout the the building. Note locations that ° 7 series details. We are using the spray foam as require caulking, sealing,taping, the air barrier. etc. Note which components are included in the air barrier such as spray foam, gypsum, housewrap, and/or exterior insulation.You may have all of the above but you need to pick one continuous barrier and stick to it. It needs to follow the thermal barrier.The better detail you provide,the easier it will be for the contractor and inspector to be successful.This is a new 2015 code requirement in lieu of a blower door test. I've attached a set of our example typical air sealing details for your reference to this comment letter. You may incorporate these details into your own if you like. P Subject: PlanCheck This detail does not work,when 02-7.0! Page Label: 7.1 FLOOR ASSEMBLIES& DETAILS you perforate your 2"of rigid Author:justinh File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf insulation you no longer have an overall R10 insulation value detail revised. F8 on A7.01 (also, engineering will require ▪ - —▪ J -DM 4 30%open to be considered pervious). I've attached our 1 pervious snowmelt insulation perforation calculator. Revise this detail to comply and detail or call out the proposed hole pattern to show compliance. : �„ +-- Subject: PlanCheck ✓ When I check the structural Page Label: 7.2 FLOOR ASSEMBLIES& DETAILS M . Author:justinh foundation plan against the civil grading plan the foundation wall File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf g g does not extend above grade. Details 2 & 5 revised on A7.02. T.O. wall tags Foundation walls are required to "SIRM adjusted on A1.03 & S.2.01. extend a minimum of 6"above o' II o- grade per IRC 404.1.6. IRC 317.1 also requires wood wall framing to be 6"above grade unless it is treated to be protected against decay. Revise all applicable details to show compliance and coordinate the civil and structural plans so that thewith this requi CEI rE with this requir ,� v 12/1/2018 ASPEN BUILDING DEPARTMENT Subject: PlanCheck✓ This reference is for heated slab Page Label: 7.2 FLOOR ASSEMBLIES& DETAILS Author:justinh on grade,the mechanical plan File Name:Architecture Set.183 Red Mtn Rd.2018.01.pdf does not show radiant heat in _ the basement level. Provide the �am o;iv o 111 �^� a correct detail for this floor. F7 Sim. No Heat listed on A7.01 miummour Subject: PlanCheck ✓ Page Label: 7.2 FLOOR ASSEMBLIES& DETAILS This opening must be less than �� � 4", IRC 312.1.3 requires Author:justinh -' File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf openings in guards to restrict the I ��.,. passage of a 4"sphere, please Detail revised. revise. See detail 6 on A7.2 iNiti Mir ..=a — Subject: PlanCheck ✓ ' ° Page Label: 7.2 FLOOR ASSEMBLIES& DETAILS As this is an unvented ==,.° Author:justinh crawlspace a class I vapor ENMENinc retarder is not optional. �° p,B0,, File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf Clearly show required,in this detail how "°aE� " .. \ � n Vapor retarder not required, water proofing you are meeting the requirements of IRC 408.3. re membrane in detail takes it place. Crawl will be --� W°° °"rff vented 1 CFM/50 sf, see mechanical plans.�CI A._(1w'� ten.,.DETAILS ®�. _7 . b..'....._ 2 Subject: PlanCheck ✓ Page Label: 7.3 FLOOR ASSEMBLIES& DETAILS Where is this actually being proposed as you have a 24"mat 3 Author:justinh slab per the structural plans. .= File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf Please clarify or remove this E. z-_ Not required, detail removed. detail, the requirement for a .. - radon mitigation system is met 1111E, °1'' Y 4 - with your sealed/waterproofed I. mat slab construction. tj! tLi, -- R„ Subject: PlanCheck ✓ -_ Revise this detail to show the Page Label: 7.5 ROOF ASSEMBLIES& DETAILS items listed in the UL assembly _-_-<p" °"T"E1BRA NE Ro°` Ell Author:justinh File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf description you've copied onto _= __ / .. this sheet. Currently the only item your detail is showing from - I The description and detail match. See "Class A UL the UL assembly is the 8 listing Hydrotech.183 Red Man rd.2018.01" in insulation. ' m -�• '' 4O� =8 regards to "surfacing" p__ ii Opo,e OREM ROOF z RECEIVED 12/1/2018 ASPEN BUILDING DEPARTMENT Subject: PlanCheck ✓ Page Label: 7.5 ROOF ASSEMBLIES& DETAILS Per the class A documentation Author:justinh submitted this assembly does LL File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf not meet the requirements to be 01 class A. Revise to match one of Revised to meet#4 in table on page 6 of"TPO the class A systems outlined in Roof Class A& Safety Listings..." your Carlisle Sure-Weld report. ...._ a i' Subject: PlanCheck ✓ I� Page Label: 7.7 DOOR DETAILS Dimension the height of the top r�" Author:justinh of the threshold above the 11 � landing to show compliance with �._.� File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf R311.3.1. fill .� Detail revised. 0- 0 iiiii'IF pro Ili- — OIXIERIOR DOOR THRESHOLD 1VR. 1: Subject: PlanCheck ✓ Page Label: 7.8 FIREPLACE DETAILS This staggered hearth extension i'F'-'" --- M•- Author:justinh does not comply with what is iiIrJ � shown in the installation �� File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf instructions. Either revise your am revised. See 8.1-8.4 for fireplace details. details or provide documentation �"'i Fireplace registration updated to reflect changes. from Isokern that this complies • . IINI L with their installation instructions. ______ As drawn the lower portion of MI the hearth extension is not -I�c- "idi�i�Ji��i�di ■b lili supported with non combustible construction which also does not comply with IRC requirements or the installation instructions. Subject: PlanCheck ✓ Page Label: 7.8 FIREPLACE DETAILS Specify the actual minimum Author:justinh extension above the roof per the File Name:Architecture Set.183 Red Mtn Rd.2018.01.pdf installation instructions, do not just state per manufacturer. Detail revised. See 8.1-8.4 for fireplace details. Fireplace registration updated to reflect changes. Subject: PlanCheck ✓ �j Page Label: 7.9 STAIR DETAILS Provide documentation of what a"%7� �o�`,•�Tx *x��uicxweo mn�x�m sui Author:justinh these cables will be tensioned to ®.„, if they are to be set at 4"CL to File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf CL and will not allow passage of �\ The labels are spaced 4"vertically(see 7.12) a 4"sphere as they will deflect \€\ ::°0,;';=., ,ct `"B , resulting in 3 1/4" between cables measured when force is applied to them. °F.C.,aee=; to perpendicular. The cables are to be tensioned to I'm assuming that they will need ��narea�a��' °�;m,�';�b°,�: 300 lbs of force. to be set closer together than 4" '4,,,,,At, on center if they are to restrict the opening properly when force is applied to them. RECEIVED 12/1/2018 ASPEN BUILDING DEPARTMENT Subject: PlanCheck ✓- In detail 2 above you call out 4" In detail 2 above you Page Label: 7.9 STAIR DETAILS spacing of the steel cables, call out 4"spacing the steel cables, of Author:justinh revise one detail or the other for revise one detail or the File Name:Architecture Set.183 Red Mtn Rd.2018.01.pdf other p consistency. consistency. Note revised. The labels are spaced 4"vertically M 114"05TEEL CABLES,3"VERTICALLY SPACED (see 7.12) resulting in 3 1/4" between cables ��'Alti ,TE`MEDCHEPOST°3'x1i°STEEL measured perpendicular. The cables are to be INTERMEDIATE POSTS f-''��T3'THICKWOOD SLAB TREAD tensioned to 300 Ibs of force. a'0 STEEL PIPE CENTER STRINGER .. qE:STRUCTURE Subject: PlanChecki/ Page Label:A0.01 FIRE RESISTANCE PLAN Usable areas under the ' HE Author:justinh horizontal projection of the floor File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf or roof above shall be included • �t in your fire area calculations = n'� ' Drawing revised. •I �, 4 (walkway under deck overhang). .m; I - I Please revise fire area calculations. Subject: PlanCheck ✓ Page Label:A0.02 FIRE RESISTANCE PLAN Usable areas under the Author:justinh horizontal projection of the floor File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdfli or roof above shall be included IIIIIIII� :���.�,r ,,., in your fire area calculations i Drawing revised. (deck under roof above). Please e ; revise your fire area calculations. aw. . aE.aEa Subject: PlanCheck ✓ I I Provide a detail for the retaining `7p�Vtl Ue, / \ Page Label:A1.02 SNOWMELT PLAN 11/8 walls. If they are taller than 4' are taller than 0 from \ Author:justinh from bottom of footing to top of �. File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf wall then a structural detail is See structure. S.6.01 required. ±-\ij , y \ jffi \e \ Subject: PlanCheck ✓ The two sump pits and pumps / o\i Page Label: A1.03 BASEMENT FLOR PLA t are not shown on your MEP r JF - I 1 --gip if - \ Author:justinh p plans. Show them on the I File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf I._ t.:< „ �.1 mechanical plans and identify --II---i----- --.-, Revised per mechanical set. Sump pump in where these pits discharge. IThehvosump plts and plumbing sheets schedule. --�- �L.Mpumps are not shown -� - �� !I 4'-'"- ii Showt Me on then. 'Show them on the I I mechanical plans and I identify where these .._ ... pits discharge. !I I I RECEIVED 12/1/2018 ASPEN BUILDING DEPARTMENT ,..L., Subject: PlanCheck ✓ This page reference for section ,I o-.—.—.—.—.—.—.—. Page Label:A1.03 BASEMENT FLOR PLA Author:justinh J is incorrect. Revise the section 1 o-_— —Thispagereference — — File Name:Architecture Set.183 Red Mtn Rd.2018.01.pdf page reference in all locations. s for section J is -- +„ r- - incorrect. Revise the 1 Revised section page I H .. .—reference in all — .I . '—locations. —— ' Subject: PlanCheck ,/ ____ Provide an actual installation --- Page Label:A1.04 LOWER LEVELFLOR PL Author:justinh manual for the specific model E - -—�—�� �' � outdoor fireplace you are """a -` File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf F --— ���,,., � ��.; proposing. The cutsheets Provieeanacua 1 a_ More documentation provided and clearances currently provided do not provide omeoorr.rePi="e,P"r provided. See Fire Place Manufacturers that information. --areSProPosln9.The — ;P deddo"«""" Installation Instruction Gyrofocus" � r,70 mat Subject: PlanCheck ✓ Page Label:A1.04 LOWER LEVELFLOR PL Provide cutsheets on the heater, Author:justinh time switch controls and vapor MI 1_11 File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf retardant cover for the pool spa required by IECC R403.10. e ee4 77"�'. I ,o a Boiler called out on M610 & M111. See pool �� drawings and cut sheets. PL1.0 &"Pool Cover Spec.183 Red Man Rd.2018.01" I Subject: PlanCheck Provide a cutsheet on the -- Page Label:A1.04 LOWER LEVELFLOR PL proposed glass wall system. 11 Author:justinh 0 -__ —____ 1el File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf A Provide a cutsheet on • t•av the proposed glass See Nanawall Cero Ill Information.183 Red Man wall system. Rd.2018.01 b Subject: PlanCheck ✓ Page Label: A1.04 LOWER LEVELFLOR PL Show the electrical panel Author:justinh location on your floor plan ® I .- -.—.—.—i— — — — _ File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf Show the electrical panel location on your floor plan See main floor plan A1.05 1 1 1 1 1 " i 1 .7 RECEIVED 12/1/2018 ASPEN BUILDING DEPARTMENT = ir— , $_: Subject: PlanCheck X 1 Identify this fireplace by make =_ e- Page Label:A1.04 LOWER LEVELFLOR PL I a 11 0 and model similar to all other Author:justinh I a i lE r File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf units shown.The structural plan y �h "' See 8.3 for enlarged plan. This is a custom built concredoes not appear to provide a -[ . m-E I''I gas appliance. See manufacturer's warranty, testing combustible bframisupported ng ndthis non _urvr 1 1 i 1 criteria and quote. See "Acucraft Custom Fireplace location as it does for the upper M 1 Documentation.183 Red Mtn Rd.2018.01" level gas log fireplaces. You are I' also not showing a hearth db 6 �qa,. ebb d extension as you are at the other fireplaces. Subject: PlanCheck ✓ Page Label:A1.05 MAIN LEVEL FLOR PL Provide a cutsheet and and a cutsheet installation manual for this grill. dinstallation Author:justinh manual for this grill. File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf _ 4. _I_ _ ) _ _ _i_ k — Grill has been removed. .i illiiiiilli,L,„11lii1„„,iiiiiiiiiiij..- ®0 .1. lllllll,11111PIIIIIIIIII ©. : 'r ' Tri v _ 71-ur -. .. T Subject: PlanCheck ii ,III Page Label:A1.05 MAIN LEVEL FLOR PL You are referencing the same II I I I 1111 I Author:justinh _i -____ r ____ '' 'I-.-1 File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf fireplaces but the floor plan does TI 9 ,,,,,,,,,,,,,, ,,,,,,, , r; not show similar hearth I go x - - i -tiil- Detail revised. See 8.1-8.4 for fireplace details. extensions. Revise the floor aw l .1 Fireplace registration updated to reflect changes. plan or provide details that uf ill i, � `, match what is shown here. b d fIIo uu."1 0 I ,:u i® t Subject: PlanCheck ✓ A dryer installed within a closet ¢ ijkihinvio Page Label:A1.05 MAIN LEVEL FLOR PLo is required to be provided with ,�#! 1 ��l Author:justinh an opening of 100 square inches ` File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf IW �Il li for makeup air per IMC 504.6, See M-112. Transfer grille to be probvided please note this on your plan. A dryer installed within a closet is required to boe prourded vnth an pening of 100 square Inches for makeup air per IMC 604.6,please /, note this on yoour plan. , l� MATCH NNEy UN0 r Subject: PlanCheck ✓ Show compliant secondary roof I IiI , I( 1 Page Label: A1.22 ROOF PLAN drainage per IRC 903.4.1. j j Author:justinh I 1 Secondary drains/scuppers must mmqneae�fe�1nale�rllemaat$e: File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf be above the primary drain inlet :Irrti = I elevation and drain via separate a ,aryd;a'a ,ce° °== da,m° Additional scupper added and labeled scupper on T�re- - — roof plan. Primary drainage is via internal train and plumbing and discharge in a 1 Im - location above grade that can be .em. they are graphically represented on the roof plan 711t31 observed by occupants. Identify A / ` � � which outlets are primary drainage and which are secondary drainage. Identify secondary discharge locations. RECEIVED 12/1/2018 ASPEN BUILDING DEPARTMENT I Subject: PlanCheck ✓ Page Label:A1.22 ROOF PLAN Show and identify all venting on the roof plan and elevations. Author:justinh I Currently I do not see venting to Show and identify allvenlingontheroofplanand File Name:Architecture Set.183 Red Mtn Rd.2018.01.pdf account for all DV fireplaces and elevations.Currently I do not see venting to FPs in Suites# have been removed. See 3 on account for all DV fireplaces and gas log fireplace gas log fireplace that are that are proposed.Please revise clarify where A2.08 for suite#3 venting. See Al22 for sunken- -. thiavanlingiss^own. -- 9 proposed. Please revise or denvent termination clarify where this venting is t ,f l shown. mi. , ', .- J \° / Subject: PlanCheck ✓ Page Label:A2.01 ELEVATIONS Show all venting on your Show all venting on your Author:justinh elevations,there are multiple elevations,there are dryer vents and exhaust multiple dryer vents and File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf y exhaust terminations terminations shown on the shown on the mechanical Drawings revised. See A2.01 -A2.07 plans that are not shown mechanical plans that are not on your elevations.Be sure that all vent Q Q shown on your elevations. Be terminations comply with _ the requirements of IMC sure that all vent terminations 501.3.1. '�mI comply with the requirements of A' G' IMC 501.3.1. Ill,— I Subject: PlanCheck ✓ Page Label:A2.02 ELEVATIONS This is a partial south elevation, ----------- -r-,Y Author:justinh revise sheet title. File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf 1 PARTIAESfELEVATION Drawings revised.LW -- Subject: PlanCheck ✓ u Page Label:A2.03 ELEVATIONS This is a partial south elevation, Author:justinh revise sheet title. File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf PAa11AL WEST EIEVAIION Drawings revised. Subject: PlanCheck ✓ Page Label: A2.04 ELEVATIONS This a partial north elevation, II Author:justinh revise sheet title. File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf PARTIAL EAST ELEVATION 71.. .=.. Drawings revised. RECEIVED 12/1/2018 ASPEN BUILDING DEPARTMENT Subject: PlanCheck ✓ Page Label:A2.05 ELEVATIONS This a partial north elevation, Author:justinh revise sheet title. File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf PARTIAL EAST ELEVATION Drawings revised. t Subject: PlanCheck .I Identify the meters individually Page Label:A2.06 ELEVATIONS by type(gas vs electric). Author:justinh File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf Drawings revised. See A2.06. i Subject: PlanCheck ✓ Page Label:A3.06 BUILDING SECTIONS Section E is duplicated on Author:justinh sheets A3.05 and A3.06, please File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf remove one. Duplicate removed. A B gc7 QE QF QG H J ; I n I. I .., !.. I—I- ,H 0 0 WAN. oom„ Subject: PlanCheck ✓ Page Label:A3.14 BUILDING SECTIONS Per F1 you are proposing to 1�--- 1m1- insulate all interior floors with Author:justinh R38 spray foam, is this actually File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf the case'? That is fine but not - - Fl shows over"living space" and "mech crawl" required where the floor is not part of the thermal envelope. If � not, provide a detail for your • interior floors that shows what you actually intend to build. Subject: PlanCheck ✓ Page Label: A6.01 DOOR SCHEDULE Note the requirement for a self _ = o� Author:justinh closing device on this door per s File Name: Architecture Set.183 Red Mtn Rd.2018.01.pdf IRC 302.5.1 "- Schedule revised of sj RECEIVED 12/1/2018 ASPEN BUILDING DEPARTMENT Fireplace Registration Form.183 Red Mtn Road.2018.01.pdf(1) Subject: PlanCheck ✓ Page Label: 1 You are only allowed 2 gas log Author:justinh fireplaces per city policy(see File Name: Fireplace Registration Form.183 Red Mtn page 2 of this form). Revise this Road.2018.01.pdf form and your plans to comply. Worksheet revised. Lighting Set.183 Red Mtn Rd.2018.01.pdf(1) Subject: PlanCheck ✓ Page Label: 1 Note the requirement for all Author:justinh recessed fixtures on the main File Name: Lighting Set.183 Red Mtn Rd.2018.01.pdf level to be air sealed and IC rated on both main level plans °'� _ �'re'o•9Pa�a; Plan revised to include note on IC requirements. as these are being placed in the I — — building thermal envelope- ------ ---- — IECC R402.4.5 Line Grade Verification Form.183 Red Mtn Road.2018.01.pdf(1) Subject: PlanCheck x You have filled out the incorrect Page Label: 1 _= Author:justinh portion of this form. Resubmit File Name: Line Grade Verification Form.183 Red Mtn this form with part A filled out Road.2018.01.pdf completely, part B should be left blank to be filled out by a Revised. licensed surveyor during construction. Please indicate on = -- what sheet you are showing our dimensions that tie the building to the property. MEP.183 Red Mtn Rd.2018.01.pdf(3) Subject: PlanCheck ✓ Page Label: [3] 17061.00- M2(D-64)-M-110 All basement level HVAC Author:justinh appears to be routed up to the File Name: MEP.183 Red Mtn Rd.2018.01.pdf main/upper levels. The l, ,q....m.. .._. .. .. . basement is required to have its Revised. See Mechanical drawings and schedule own supply and exhaust as an m� qm�m� � �-- — --- unvented crawlspace per IRC M1 vy = 408.3. The soils report also calls _D ° out the need for a humidistat °® controlled ventilation system in the crawlspace to control moisture. Clearly show how you are providing this. Subject: PlanCheck ✓ Page Label: [5] 17061.00- M2(D-64)-M-112 Kitchen hood exhaust not shown - + Author:justinh on the plan or equipment o File Name: MEP.183 Red Mtn Rd.2018.01.pdf schedule but it is noted on the architectural plan and in the ®® � Revised. See Mechanical drawings and schedule sequence of operations. Revise o•. �� ® to show the hood and associated exhaust run. RECEIVED 12/1/2018 ASPEN BUILDING DEPARTMENT Subject: PlanCheck ✓ ® ®® Page Label: [10] 17061.00- M1(D-48)-M-602 Balanced ventilation as defined ® ®® Author:justinh in COA adoption of the IMC File Name: MEP.183 Red Mtn Rd.2018.01.pdf requires supply and exhaust to be within 20%of each other. See M6.02 Please specify a ERV that will meet this requirement as you are currently exceeding it. MP.183 Red Mtn Rd.2018.01.pdf(1) Subject: PlanCheck ✓ Who will be providing this Page Label: 3 testing? The inspector is Author:justinh required to sign the special Ear- File Name: MP.183 Red Mtn Rd.2018.01.pdf` inspection agreement. �... .µ; Revised special inspections form =.__.d_.._._ The document you referenced was not REMP Worksheet.183 Red Mtn Rd.2018.01.pdf(1) provided, but a budget is not what I need to see anyway. Provide a plan and details for Subject: PlanCheck Page Label: 1 4/ what this system will be. We need to see is e®o-ss� c Author:justinh how the foundation is being dewatered, as e Phone The 3F does not match wha„s a. reOORfx , File Name: REMP Worksheet.l8<well where this water is being sent. ra shown on sheet At.02,please revise.;w mnx� Or.. µm. New worksheet Currently there is nothing in the plan sets to 000 ,ate � �oo indicate that this is being proposed. oo m. xnka.pn varmem��F�F a oxsnE xENewnelECREorts suwlanamerenam x[xa Usn; axon;aomnu;.s .m 3 u;memul wonsnee Hmwaxr F•nxa i3 S 8 d t 1 f Subject: PlanCheck Page Label: 4 Please verify that a dewatering Author:justinh system is no longer part of the File Name: Soils Report.183 Red Mtn Road.2018.01.pdf design requirements for this project as it was not mentioned Dewatering IS part of the design requirements. See in the most recent report. H° KUMA a� a•�•,- "dewatering budget.183 Red Man Rd.2018.01" PPM Special Inspections.183 Red Mtn Rd.2018.01.pdf(1) • Subject: PlanCheck -- -- Page Label: 1 You are missing the owner's Author:justinh ✓ signature, either an approved or inspected fabricator's signature File Name: Special Inspections.183 Red Mtn Rd.2018.01.pdf for the steel welding and an —Y s Revised special inspections form inspector for the permanent -- — _- micropiles. You may resubmit responses without this but the , , „ •,.ma.;_a_ building department will not be able to approve this permit until we have received the missing signatures. E IV RE .�C' ED 12/1/2018 ASPEN BUILDING DEPARTMENT Structural SeL183 Rod Mtn Rd.2018.01.pdf(1) 8ubjeot: P|anCheok ' Page Label: 13 Provide a spec onthe Au�hociustinh wabrpmohngmaVeha|tobe used on the foundation. What File Name: Structural SoL1O3 Red Mtn Rd2018.O1.pdf are you proposing Vmseal penetrations from the See VVP'1 detail 2 miompi|oa? W'~�B�OUNDA...~.'ION q) RECEIVED 12/1/2018 ASPEN BUILDING DEPARTMENT